Gene by Emily

Page 1

A R C H I T E C T U R E

B Y

E M I L Y

D E S I G N

T I N G

Z C

|

S T U D I O

V I

1 0 0 1 9 5 5 2 6 9

|

T U T O R

: M R

B A K T H I A R


C O N T E N T

PROJECT 01 \\SITE SYNERGY : Interrelation of Foochow Settlement Patrimony \\MODEL

PROJECT 02 \\PROJECT STRATEGIES : DISSECTION and COLLOCATION \\URBAN STRATEGIES


PROJECT 03 \\DESIGN INTRODUCTION \\TARGET USER \\BUILDING STRATEGIES \\BUILDING PROGRAM \\FLOOR PLAN \\ELEVATION \\SECTION \\AXONOMETRIC \\PERSPECTIVE RENDER \\TECHNICAL REPORT


Interrelation of Foochow Settlement Patrimony The mutual relationship in between the Foochow settlement and their heritage



T H E

S E T T L E M E N T

1903 – A journey for the Foochow people who want to rescue themselves from the tough situation and pre pare to accept the unknown challenges. In the mean time, challenges are gifts that force them to search for a new center of gravity where it allows them to increase their quality of lifestyles.


Nevertheless, the government had a few proposals for these undeveloped places. Government decides to immigrants the Chinese to accomplish the proposals which there are a few successful immigrant cases in Sibu Sarawak. 363 person was immigrants from china to Sitiawan and living at the attap house that are surrounded with forest which were provided by the government.

Afterwards, emigrants have been waiting for the land promised by the government for a long time. Later, the promised land by government was actually 10 acres but only 3 acres was given. Therefore, some of them feel confused, overwhelmed, scared of the scourge that immigrants together with them.


A G R I C U L T U R A L Rice Cultivation

After the land was gifted to the people, the government gave them the opportunity to start their agriculture harvesting such as rice cultivation, furnished with the gems and seedlings of sweet potatoes and cabbages of nanyang origin but proved unsuitable for local soil. There is no income.

It was a tough time for them therefore they change their it to harvesting crops and raise pig instead in order to generate more income.

Afterward, the arriv -

al of rubber in Malaya in the early twentieth century witnessed a shift towards rubber planting. Sitiawan Methodist mission acquired land concessions for rubber planting, promise to pay 20 cents for each rubber tree planted. Therefore, this was the changes and op portunity that some Foochow get wealthy at that times





W A R

2

1942 - The Second World War brought hardship to the town, which continued with the declaration of the Ma layan Emergency in 1948. Most areas in Perak were classified as “black areas”, and Sitiawan’s dispersed settlement and vast rubber plantations were advantageous to the communist guerrillas. According to the documentary, which the people tell that some of them are hiding in the jungle for around three to four years to escape from the gun down.


A G R I C U L T U R A L Oil Palm

After the sec ond world war, agriculture such as rubber plantation began to slowly develop in which most of the settlement are involved. The hard work of reclaiming acres of rub ber plantations finally brought a bumper harvest. Is one of the reasons which makes Foochow people at that time getting wealthy.

In the late 19th century, the popularity of oil palm plantations has begun. The process of rubber harvesting is very difficult and requires a lot of hard manmade work. Therefore, by compare between oil palm industry and rubber harvesting. It resulting that the palm oil ind ustry are relatively easy. And also it re quires shorter time comparing to rubber harvesting.


D E V E L O P M E N T Afterward,

s ome mogul also some wealthy has helped

with the town development of Sitiawan. The people slowly developed this place from a forest, kampung until today a small city. But still, waiting for more further development.

The pioneering spirit of Fuzhou people, hope the younger generation can inherit it. When the ancestors came to Malaya, they had nothing, no good living conditions, no good education conditions. At that time they can be said to be foreign workers, a foreign worker from China. But they can open up a whole new world, from nothing to today’s economy, today’s development.





The platform in this model is to display the different level challenges of the people which at the same times also represent the emotions they had neither success not failure towards the challenges .



The path is to reclaim the physical heart of the people and completes connections to their experiences and challenges that they’re faced neither failure nor success where it originally envisioned the cycle of life. It is to vastly enhance the desire to explore for a better life upon sightlines towards the challenges they will facing.


This supporting structure is like icing on the cake, it represents their experiences and setbacks that have created a better future for them.


P R O J E C T

2

D I S S E C T I O N

+

C O L L O C A T I O N


Unsustainable palm oil industrial Issue + Deforestation + Greenhouses Gases Emissions + Wildlife loss habitat area + Child Labour and Slavery Trend of Issue + replace palm oil to others plantation (ex sunflower seed oil) Hypothesis of issue + environmental friendly industrial way pro posed for natural and humane. Idea + Multi Crop system for palm oil plantation and seasonal fruit plantation + Vertical Farming with smart technology

Issue + non-environmental friendly product + High demand of palm oil product Trend of Issue + boycotting palm oil product Hypothesis of issue + sustainable product proposed for environmental friendly and acceptance of the users. + Alternative way of palm oil planation and mill waste Idea + Bio-technology (Productive palm oil through biotechnology) + Bio-Energy (bio-fuels to replace current fossil fuels which is a more sustainable product )


S u s t a i n a b l e

p a l m

o i l

Multi crop system in oil palm plantations could improve the health of the soil, bring back the wildlife. Diversity of plantation means organic materials build up the soil which would become chemical-free, the chemical is away more wildlife is coming to the farm and cooperating in sort of happy family ways.

Each platform represent each different seasonal fruit that also in high demand of production, the oil palm also with the high demand for production.

Smart farming solving the slavery and child labor problem that cause in palm oil industrial.


B I O -

T E C H N O L O G Y

Bio-technology Limited spaces for a plant that very tall. oil palm tree by regenerating the gene mapping of the oil palm DNA – Gene Mutation

Alternative way of the oil palm waste – Bio-Fuels , Bio-Energy By using the empty fruit brunches, kernel shells and palm oil mill waste to producing a more sustainable bio-fuels which compares to the current fossil fuels for the transportation. Bio-fuels the renewable, alternative energy source that can be made from palm oil and only release ¼ of cardon dioxide that conventional diesel releases. Environ mental friendly than fossil fuels.

In fact, bioenergy as alternative renewable energy could provide a large perspective for the develop ment of biofuels in future.


Integrating the multi-crop system, alternative ways of palm oil waste and biotechnology engineering to represent a more sustainable and environmentally friendly of the oil palm to the nature.

Palm tree is a huge contributing factor in the reduction of Global warming but have to ensure that from palm oil plantation, industry and products those are in very environmental friendly and sustainable palm oil.


P R O J E C T U R B A N \

2 B U I L D I N G

S T R A T E G I E S




ZONING

SPLIT Use river as the middle line to split the site into two for public and private spaces purposes

CONNECTIONS Create the connection in between the urban fabric with the proposed building to enhance the landscapes that will be created

BRIDGE Connect the building instead of individual block

WILD LIFE CORRIDOR implementing habitat corridors is to increase biodiversity. By re-connecting the fragments, the population fluctuations can decrease dramatically. Instead of chasing away the wildlife

URBAN GARDEN Argricultural farming without deforestration the natural



G E N E +

PALM

OIL

GENETIC

MAPPING

ENGINEERING

RE-

SEARCH LABORATORY + MANOR NURSERY + HANDMADE SOAP WORKSHOP

interrelation of technology and agriculture. a research laboratory about the gene mutation of oil palm plantations. palm oil is the country’s main economy. in fact, it exists deforestation, slavery, and child labor yet it could change the current trend thru scientific technology.

Genetic

mapping

is

like

identifying

the

DNA

of

oil

palm plants. With biotechnology, can detect positive traits related to oil palm productivity and stability of a plant and select the elite plants that have the desired high

characteristics

nutrient

cross-breeding.

content,

(such and

as

high

oil

content,

disease-resistant)

for



TA R G E T U S E R

KIDS By providing the after school program - workshop and manor nursery. Learning about new technology of farming with the seed of after the genetic mapping.

SCIENTISTS Researching the opportunities that can transform the current trend of the palm oil industry into a more eco-friendly, co-efficiency and high production to meet the needed of humane

YOUNGSTERS By providing new work opportunities to bring them back instead of leaving elders at hometown.


BUILDING PROGRAM

GENETIC MAPPING OF AGRICULTURAL

RESEARCH AND LABORATORY

HANDMAND WORKSHOP

SOAP

ACCOMODATION

MANOR NURSERY WITH NEW TECHNOLOGY OF FARMING.


BUILDING DEVELOPMENTS

3.5 ARCES

DIVIDE use the river as middle point to split the spaces into public and private spaces. As public spaces on the right side due to the main road to Tua Pek Kong is connected. For the left side of the private which is surround with green and residential area.

VOLUME reduce the unwanted spaces


BUILDING DEVELOPMENTS

PUSH + PULL to create the slanted as it intertwined the nature with the architecture

CONNECTIONS in between the laboratory and accomodation with the public building.

FACADE red brick skin facade design to reduce glare, let natural air in and maintain the privacy.


SITE PLAN WITH ROOF PLAN SCALE NTS


BASEMENT PLAN SCALE NTS


GROUND FLOOR PLAN SCALE NTS 1. LOBBY WITH INFORMATION COUNTER 2. SOUVENIERS SHOP 3. HAND SOAP WORKSHOP 4. OIL PALM TRUNK WORKSHOP 5. PROMENADE 6. BUILDING SERVICES 7. WASHROOM 8 . E L E VA T O R H A L L 9. ACCOMODATION INFORMATION COUNTER 10. ACCOMODATION 11. INDOOR GARDEN 12. CAFE 13. BRAINSTORMING AREA 14. INNER COURTYARD 15. OFFICE 16. MEETING ROOM 17. PANTRY 18. STORAGE


FIRST FLOOR PLAN @PALM OIL GENETIC MAPPING DEPARTMENT SCALE NTS 1. GALLERY 2. ART AND FURNITURE DISPLAY 3. ACCOMODATION FLOOR 4. STAFF COMMON AREA 6. ELEC. ROOM 7. WASHROOM 8 . E L E VA T O R H A L L 9. MICROSCOPES ROOM 10. SPECTRAL SCIENCE ROOM 11. GEL IMAGING ROOM 12. PALM OIL SPECIES RESEARCH ROOM 13. CHEMICAL ROOM 14. WORK LAB AND MONITORING 15. CHANGING ROOM


SECOND FLOOR PLAN @BIOMASS RESEARCH DEPARTMENT SCALE NTS 1. MULTI PURPOSE FUNCTION ROOM 2. PRE - FUNCTION AREA 3. OUTDOOR SITTING AREA 4. ROOF GARDEN 6. ELEC. ROOM 7. WASHROOM 8 . E L E VA T O R H A L L 9. FUELS SYNTHESIS CATALYST TEST ROOM 10. THERMOCHEMICAL USER ROOM 11. MICRO-REACTOR LAB 12. BIOMASS CATALYST LAB 13. OFFICE 14. PANTRY 15. MEETING ROOM


THIRD FLOOR PLAN @GENETIC MAPPING OFFICE SCALE NTS 1. AUDITORIUM 2. OFFICE AREA 3. MEETING ROOM 4. ROOF GARDEN 6. ELEC. ROOM 7. WASHROOM 8 . E L E VA T O R H A L L 9. PANTRY 10. STORAGE 11. STAFF COMMON AREA


F R O N T E L E VA T I O N SCALE NTS



R I G H T E L E VA T I O N SCALE NTS



R E A R E L E VA T I O N SCALE NTS



L E F T E L E VA T I O N SCALE NTS



SECTION A-A SCALE NTS



SECTION B-B SCALE NTS



EXPLODED AXONO

ROOF FLOOR LEVEL

S PA C E S Z O N I N G THIRD FLOOR LEVEL

SECOND FLOOR LEVEL

FIRST FLOOR LEVEL

GROUND FLOOR LEVEL PUBLIC

SE RV IC E S P R I VA T E

LOWER GROUND FLOOR LEVEL


COMPONENTIAL AXONO MANOR NURSERY Genetic mapping planting area

test


COMPONENTIAL AXONO ROOF GARDEN recreation spaces


COMPONENTIAL AXONO M U LT I LEVEL CROP WITH S TA I R S Successfully genetic mapping planting area



VIEW FROM PROMENADE TO MAIN BUILDING (RIGHT) AND ACCOMODATION BLOCK (LEFT)


VIEW FROM MAIN ENTRANCES


PUBLIC BUILDING INNER COURTYARD + HANDMADE SOAP WORKSHOP


VIEW FROM PROMENADE TO MANOR NURSERY


ENTRANCES TWO TO LABORATORY



WORKLAB AND MONITORING LAB


BRIDGE CONNECTION BETWEEN ACCOMODATION AND LABORATORY BUILDING





GALLERY


T e c h n i c a l

r e p o r t


PRODUCED BY AN AUTODESK STUDENT VERSION DATE

NO REMARKS

PROJECT TITLE

PROPOSED A NEW BUILDING OF 4 STORY AS A BIO-TECHNOLOGY RESEARCH CENTER AT OLD TOWNSHIP OF SITIAWAN, JALAN PASIR PANJANG, 32000 SITIAWAN, PERAK. FOR : NBU (M) SDN BHD

CLIENT

0

00

R6

BO

............................................................ GARY WONG

Y AR D N U E LIN

TURFING TF

FFL : +1.500

6M

DIRECTOR OF NBU 931007-13-5708 NBU SDN.BHD. (169000-U) 898, Q112B, Tabuan Jaya, 93350 Kuching, Sarawak

G IN D IL BU B

-B

E C N IA PL AP

E LIN

E FIR

K AC TB SE 50 dp

00 12

R6 000

PANTRY AREA

50 dp

ARCHITECT

S ES C AC

0

STORAGE ROOM

INNER COURTYARD

Saya memperalaui bahawa perincian dalam pelan - pelan ini adalah menurut kehendak kehendak Undang - Undang Kecil Bangunan Seragam 1984 dan saya setuju terima tanggungjawab penuh dengan sewajarnya.

MEETING ROOM

INNER COURTYARD

PRODUCED BY AN AUTODESK STUDENT VERSION

45

00

0

MANAGEMENT OFFICE

50 dp

B

-B

50 dp

MAI

NR

OAD

UP

RISER ROOM

WASHROOM

...............................................

ELE. HALL CAFE

EMILY TING LEMBAGA ARKITEK MALAYSIA

50 dp

C

D11

TS1

FFL : + 2.500

PP

MAI

50 dp

50 dp

50 dp

50 dp

NR

50 dp

D10 D9

OAD

50 dp

C

PP

TS1

D10

FFL : + 2.500

50 dp

50 dp

50 dp

RAMP DO GR ADIEN WN T 1: 7

50 dp

INDOOR GARDEN D9 C

CR

PP

FFL : + 1.550

50 dp

C

D11

TS1

FFL : + 2.500

PP

50 dp

50 dp

50 dp

50 dp

D10

EN

RISER ROOM D8

PR

D8

BASE PARK MENT ENTA ING NCES

OM

AD

E

D9

ARKITEK PROFESIONAL No Pendaftaran LAM: A/Q 9 No. 25C, Lot 2967, Bangunan Hock Hui, Jalan Tun Ahmad Zaidi Adruce, Hock Kui Commercial Centre, 93150 Kuching, Sarawak

D7

50 dp

R

ACCOMMODATION RECEPTION C

CR

PP

FFL : + 1.550

D1

CONSULTANT

PR

OM EN

AD

R

E

IV

E

50 dp

AMPHITHEATER TS2

FFL : -3.000

TURFING TF

FFL : +1.500

ENTRANCES PLAZA TS2

................................................. ALDA YUNG

FFL : +1.500

EN

PREMIX DRIVEWAY

DROP OFF POINT

PR

OM

AD

E

TS

FFL : + 1.550

MECHANICAL AND ELECTRICAL ENGINEERING EN PR

OM

AD

E

Sublot 56, Lot 3789, 4th Mile, Liang Kee Commercial Centre, 4th Miles Penrissen Road, Taman Berjaya, 93250 Kuching, Sarawak

50 dp

D1

A-

SOUVENIRS SHOP

A

LOBBY C

CR

PP

FFL : + 1.550

C

BASE PARK MENT ING EXIT

50 dp

CR

FFL : + 1.550

EC

50 dp

D1

RAMP UP GR ADIEN T 1:

6005

50 dp

7

HANDMADE SOAP WORKSHOP

D3

C

EC

50 dp

CR

FFL : + 1.550

D4 D2

ELE. HALL

OIL PALM TRUNK WORKSHOP

D4 C

CR

PP

FFL : + 1.550

50 dp

UP

C

CR

D5 FFL : + 1.550

EC

D4

D4

INNER COURTYARD

C

HT2

PP

FFL : + 1.500

C

RISER ROOM

WASHROOM

LV ROOM

................................................. MICHELLE LAW

CR

FFL : + 1.550

EC

TRANSFORMER ROOM

D6

50 dp

D6

D6

0

00

GEN SET ROOM

R6

D6

TNB SUBSTATION

CIVIL AND STRUCTURE ENGINEERING

REFUSE CHAMBER

2345

D6

D6

LOADING BAY

MAI

A-

Sublot 56, Lot 3789, 4th Mile, Liang Kee Commercial Centre, 4th Miles Penrissen Road, Taman Berjaya, 93250 Kuching, Sarawak

A

NR

OAD 6M

BUIL

DIN

G SE

TBAC

K LI

NE

BOU

NDAR

Y LI

NE

LEGEND FIRE HYDRANT

CONSTRUCTION DRAWING

HYDRANT COVERAGE BUILDING SET BACK SITE BOUNDRY SITE PLANNING REQUIREMENTS UBBL Clause 140 - Fire Appliance Access According to Clause 140, minimum proportion of perimeter building for fire appliance access is one sixth of total building perimeter. Furthermore, road and open space not less than 10meter width and accessible to fire brigae appliance is provided.

MAI

NR

DRAWING TITLE

OAD

GROUND FLOOR PLAN - FIRE HYDRANT

Bomba road access width min 6m, proposed road width 10m for turning radius.

COVERAGE AND FIRE APPLIANCE ACCESS

UBBL Clause 225 - Detecting and Extinguisher fire According to UBBL Clause 225, every building shall be served by at least one fire hydrant located not more than 45 meter radius from the nearest point of fire brigade access.

N

DRAWING BY

EMILY TING ZHEN CHING

CHECKED BY

GROUND FLOOR PLAN REF: -

SCALE : 1 : 500

SCALE

AS SHOWN

DATE

07.05.2021

DRAWING NO :

REVISION :

EARCH/CD/2021/01/200 -01

01

PRODUCED BY AN AUTODESK STUDENT VERSION

45000

50 dp

PRODUCED BY AN AUTODESK STUDENT VERSION


PRODUCED BY AN AUTODESK STUDENT VERSION DATE

NO REMARKS

6M BU D IL IN G SE TB AC E

N LI

R FI

K

AP

E

PL IA

B

-B

E C N

50 dp

S

PANTRY AREA

50 dp

PROJECT TITLE

ES C AC

12 00 0

STORAGE ROOM

INNER COURTYARD

MEETING ROOM

PROPOSED A NEW BUILDING OF 4 STORY AS A BIO-TECHNOLOGY RESEARCH CENTER AT OLD TOWNSHIP OF SITIAWAN, JALAN PASIR PANJANG, 32000 SITIAWAN, PERAK.

50 dp

DC

EL

ABC

INNER COURTYARD

FOR : NBU (M) SDN BHD

MANAGEMENT OFFICE

50 dp

CLIENT

50 dp

B

-B

MA

............................................................ GARY WONG

OAD

DIRECTOR OF NBU 931007-13-5708 NBU SDN.BHD. (169000-U) 898, Q112B, Tabuan Jaya, 93350 Kuching, Sarawak

DC

ABC

IN R

EL UP

RISER ROOM

WASHROOM ELE. HALL CAFE

ARCHITECT Saya memperalaui bahawa perincian dalam pelan - pelan ini adalah menurut kehendak kehendak Undang - Undang Kecil Bangunan Seragam 1984 dan saya setuju terima tanggungjawab penuh dengan sewajarnya. 50 dp

C

D11

TS1

FFL : + 2.500

PP

50 dp

50 dp

50 dp

50 dp

50 dp

D10

PRODUCED BY AN AUTODESK STUDENT VERSION

TS1

D10

FFL : + 2.500

ABC

PP

DC

C

50 dp

50 dp

50 dp

RAM GR P DOW ADIE N NT 1: 7

50 dp

INDOOR GARDEN D9 C

CR

PP

FFL : + 1.550

50 dp

D11

C

PP

TS1

FFL : + 2.500

50 dp

50 dp

50 dp

50 dp

D10

AD

E

D9

EN OM

EMILY TING

PR

D8

BAS PAR EMEN T ENT KING ANC ES

D7 DC ABC 50 dp

LEGEND

CR

PP

FFL : + 1.550

FIRE EXTINGUISHER HOSE REEL

DC

ABC

EMERGENCY LIGHT

C

LEMBAGA ARKITEK MALAYSIA

D1

ARKITEK PROFESIONAL No Pendaftaran LAM: A/Q 9 No. 25C, Lot 2967, Bangunan Hock Hui, Jalan Tun Ahmad Zaidi Adruce, Hock Kui Commercial Centre, 93150 Kuching, Sarawak

SMOKE DETECTOR

EN

AD

R

1HR FIRE RATED DOOR

E

IV

FIRE ALARM

EL

E

50 dp

CONSULTANT

OM

ABC

DC

ACCOMMODATION RECEPTION

R

EL

...............................................

RISER ROOM

D8

PR

EXIT LIGHT

AMPHITHEATER

SPRINKLES

TS2

FFL : -3.000

ACTIVE M&E INTERVENTION Detection and Alarm UBBL Clause 153 - Smoke Detector UBBL Clause 225 - Detecting and Extinguisher Fire UBBL Clause 237 - Fire Alarm

TURFING TF

FFL : +1.500

................................................. ALDA YUNG

ENTRANCES PLAZA TS2

MECHANICAL AND ELECTRICAL ENGINEERING

FFL : +1.500

AD

E

TS

OM EN

PREMIX DRIVEWAY

DROP OFF POINT

Sublot 56, Lot 3789, 4th Mile, Liang Kee Commercial Centre, 4th Miles Penrissen Road, Taman Berjaya, 93250 Kuching, Sarawak

FFL : + 1.550

PR O

M

EN A

DE

PR

EXITS AND EVACUATION UBBL Clause 165 - Measurements of Travel Distance to Exits UBBL Clause 168 - Staircase UBBL Clause 182 - Emergency Exit Signs UBBL Clause 177 - Computing Number of Staircase and widths UBBL Clause 181 - Width of means of egress

................................................. MICHELLE LAW

50 dp

D1 DC ABC

EL

SOUVENIRS SHOP

A

BAS PAR EMEN T KIN GE XIT

50 dp

LOBBY

CIVIL AND STRUCTURE ENGINEERING

50 dp

D1

RAM GR P UP ADIE NT 1:

7

HANDMADE SOAP WORKSHOP

D3

Sublot 56, Lot 3789, 4th Mile, Liang Kee Commercial Centre, 4th Miles Penrissen Road, Taman Berjaya, 93250 Kuching, Sarawak

600 5

A-

50 dp

50 dp

D4 D2

ELE. HALL

OIL PALM TRUNK WORKSHOP

D4 50 dp

UP

CONSTRUCTION DRAWING

D5

D4

DRAWING TITLE D4

RISER ROOM

WASHROOM C

PP

FFL : + 1.500

GROUND FLOOR PLAN - FIRE SERVICE SYSTEM

LV ROOM

HT2

TRANSFORMER ROOM

D6

50 dp

D6

GEN SET ROOM D6

N

D6

TNB SUBSTATION REFUSE CHAMBER

D6

LOADING BAY

MA

DRAWING BY

2345

D6

A-

IN R

A

6M

BUIL

DIN

FIRST FLOOR PLAN

GS

ETB

ACK

REF:LIN -

SCALE : 1 : 250

EMILY TING ZHEN CHING

CHECKED BY

OAD

E

SCALE

AS SHOWN

DATE

07.05.2021

DRAWING NO :

REVISION :

EARCH/CD/2021/01/200 -02

01

PRODUCED BY AN AUTODESK STUDENT VERSION

D9

50 dp

PRODUCED BY AN AUTODESK STUDENT VERSION


PRODUCED BY AN AUTODESK STUDENT VERSION DATE

NO REMARKS

B

-B

PROJECT TITLE

PROPOSED A NEW BUILDING OF 4 STORY AS A BIO-TECHNOLOGY RESEARCH CENTER AT OLD TOWNSHIP OF SITIAWAN, JALAN PASIR PANJANG, 32000 SITIAWAN, PERAK. 13

FOR : NBU (M) SDN BHD

14

15

CLIENT

EL

12 -B

7

ABC

EL

B

54

60

............................................................ GARY WONG

DC

DIRECTOR OF NBU 931007-13-5708 NBU SDN.BHD. (169000-U) 898, Q112B, Tabuan Jaya, 93350 Kuching, Sarawak

EL UP

11

9

EL

8

10

ARCHITECT Saya memperalaui bahawa perincian dalam pelan - pelan ini adalah menurut kehendak kehendak Undang - Undang Kecil Bangunan Seragam 1984 dan saya setuju terima tanggungjawab penuh dengan sewajarnya.

ABC

...............................................

DN

LEGEND

EMILY TING

DC ABC

EL

ABC

DC

EMERGENCY LIGHT LEMBAGA ARKITEK MALAYSIA

FIRE EXTINGUISHER 3

HOSE REEL

R

FIRE ALARM

ARKITEK PROFESIONAL No Pendaftaran LAM: A/Q 9 No. 25C, Lot 2967, Bangunan Hock Hui, Jalan Tun Ahmad Zaidi Adruce, Hock Kui Commercial Centre, 93150 Kuching, Sarawak

ABC

DC

E

EL

SMOKE DETECTOR

IV

1HR FIRE RATED DOOR

R

EXIT LIGHT SPRINKLES

CONSULTANT

ACTIVE M&E INTERVENTION Detection and Alarm UBBL Clause 153 - Smoke Detector UBBL Clause 225 - Detecting and Extinguisher Fire UBBL Clause 237 - Fire Alarm EXITS AND EVACUATION UBBL Clause 165 - Measurements of Travel Distance to Exits UBBL Clause 168 - Staircase UBBL Clause 182 - Emergency Exit Signs UBBL Clause 177 - Computing Number of Staircase and widths UBBL Clause 181 - Width of means of egress

................................................. ALDA YUNG MECHANICAL AND ELECTRICAL ENGINEERING Sublot 56, Lot 3789, 4th Mile, Liang Kee Commercial Centre, 4th Miles Penrissen Road, Taman Berjaya, 93250 Kuching, Sarawak A-

A

................................................. MICHELLE LAW CIVIL AND STRUCTURE ENGINEERING UP

1

PU

Sublot 56, Lot 3789, 4th Mile, Liang Kee Commercial Centre, 4th Miles Penrissen Road, Taman Berjaya, 93250 Kuching, Sarawak

2 EL ABC

DC

INNER COURTYARD

8 UP

CONSTRUCTION DRAWING

7 1

DRAWING TITLE

FIRST FLOOR PLAN - FIRE SERVICE SYSTEM

N

A-

A

DRAWING BY

LOADING BAY

EMILY TING ZHEN CHING

CHECKED BY

FIRST FLOOR PLAN REF: -

SCALE : 1 : 250

SCALE

AS SHOWN

DATE

07.05.2021

DRAWING NO :

REVISION :

EARCH/CD/2021/01/200 -03

01

PRODUCED BY AN AUTODESK STUDENT VERSION

DC

PRODUCED BY AN AUTODESK STUDENT VERSION

4

PRODUCED BY AN AUTODESK STUDENT VERSION


PRODUCED BY AN AUTODESK STUDENT VERSION DATE

NO REMARKS

B

-B

PROJECT TITLE

PROPOSED A NEW BUILDING OF 4 STORY AS A BIO-TECHNOLOGY RESEARCH CENTER AT OLD TOWNSHIP OF SITIAWAN, JALAN PASIR PANJANG, 32000 SITIAWAN, PERAK. FOR : NBU (M) SDN BHD 12

EL

CLIENT

B

-B

7

............................................................ GARY WONG

DC

ABC

EL

DIRECTOR OF NBU 931007-13-5708 NBU SDN.BHD. (169000-U) 898, Q112B, Tabuan Jaya, 93350 Kuching, Sarawak

UP

11

10

8 EL

15

13

ARCHITECT Saya memperalaui bahawa perincian dalam pelan - pelan ini adalah menurut kehendak kehendak Undang - Undang Kecil Bangunan Seragam 1984 dan saya setuju terima tanggungjawab penuh dengan sewajarnya.

9

DN

LEGEND EL

ABC

DC

...............................................

EMERGENCY LIGHT

EMILY TING

FIRE EXTINGUISHER LEMBAGA ARKITEK MALAYSIA

HOSE REEL

R

FIRE ALARM

E

SMOKE DETECTOR

IV

1HR FIRE RATED DOOR

4

R

EXIT LIGHT

ARKITEK PROFESIONAL No Pendaftaran LAM: A/Q 9 No. 25C, Lot 2967, Bangunan Hock Hui, Jalan Tun Ahmad Zaidi Adruce, Hock Kui Commercial Centre, 93150 Kuching, Sarawak

SPRINKLES ACTIVE M&E INTERVENTION Detection and Alarm UBBL Clause 153 - Smoke Detector UBBL Clause 225 - Detecting and Extinguisher Fire UBBL Clause 237 - Fire Alarm

CONSULTANT

EXITS AND EVACUATION UBBL Clause 165 - Measurements of Travel Distance to Exits UBBL Clause 168 - Staircase UBBL Clause 182 - Emergency Exit Signs UBBL Clause 177 - Computing Number of Staircase and widths UBBL Clause 181 - Width of means of egress

................................................. ALDA YUNG MECHANICAL AND ELECTRICAL ENGINEERING

A-

Sublot 56, Lot 3789, 4th Mile, Liang Kee Commercial Centre, 4th Miles Penrissen Road, Taman Berjaya, 93250 Kuching, Sarawak A

................................................. MICHELLE LAW CIVIL AND STRUCTURE ENGINEERING

UP

1 2

UP

Sublot 56, Lot 3789, 4th Mile, Liang Kee Commercial Centre, 4th Miles Penrissen Road, Taman Berjaya, 93250 Kuching, Sarawak

3 EL ABC

DC

8

UP

7

CONSTRUCTION DRAWING DRAWING TITLE

SECOND FLOOR PLAN - FIRE SERVICE SYSTEM

N

A-

A

LOADING BAY

DRAWING BY

EMILY TING ZHEN CHING

CHECKED BY

SECOND FLOOR PLAN REF: -

SCALE : 1 : 250

SCALE

AS SHOWN

DATE

07.05.2021

DRAWING NO :

REVISION :

EARCH/CD/2021/01/200 -04

01

PRODUCED BY AN AUTODESK STUDENT VERSION

PRODUCED BY AN AUTODESK STUDENT VERSION

14

PRODUCED BY AN AUTODESK STUDENT VERSION


PRODUCED BY AN AUTODESK STUDENT VERSION DATE

NO REMARKS

B

-B

PROJECT TITLE

PROPOSED A NEW BUILDING OF 4 STORY AS A BIO-TECHNOLOGY RESEARCH CENTER AT OLD TOWNSHIP OF SITIAWAN, JALAN PASIR PANJANG, 32000 SITIAWAN, PERAK. FOR : NBU (M) SDN BHD

CLIENT

B

-B

7

DC

ABC

............................................................ GARY WONG

EL

DIRECTOR OF NBU 931007-13-5708 NBU SDN.BHD. (169000-U) 898, Q112B, Tabuan Jaya, 93350 Kuching, Sarawak

UP

10

3

9

EL

8

2

11

ARCHITECT

EL

ABC

DC

...............................................

DN

LEGEND

EMILY TING

EMERGENCY LIGHT FIRE EXTINGUISHER

LEMBAGA ARKITEK MALAYSIA

4

HOSE REEL

R

FIRE ALARM

E

SMOKE DETECTOR

ARKITEK PROFESIONAL No Pendaftaran LAM: A/Q 9 No. 25C, Lot 2967, Bangunan Hock Hui, Jalan Tun Ahmad Zaidi Adruce, Hock Kui Commercial Centre, 93150 Kuching, Sarawak

IV

1HR FIRE RATED DOOR

R

EXIT LIGHT SPRINKLES

CONSULTANT

ACTIVE M&E INTERVENTION Detection and Alarm UBBL Clause 153 - Smoke Detector UBBL Clause 225 - Detecting and Extinguisher Fire UBBL Clause 237 - Fire Alarm EXITS AND EVACUATION UBBL Clause 165 - Measurements of Travel Distance to Exits UBBL Clause 168 - Staircase UBBL Clause 182 - Emergency Exit Signs UBBL Clause 177 - Computing Number of Staircase and widths UBBL Clause 181 - Width of means of egress

................................................. ALDA YUNG MECHANICAL AND ELECTRICAL ENGINEERING Sublot 56, Lot 3789, 4th Mile, Liang Kee Commercial Centre, 4th Miles Penrissen Road, Taman Berjaya, 93250 Kuching, Sarawak A-

A

................................................. MICHELLE LAW CIVIL AND STRUCTURE ENGINEERING

1

UP

7

UP

Sublot 56, Lot 3789, 4th Mile, Liang Kee Commercial Centre, 4th Miles Penrissen Road, Taman Berjaya, 93250 Kuching, Sarawak

EL ABC

DC

8 UP

CONSTRUCTION DRAWING DRAWING TITLE

THIRD FLOOR PLAN - FIRE SERVICE SYSTEM

N

A-

A

DRAWING BY

LOADING BAY

EMILY TING ZHEN CHING

CHECKED BY

THIRD FLOOR PLAN REF: -

SCALE : 1 : 250

SCALE

AS SHOWN

DATE

07.05.2021

DRAWING NO :

REVISION :

EARCH/CD/2021/01/200 -05

01

PRODUCED BY AN AUTODESK STUDENT VERSION

PRODUCED BY AN AUTODESK STUDENT VERSION

Saya memperalaui bahawa perincian dalam pelan - pelan ini adalah menurut kehendak kehendak Undang - Undang Kecil Bangunan Seragam 1984 dan saya setuju terima tanggungjawab penuh dengan sewajarnya.

PRODUCED BY AN AUTODESK STUDENT VERSION


6M BU

PRODUCED BY AN AUTODESK STUDENT VERSION DATE

IL

NO REMARKS

D IN G AC TB SE K N

LI E 50 dp

5854

STORAGE ROOM

INNER COURTYARD

PROJECT TITLE 05 21

50 dp

PANTRY AREA 6164

00

15

5403

MEETING ROOM

50 dp

685 8

MEANS OF ESCAPE (UBBL 229) According to UBBL Clause 229 - the fire fighting access of the building should not acceed 45.75m and provide with the means of gaining access and fire fighting from within the building. The building should consist of fire fighting access lobbies, fire fighting staircases, fire lifts and dry or wet rising systems.

5

701

PROPOSED A NEW BUILDING OF 4 STORY AS A BIO-TECHNOLOGY RESEARCH CENTER AT OLD TOWNSHIP OF SITIAWAN, JALAN PASIR PANJANG, 32000 SITIAWAN, PERAK.

15 39

00 13

INNER COURTYARD

0

80

23

MANAGEMENT OFFICE 1172

8

FOR : NBU (M) SDN BHD 50 dp

50 dp

9

692

CLIENT

MA

IN R

WASHROOM

OAD

............................................................ GARY WONG

UP

RISER ROOM 20 2

48

DIRECTOR OF NBU 931007-13-5708 NBU SDN.BHD. (169000-U) 898, Q112B, Tabuan Jaya, 93350 Kuching, Sarawak

ELE. HALL CAFE

ARCHITECT Saya memperalaui bahawa perincian dalam pelan - pelan ini adalah menurut kehendak kehendak Undang - Undang Kecil Bangunan Seragam 1984 dan saya setuju terima tanggungjawab penuh dengan sewajarnya.

50 dp

D11 50 dp

50 dp5836 50 dp

50 dp

50 dp

D10 D9

50 dp

100

42

D10 50 dp

50 dp

5591 50 dp

PRODUCED BY AN AUTODESK STUDENT VERSION

INDOOR GARDEN D9

50 dp

D11 505400 dp

50 dp

50 dp

50 dp

D10

AD

E

D9

EN

RISER ROOM

OM

7300

PR

D8 D8

...............................................

D7

2160

8148

EMILY TING

50 dp

5963

ACCOMMODATION RECEPTION

77

R

16

LEMBAGA ARKITEK MALAYSIA

D1

PR

OM

EN

AD

R

E

IV

E

50 dp

ARKITEK PROFESIONAL No Pendaftaran LAM: A/Q 9 No. 25C, Lot 2967, Bangunan Hock Hui, Jalan Tun Ahmad Zaidi Adruce, Hock Kui Commercial Centre, 93150 Kuching, Sarawak

AMPHITHEATER

CONSULTANT TURFING

AD E

ENTRANCES PLAZA

................................................. ALDA YUNG

M EN

PREMIX DRIVEWAY

PR O

DROP OFF POINT

MECHANICAL AND ELECTRICAL ENGINEERING

PR O

M

EN A

DE

Sublot 56, Lot 3789, 4th Mile, Liang Kee Commercial Centre, 4th Miles Penrissen Road, Taman Berjaya, 93250 Kuching, Sarawak

50 dp

D1

50 dp

78

................................................. MICHELLE LAW

102

A-

SOUVENIRS SHOP

A

CIVIL AND STRUCTURE ENGINEERING

50 dp

LOBBY 41

15877

49

Sublot 56, Lot 3789, 4th Mile, Liang Kee Commercial Centre, 4th Miles Penrissen Road, Taman Berjaya, 93250 Kuching, Sarawak

50 dp

8738

HANDMADE SOAP WORKSHOP

3699

D1 D3

50 dp

D4

33

36

D2

ELE. HALL 3699

D4 50 dp

UP

OIL PALM TRUNK WORKSHOP

D5

WASHROOM D4

33

36

D4

RISER ROOM LV ROOM

DRAWING TITLE

TRANSFORMER ROOM

D6

50 dp

D6

GEN SET ROOM

GROUND FLOOR PLAN - MEANS OF

D6

D6

TNB SUBSTATION

ESCAPE

REFUSE CHAMBER

2345

D6

N

D6

LOADING BAY

MA

A-

IN R

A

DRAWING BY

OAD

6M

DIN

GROUND FLOOR PLAN

GS

ETB

ACK

LIN

E REF: -

SCALE : 1 : 250

EMILY TING ZHEN CHING

CHECKED BY

BUIL

SCALE

AS SHOWN

DATE

07.05.2021

DRAWING NO :

REVISION :

EARCH/CD/2021/01/200 -05

01

PRODUCED BY AN AUTODESK STUDENT VERSION

50 dp

PRODUCED BY AN AUTODESK STUDENT VERSION


PRODUCED BY AN AUTODESK STUDENT VERSION DATE

NO REMARKS

MEANS OF ESCAPE (UBBL 229) According to UBBL Clause 229 - the fire fighting access of the building should not acceed 45.75m and provide with the means of gaining access and fire fighting from within the building. The building should consist of fire fighting access lobbies, fire fighting staircases, fire lifts and dry or wet rising systems.

B

-B

PROJECT TITLE

PROPOSED A NEW BUILDING OF 4 STORY AS A BIO-TECHNOLOGY RESEARCH CENTER AT OLD TOWNSHIP OF SITIAWAN, JALAN PASIR PANJANG, 32000 SITIAWAN, PERAK. 13

FOR : NBU (M) SDN BHD

14

CLIENT

15 12 -B

7

B

5460

............................................................ GARY WONG DIRECTOR OF NBU 931007-13-5708 NBU SDN.BHD. (169000-U) 898, Q112B, Tabuan Jaya, 93350 Kuching, Sarawak

UP

11

9

8

10

ARCHITECT Saya memperalaui bahawa perincian dalam pelan - pelan ini adalah menurut kehendak kehendak Undang - Undang Kecil Bangunan Seragam 1984 dan saya setuju terima tanggungjawab penuh dengan sewajarnya.

............................................... DN

EMILY TING LEMBAGA ARKITEK MALAYSIA

ARKITEK PROFESIONAL No Pendaftaran LAM: A/Q 9 No. 25C, Lot 2967, Bangunan Hock Hui, Jalan Tun Ahmad Zaidi Adruce, Hock Kui Commercial Centre, 93150 Kuching, Sarawak

R

IV

E

R

3

CONSULTANT

................................................. ALDA YUNG MECHANICAL AND ELECTRICAL ENGINEERING Sublot 56, Lot 3789, 4th Mile, Liang Kee Commercial Centre, 4th Miles Penrissen Road, Taman Berjaya, 93250 Kuching, Sarawak A-

A

................................................. MICHELLE LAW CIVIL AND STRUCTURE ENGINEERING 1

PU

UP

Sublot 56, Lot 3789, 4th Mile, Liang Kee Commercial Centre, 4th Miles Penrissen Road, Taman Berjaya, 93250 Kuching, Sarawak

2 INNER COURTYARD

8 UP

7

DRAWING TITLE

1

FIRST FLOOR PLAN - FIRE SERVICE SYSTEM

N A-

A

DRAWING BY LOADING BAY

FIRST FLOOR PLAN REF: -

SCALE : 1 : 250

EMILY TING ZHEN CHING

CHECKED BY SCALE

AS SHOWN

DATE

07.05.2021

DRAWING NO :

REVISION :

EARCH/CD/2021/01/200 -06

01

PRODUCED BY AN AUTODESK STUDENT VERSION

PRODUCED BY AN AUTODESK STUDENT VERSION

4

PRODUCED BY AN AUTODESK STUDENT VERSION


PRODUCED BY AN AUTODESK STUDENT VERSION DATE

NO REMARKS

MEANS OF ESCAPE (UBBL 229) According to UBBL Clause 229 - the fire fighting access of the building should not acceed 45.75m and provide with the means of gaining access and fire fighting from within the building. The building should consist of fire fighting access lobbies, fire fighting staircases, fire lifts and dry or wet rising systems.

B

-B

PROJECT TITLE

PROPOSED A NEW BUILDING OF 4 STORY AS A BIO-TECHNOLOGY RESEARCH CENTER AT OLD TOWNSHIP OF SITIAWAN, JALAN PASIR PANJANG, 32000 SITIAWAN, PERAK. FOR : NBU (M) SDN BHD

12

CLIENT

............................................................ GARY WONG

B

-B

7

DIRECTOR OF NBU 931007-13-5708 NBU SDN.BHD. (169000-U) 898, Q112B, Tabuan Jaya, 93350 Kuching, Sarawak

UP

11

10

8

15

ARCHITECT Saya memperalaui bahawa perincian dalam pelan - pelan ini adalah menurut kehendak kehendak Undang - Undang Kecil Bangunan Seragam 1984 dan saya setuju terima tanggungjawab penuh dengan sewajarnya.

13

9

............................................... EMILY TING

DN

ARKITEK PROFESIONAL No Pendaftaran LAM: A/Q 9 No. 25C, Lot 2967, Bangunan Hock Hui, Jalan Tun Ahmad Zaidi Adruce, Hock Kui Commercial Centre, 93150 Kuching, Sarawak

IV

E

R

LEMBAGA ARKITEK MALAYSIA

R

4

CONSULTANT

................................................. ALDA YUNG MECHANICAL AND ELECTRICAL ENGINEERING Sublot 56, Lot 3789, 4th Mile, Liang Kee Commercial Centre, 4th Miles Penrissen Road, Taman Berjaya, 93250 Kuching, Sarawak A-

A

................................................. MICHELLE LAW CIVIL AND STRUCTURE ENGINEERING 1

Sublot 56, Lot 3789, 4th Mile, Liang Kee Commercial Centre, 4th Miles Penrissen Road, Taman Berjaya, 93250 Kuching, Sarawak

UP

2

UP

3

8

UP

7

DRAWING TITLE

SECOND FLOOR PLAN - FIRE SERVICE SYSTEM

N A-

A

DRAWING BY

LOADING BAY

SECOND FLOOR PLAN REF: -

SCALE : 1 : 250

EMILY TING ZHEN CHING

CHECKED BY SCALE

AS SHOWN

DATE

07.05.2021

DRAWING NO :

REVISION :

EARCH/CD/2021/01/200 -07

01

PRODUCED BY AN AUTODESK STUDENT VERSION

PRODUCED BY AN AUTODESK STUDENT VERSION

14

PRODUCED BY AN AUTODESK STUDENT VERSION


PRODUCED BY AN AUTODESK STUDENT VERSION DATE

NO REMARKS

MEANS OF ESCAPE (UBBL 229) According to UBBL Clause 229 - the fire fighting access of the building should not acceed 45.75m and provide with the means of gaining access and fire fighting from within the building. The building should consist of fire fighting access lobbies, fire fighting staircases, fire lifts and dry or wet rising systems.

B

-B

PROJECT TITLE

PROPOSED A NEW BUILDING OF 4 STORY AS A BIO-TECHNOLOGY RESEARCH CENTER AT OLD TOWNSHIP OF SITIAWAN, JALAN PASIR PANJANG, 32000 SITIAWAN, PERAK. FOR : NBU (M) SDN BHD

CLIENT

............................................................ GARY WONG DIRECTOR OF NBU 931007-13-5708 NBU SDN.BHD. (169000-U) 898, Q112B, Tabuan Jaya, 93350 Kuching, Sarawak

10

UP

B

7

-B

8

9

3

2

ARCHITECT

11

............................................... DN

EMILY TING LEMBAGA ARKITEK MALAYSIA

ARKITEK PROFESIONAL No Pendaftaran LAM: A/Q 9 No. 25C, Lot 2967, Bangunan Hock Hui, Jalan Tun Ahmad Zaidi Adruce, Hock Kui Commercial Centre, 93150 Kuching, Sarawak

R

IV

E

R

4

CONSULTANT

................................................. ALDA YUNG MECHANICAL AND ELECTRICAL ENGINEERING Sublot 56, Lot 3789, 4th Mile, Liang Kee Commercial Centre, 4th Miles Penrissen Road, Taman Berjaya, 93250 Kuching, Sarawak A-

A

................................................. MICHELLE LAW CIVIL AND STRUCTURE ENGINEERING

1

Sublot 56, Lot 3789, 4th Mile, Liang Kee Commercial Centre, 4th Miles Penrissen Road, Taman Berjaya, 93250 Kuching, Sarawak

UP

7

UP

8 UP

DRAWING TITLE

THIRD FLOOR PLAN - FIRE SERVICE SYSTEM

N A-

A

DRAWING BY LOADING BAY

THIRD FLOOR PLAN REF: -

SCALE : 1 : 250

EMILY TING ZHEN CHING

CHECKED BY SCALE

AS SHOWN

DATE

07.05.2021

DRAWING NO :

REVISION :

EARCH/CD/2021/01/200 -08

01

PRODUCED BY AN AUTODESK STUDENT VERSION

PRODUCED BY AN AUTODESK STUDENT VERSION

Saya memperalaui bahawa perincian dalam pelan - pelan ini adalah menurut kehendak kehendak Undang - Undang Kecil Bangunan Seragam 1984 dan saya setuju terima tanggungjawab penuh dengan sewajarnya.

PRODUCED BY AN AUTODESK STUDENT VERSION


PRODUCED BY AN AUTODESK STUDENT VERSION

BO U N D AR Y E LIN

TURFING TF

FFL : +1.500

6M BU IL D IN G C

A TB

SE K LIN E

STORAGE ROOM

B

50 dp

-B

INNER COURTYARD

PANTRY AREA

50 dp

WATER SUPPLY SYSTEM UBBL Clause 247 - Water Storage Based on Clause 247, water storage tanks within the building shall be located at ground or first for fire brigade pumping inlet connections accessible to fire appliances.

MEETING ROOM

50 dp

INNER COURTYARD

MANAGEMENT OFFICE

50 dp

B

-B

50 dp

WASHROOM

UP

RISER ROOM

ELE. HALL CAFE

50 dp

D11 50 dp

50 dp

50 dp

50 dp

50 dp

D10 D9

50 dp

D10 50 dp

50 dp

50 dp 50 dp

D9

INDOOR GARDEN

50 dp

D11

50 dp

50 dp

50 dp

50 dp

D10

EN

D8

PR

OM

AD

E

D9

RISER ROOM

D8 D7

50 dp

R

ACCOMMODATION RECEPTION

D1

EN PR

OM

AD

R

E

IV

E

50 dp

AMPHITHEATER

WATER SUPPLY SYSTEM UBBL Clause 247 - Water Storage Based on Clause 247, water storage tanks within the building shall be located at ground or first for fire brigade pumping inlet connections accessible to fire appliances.

TURFING

EN

PREMIX DRIVEWAY

DROP OFF POINT

PR

OM EN

AD

E

PR

OM

AD

E

ENTRANCES PLAZA

50 dp

D1

PRODUCED BY AN AUTODESK STUDENT VERSION

SOUVENIRS SHOP

A

50 dp

LOBBY

50 dp

D1

HANDMADE SOAP WORKSHOP

D3

50 dp

D4 D2

ELE. HALL

OIL PALM TRUNK WORKSHOP

D4 50 dp

UP

D5

WASHROOM D4

D4

RISER ROOM LV ROOM TRANSFORMER ROOM

D6

50 dp

D6

GEN SET ROOM

LEGEND : KS

N

KITCHEN SINK

SH T WC

SHOWER TAP HEAD WATER CLOSET

WHB BT

WASH HAND BASIN BATHTUB WATER METER BRASS TYPE STOPCOCK

D6

D6

TNB SUBSTATION REFUSE CHAMBER

2345

D6

D6

LOADING BAY

MA

A-

IN RO

A

AD 6M

BUILD

ING

SETB

ACK

LIN

E

BOUN

DARY

LIN

E

GROUND FLOOR PLAN SCALE : 1 : 600

35MMØ SCOUR PIPE SHALL BE CONCEALED AND CONNECTED TO FLOOR TRAP

35MMØ SCOUR PIPE SHALL BE CONCEALED AND CONNECTED TO FLOOR TRAP

25Ø OVERFLOW PIPE

25Ø OVERFLOW PIPE

6800 LITRES R68CS-(2) WATER TANK

6800 LITRES R68CS-(2) WATER TANK

6800 LITRES R68CS-(2) WATER TANK

POLYSTOR POLYETHYLENE WATER TANK TO BE SUPPORTED ON 20mm THK. PLYWOOD

6800 LITRES R68CS-(2) WATER TANK

6800 LITRES R68CS-(2) WATER TANK

POLYSTOR POLYETHYLENE WATER TANK TO BE SUPPORTED ON 20mm THK. PLYWOOD

5000

5000

6800 LITRES R68CS-(2) WATER TANK

20Ø

20Ø

20Ø

20Ø

20Ø

20Ø

20Ø

20Ø

20Ø

20Ø

20Ø

20Ø

20Ø

20Ø

20Ø

20Ø

20Ø

20Ø

20Ø

20Ø

20Ø

20Ø

20Ø

20Ø

20Ø

20Ø

20Ø

20Ø

20Ø

20Ø

20Ø

20Ø

20Ø

20Ø

20Ø

20Ø

20Ø

20Ø

20Ø

20Ø

20Ø

20Ø

20Ø

20Ø

20Ø

20Ø

20Ø

20Ø

20Ø

20Ø

20Ø

20Ø

20Ø

20Ø

20Ø

20Ø

20Ø

20Ø

20Ø

20Ø

20Ø

20Ø

20Ø

20Ø

20Ø

20Ø

20Ø

20Ø

20Ø

20Ø

20Ø

20Ø

20Ø

20Ø

20Ø

20Ø

20Ø

20Ø

20Ø

20Ø

20Ø

20Ø

20Ø

5000

5000

20Ø

35MMØ SCOUR PIPE SHALL BE CONCEALED AND CONNECTED TO FLOOR TRAP 25Ø OVERFLOW PIPE

6800 LITRES R68CS-(2) WATER TANK

6800 LITRES R68CS-(2) WATER TANK

POLYSTOR POLYETHYLENE WATER TANK TO BE SUPPORTED ON 20mm THK. PLYWOOD

5000

5000

6800 LITRES R68CS-(2) WATER TANK

20Ø

20Ø

20Ø

20Ø

20Ø

20Ø

20Ø

20Ø

20Ø

20Ø

20Ø

20Ø

20Ø

20Ø

20Ø

20Ø

20Ø

20Ø

20Ø

20Ø

20Ø

20Ø

20Ø

20Ø

20Ø

20Ø

20Ø

20Ø

20Ø

20Ø

20Ø

20Ø

20Ø

20Ø

20Ø

20Ø

20Ø

20Ø

20Ø

20Ø

20Ø

20Ø

20Ø

20Ø

20Ø

20Ø

20Ø

20Ø

20Ø

20Ø

20Ø

20Ø

20Ø

20Ø

20Ø

20Ø

20Ø

20Ø

20Ø

5000

20Ø

25mm Ø RISER MAIN SUPPLY G.I. PIPE TO COLD WATER TANK WITH STOPCOCK

25mm Ø RISER MAIN SUPPLY G.I. PIPE TO COLD WATER TANK WITH STOPCOCK

SUCTION TANK 32mm Ø BRASS TYPE METER AND STOPCOCK

20Ø

20Ø

20Ø

20Ø

20Ø

20Ø

20Ø

20Ø

20Ø

20Ø

20Ø

20Ø

20Ø

20Ø

20Ø

20Ø

20Ø

20Ø

5000

5000

SUCTION TANK

20Ø

32mm Ø BRASS TYPE METER AND STOPCOCK 20Ø

20Ø

20Ø

150

32mm Ø BRASS TYPE METER AND STOPCOCK

FROM WATER MAIN SUPPLY (J.B.A)

50mm Ø G.I. PIPE

50mm Ø G.I. PIPE

150

WATER PUMP

3000

150

5000

SUCTION TANK

FROM WATER MAIN SUPPLY (J.B.A)

FROM WATER MAIN SUPPLY (J.B.A)

WATER PUMP

50mm Ø G.I. PIPE

WATER PUMP

PRODUCED BY AN AUTODESK STUDENT VERSION

PRODUCED BY AN AUTODESK STUDENT VERSION

50 dp

A-

WATER SUPPLY SYSTEM


PRODUCED BY AN AUTODESK STUDENT VERSION MH12

LEGEND : KS SH T WC WHB BT FT

MH11

KITCHEN SINK SHOWER TAP HEAD WATER CLOSET WASH HAND BASIN BATHTUB FLOOR TRAP VENT PIPE

MH010

BO

MH09

U N D AR Y LIN

TURFING TF

E

FFL : +1.500

MH08

6M BU IL D IN G A TB

SE MH07

C K LIN -B

E MH06

50 dp

B

STORAGE ROOM

INNER COURTYARD

PANTRY AREA

50 dp

MEETING ROOM

MH05

50 dp

INNER COURTYARD

MANAGEMENT OFFICE

MH04

50 dp

B

-B

50 dp

SEWERAGE SYSTEM UBBL Clause 123 - Pipes and Service ducts. Based on Clause 123, ducts or enclosure are provided in any building to acomodate pipes, or conduits the dimensions of such ducts or enclosure to cleaning eyes and other control there to enable repairs.

MH03 WASHROOM

UP

RISER ROOM

ELE. HALL CAFE

MH02 MH02 MH03

MH01

MH04 50 dp

D11 50 dp

50 dp

50 dp

50 dp

50 dp

D10 D9

MH01

MH05

50 dp

D10 50 dp

50 dp

50 dp

D9

50 dp

INDOOR GARDEN

MH06

50 dp

D11

50 dp

50 dp

50 dp

50 dp

D10 D9

AD

E

MH07

OM EN

RISER ROOM

PR

D8 D8 D7

MH08

50 dp

R

ACCOMMODATION RECEPTION

MH09

D1

IV

E

50 dp

PR

OM EN

AD

R

E

MH10

AMPHITHEATER

SEWERAGE SYSTEM UBBL Clause 123 - Pipes and Service ducts Based on Clause 123, ducts or enclosure are provided in any building to acomodate pipes, or conduits the dimensions of such ducts or enclosure to cleaning eyes and other control there to enable repairs.

TURFING

EN

PREMIX DRIVEWAY

DROP OFF POINT

EN PR OM

AD

E

PR

OM

AD

E

ENTRANCES PLAZA

50 dp

D1

SOUVENIRS SHOP

A

PRODUCED BY AN AUTODESK STUDENT VERSION

50 dp

LOBBY

50 dp

D1

HANDMADE SOAP WORKSHOP

D3

50 dp

D4 D2

ELE. HALL

OIL PALM TRUNK WORKSHOP

D4 50 dp

UP

D5

WASHROOM D4

D4

RISER ROOM

MH01

LV ROOM TRANSFORMER ROOM

D6

50 dp

D6

GEN SET ROOM D6

MH02

TNB SUBSTATION D6

REFUSE CHAMBER

MH03

2345

D6

D6

LOADING BAY

MA

N

IN RO

A-

A

MH04

AD

6M MH05

BUILD

ING

MH06

SETB

ACK

LIN

E

MH07

BOUN

DARY

LIN

E

MA

IN RO

AD

GROUND FLOOR PLAN SCALE : 1 : 600 LEGEND : KS SH T WC WHB BT FT

KITCHEN SINK SHOWER TAP HEAD WATER CLOSET WASH HAND BASIN BATHTUB FLOOR TRAP VENT PIPE

KITCHEN SINK SHOWER TAP HEAD WATER CLOSET WASH HAND BASIN BATHTUB FLOOR TRAP VENT PIPE

5000

900

900

5000

900

KITCHEN SINK SHOWER TAP HEAD WATER CLOSET WASH HAND BASIN BATHTUB FLOOR TRAP VENT PIPE

900

LEGEND : KS SH T WC WHB BT FT

40mm Ø

40mm Ø

40mm Ø

40mm Ø

40mm Ø

40mm Ø

40mm Ø

40mm Ø

40mm Ø

40mm Ø

40mm Ø

40mm Ø

40mm Ø

40mm Ø

40mm Ø

40mm Ø

40mm Ø

40mm Ø

40mm Ø

40mm Ø

40mm Ø

40mm Ø

40mm Ø

40mm Ø

40mm Ø

40mm Ø

40mm Ø

40mm Ø

40mm Ø

40mm Ø

40mm Ø

40mm Ø

40mm Ø

40mm Ø

40mm Ø

40mm Ø

40mm Ø

40mm Ø

40mm Ø

40mm Ø

40mm Ø

40mm Ø

40mm Ø

40mm Ø

40mm Ø

40mm Ø

40mm Ø

40mm Ø

40mm Ø

40mm Ø

40mm Ø

40mm Ø

40mm Ø

40mm Ø

40mm Ø

40mm Ø

40mm Ø

40mm Ø

40mm Ø

40mm Ø

40mm Ø

40mm Ø

40mm Ø

40mm Ø

40mm Ø

40mm Ø

40mm Ø

40mm Ø

40mm Ø

40mm Ø

40mm Ø

40mm Ø

40mm Ø

40mm Ø

40mm Ø

40mm Ø

40mm Ø

40mm Ø

40mm Ø

40mm Ø

40mm Ø

40mm Ø

40mm Ø

40mm Ø

40mm Ø

40mm Ø

40mm Ø

40mm Ø

40mm Ø

40mm Ø

40mm Ø

40mm Ø

40mm Ø

40mm Ø

40mm Ø

40mm Ø

40mm Ø

40mm Ø

40mm Ø

40mm Ø

40mm Ø

40mm Ø

40mm Ø

40mm Ø

40mm Ø

40mm Ø

40mm Ø

40mm Ø

40mm Ø

40mm Ø

40mm Ø

40mm Ø

40mm Ø

40mm Ø

40mm Ø

40mm Ø

40mm Ø

40mm Ø

40mm Ø

40mm Ø

40mm Ø

40mm Ø

40mm Ø

40mm Ø

40mm Ø

40mm Ø

40mm Ø

40mm Ø

40mm Ø

40mm Ø

40mm Ø

40mm Ø

40mm Ø

40mm Ø

40mm Ø

40mm Ø

40mm Ø

40mm Ø

40mm Ø

40mm Ø

40mm Ø

40mm Ø

40mm Ø

40mm Ø

40mm Ø

40mm Ø

40mm Ø

40mm Ø

40mm Ø

40mm Ø

40mm Ø

40mm Ø

40mm Ø

40mm Ø

40mm Ø

40mm Ø

40mm Ø

40mm Ø

40mm Ø

40mm Ø

40mm Ø

40mm Ø

40mm Ø

40mm Ø

40mm Ø

40mm Ø

40mm Ø

40mm Ø

40mm Ø

5000

40mm Ø

40mm Ø

40mm Ø

40mm Ø

40mm Ø

40mm Ø

40mm Ø

40mm Ø

40mm Ø

40mm Ø

40mm Ø

40mm Ø

40mm Ø

40mm Ø

40mm Ø

40mm Ø

40mm Ø

40mm Ø

40mm Ø

40mm Ø

40mm Ø

40mm Ø

40mm Ø

150

40mm Ø

150

150

40mm Ø

40mm Ø

5000

5000

5000

5000

5000

900

5000

5000

40mm Ø

900

900

LEGEND : KS SH T WC WHB BT FT

PRODUCED BY AN AUTODESK STUDENT VERSION

PRODUCED BY AN AUTODESK STUDENT VERSION

50 dp

A-

SEWERAGE SYSTEM




PRODUCED BY AN AUTODESK STUDENT VERSION DATE

NO REMARKS

ARCHITECTURAL CONSTRUCTION DRAWINGS LISTS LEGEND : NO.

DRAWING TITLE

DRAWING NO.

SIZE

1.

SITE PLAN & LOCATION PLAN

EARCH/CD/2021/01/100

A1

2.

FLOOR PLAN

3.

GROUND FLOOR PLAN

EARCH/CD/2021/01/200

NOTE

WALL FINISHES

CEILING FINISHES

FLOOR FINISHES

TS

TIMBER STRIP CEILING

PC

CEMENT PLASTER & PAINTED FINISH

HT1

SC

GYPSUM CEILING BOARD

SC

SKIM COAT & PAINT

HT2

ANTI-SLIP HOMOGENOUS TILES

MS

METAL STRIP

HT

HOMOGENOUS TILES

CT1

CERAMIC TILES

PP

MOISTURE RESISTANT FIBROUS PLASTER CEILING AND PAINTED FINISH

CT

CERAMIC TILES

CT2

ANTI-SLIP CERAMIC TILES

EC

EXPOSED CEILINGS

A1

HOMOGENOUS TILES

PROJECT TITLE

SC

STONE CLADDING

MT

MARBLE TILES

LA

LAMINATED FINISH

TS1

INTERIOR TIMBER STRIP

C

CEMENT FINISH

TS2

EXTERIOR TIMBER STRIP

ELEVATION 4.

FRONT ELEVATION

EARCH/CD/2021/01/300

A1

5.

RIGHT ELEVATION

EARCH/CD/2021/01/301

A1

SECTION A-A

EARCH/CD/2021/01/400

A1

SECTION B-B

EARCH/CD/2021/01/401

A1

SECTION 6. 7.

TF

TURFING

CR

CEMENT RENDER

CS

CONCRETE PAVER SLAB

MO

MOSAIC TILES

PROPOSED A NEW BUILDING OF 4 STORY AS A BIO-TECHNOLOGY RESEARCH CENTER AT OLD TOWNSHIP OF SITIAWAN, JALAN PASIR PANJANG, 32000 SITIAWAN, PERAK. FOR : NBU (M) SDN BHD

CLIENT

............................................................ GARY WONG DIRECTOR OF NBU 931007-13-5708 NBU SDN.BHD. (169000-U) 898, Q112B, Tabuan Jaya, 93350 Kuching, Sarawak

8.

ACCOMMODATION GROUND FLOOR PLAN

EARCH/CD/2021/01/500

A3

9.

ACCOMMODATION FIRST FLOOR PLAN

EARCH/CD/2021/01/501

A3

10.

ACCOMMODATION UNIT PLAN

EARCH/CD/2021/01/502

A3

11.

WALL SLAB TO ROOF DETAILS

EARCH/CD/2021/01/503

A3

12.

ROOF GARDEN DETAILS

EARCH/CD/2021/01/504

A3

13.

STAIRCASES PLAN DETAILS

EARCH/CD/2021/01/505

A3

14.

STAIRCASES TO RAILING DETAILS

EARCH/CD/2021/01/506

A3

15.

STAIRCASE NOSING DETAILS

EARCH/CD/2021/01/507

A3

16.

AUDITORIUM ACOUSTICS ROOF DETAILS

EARCH/CD/2021/01/508

A3

17.

AUDITORIUM WALL DETAILS

EARCH/CD/2021/01/509

A3

ARCHITECT Saya memperalaui bahawa perincian dalam pelan - pelan ini adalah menurut kehendak kehendak Undang - Undang Kecil Bangunan Seragam 1984 dan saya setuju terima tanggungjawab penuh dengan sewajarnya.

............................................... EMILY TING LEMBAGA ARKITEK MALAYSIA

ARKITEK PROFESIONAL No Pendaftaran LAM: A/Q 9 No. 25C, Lot 2967, Bangunan Hock Hui, Jalan Tun Ahmad Zaidi Adruce, Hock Kui Commercial Centre, 93150 Kuching, Sarawak

CONSULTANT

................................................. ALDA YUNG MECHANICAL AND ELECTRICAL ENGINEERING Sublot 56, Lot 3789, 4th Mile, Liang Kee Commercial Centre, 4th Miles Penrissen Road, Taman Berjaya, 93250 Kuching, Sarawak

................................................. MICHELLE LAW CIVIL AND STRUCTURE ENGINEERING Sublot 56, Lot 3789, 4th Mile, Liang Kee Commercial Centre, 4th Miles Penrissen Road, Taman Berjaya, 93250 Kuching, Sarawak

CONSTRUCTION DRAWING DRAWING TITLE

KEY PLAN, LOCATION PLAN & SITE PLAN

DRAWING BY

EMILY TING ZHEN CHING

CHECKED BY

MR BAKTHIAR

SCALE

AS SHOWN

DATE

29.01.2021

DRAWING NO :

REVISION :

PRODUCED BY AN AUTODESK STUDENT VERSION

PRODUCED BY AN AUTODESK STUDENT VERSION

PRODUCED BY AN AUTODESK STUDENT VERSION

DETAILS


PRODUCED BY AN AUTODESK STUDENT VERSION DATE

NO REMARKS

JAL

AN

KA

MP

UN

GP

EN

CE

LAN

G

PROJECT TITLE

PROPOSED A NEW BUILDING OF 4 STORY AS A BIO-TECHNOLOGY RESEARCH CENTER AT OLD TOWNSHIP OF SITIAWAN, JALAN PASIR PANJANG, 32000 SITIAWAN, PERAK.

E

R

FOR : NBU (M) SDN BHD

R

IV

CLIENT

............................................................ GARY WONG DIRECTOR OF NBU 931007-13-5708 NBU SDN.BHD. (169000-U) 898, Q112B, Tabuan Jaya, 93350 Kuching, Sarawak

20032

ARCHITECT Saya memperalaui bahawa perincian dalam pelan - pelan ini adalah menurut kehendak kehendak Undang - Undang Kecil Bangunan Seragam 1984 dan saya setuju terima tanggungjawab penuh dengan sewajarnya.

INNER COURTYARD

............................................... EMILY TING ROOF TOP SERVICES

KEY PLAN

LEMBAGA ARKITEK MALAYSIA

DN

OIL PALM PLANTATION

E

R

ROOF TOP GARDEN

ARKITEK PROFESIONAL No Pendaftaran LAM: A/Q 9 No. 25C, Lot 2967, Bangunan Hock Hui, Jalan Tun Ahmad Zaidi Adruce, Hock Kui Commercial Centre, 93150 Kuching, Sarawak

R

IV

REF: -

SCALE : NTS 34017

33416

34022

NG

PE

JAN AN

NC

ALA

14581

NG

34024 551

52539

IR P

PU

CONSULTANT

52538 UP

AM

AS

NK

13930

34030

34026

JALA

G

14582 34021

JALA NP

34025 33418

R

19085

IV

E

552

R

PRODUCED BY AN AUTODESK STUDENT VERSION

PROPOSED SITE LOT 571, 20032

543

................................................. ALDA YUNG

LOADING BAY

561

JALA

34028

NK

AM

19086

562

MECHANICAL AND ELECTRICAL ENGINEERING

PU

34029

NG

PE

NC

ALA

34031

550

Sublot 56, Lot 3789, 4th Mile, Liang Kee Commercial Centre, 4th Miles Penrissen Road, Taman Berjaya, 93250 Kuching, Sarawak

NG

14071

20073

559 CE

20181

ME

TR

Y

E

R

19087 549

IV

2224

OIL PALM PLANTATION &

R 20074

20033

566

8842

WILDLIFE CORRIDOR

564 19088 565

20180

................................................. MICHELLE LAW

RIVER

571

RIVER 2225

567

CIVIL AND STRUCTURE ENGINEERING

568 26370

20032

Sublot 56, Lot 3789, 4th Mile, Liang Kee Commercial Centre, 4th Miles Penrissen Road, Taman Berjaya, 93250 Kuching, Sarawak

20178

32703 33171 33172 40085

33173 40086 4518

33176

33174 33175

33179 597

CONSTRUCTION DRAWING

SUNGAI PASIR PANJANG

33180

33181

33182

33183 40088

33184

DRAWING TITLE

33186

10365

33187 33185

PROPOSED SITE LOT 571, 20032

KEY PLAN, LOCATION PLAN & SITE PLAN

41952 40089

33188

41955 41953 41954

33190 33191

33192

41956 33193

33195 41957

N

33194 33196

33198 41959

33199

12367

DRAWING BY

TING ZHEN CHING

CHECKED BY

MR BAKTHIAR

35015 12368

42000

41998 35017

42001

35018

42002

35024

REF: -

REF: -

SCALE : 1 : 1000

PRODUCED BY AN AUTODESK STUDENT VERSION

SCALE : NTS

35024

SITE PLAN

LOCATION PLAN

SCALE

AS SHOWN

DATE

07.05.2021

DRAWING NO :

REVISION :

EARCH/CD/2021/01/100

01

PRODUCED BY AN AUTODESK STUDENT VERSION

INNER COURTYARD


PRODUCED BY AN AUTODESK STUDENT VERSION DATE

R EN .C. G S R T 'S A D IRC ET A G AIL SE EN EO ( T SC =2 1 U S 60 TO TIL , E FIN IS H

NO REMARKS

PROJECT TITLE

IP

SL

TI-

U BO

A M LU AN M F' N. F H D R ET A KIT IDD AIL ME C EN A S TIM C LU HE LIN N U M BE R N E C TA . R AB IN D IN FR IN DIC O W AM ET A O R AL E TE TO L DO D BU U BL IL E T-I G N LA ZIN G

H

AR

R

M

D Y E D IL

G

ZIN

LA

S

K

D

E -B B

50 dp

L

AL

INNER COURTYARD

IN

W

TA

R

C

CR

FFL : + 1.550

E

C

CR

PC

FFL : + 1.550

TO

SC

CLIENT

AS

MEETING ROOM

C

AIR

50 dp

ST

.

L

C

PC

VE

80 34

1

U

PANTRY AREA

50 dp

FOR : NBU (M) SDN BHD

M

U

AL

N LI CR

FFL : + 1.550

U

O

E

R

.F

D

AC C

G

N

STORAGE ROOM

PC

E BL

AM

ET

TB

AIL

30

SE

50

R

.F

N

M

U

AL

PROPOSED A NEW BUILDING OF 4 STORY AS A BIO-TECHNOLOGY RESEARCH CENTER AT OLD TOWNSHIP OF SITIAWAN, JALAN PASIR PANJANG, 32000 SITIAWAN, PERAK.

M

G

E

G

40

TO

D

AM

IN

2D 54

F'

AN

R

O

O

SS

LA

C U R TA IN 2 W PL 30 AL AS TH L TE K B R RIC FIN K AL C U IS W U M H AL R N TA . L F W IN R IT W AM H AL AL E C U L DO EM M U N EN BL .F A T R E M LU AM G AN M LA E F' N. F ZIN D D R O ET A G U BL AIL ME E E S TIM G R NG LA BE H =17 R'S ZIN O 8 R M ) D G D O W ET O G IT A O EN H IL R TO EO A ( T U NT =2 S I-S 6 TIL L 0, E IP FIN IS H

72

BU

35

6M

2C

18

80

0

FFL : +1.500

LE

15

N LI

61

TF

O

N

2B

TURFING

AN

)W

O

2A

H

IT

78

=1

.C

IG H ED AT IC

............................................................ GARY WONG

H FL IDD O E O N R L AB IN O E IN VE D

RESEARCHER'S OFFICE

0 97 25

CR

FFL : + 1.550

00 15

C

PC

H

R

INNER COURTYARD

C

CR

PC

FFL : + 1.550

DIRECTOR OF NBU 931007-13-5708 NBU SDN.BHD. (169000-U) 898, Q112B, Tabuan Jaya, 93350 Kuching, Sarawak

50 dp

32

85

B

-B

50 dp

RISER ROOM C

CR

EC

FFL : + 1.550

ARCHITECT

WASHROOM ELE. HALL

C

HT2

PP

FFL : + 1.500

CAFE C

CR

PP

FFL : + 1.550

Saya memperalaui bahawa perincian dalam pelan - pelan ini adalah menurut kehendak kehendak Undang - Undang Kecil Bangunan Seragam 1984 dan saya setuju terima tanggungjawab penuh dengan sewajarnya. 5560 1740 50 dp

C

D11

PP

9652

TS1

FFL : + 2.500

50 dp

50 dp

50 dp

PRODUCED BY AN AUTODESK STUDENT VERSION

D9

50 dp

C

PP

TS1

FFL : + 2.500

D10 50 dp

50 dp

50 dp

RAMP DO GR ADIE WN NT 1: 7

00

0

50 dp

25

INDOOR GARDEN D9 C

CR

PP

FFL : + 1.550

50 dp

C

D11

TS1

FFL : + 2.500

PP

50 dp

50 dp

50 dp 50 dp

D10

EN

RISER ROOM

2185

50 dp

C

CR

PP

FFL : + 1.550

............................................... EMILY TING

6375

ACCOMMODATION RECEPTION

5180

12925

00

R

80

66 74

D7

3855

3125

M

7015

BASE PARK MENT ENTA ING NCES

D8

PR

20

OM

96

AD

E

D9

930 D8

D1

L

E

85

EN PR

OM

AD

R

0

2

70

71

39

10

K

LEMBAGA ARKITEK MALAYSIA

IV

11

00

E

50 dp

TS2

25100

25 AMPHITHEATER

FFL : -3.000

ARKITEK PROFESIONAL No Pendaftaran LAM: A/Q 9 No. 25C, Lot 2967, Bangunan Hock Hui, Jalan Tun Ahmad Zaidi Adruce, Hock Kui Commercial Centre, 93150 Kuching, Sarawak

TURFING

30

TF

40 FFL : +1.500

57

8

68

12

J

ENTRANCES PLAZA

85 TS2

FFL : +1.500

1G

3805

I 10000

5945

1F

2000

EN PR OM

AD

E

9115

4555

CONSULTANT

7535

3805

FFL : + 1.550

0

7609

DROP OFF POINT

16000

1665

EN

PREMIX DRIVEWAY

PR

OM

AD

E

TS

................................................. ALDA YUNG

50 dp

1E

D1

50 dp

A-

SOUVENIRS SHOP

A

LOBBY C

CR

PP

FFL : + 1.550

C

MECHANICAL AND ELECTRICAL ENGINEERING

BASE PARK MENT ING EXIT

50 dp

CR

RAMP UP GR ADIE NT

FFL : + 1.550

EC

HANDMADE SOAP WORKSHOP

D3

C

EC

50 dp

CR

Sublot 56, Lot 3789, 4th Mile, Liang Kee Commercial Centre, 4th Miles Penrissen Road, Taman Berjaya, 93250 Kuching, Sarawak

1: 7

600

50 dp

D1

FFL : + 1.550

D4

25000

OIL PALM TRUNK WORKSHOP

D4 C

CR

50 dp

C PP

5560

FFL : + 1.550

3144 1

D2

ELE. HALL

CR

D5 FFL : + 1.550

EC

D4

1140 5180

D4

RISER ROOM

WASHROOM

9652

C

HT2

PP

FFL : + 1.500

2500

9127

LV ROOM

INNER COURTYARD C

CR

FFL : + 1.550

EC

TRANSFORMER ROOM

D6

50 dp

D6

GEN SET ROOM D6

REFUSE CHAMBER

3050

D6

LOADING BAY

................................................. MICHELLE LAW

A

1275 0

0

6M

DIN

1030 0

GS

ETB

LIN

1B

BOU

NDA

RY

LIN

E

1A

BER

BI-F

OLD

A

CONSTRUCTION DRAWING

E TIM

DRAWING TITLE

GROUND FLOOR PLAN

R.C.

WOO DO D FR OR AM

150M CEMEM TH NT K BRIC PLAS K TER WALL W FIN ISH ITH

BI-F OLD 230M CEME M TH NT K BRIC PLAS K TER WALL W FIN ISH ITH

Sublot 56, Lot 3789, 4th Mile, Liang Kee Commercial Centre, 4th Miles Penrissen Road, Taman Berjaya, 93250 Kuching, Sarawak

E 5785

ACK

B

WOO DO D FR OR AM E TIM BER

CIVIL AND STRUCTURE ENGINEERING

1C

BUIL

6710

4405

1D

1635 0

C1 C

ALUM N. DO OR TO FRAM MA NF' E GLAS ALUM DETA S ILS GLAZ N. FR ING AME CURT DOUB AIN LE WAL L

BRIC DETA K PLAN TE ILS

A-

1030 0

'S ARCH X TO

D

R BO

E

11150 885

6200

9850

F

ENGR STAI R=17 'S DE RCASE TAIL SC1 HO 8 ) WITH TO ( MO GENE AN T=300, OU TI-SLIP S TIL E FIN ISH

2610

G

D6

3855

D6

8540

2345

H

TNB SUBSTATION

N GROUND FLOOR PLAN REF: -

SCALE : 1 : 250

DRAWING BY

EMILY TING ZHEN CHING

CHECKED BY

MR BAKTHIAR

SCALE

AS SHOWN

DATE

07.05.2021

DRAWING NO :

REVISION :

EARCH/CD/2021/01/200

01

PRODUCED BY AN AUTODESK STUDENT VERSION

50 dp

D10

PRODUCED BY AN AUTODESK STUDENT VERSION


PRODUCED BY AN AUTODESK STUDENT VERSION DATE

NO REMARKS

PROJECT TITLE

1A

1B 150

1D

1C

5785

6710

3855

5000

5280

1E

1F

64441 31441 1776

9115

26750

1675

640

6450

1G 7535

2665

1150 1000

PROPOSED A NEW BUILDING OF 4 STORY AS A BIO-TECHNOLOGY RESEARCH CENTER AT OLD TOWNSHIP OF SITIAWAN, JALAN PASIR PANJANG, 32000 SITIAWAN, PERAK. FOR : NBU (M) SDN BHD

4850

▼ROOF GARDEN LEVEL

CLIENT

19600

4850

▼THIRD FLOOR LEVEL

............................................................ GARY WONG

▼SECOND FLOOR LEVEL

4850

DIRECTOR OF NBU 931007-13-5708 NBU SDN.BHD. (169000-U) 898, Q112B, Tabuan Jaya, 93350 Kuching, Sarawak

FIRST FLOOR LEVEL

4850

ARCHITECT Saya memperalaui bahawa perincian dalam pelan - pelan ini adalah menurut kehendak kehendak Undang - Undang Kecil Bangunan Seragam 1984 dan saya setuju terima tanggungjawab penuh dengan sewajarnya.

▼GROUND FLOOR LEVEL

N ............................................... EMILY TING LEMBAGA ARKITEK MALAYSIA

FRONT ELEVATION

ARKITEK PROFESIONAL No Pendaftaran LAM: A/Q 9 No. 25C, Lot 2967, Bangunan Hock Hui, Jalan Tun Ahmad Zaidi Adruce, Hock Kui Commercial Centre, 93150 Kuching, Sarawak

SCALE : 1 : 200

CONSULTANT

................................................. ALDA YUNG MECHANICAL AND ELECTRICAL ENGINEERING

B

D

C1

E

F

Sublot 56, Lot 3789, 4th Mile, Liang Kee Commercial Centre, 4th Miles Penrissen Road, Taman Berjaya, 93250 Kuching, Sarawak

H

A

G

61250 10300

13350

9250

2610

8540

8073

9127

▼ROOF GARDEN LEVEL

4850

................................................. MICHELLE LAW CIVIL AND STRUCTURE ENGINEERING ▼THIRD FLOOR LEVEL

19600

4850

Sublot 56, Lot 3789, 4th Mile, Liang Kee Commercial Centre, 4th Miles Penrissen Road, Taman Berjaya, 93250 Kuching, Sarawak

4850

▼SECOND FLOOR LEVEL

FIRST FLOOR LEVEL

4850

CONSTRUCTION DRAWING DRAWING TITLE ▼GROUND FLOOR LEVEL

200

▲GROUND LEVEL

FRONT ELEVATION

N RIGHT ELEVATION REF: -

SCALE : 1 : 250

DRAWING BY

TING ZHEN CHING

CHECKED BY

MR BAKTHIAR

SCALE

AS SHOWN

DATE

07.05.2021

DRAWING NO :

REVISION :

EARCH/CD/2021/01/300 EARCH/CD/2021/01/301

01

PRODUCED BY AN AUTODESK STUDENT VERSION

PRODUCED BY AN AUTODESK STUDENT VERSION

PRODUCED BY AN AUTODESK STUDENT VERSION

200

▲GROUND LEVEL


PRODUCED BY AN AUTODESK STUDENT VERSION DATE

NO REMARKS

C1 F

E

D

B

C

A

44050 5200

3928

8073

8540

2610

9250

600

PROJECT TITLE 12750

10300

PROPOSED A NEW BUILDING OF 4 STORY AS A BIO-TECHNOLOGY RESEARCH CENTER AT OLD TOWNSHIP OF SITIAWAN, JALAN PASIR PANJANG, 32000 SITIAWAN, PERAK.

4850

▼ROOF GARDEN LEVEL

FOR : NBU (M) SDN BHD

CLIENT

4850

▼SECOND FLOOR LEVEL

19600

4850

▼THIRD FLOOR LEVEL

FIRST FLOOR LEVEL

4850

............................................................ GARY WONG DIRECTOR OF NBU 931007-13-5708 NBU SDN.BHD. (169000-U) 898, Q112B, Tabuan Jaya, 93350 Kuching, Sarawak

▼GROUND FLOOR LEVEL

200

▲GROUND LEVEL

ARCHITECT

N ............................................... EMILY TING LEMBAGA ARKITEK MALAYSIA

SECTION A - A

ARKITEK PROFESIONAL No Pendaftaran LAM: A/Q 9 No. 25C, Lot 2967, Bangunan Hock Hui, Jalan Tun Ahmad Zaidi Adruce, Hock Kui Commercial Centre, 93150 Kuching, Sarawak

SCALE : 1 : 250

CONSULTANT

................................................. ALDA YUNG

2A 445

2B 6115 7000

18800 7235 680 6115

MECHANICAL AND ELECTRICAL ENGINEERING

2D

2C

Sublot 56, Lot 3789, 4th Mile, Liang Kee Commercial Centre, 4th Miles Penrissen Road, Taman Berjaya, 93250 Kuching, Sarawak

5450 290

3295

4850

▼ROOF GARDEN LEVEL

................................................. MICHELLE LAW

▼THIRD FLOOR LEVEL

19600

4850

CIVIL AND STRUCTURE ENGINEERING Sublot 56, Lot 3789, 4th Mile, Liang Kee Commercial Centre, 4th Miles Penrissen Road, Taman Berjaya, 93250 Kuching, Sarawak

4850

▼SECOND FLOOR LEVEL

4850

FIRST FLOOR LEVEL

CONSTRUCTION DRAWING

▼GROUND FLOOR LEVEL

200

▲GROUND LEVEL

DRAWING TITLE

SECTION

N SECTION B - B REF: -

SCALE : 1 : 250

DRAWING BY

EMILY TING ZHEN CHING

CHECKED BY

MR BAKTHIAR

SCALE

AS SHOWN

DATE

07.05.2021

DRAWING NO :

REVISION :

EARCH/CD/2021/01/400 EARCH/CD/2021/01/401

01

PRODUCED BY AN AUTODESK STUDENT VERSION

PRODUCED BY AN AUTODESK STUDENT VERSION

PRODUCED BY AN AUTODESK STUDENT VERSION

Saya memperalaui bahawa perincian dalam pelan - pelan ini adalah menurut kehendak kehendak Undang - Undang Kecil Bangunan Seragam 1984 dan saya setuju terima tanggungjawab penuh dengan sewajarnya.


A3

PRODUCED BY AN AUTODESK STUDENT VERSION 1740

3880

3805

3805

1G 5875 3805

1F

3805

3855

2185 7015

3165

5180

3125

930

16650

2610

2950

5560

1815

9652

PRODUCED BY AN AUTODESK STUDENT VERSION

3805

INDOOR GARDEN

16650

3805

7535

1G

D9 D10

1F

ACCOMMODATION RECEPTION

7015

5180

3125

930

50

9127

H

6375

3855

2185

ELEC. ROOM

9115

50 dp

1E

dp

9652

G

F 2950 1530

5560

1140

5180

9127

H

9127

G

ACCOMMODATION GROUND FLOOR KEY PLAN

ACCOMMODATION GROUND FLOOR KEY PLAN

SCALE : 1 : 250

SCALE : 1 : 250

PROJECT TITLE :

PROPOSED A NEW BUILDING OF 4 STORY AS A BIO-TECHNOLOGY RESEARCH CENTER AT OLD TOWNSHIP OF SITIAWAN, JALAN PASIR PANJANG, 32000, SITIAWAN, PERAK. FOR : NBU (M) SDN BHD

ARCHITECT :

CLIENT :

............................................................ GARY WONG DIRECTOR OF NBU 931007-13-5708 NBU SDN.BHD. (169000-U) 898, Q112B, Tabuan Jaya, 93350 Kuching, Sarawak

7485

F

E

DRAWING TITLE : ACCOMMODATION KEY PLAN

............................................... EMILY TING ARKITEK PROFESIONAL No Pendaftaran LAM: A/Q 9 No. 25C, Lot 2967, Bangunan Hock Hui, Jalan Tun Ahmad Zaidi Adruce, Hock Kui Commercial Centre, 93150 Kuching, Sarawak

PRODUCED BY AN AUTODESK STUDENT VERSION

PRODUCED BY AN AUTODESK STUDENT VERSION

1E 5560

DRAWN

: TZC

SCALE : AS SHOWN

CHECKED

: MR BAKTHIAR

DATE : 11.04.2021

DRAWING NO :

EARCH/CD/2021/01/500 EARCH/CD/2021/01/501


A3

PRODUCED BY AN AUTODESK STUDENT VERSION

1300MM WIDTH X 2200MM HEIGHT GLASS SLIDING DOOR WITH 10MM THK ALUMINIUM FRAME

1355MM WIDTH X 700MM HEIGHT GLASS CASEMENT WINDOW WITH 10MM THK ALUMINIUM FRAME

150MM THK. BRICK WALL WITH CEMENT PLASTER ON BOTH SIDES

150MM THK. BRICK WALL WITH CEMENT PLASTER ON BOTH SIDES

LAMINATED TIMBER FLOORING FINISH LAMINATED TIMBER FLOORING FINISH

ANTI-SLIP HOMOGENOUS TILES ANTI-SLIP HOMOGENOUS TILES

HIDDEN LINE TO INDICATED THE BUILT-IN KITCHEN CABINET

ACCOMMODATION UNIT PLAN FOR DUO WITH BALCONY

ACCOMMODATION UNIT PLAN FOR DUO WITHOUT BALCONY

SCALE : 1 : 250

SCALE : 1 : 250

PRODUCED BY AN AUTODESK STUDENT VERSION

HIDDEN LINE TO INDICATED THE BUILT-IN KITCHEN CABINET 1300MM WIDTH X 2200MM HEIGHT GLASS SLIDING DOOR WITH 10MM THK ALUMINIUM FRAME

LAMINATED TIMBER FLOORING FINISH

ANTI-SLIP HOMOGENOUS TILES

150MM THK. BRICK WALL WITH CEMENT PLASTER ON BOTH SIDES

ACCOMMODATION UNIT PLAN WITH LOFT BED SCALE : 1 : 250

PROJECT TITLE :

PROPOSED A NEW BUILDING OF 4 STORY AS A BIO-TECHNOLOGY RESEARCH CENTER AT OLD TOWNSHIP OF SITIAWAN, JALAN PASIR PANJANG, 32000, SITIAWAN, PERAK. FOR : NBU (M) SDN BHD

ARCHITECT :

CLIENT :

............................................................ GARY WONG DIRECTOR OF NBU 931007-13-5708 NBU SDN.BHD. (169000-U) 898, Q112B, Tabuan Jaya, 93350 Kuching, Sarawak

DRAWING TITLE : ACCOMMODATION UNIT PLAN

............................................... EMILY TING ARKITEK PROFESIONAL No Pendaftaran LAM: A/Q 9 No. 25C, Lot 2967, Bangunan Hock Hui, Jalan Tun Ahmad Zaidi Adruce, Hock Kui Commercial Centre, 93150 Kuching, Sarawak

PRODUCED BY AN AUTODESK STUDENT VERSION

PRODUCED BY AN AUTODESK STUDENT VERSION

HIDDEN LINE TO INDICATED THE BUILT-IN KITCHEN CABINET

DRAWN

: TZC

SCALE : AS SHOWN

CHECKED

: MR BAKTHIAR

DATE : 11.04.2021

DRAWING NO :

EARCH/CD/2021/01/502


BITUMEN VAPOUR BARRIER EXTENSIVE SUBSTRATE FILTERING LAYER DRAINAGE LAYER GEOTEXTYLE PROTECTION LAYER PE SEPERATING AND PRORECTION LAYER

BITUMEN VAPOUR BARRIER WITH FFL ANTI-ROOT

INSULATION

THERMAL INSULATION

ROOF GARDEN DETAILS SCALE : 1 : 20

PROPOSED A NEW BUILDING OF 4 STORY AS A BIO-TECHNOLOGY RESEARCH CENTER AT OLD TOWNSHIP OF SITIAWAN, JALAN PASIR PANJANG, 32000, SITIAWAN, PERAK. FOR : NBU (M) SDN BHD

ARCHITECT :

CLIENT :

............................................................ GARY WONG DIRECTOR OF NBU 931007-13-5708 NBU SDN.BHD. (169000-U) 898, Q112B, Tabuan Jaya, 93350 Kuching, Sarawak

DRAWING TITLE : ROOF GARDEN DETAILS

............................................... EMILY TING ARKITEK PROFESIONAL No Pendaftaran LAM: A/Q 9 No. 25C, Lot 2967, Bangunan Hock Hui, Jalan Tun Ahmad Zaidi Adruce, Hock Kui Commercial Centre, 93150 Kuching, Sarawak

PRODUCED BY AN AUTODESK STUDENT VERSION

PROJECT TITLE :

DRAWN

: EMILY TING

SCALE : AS SHOWN

CHECKED

: MR BAKTHIAR

DATE : 29.01.2021

DRAWING NO : EARCH/CD/2021/01/504

PRODUCED BY AN AUTODESK STUDENT VERSION

PRODUCED BY AN AUTODESK STUDENT VERSION

PRODUCED BY AN AUTODESK STUDENT VERSION


A3 PRODUCED BY AN AUTODESK STUDENT VERSION

PLANTER BOX WITH SEASONED TREE

300 2000

50mm THK. 1000mm HEIGHT STAINLESS STEEL HANDRAILS

R.C. STAIRCASE SC1 TO ENGR'S DETAIL ( T=300, R=175 ) WITH ANTI SLIP FINISH

ACCOMMODATION GROUND FLOOR KEY PLAN SCALE : 1 : 150

ANTI SLIP FINISHES

R.C. STAIRCASE TO ENGR'S DETAIL

R.C STAIRCASE NOSING DETAILS SCALE : 1 : 1O

PROPOSED A NEW BUILDING OF 4 STORY AS A BIO-TECHNOLOGY RESEARCH CENTER AT OLD TOWNSHIP OF SITIAWAN, JALAN PASIR PANJANG, 32000, SITIAWAN, PERAK. FOR : NBU (M) SDN BHD

ARCHITECT :

CLIENT :

DRAWING TITLE :

STAIRCASE PLAN ............................................................ GARY WONG DIRECTOR OF NBU 931007-13-5708 NBU SDN.BHD. (169000-U) 898, Q112B, Tabuan Jaya, 93350 Kuching, Sarawak

............................................... EMILY TING ARKITEK PROFESIONAL No Pendaftaran LAM: A/Q 9 No. 25C, Lot 2967, Bangunan Hock Hui, Jalan Tun Ahmad Zaidi Adruce, Hock Kui Commercial Centre, 93150 Kuching, Sarawak

PRODUCED BY AN AUTODESK STUDENT VERSION

PROJECT TITLE :

STAIRCASE NOSING DETAILS DRAWN

: TZC

SCALE : AS SHOWN

CHECKED

: MR BAKTHIAR

DATE : 29.01.2021

DRAWING NO :

EARCH/CD/2021/01/505 EARCH/CD/2021/01/507

PRODUCED BY AN AUTODESK STUDENT VERSION

3230

PRODUCED BY AN AUTODESK STUDENT VERSION


A3

PRODUCED BY AN AUTODESK STUDENT VERSION

PRODUCED BY AN AUTODESK STUDENT VERSION

PRODUCED BY AN AUTODESK STUDENT VERSION

50mm THK. 1000mm HEIGHT STAINLESS STEEL HANDRAILS R.C. STAIRCASE SC1 TO ENGR'S DETAIL ( T=300, R=175± ) WITH CEMENT FINISH 230mm THK. BRICK WALL WITH CEMENT PLASTER FINISHES

230mm THK. R.C PLANTER BOX

PROPOSED A NEW BUILDING OF 4 STORY AS A BIO-TECHNOLOGY RESEARCH CENTER AT OLD TOWNSHIP OF SITIAWAN, JALAN PASIR PANJANG, 32000, SITIAWAN, PERAK. FOR : NBU (M) SDN BHD

ARCHITECT :

CLIENT :

DRAWING TITLE :

STAIRCASES TO RAILING DETAILS ............................................................ GARY WONG DIRECTOR OF NBU 931007-13-5708 NBU SDN.BHD. (169000-U) 898, Q112B, Tabuan Jaya, 93350 Kuching, Sarawak

............................................... EMILY TING ARKITEK PROFESIONAL No Pendaftaran LAM: A/Q 9 No. 25C, Lot 2967, Bangunan Hock Hui, Jalan Tun Ahmad Zaidi Adruce, Hock Kui Commercial Centre, 93150 Kuching, Sarawak

PRODUCED BY AN AUTODESK STUDENT VERSION

PROJECT TITLE :

DRAWN

: TZC

SCALE : AS SHOWN

CHECKED

: MR BAKTHIAR

DATE : 29.01.2021

DRAWING NO :

EARCH/CD/2021/01/506


PRODUCED BY AN AUTODESK STUDENT VERSION

STONE BALLAST OR OTHER FINISH EG. PAVERS PROCTOR WRAP DOW STYROFOAM RTM-X WATERPROOFING MEMBRANE

PRODUCED BY AN AUTODESK STUDENT VERSION

SUSPENDED PLASTERBOARD CEILING

DOW TUFF-R

50MM GLASS MINERAL WOOL DENSITY 19.5KG/M3 TIMBER SOLE PLATE

LIGHT STEEL STUD WALL WITH TWO LAYERS OF GYPSUM BASED BOARD MIN 40MM THICK GYVLON SCREED OR 65MM SAND/CEMENT SCREED ISOLATING FOAM LAYER

150 OR 200 MM HOLLOW CORE FLOOR UNIT 10MM ISOLATION LAYER ACOUSTIC QUILT

GYPSUM BASED CEILING BOARD SUSPENDED FROM A PROPRIETORY SUPPORT SYSTEM TWO LAYERS OF GYPSUM BASED BOARD ENCASEMENT TO STEELWORK. RESTRAINED VIA PROPERTARY FRAMING SYSTEM DEFECTION HEAD DETAILS

ACOUSTICS ROOF FOR AUDITORIUM

ACOUSTIC WALL FOR AUDITORIUM

SCALE : 1 : 20

SCALE : 1 : 250

PROPOSED A NEW BUILDING OF 4 STORY AS A BIO-TECHNOLOGY RESEARCH CENTER AT OLD TOWNSHIP OF SITIAWAN, JALAN PASIR PANJANG, 32000, SITIAWAN, PERAK. FOR : NBU (M) SDN BHD

ARCHITECT :

CLIENT :

............................................................ GARY WONG DIRECTOR OF NBU 931007-13-5708 NBU SDN.BHD. (169000-U) 898, Q112B, Tabuan Jaya, 93350 Kuching, Sarawak

DRAWING TITLE : ACOUSTICS ROOF DETAILS ACOUSTICS WALL FOR AUDITORIUM

............................................... EMILY TING ARKITEK PROFESIONAL No Pendaftaran LAM: A/Q 9 No. 25C, Lot 2967, Bangunan Hock Hui, Jalan Tun Ahmad Zaidi Adruce, Hock Kui Commercial Centre, 93150 Kuching, Sarawak

PRODUCED BY AN AUTODESK STUDENT VERSION

PROJECT TITLE :

DRAWN

: EMILY TING

SCALE : AS SHOWN

CHECKED

: MR BAKTHIAR

DATE : 29.01.2021

DRAWING NO :

EARCH/CD/2021/01/508 EARCH/CD/2021/01/509

PRODUCED BY AN AUTODESK STUDENT VERSION

CONCRETE ROOF SLAB


t h a n k

y o u


Turn static files into dynamic content formats.

Create a flipbook
Issuu converts static files into: digital portfolios, online yearbooks, online catalogs, digital photo albums and more. Sign up and create your flipbook.