PORTFOLIO
EMILY FOSS ARCHITECTURAL TECH.
TABLE OF CONTENTS: 5
REVIT
6
REVIT CONSTRUCTION DOCUMENTS
7
AUTOCAD CONSTRUCTION DOCUMENTS
10
SKETCHUP
12
CONSTRUCTION DETAILS
16
DESIGN INSPIRATION
18
SUSTAINABILITY INSPIRATION
REVIT
REVIT
The top, bottom and top right pictures are renderings from the ATB Financial Project 2016. We had to design a bank including floor plans, renderings and design inspiration sketches using AutoCAD and Revit.
The above render image is a eye level view of a plaza site. Created and rendered in Revit.
5
REVIT CONSTRUCTION DOCUMENTS ROOF CONSTRUCTION: BASIC ROOF WOOD RAFTER 8" ASPHALT SHINGLE INSULATED WITH CEILING 3-5/8" STUD @ 24" O.C. WITH 5/8" GYPSUM BOARD
All construction documents on this page are from a project called “James House” in 2016. The assignment was to build a house with specific requirements and show varies views of the house in the end.
T.O. WALLS 8' - 10"
P1-INTERIOR WALL CONSTRUCTION: 1/2" GYPSUM WALL BOARD 2x4" SOFTWOOD LUMBER STUD @ 16" O.C. 1/2" GYPSUM WALLBOARD
UP
FLOOR CONSTRUCTION: WOOD JOIST 10"-WOOD FINISH
T.O. MAIN FLOOR 0' - 0" GRADE -2' - 0"
P2-INTERIOR BASEMENT WALL 1" SPACE 2x4" SOFTWOOD LUMBER STUD @ 16" O.C. VAPOR RETARDER 1/2" GYPSUM WALLBOARD
W2 FOUNDATION CONSTRUCTION: DAMPROOFING 8" CONCRETE CAST IN PLACE
BASEMENT FLOOR CONSTRUCTION: 6" CONCRETE CAST IN PLACE
2 No.
SCHOOL OF SUSTAINABLE BUILDING AND ENVIRONMENTAL MANAGEMENT ARCHITECTURAL TECHNOLOGY
T.O. BASEMENT -8' - 0"
Wall Section 3/8" = 1'-0" Description
Date
FOSS-JAMES HOUSE
INTERIOR DESIGN TECHNOLOGY
BASEMENT PLAN Project number Date Drawn by Checked by
3 APRIL 22, 2016 EMILY FOSS S. STEINHAUER
A.2 Scale As indicated
2016-04-22 9:04:51 AM
LINE OF STRIP FOOTING BEYOND 24" x 12"
W1-EXTERIOR WALL CONSTRUCTION: 1-3/8" SIDING-CLAPBOARD AIR INFILTRATION BARRIER 5/8" SHEATHING 2x6" SOFTWOOD LUMBER STUD @ 16" O.C. VAPOUR RETARDER 1/2" GYPSUM WALLBOARD
T.O. WALLS 8' - 10"
24" TALL CABINET DOUBLE DOOR
SINK VANITYROUND 19"x19"
VANITY COUNTERTOP W/ ROUND SINK HOLE 24" DEEP
1
T.O. WALLS 8' - 10"
T.O. WALLS 8' - 10"
T.O. MAIN FLOOR 0' - 0" GRADE -2' - 0"
T.O. MAIN FLOOR 0' - 0" GRADE -2' - 0"
T.O. BASEMENT -8' - 0"
T.O. BASEMENT -8' - 0"
East 1/8" = 1'-0"
3
South 1/8" = 1'-0"
VANITY CABINET-DOUBLE DOOR & 4 DRAWER 48"
T.O. MAIN FLOOR 0' - 0" TOILET DOMESTIC-3D
1
Bathroom view 1/4" = 1'-0"
T.O. MAIN FLOOR 0' - 0"
NOTE: TUB ON OPPOSITE WALL "RECTANGULAR-3D"
3
South Kitchen 1/4" = 1'-0"
30" TALL CABINET DOUBLE DOOR
T.O. WALLS 8' - 10"
T.O. WALLS 8' - 10"
T.O. MAIN FLOOR 0' - 0" GRADE -2' - 0"
T.O. MAIN FLOOR 0' - 0" GRADE -2' - 0"
42" UPPER DOUBLE DOOR
T.O. WALLS 8' - 10" TALL CABINETS REFER TO SOUTH ELEVATION
36" UPPER CABINET DOUBLE DOOR UPPER CABINETCORNER UNIT
T.O. WALLS 8' - 10" 2
30" BASE DOUBLE DOOR-2 DRAWER
4
6
West Kitchen 1/4" = 1'-0"
30"x26" RANGE
L-SHAPED COUNTERTOP
ARCHITECTURAL TECHNOLOGY
No.
North Kitchen 1/4" = 1'-0"
Description
INTERIOR DESIGN TECHNOLOGY
T.O. MAIN FLOOR 0' - 0"
30" BASE DOUBLE DOOR-2 DRAWER
2
SCHOOL OF SUSTAINABLE BUILDING AND ENVIRONMENTAL MANAGEMENT
ARCHITECTURAL TECHNOLOGY
3' - 0"
T.O. MAIN FLOOR 0' - 0"
North 1/8" = 1'-0"
24"x24" DISHWASHER 36" CORNER UNIT ANGLED
Date
48" CASEWORK WITH SINK
INTERIOR ELEVATIONS Project number
3
T.O. BASEMENT -8' - 0" 4
FOSS-JAMES HOUSE
T.O. BASEMENT -8' - 0"
West 1/8" = 1'-0" No.
SCHOOL OF SUSTAINABLE BUILDING AND ENVIRONMENTAL MANAGEMENT
32"x35" LH FRIDGE
9:07:54 AM
42" UPPER CABINET DOUBLE DOOR REFER TO WEST ELEVATION
1' - 6"
COUNTERTOP WITH SINK
Description
Date
EXTERIOR ELEVATIONS Project number Date Drawn by Checked by
3 APRIL 22, 2016 EMILY FOSS S. STEINHAUER
A.4 Scale 1/8" = 1'-0"
2016-04-22 9:07:32 AM
UPPER CABINET CORNER UNIT
NORTH
KIT./NOOK 14'4x13'10
M. BEDRM 14'6x13'6
ENSTE. COV.ENT.
AUTOCAD construction documents W.I.C
LIVING 14'4x14'8
FOYER
BDRM.2 10'8x10'9
LAUND. BATH
A
MAIN FLOOR PLAN
CONSTRUCTION DRAWINGS A
C
B
D
E
1
1
“Measure Up” assignment. Completed in AutoCAD in 2015.
3
2 4
3
4
B
KEY PLAN
5 2
6
A
1
SITE PLAN
C
1
SECTION DETAIL
A3.3
MAIN FLOOR PLAN
A3
SCHOOL OF SUSTAINABLE BUILDING AND ENVIRONMENTAL MANAGEMENT ARCHITECTURAL TECHNOLOGY
A
A
C
B
LAUNDRY
D
SUITE
SUITE
SUITE
B
C
D
E
F
F
E
SUITE
1
CONSTRUCTION SCHEDULE
STAIRS
LAUNDRY
SUITE
SUITE
SUITE
“Nait Dormitory” assignment site plan (upper left) and floor plans and building section (bottom) Completed in AutoCAD in 2016.
SUITE
ELEV.
VEST.
A
CONSTRUCTION SCHEDULE: RECEPTION
CAFE
BUILDING SECTION
3
2
COMMON AREA
1
SUITE
WALL CONSTRUCTION SUITE
2
SUITE
SUITE
SUITE
COMMON AREA STAIRS
3
2
PARTITION CONSTRUCTION
SECOND AND THIRD FLOOR PLAN
A
B
C
D
STAIR MEN'S
WOMEN'S
OFFICE
MACHINE
KITCHEN
F
MECH.
ELEV.
J/CLOS.
STORAGE
2
E
CAFE
SUITE
SEATING AREA
SUITE
CORRIDER
LAUNDRY
1 COMMON AREA
SUITE
SUITE
VEST.
VEST.
SEATING AREA RECEPTION
STAIR
3 B
BUILDING SECTION
1
A3.2
8
MAIN FLOOR PLAN
A2.1
CONSTRUCTION DRAWINGS
7
1
SECTION DETAIL
4
SECTION DETAIL
2
SECTION DETAIL
5
SECTION DETAIL
8
SECTION DETAIL
SECTION DETAIL
3
SECTION DETAIL
6
SECTION DETAIL
9
SECTION DETAIL
All construction documents on this page are for the “Nait Dormitory” project. Completed using AutoCAD in 2017.
A5.1
A
B
STAIRS
1
1
1
1
A
4
THIRD FLOOR STAIR PLAN
5
STAIR DETAIL
STAIRS
A
3
SECOND FLOOR STAIR PLAN
STAIRS
1
WALL SECTION
2
WALL SECTION
3
WALL SECTION
4
WALL SECTION
6
A4.1
STAIR DETAIL
A 2
FIRST FLOOR STAIR PLAN
1
STAIR SECTION
A7.1
9
sketchup
SKETCHUP
These pictures are from renderings done in SketchUp. Using techniques such as shadows, scenery pictures, entourage and lighting, I was able to achieve realistic appearances of the scenes.
11
1
construction details
PLAN SECTION
DETAILS B
STAIRS
OFFICE MENS
VEST.
WOMENS
VEST.
J/CLOS
3
1
SECTION DETAIL
PARTIAL FLOOR PLAN
1
DORM WASHROOMS
SCHOOL OF SUSTAINABLE BUILDING AND ENVIRONMENT MANAGEMENT
ELEVATION DETAIL
A3
WASHROOM DETAIL
2
SECTION DETAIL
ARCT 2410
ARCHITECTURAL TECHNOLOGY
SCHOOL OF SUSTAINABLE BUILDING AND ENVIRONMENT MANAGEMENT
FIRE SHUTTERS
A7
ARCHITECTURAL TECHNOLOGY
1
SECTION DETAIL
2
SECTION DETAIL
3
SECTION DETAIL
4
SECTION DETAIL
All detailing assignments that I have done through the program have been using AutoCAD. The picture on the top left is a washroom plan detail for my dormitory. The picture on the bottom left is of stair details. The picture above is of fire shutter details.
ARCT 2410
SCHOOL OF SUSTAINABLE BUILDING AND ENVIRONMENT MANAGEMENT ARCHITECTURAL TECHNOLOGY
STAIR SECTIONS
3B
13
A
B
C
A 1
DETAILS
2
3
1
2ND FLOOR FRAMING PLAN
3B 2
SECTION DETAIL
N
1
NORTH ELEVATION
2
1 3
SOUTH ELEVATION
4
E
W
WEST ELEVATION
PLAN DETAIL
EAST ELEVATION
S
CUSTOM MILLWORK CUSTOM MILLWORK
14
SCHOOL OF SUSTAINABLE BUILDING AND ENVIRONMENT MANAGEMENT ARCHITECTURAL TECHNOLOGY
ELEVATIONS
5A
SCHOOL OF SUSTAINABLE BUILDING AND ENVIRONMENT MANAGEMENT ARCHITECTURAL TECHNOLOGY
PLAN DETAIL
5A
A
DETAILS
2
SECTION DETAIL 1
STAIR PLAN DETAIL
ARCT 2410
SCHOOL OF SUSTAINABLE BUILDING AND ENVIRONMENT MANAGEMENT
STAIR PLAN DETAIL
ARCHITECTURAL TECHNOLOGY
1
SECTION DETAIL
2
3
SECTION DETAIL
SECTION DETAIL
CUSTOM MILLWORK
SCHOOL OF SUSTAINABLE BUILDING AND ENVIRONMENT MANAGEMENT ARCHITECTURAL TECHNOLOGY
SECTION DETAILS
5B
15 15
DESIGN INSPIRATION
DESIGN janitor
work station
STAIRS
principal
it rm
multi purpose
supply rm
senior
STAIRS
staff rm
small meeting rm
wash. wash.
wash.
manager
meeting rm
roof deck
RECEP.
wash.
STAIRS
associate
event storage
wash.
large meeting area
ELEV & LOBBY
staff rm
atrium
second FLOOR
STAIRS
sdb vault
STAIRS
bullpen
unisex wash.
file rm
ATM DEPOSIT RM
ATM LOBBY
janitor rm
touch down zone coffee area
small meeting rm
secure rm
data rm
RECEP.
sdb viewing rm
public teller area
ELEV & LOBBY
office
STAIRS
ATRIUM office
office
vest.
MAIN FLOOR
17
SUSTAINABILITY INSPIRATION
sufficient indoor air quality conditions – without the need for additional recirculation of air.”
1
Scanned by CamScanner
DESIGN
19