Architecture and Design Facility Renovation Megan Kelly and Emily Hock Arch 609 Spring 2020 Steve Padget
Project Goals
Campus Goals
Open Studio Spaces -flexible, efficient, naturally lit studio area
Goal 1: Reduce the amount and impact of waste sent to the landfill.
Capitalize on Design-Build -allow student abilities to transform facilities over time
Goal 2: Maintain the campus landscape using sustainable practices. Goal 3: Create a built environment that enhances and sustains the human, environmental and economic well-being of the campus.
Replace Marvin Studios -integrated common studios and makerspaces for all ArcD students
Goal 4: Establish a work environment that supports professional and personal well-being.
Tie Together and Add Light -circulation path from Jayhawk
Goal 5: Adopt university policies and practices to reduce energy consumption. Goal 6: Integrate environmental, economic, and social sustainability in ongoing administrative, developmental, and institutional planning decisions. Goal 7: Transition from our current carbon-based system to a reliable renewable energy system.
Existing Structure - Mud Hut to be Demolished
Existing Site
Program
Studio Spaces 8 Architecture Studios 8 Design Studios
6,000 SF 6,000 SF
Maker Spaces / Shops 3D Print / Prototyping Cafe Laser cutting and vacuum forming Physical computing / Arduino lab Traditional wood shop CNC wood shop Robotics lab Storage & staging
1,000 SF 1,000 SF 1,000 SF 2,000 SF 2,000 SF 1,000 SF 450 SF
Support Spaces 4 Seminar / Flex classrooms Gallery Offices Supply shop
3,000 SF 1,800 SF 800 SF 400 SF
TOTAL NET
27,150 SF
TOTAL GROSS
38,010 SF
C W A A S S E H S S I T N U G D T Y O N U N I V E R S I T Y
Responding to the Site
Full site with Marvin Hall to the north and Chalmers Hall to the west
Cut off the site to the south for road access to out site other buildings on campus.
Made a smaller footprint as well as allow maximum sun access fom the south and allow green space at the north and south.
Final form that extends the whole site from southwest to northeast, providing natrual lit spaces and large outdoor areas.
I N T R O D U C T O R Y
STUDIOS
DESIGN STUDIOS
OFFICES
MAKERSPACE
M A S S I N G
WORKSHOPS
GALLERY
STUDIOS
WORKSHOPS
NORTH/EAST SECTION
DESIGN STUDIOS
OFFICES
MAKERSPACE
GALLERY
S I T E P L A N
Basement Level
Main Level
12
UP
DN
Up
2 11
1
10 9
8
Section A
7
6
5
UP
DN
Basement 1” =20’
Mechanical Collaborative Spaces Support Spaces Makers Spaces / Shops Nautral ventilation into basement parking garage
Restrooms
Main Floor 1”= 20’
UP
Shipping Container Main Entry Rockwell Brewery, St Louis
1. CNC
9. Physical Computing / Arduino Lab
2. Wood Shop
10. Supply Shop
5. Storage
11. Offices
6. 3D Print / Prototyping Cafe
12. Gallery
7. Laser Cutting 8. Robotics Lab
Open Concept Main Entry Washington University, St Louis
Level 2
Level 3
15
DN
14
DN
13
UP
DN
14 DN
13
14
14
13
13
13
14
14
13
13 5
13
14
UP
14 DN UP
5 2nd
Floor 1” = 20’
Glass pocket door connections between studios
Support Spaces Studios Restrooms Collaborative Spaces
DN
5. Storage 13. Design Studio 14. Architecture Studio 15. Flex Classrooms
UP
3 1
Studio Flexibility
Modular doors allow for class privacy during pin-ups Glass doors allow for visibiity between classrooms and when open, a second hallway, promoting collaboration between design and architecture studios
Accessibility Centrally located stairwells Elevator easily accessible from garage level to floors above ADA accessible individual toilet rooms on every floor Single loaded corridoor for maximum light into studio rooms
Mechanical Variable Air Volume System Exposed Supply and Return Ducts in studio spaces
Supply Ducts
Return
Structure Steel beams and girders 30’ x 40’ grid
40
’
’
30
’
30
’
30
’
30
N O R T H E L E V A T I O N
E A S T E L E V A T I O N
Jawhawk Blvd
Detailed Wall Section
Flashing
Flashing
Flashing
Metal Finisher Metal Finisher
Metal Finisher
8" Tapered Rigid 8" Tapered Insulation Rigid Insulation8" Tapered Rigid Insulation
Metal Fastener Metal Fastener
Window Frame Window Header Frame Header
Window Frame Header
Metal Flashing Metal Flashing
Metal Flashing
Metal Fastener
Extruded Aluminum ExtrudedTransom Aluminum Transom Extruded Aluminum Transom Single Glazed Single UnitGlazed Unit
Single Glazed Unit
Makers Spoace
Makers Spoace Makers Spoace Corten SteelCorten Rainscreen Steel Rainscreen Corten Steel Rainscreen
Window Frame Window Frame
Window Frame
Window SillWindow Sill
Window Sill
Finished Floor
hed Floor Finished Floor
etal in 4" Decking Concrete in 4" Concrete Metal Decking in 4" Concrete
altion " Rigid Insualtion
4" Rigid Insualtion
ge teelBeam W-Flange Beam
Steel W-Flange Beam
teel angeWide JoistFlange Joist
Steel Wide Flange Joist
avity Air Cavity
Rigid on Insulation
Air Cavity 2" Rigid Insulation
arrier Moisture Barrier
" Gypsum 5/8" Gypsum tt Insulation 6" Batt Insulation " Gypsum 5/8" Gypsum
Moisture Barrier 5/8" Gypsum 6" Batt Insulation 5/8" Gypsum
Gallery
Gallery
Gallery 12" Retaining 12"Wall Retaining Wall
12" Retaining Wall
Rigid Insulation Rigid Insulation Gravel
Gravel
8" Drainage8" Pipe Drainage Pipe Concrete Footing Concrete Footing
Rigid Insulation Gravel 8" Drainage Pipe Concrete Footing
Building Section
Budig
Maker Space
Natural Daylighting
Intake
Gallery
Exhaust
Detailed Wall Section
m
Building Section
Budig
Hallway
Studio Space Natural Daylighting
Exhaust
Intake Hallway
Main Corridor
Studio Space
Supply Shop
Parking Garage
Building to wrap around major courtyard gathering area
I N T E R I O R V I E W S
C O U R T Y A R D V I E W S