...In our studio, where we produce many different subjects and on many different scales, we aim to maintain an architectural design practice focused on situation and to develop this through the potentials inherent to it. This is a practice based on identifying the individual problems of each project, of each special situation, distinguishing their particular inputs, and looking for answers to the situation that has now become specific through a description that is as stratified as possible. Familiar styles, motivations of architectural movements, and design conventions are introduced at times, however, a noteworthy investment in these are put off each time. This tendency also problematizes a sort of aspiration to be consistent, which is rather widespread in the milieu and which pins its hopes on the kinship in the appearance of buildings produced.We believe that the situation of being chosen in a mechanical way, which is the fundamental characteristic of the seemingly antipodal two attitudes, uproots them both from the real world and renders them no different from one another. And we hope that our design tendency, which could be called a sort of tropism, will be able to reach the marks of its inherent consistency – if there is such a thing – through the quest for awareness in the process of redefining each time what is to be conceived. This is an attitude in which the creative subjects–the persons in charge of the design, just like the product they create, feel that they themselves are not entirely free of these nonconformities, in which they question each time both the situation and themselves instead of forming consistent systems, instead of playing it safe, and contenting themselves with what suits their best interest...



Profile Emre Arolat Architects was founded in May 2004 by Emre Arolat and Gonca Paşolar in Istanbul, as the continuation of Emre Arolat’s architectural practices which he started at Arolat Architects as an associate designer in 1987. Arolat Architects was founded in 1961 and the group has drawn significant professional experience from regular contributions to architectural 2004

competitions and executed significant housing, tourism facilities, leisure centers, administrative buildings and sports grounds projects. The practice is being continued with the same range of projects in EAA-Emre Arolat Architects with the contributions of other partners, Neşet Arolat, Şaziment Arolat, Sezer Bahtiyar and a professional architectural staff in its office in Istanbul. Awards

2008

European Union Prize Mies van der Rohe Award 2005 Minicity Model Park 2006 Architectural Review Awards for Emerging Architecture (Highly Commended) Dalaman International Airport 2008 Architectural Review Awards for Emerging Architecture (Commended) Minicity Model Park

2009

Cityscape Dubai Special Award 2008 Zorlu Center MIPIM Architectural Review Future Project Awards (Commended) Tekfen Kağıthane Offices and Milas Golf Hotel European and African Property Awards 2009 Zorlu Konak Residences European and African Property Awards 2009 Zorlu Center, Lara Kervansaray Hotel & Convention Center and Santralistanbul Museum of Contemporary Arts 2009 Emirates Glass Leaf Awards Mixed Used Building of the Year 7800 Çeşme Residences & Hotel 2010 Europe 40 Under 40 Awards received by Gonca Paşolar and Kerem Piker 2010 International Architecture Awards Santralistanbul Museum of Contemporary Arts 2010 European Property Awards (Highly Commended) Tekfen Kağıthane Offices, Raif Dinçkök Yalova Cultural Center, 7800 Çeşme Residences and Folkart Narlıdere Housing Aga Khan Awards for Architecture 2010 İpekyol Textile Factory 2010 MIPIM AR Future Project Awards Zorlu Center and Varyap Merkez Shopping and Cultural Center Green Good Design Awards 2010, 2011 Zorlu Center, Yalıkavak Residences, Sinpas EcoTown and Izmir Fair Complex


SEL EC TED PR OJ EC TS


RA IF D I N C K OK CU LTU R A L CENTER location Yalova, Turkey client Akkรถk Group time 2007-2008 area 7800 m2 program Cultural center with galleries, conference hall, library, cafe status Built

...The fact that the facade is perforated provide the surface to dissolve at the night time like a tulle curtain and the inner would to be perceived easily. The user enters the building from its mouth. There is not a door or a barrier. The metal tulle now transforms into a protector. It leaves the negative impacts of rain, sun and wind but it does not transform into an interior space because of it semi-transparent nature. The air ventilates freely in this area...



AS Y M I X E D & L IKOR PROJECT Location Istanbul, Turkey Client Viatrans - Meydanbey (Likör) Torunlar, Aşçıoğlu, Kapıcıoğlu (ASY) Time 2008-2011 Area 185.000 m2 (Likör), 268.000m2 (ASY) Program Mixed-use development Status Under construction

...As one of the most important decisions related to the general settlement strategy, it was proposed that approximately ten thousand square meters area on the northern part of the land to turn into a city park by integrating with the existing green area on the adjacent parcel and designed large public space came into existence by this way to generate a kind of breathing zone between dense urban blocks of Mecidiyeköy...



AN TAK YA M USEUM HOTEL Location Antakya, Turkey Client ASF Tourism Company Time 2011-2012 Area 34.100 m2 Program Museum and hotel on an archeological site Status Under construction

...The configuration of the artifacts discovered on site determines the exact location of the columns. The canopy supported by these columns acts both as a marker for the archeological park and as a platform housing program elements such as the ballroom, meeting rooms, swimming pool and fitness center. Slits on the platform act as skylights for the archeological site below and provide a visual connection inside the building...



AR K E TI P H OUSING Location Istanbul, Turkey Client Metal Yap覺 Time 2006-2011 Area 78.470 m2 Program Housing and social facilities Status Built

...The main fa癟ade materials include natural stone, wood, and concrete, which are materials that age well with time. The private gardens at the ground level are replaced with large terraces at the upper levels. The mobile screens that surround these terraces provide protection from wind and light, as well as form a unique and shifting aesthetic construction, by their various ways of usage...



BE R GA M A C ULT URAL CENTER Location Bergama, Turkey Client Bergama Municipality Time 2010 Area 8.500 m2 Program Cultural center with commercial activities, cinema and library Status Under construction

...This arcade creates an interior space that seems like a courtyard by surrounding the area from three sides. The stores which work both ways bring life into the courtyard. The three masses which rise from the arcade and become visible from the avenue, represent their functions with their strong geometries and reveal rich spaces open for public use in the voids generated between each other...



BO DR U M V I CEM RESIDENCES Location Bodrum, Turkey Client Vicem Yachting, Sanko Holding Time 2010 Area 12.900 m2 Program Housing Status Under construction

...The tension that is arises from the conflict of the coast’s untouched quality and the presumable dense physical pattern that is going to be built on the site, emerges as the most crucial fact of the design. In this sense, the settlement scheme is treated as an experimentation of mass fragmentation that loosens the phenomenon of the stereotypical large single house that also deals with the three dimensional topographic problem...



CU K U R OVA REGIONAL AIRPORT Location Tarsus, Turkey Client General Directorate of State Airports Administration Time 2010 Area 376.200 m2 Program Airport domestic and international terminals, service facilities Status On board

...Formation of atopography-building is proposed to meet the facts of the context and place. The main green shell acts as a second roof that fade away and become permeable at some places in the passenger terminal and allow natural air ventilation in space. Produced with similar ecological intentions, large inner gardens form attractive perspectives inside the main space and carry the sunlight to the furthest corners...



EY U P M U N I CIPAL ITY CULT URAL CE N TE R A N D MARRIAGE HAL L Location Istanbul, Turkey Client Ey端p Municipality Time 2006-2011 Area 6840 m2 Program Multi purpose hall, marriage hall and service facilities Status Under construction

...The Marriage Hall project has been considered as a kind of structural landscape component combining the level difference between the pedesterian way and the sea with a walking ramp on the waterfront of Golden Horn, in Eyup.With its composition is been located between the platforms at different levels and its scenario composes the various functions of marriage hall as the component of structural landscape...



KA GI TH A N E OF FICEPARK Location Istanbul, Turkey Client Tekfen Holding Time 2007-2011 Area 30.000 m2 Program Office and commercial functions Status Completed

...In the first phase of the design, the site and its surrounding has been analyzed in depth. As one of the most critical decisions of the project, the various possibilities of the fragmentation that is the derived from the surrounding building pattern was elaborated rather than the totalitarian approach of the familiar office buildings. Parallelly, this abstraction process was utilized by slenderizing the decisions related to surfaces...



L E MÉ R I D I E N ISTANBUL ETIL ER Location Istanbul, Turkey Client Makyol Time 2007-2009 Area 65.000 m2 Program Hotel and commercial functions Status Built

...Three masses, having the scale of surrounding buildings approximately, were separated from each other vertically and large terrace gardens were created in-between. In common with the other parts of the city, this attack which even more liberalizes the buildings from each other strengthened the dialogue of the building with its location as a reference to the environmental texture. Exterior surfaces of the masses were differentiated in such a way that increases the effects of this separation...



MA C K A H OTEL Location Istanbul, Turkey Client Makyol Time 2007-2009 Area 65.000 m2 Program Hotel and commercial functions Status Under construction

...The facade of the hotel that faces Maçka Valley is exposed to ‘nature’ –sun and wind- as well as the Istanbul scene which has been naturalised with the distance brought by the green gap in-between. The screen is fragmented into smaller louvres to let the visitors manipulate the screen. Thus, facade of Maçka Street becomes a living facade, a changing composition due to time of day, weather and user preferences...



F O L K A RT N ARLIDERE HOUSING Location Izmir, Turkey Client Folkart Construction company Time 2007-2008 Area 70.000 m2 Program Housing and social center Status Built

...On the rear facade of the buildings, the promenades that provide horizontal circulation were separated from the main masses and leaned against the wall with rosebays. The inner spaces that were created after this decision appeared as a place beyond an ordinary apartment hallway by means of the light roof skin, structural features that allow air circulation and microclimatic effects of the cooling pools that were designed at the base of these spaces...



SA N C A K LA R MOSQUE Location Istanbul, Turkey Client Sancak Holding Time 2011 Area 1.500 m2 Program Mosque and social facilities Status Under construction

...The high walls surrounding the park on the upper courtyard of the mosque depict a clear boundary between the chaotic outer world and the serene atmosphere of the public park. The building blends in completely with the topography and the outside world is left behind as one moves through the landscape, down the hill and in between the walls to enter the mosque. The interior of the mosque, a simple cave like space, becomes a dramatic and inspiring place to pray and be alone with God...



MA S LA K N O .1 OFFICE TOWER Location Istanbul, Turkey Client Saral - Ciya Time 2009-2011 Area 29.000 m2 Program Multi-story office building Status Under construction

...Apart from the other projects along the Buyukdere Avenue, which is the main business district of Istanbul, Maslak No.1 Office Tower was designed to enrich the quality of the typical office space by vertical gardens. The envelope acting as a secondary facade in south and west direction is detached from the building up to 17 meters wide letting vertical gardens in 20 meters high. The space, in-between two facades, was considered as a buffer both for the acoustical and the climatic sense...



UL U S S AV O Y RESIDENCES Location Istanbul, Turkey Client Çarmıklı Saruhan Partnership Time 2005-2011 Area 83.500 m2 Program Housing and social facilities Status Under construction

...It was envisaged that it would be an important characteristic for the settlement that the shells, which are the main material of the exterior landscape, would, in places, be present in all there hardness and sharpness, though most often partly concealed by the layer of vegetation growing over them, while they would still remain legible in some way from all points of the area...



Z O R LU C E N TER Location Istanbul, Turkey Client Zorlu Holding Time 2007-2011 Area 620.000 m2 Program Shopping mall, offices, hotel, residences and performance hall Status Under construction

...The shell emerges from the ground. Inversely, it comes from high above and collides with the ground. As it rises it evolves into a tribune. As it rises the green texture interferes with the stone and slowly expands and spreads to the surface. In this sense, this hard shell evolves into a soft and green hill. The hole in the middle is taken out , potentially becomes a space that can have multiple uses...



VARYA P S H OPPING AND L IF E S TY LE CENTER Location Istanbul, Turkey Client Varlıbaşlar Holding Time 2010 Area 90.000 m2 Program Shopping mall and social facilities Status Proposal

...The courtyard, the heart of shopping center and around which the green cover has been formalized has been covered with a pergola in order to associate it to the ground floor that has been formed with a one-way shopping arrangement instead of a mutual one and in order to create shaded interspaces for making the usage of the building eligible during hot summer. Continuity of internal circulation has been provided with the pedestrian bridges passing over this garden...



S eka Industrial Heritage Z one Urban Renewal P roject Location Kocaeli, Turkey Client Kocaeli Municipality Time 2010 Area 450.000 m2 Program Museum, archeological park, conference hall, social and recreational facilities Status Organizational procedures

...Thus the factory land which will become an area that can be walk through, will not be an area identifiable with the borders of the untouchable factory buildings that have become museum objects inside. It will bring life both to its environment and to itself inside. It will evolve into an area that can be stepped on everywhere with its provocative factory buildings, a part of city that’s boundaries have been lifted in everyway...



7 8 0 0 C E S M E RESIDENCES AN D H O TE L Location Izmir, Turkey Client Çarmıklı, Kalyoncu, Tamtex Time 2007 Area 15.750 m2 Program Hotel, residence and social facilities Status Built

...Main mass has been set back, frontal beach and the natural environment has left as is exists as possible. Instead of being self-centralized and prominent by visual structural form, attractive and awaiting to gain its power by this kind of attention, what is aimed in the project is a kind of structure that tends to hide behind the landscape layer which covers it and by this way choose to get rid of all the burden of concepts that might be defined as style, taste and genre of architecture...



CE N D E R E VALL EY UR B A N D E S I GN PROJECT Location Istanbul, Turkey Client KAYADER Time 2011 Area 332.000 m2 Program Mixed-use development and recreation Status Proposal

...Semi-open shaded spaces that enable multiple uses are placed rather than masses with uninterrupted facades. Seperating the functions to different blocks in plan level, creates irreparable division and divergence in the city texture. For this reason, instead of following a zoning strategy in plan, the strategy of seperating functions in section was accepted as a way to sustain the mixed function building in the whole area...



KE M E R LI FE XXI HOUSING Location Istanbul, Turkey Client Metal Yap覺 Time 2004-2006 Area 40.000 m2 Program Housing and social facilities Status Built

...A calm architectural language which made use of contemporary production techniques instead of an eclecticist attitude, encountered so frequently in these surroundings that they constitute a norm. Designed as terrace-houses, the duplexes in the lower section open out on their own private gardens which have the quality of thresholds being detached from the public garden using the difference in elevation formed on the site...



IP E K Y O L TE XT IL E FACTORY Location Edirne, Turkey Client Ipekyol Textile Company Time 2004-2006 Area 20.000 m2 Program Factory and social facilities Status Built

...The administrative section, which commonly is detached from the production building due to the conventional approach, was more directly associated with production in this project. The mass was implicitly loosened thanks to linear gardens located between sections. These gardens are used by the staff during breaks and that natural light and air enter work places; it was intended that the gardens separate areas and that thanks to their transparent frames visual fluidity would be achieved...



DA L A M A N I N T ERNAT IONAL AIRP ORT Location Dalaman, Turkey Client General Directorate of State Airports Administration, ATM Time 2004-2006 Area 85.000 m2 Program Airport terminal and service facilities Status Built

...The cover, which was designed by detaching it from the main building both on the horizontal and vertical planes, was intended to create its own microclimate through the gap between the two roofs and through sunbreakers; and the system, which opened up to the wind and thus could breath, was intended to create a holistic serenity through its regular repetition along the fragmented masses...



L AR A K E RVANSARAY HOT EL AN D C O N V E NTION CENT ER Location Antalya, Turkey Client Kervansaray Hotels Time 2000-2005 Area 87.000 m2 Program Hotel, convention center and social facilities Status Built

...The main mass was shaped according to the premise that the width of the front elevation and that all rooms would have a view of the sea.The choice of construction materials, the questioning of covering and concealing habits, which dominate customary design strategies, and the repeating load-bearing system which optimizes construction techniques made it possible to build the complex with a relatively low budget and in a short time compared to similar buildings...



S antralistanbul M useum of C ontemporary Arts Location Istanbul, Turkey Client Istanbul Bilgi University Time 2004-2007 Area 120.000 m2 Program Museum and galleries Status Built

...New structures are composed of a dense and heavy inner core and a light, semi-transparent exterior sheathing that covers the core without touching to the possible extend. A metal mesh that this time homogenises the sense of the whole building is simply placed on the concrete base. It was considered that the buildings should evoke a kind of insignaficance by intervening into the aura of the environment at daytime, but should turn out to be a simple lighthouse with the interior lighting of the museum that makes the metal mesh invisible at night time...



S antral覺stanbul I nfobox Location Istanbul, Turkey Client Istanbul Bilgi University Time 2004-2007 Area 400 m2 Program Infobox Status Built

...A carefully-established renovation style, which would take into account the situation and the object at hand, and which at each specific encounter would reconsider them and give them their due, was accepted as the common denominator for the different components of this project...



salvaraga Residences Location Bodrum, Turkey Client Çağdaş Construction Company Time 2009-2011 Area 4.000 m2 Program Hotel and social facilities Status Under construction

...On Salvaraga Hill, where Bodrum Büyük Kulüp Project has been settled, a kind of existence form, which hides itself by growing into a ‘landscape-building’ rather then to be visible, which aims to continue its relation structurally with the topography and to give back the identity of topography even though rebuilding, can be summerize as the main approach of the project...



A ksay Shipping H eadquarters Location Bodrum, Turkey Client Aksay Shipping Time 1998-1999 Area 1.600 m2 Program Office building Status Built

...Designed as the headquarters of a shipping firm, this building was intended to have a calm and clear presence in contrast to the unplanned and chaotic pattern of its neighborhood. The spare prismatic mass formed within this context, manifested itself as an exposed concrete outer shell thanks to which its interior order.The simple rectangular plan formed in accordance with the boundaries of the site, consists of vertical transportation and service areas at the back and an open work area on the side facing the road...



IT K IB F oreign T rade C omplex Location İstanbul, Turkey Client Exporters Association Time 1997-1998 Area 240.000 m² Program Office building Status Built

...Areas for joint use such as auditorium, seminar halls, dining rooms, cafeteria, library, and exhibition hall are situated in the plaza, which is two stories high and situated beneath the square masses that were designed as the offices of three different exporters associations. These masses start at the plaza’s gallery and become dissociated and individualized toward the upper stories; the spatial voids formed by the atria at there center having translucent covers above them enable natural light to diffuse homogenously into the offices from the interior surfaces as well...



SAYI LGA N res覺dence Location Bursa, Turkey Client Selim Say覺lgan Time 1997-1998 Area 1.200 m簡 Program Residence Status Built

...Instead of compromising with the dense landscape and of disintegrating, this conflict, which developed through the reflective power of the artificial and bright materials, defined a new area of conciliation which was created by the landscape felt through the deep slits on the main house. The conception of the interior the fluidity achieved through the vertical slits and the natural light would homogenizes their diffusion; and that at night the building shines like a big lantern among the trees...



c U B U K LU vadı houses Location Çubuklu-İstanbul, Turkey Client Yüksel Construction Company Time 2000-2001 Area 40.000 m² Program Housing Status Built

...The distinguishing characteristics of this prototype building, which was designed taking into account the inputs of this specific location, were deck-like terraces which were detached from the ground as alternative gardens on this highly inclined lot, articulated terrace roofs as the fifth façade which formed the view of the residence behind it, modular materials which allow for industrial production, interior and exterior spaces which can easily be separated or brought together through sliding systems...



M ax覺mum houses Location 襤stanbul, Turkey Client Kay覺 Construction Company Time 2003-2006 Area 5.500 m2 Program Housing Status Built

...The Maksimum Houses project, whose design was initiated in 2001 was accepted in order to question whether or not a settlement, which is supposed to be produced within conditions that were not derived from the realities of architecture itself, could be the subject of architecture in any way. It was envisaged that the folding sliding panels, designed to prevent the negative effects of both the sun from the west and the noise produced from the beltway very nearby, would transform the fa癟ades of the buildings into a changeable surface...



max覺mum houses SHOWROO M Location 襤stanbul, Turkey Client Kay覺 Construction Company Time 2009-2011 Area 100 m2 Program Showroom, office Status Built

...The sales office building was built with the aim to market the residences in the actual buildings. Limitations such as its relationship with the topography, the size of the block, and the shape of the roof did not apply to the sales office building due to its advantage of being temporary. All the decisions regarding these limitations were emphasized solely through the aesthetic channels of architecture...



R enovation O f B russels E ntrep么t RoyaL Location Brussels, Belgium Client tour&taxis Time 2003-2004 Area 56.000 m2 Program Commercial space Status Built

...The most noteworthy inputs for the design were the historical traces on the existing building and the industrial spirit which is legible even today. The foremost data, which were charged with all sorts of excitement and inspiration were the lofty inner and outer surfaces adorned with the patina of long years, the alluring luminosity of the gigantic interior space, and the rails stretching out as if at any moment a train might suddenly appear out of a cloud of steam...



MINI C I TY theme park Location Antalya, Turkey Client Antalya Metropolitan Municipality Time 2003-2004 Area 55.000 m2 Program Open air scale model exhibition park and recreational areas Status Built

...The main input for the design was the dichotomy between indoor and outdoor space which emerged from the investor’s request that on the one hand the park attract the tourist consumer’s attention and become a famous monument that would turn into a landmark. A long interface on the south separates the park, which was made private through the above-mentioned process, from the public area; by bringing this interface to a channel outside of the structural codes familiar to it...



E videa H ousing Location Çekmeköy, İstanbul, Turkey Client Yapı Kredi Koray Gyo & Garanti Gyo Time 2004-2005 Area 100.000 m2 Program Housing and social facilities Status Built

...Treated within this context while accepting the obdurate development of the surroundings, the design took shape through an inward-turned homogenous mass structure rather than scattering and staggering individual apartment buildings, which are usually shaped according to conventions of the construction sector in Turkey with windows, balconies, roofs and eaves peculiar to it. The large area in the middle of the housing blocks was transformed into an uninterrupted interior space consisting of private areas on the peripheries and communal areas in the lowered middle portion...



Y orum A dvertising A gency H eadquarters Location Gayrettepe, İstanbul, Turkey Client Yorum Advertising Time 2005 Area 1.800 m2 Program Office building Status Built

...The gallery formed by the removal of the part of the cantilever/projection between the first and fifth floors on the long side of the building which has a rectangular plan, was envisaged to activate all sorts of relations that could be established, and, by employing retractable systems, it was intended that this space, which has a vertical effect and stands as an interface between the main facility areas and the city, would also contribute when necessary to the way the interior of the building is used...



EA A L event Office Location Istanbul, Turkey Client EAA Time 2010 Area 1.500 m2 Program Office building Status Built

...Converted from a building whose structural construction has been completed, the office block is designed in such a way that it has voids and light penetrating to the office space and while it has a curtain wall facade like the conventional office buildings in the neighbourhood, it has a visual and tactile relationship with its surrounding...



S eyrantepe M ixed U se C omplex Location Istanbul, Turkey Client EroÄ&#x;lu Group Time 2010 Area 300.000 m2 Program Residential, office, commercial, retail and recreational areas Status Proposal

...The design of the mixed-use complex with shopping center, office and residences, the main consideration was to keep the green hill on which the new complex will be built in memory and produce an interpretation of a artificial topography through the figure of the hill and let the high rise block like a crystal reaching to the sky. The shopping mall with its spatial qualities of a generous void will draw an outline for a new typology for the program...



P rague T urkish E mbassy Location Prague, Czech Republic Client Turkish Embassy of Prague Time 2011-2012 Area 4.400 m2 Program Embassy and offices Status On board

...The design is driven by the question of how to belong to the site while facing the discourse about being Turkish in a foreign land. The answer has been searched in the structuralist approach of the modernist interpretation of Turkish regionalist architecture which is constituted on the structural grid used as a construction technique in traditional Turkish houses. The building is divided into four pieces to be able to merge its site while having this structural grid as an abstract image about Turkish architecture...



Yal覺kavak Marina Location Bodrum, Mugla, Turkey Client Palmali Group Time 2011-2012 Area 8.500 m2 Program Marina, retail and recreational areas Status Built

...The impressive scene formed by the landscape of masts of the yachts on the marina has been the inspiration of the project where the main restaurant and the social area are programmed on the main land. In the island part, an artificial landscape of rocks, having been cut in orthogonal shapes and have been laid with a masonry work creates different levels where pools, shadings, pavements and decks are...



I stanbul Museum of C ontemporary Arts Location Istanbul, Turkey Client Mimar Sinan G.S.Ăœ. Time 2012 Area 23,600 m2 Program Museum and recreational areas Status On board

...While designing the transformation of the former antrepot building into an art museum which will be home for a collection of 15.000 pieces which are considered as the most important examples of Turkish art for last two decades, the structure of the building which is the most prominent character has been kept and containers which will be the exhibition spaces for the art pieces are inserted inside the grid while having some paths, galleries and hall inside the complex...



Y enikap覺 A rcheopark P roject Location Istanbul, Turkey Client Istanbul Municipality Time 2012 Area 63.350 m2 Program Urban planning and museum Status Competition proposal

...In the proposal designed for Yenikap覺, the city archives structure blends into a texture including a transfer station below ground, commercial units also in relation with other levels on the ground, and an urban canopy at the upper level. Museum space is totally particularized and spread over the area. The canopy serves as a clear separator between the commercial activity on the ground level and the museum level, while forming a platform for pedestrian traffic...



AG U C ity C ampus P lanning Project Location Kayseri, Turkey Client Abdullah Gül University Time 2012 Area 350.000 m2 Program Abdullah Gül University campus resoration Status On board

...Transformation of the existing textile factory from 1930’s into a university campus triggered the problematization of the relationship between historical and new-comer as two entities that merge into each other. Older one of the two existing buildings have been kept as it is while the other was articulated with a new structure in such a way that it creates an inhabitable in between space in the existing composition of the site...


EAA - Emre Arolat Architects Nispetiye Mah. Aytar Cad. No:24 Kat 3-4 1.Levent, 34340 İstanbul T: 0212 284 70 73 F: 0212 284 70 63 www.emrearolat.com


Turn static files into dynamic content formats.

Create a flipbook
Issuu converts static files into: digital portfolios, online yearbooks, online catalogs, digital photo albums and more. Sign up and create your flipbook.