selected works 2019-2024
Enas Hassan - 2024
Enas Hassan (1997-Now)
I’m a 26 year old architecture student, from Sudan, master’s student in Sustainable Architecture and Landscape Design. Passionate about blending innovation with sustainability, I focus on using local materials and techniques to create eco-friendly, contextually harmonious spaces.
ENAS HASSAN ARCHITECT
Personal information: Location: Aachen - Germany Mobile no.: +4915739258108 Email: enas1997140@gmail.com
Education:
MSc Sustainable Architecture and Landscape Design 2022 - now Politecnico di Milano
BSc degree in Architecture 2014-2020
University of Khartoum
Interests:
Architectural photography Model making Sketching and hand drafting Documenting buildings
Professional experience:
Junior Architect
October 2021 – October 2022
MMC (Murtada Maaz Consultancy)
Junior Architect
Feb 2021 – May 2021
Haider A. Ali architects and building consultant Co.
Teaching Assistant
Jan 2021 – October 2021
University of Khartoum
Site Engineer
Aug 2020 - Jan 2021
Tirkaka for construction & consulting Co. Software
Chapter 01
Urban and Landscape Projects
PROJECT :
The project is about re-thinking the site of a decommissioned nuclear power plant in the PO river basin, between Piacenza province and Cremona province. The power plant is dismantled in steps, reusing the buildings without demolitions. Innovations including Increasing ecological functionality by rehabilitating wetlands, expanding forest areas and combating the spread of allochthonous vegetation species.
FUTURE EXPANSION ZONES
Areas with potentials, where the interventions in our site can be implemented in, as a prototype along the Po river tackling the same issues.
ZONE 01
Area: Piacezna
Potentiality:
- Medium Flooding Risk
- Riparian Forest
- Settlement Area
ZONE 02
Area: Caselle Landi
Potentiality:
- Medium Flooding Risk
- Riparian Forest
ZONE 03
Area: Caorso
Potentiality:
- Medium Flooding Risk
- Riparian Forest
- Proximity to two Settlement Areas
- Proximity to a Landmark “Caoroso power plant”
- Includes a Park
- Island with high biodiversity
ZONE 04
Area: Olza Fogarole
Potentiality:
- Medium Flooding Risk
- Riparian Forest
- Settlement Area
ZONE 05
Area: Rffineria
Potentiality:
- Low Flooding Risk
- Riparian Forest
- Island with high biodiversity
ZONE 06
Area: Chiavicone
Potentiality:
- Medium Flooding Risk
- Riparian Forest
- Settlement Area
- Includes a Park
Profile Sections
The sections shwoing the soil profile from diffrent areas, the Po river, settelements, CAORSO platform and the embankemnt around the river.
Mounds detail
The sections shwoing the soil profile from diffrent areas, the Po river, settelements, CAORSO platform and the embankemnt around the river.
Inaugurating our strategy for the Caorso area along the Po River, we harness the potential of nature-based solutions for seamless ecological integration and connectivity while fostering biodiversity. In response to the region’s recurrent flooding challenges, our strategy aims to operate effectively in both dry and wet conditions. We’re committed to allowing water entry in a resilient manner, enhancing the area’s flood resilience. We will engage in power plant functional regeneration and ecological renaturalization actions. Furthermore, we employ the natural filtration capabilities of plants and trees to purify the incoming water, simultaneously enriching both water quality and soil health. This transformative approach signifies our dedication to a sustainable and harmonious future for the Caorso region. .
Wet and Dry Scenario
In the first scenario, this concept will be put into action after allowing the water to flow in. As a result, wetlands will form during certain seasons, providing passageways and ramps for people to navigate. In the second scenario, this area will transform into a lush green space during dry seasons, offering people the opportunity to engage in a variety of recreational activities. During periods of lower river levels, this space will serve as a versatile, multipurpose platform, offering a scenic viewpoint for people to sit and enjoy the river.
Exploded Diagram
The area is covered with variety of spices that are shown in the diagram in layers of Flora, Funa, Aquatic life and Wild life
BRT Line system
PROJECT :
The project is Urban Revitilaization of the bus line infrastructure following human-based approach, focusing on specific stops along the bus line which contains all the issues introduced in the project. Stop 03 was in diffrent level from the main roads, the challenge was to give accessibility to the bus stop and regenerate the area using green solutions.
TOD Principles for analysin the area:
Zoom 2 Access to BRT stop and connection with the new sqaure
BRT Line system
ABSTRACT :
The project is Urban Revitilaization of the bus line infrastructure following human-based approach, focusing on specific stops along the bus line which contains all the issues introduced in the project. Stop 03 was in diffrent level from the main roads, the challenge was to give accessibility to the bus stop and regenerate the area using green solutions.
ANALYSIS MAPS
Mobility plan of Milan
Areas open for regeneration
ReFarm also focuses on transforming historic Cascina Nosedo into a hub for adaptive agriculture, where farmers can harness the power of innovation, technology, and environmental stewardship to maximize productivity and minimize ecological impact.
The renovation project will focus on upgrading the Cascina’s infrastructure to support adaptive agricultural practices. Upgraded infrastructure will enable farmers to adapt to changing needs and efficiently utilize resources, reducing waste and increasing overall productivity.
To foster growth and knowledge sharing, the Cascina Nosedo will serve as a platform for collaboration among farmers, researchers, and local communities. By facilitating partnerships and networks, the project aims to create a supportive environment for farmers to exchange ideas, share best practices, and collectively address challenges. Additionally, the Cascina can offer educational programs, training sessions, and workshops to empower farmers with the skills needed for adaptive agriculture. The New design will be accommodating educational spaces in the existing off campus block and the building next to it, while the residential building will be retained as backpackers hostel and guest houses. The other abandoned residential building will be renovated to host workshops and trainings.
The stable building will be converted in to a low carbon eating cafe and co-working spaces, Inviting the young urban population to the Cascina. By proposing a community garden and providing a multi purpose central courtyard to host community functios will make the Cascina an anchor point for the neighborhood.
Building Configuration
The first floor of the building has been thoughtfully redesigned to create a dedicated space for agricultural education. It now includes advanced research facilities, a modern lecture hall, and captivating greenhouses for experimental plant growth. The design emphasizes functionality, incorporating ample natural light and state-of-the-art equipment. The inviting atmosphere inspires curiosity and collaboration, offering visitors an immersive experience to learn and explore the world of agriculture.
The Meandering Loops
The running and bike track surrounding Porto di Mare Park consists of two main loops, each offering distinct experiences. The longer loop encompasses the entire park, allowing enthusiasts to immerse themselves in the picturesque surroundings. Meanwhile, the shorter loop offers a more condensed route for those seeking a quicker workout or a leisurely stroll. Moreover, the track incorporates minor pathways resembling veinlets, which intricately weave through the enchanting wildflower meadows around. This design not only adds aesthetic appeal but also provides a refreshing atmosphere for individuals to enjoy their exercise routines while connecting with nature.
Chapter 02
Architectural Projects
Science and Technology Museum
ABSTRACT :
A science and technology museum is to inspire and educate the public, explain complicated inventions, survey the evidence of science, display the intense industry productions.
The exhibition galleries are never static for long, as they have to reflect and comment on the increasing pace of change in science, technology and industry.
Project concept:
The main concept is to join the different functions, and create a central public place with mixused functions, while keeping the historical image of the site. Inviting diffrent types of users by introducing diffrent fuctions.
A science and technology museum is to inspire and educate the public, explain complicated inventions, survey the evidence of science, display the intense industry productions. The exhibition galleries are never static for long, as they have to reflect and comment on the increasing pace of change in science, technology and industry.
The planterium dome is exposed to the outside to give the iconic character of the museum, but closed from the inside to display the shows on it.
The planterium dome structure is steel space frame dome, and raised floors to help facilitate the halls with the electrical services and cooling systems. The circulation is main factor in museums, thats why the halls designed to be self-guiding the visitors in a loop to the end hall which kead to the planterium.
Meat Processing Plant
ABSTRACT :
A science and technology museum is to inspire and educate the public, explain complicated inventions, survey the evidence of science, display the intense industry productions.
The exhibition galleries are never static for long, as they have to reflect and comment on the increasing pace of change in science, technology and industry.
Yousif Altinay Private Villa
ABSTRACT :
The project is a private villa , the scope is architectural and interior design for ground, first and second floor, with modern style and aches in the exterior are the main feature in the design.
Giant gardens in the main entrance to enhance the indoor environment and provide fabulous views.
The project is a private villa , the scope is architectural and interior design for ground, first and second floor, with modern style and aches in the exterior are the main feature in the design.
Giant gardens in the main entrance to enhance the indoor environment and provide fabulous views.
Atbara Apartment Building
ABSTRACT :
The project challenge was to design an apartment for rent above existing commercial shops in Atbara – Sudan.
A studio and two bedrooms apartment are optimized in 150m2 area, toilets and the kitchen are accompanied in one place to be drained easily and concealed with vertical metal grid.
Abo-saed Housing Project
ABSTRACT :
After a study to the Sudanese cultures, we conclude the main consideration in the housing projects in Sudan, which are : privacy , gender separation, free of traffic space for kids to play and visible from the parents, parking which could be shared, and common space for elders.
The bridge in the first floor connecting the two unit’s stairs, with space to socializing and connecting the residents with each other. In the second floor a giant landing is act as a connecting space.
ABSTRACT :
The project is dates processing factory, with area 5000m2, ground floor and first floor. The challenge was to adapt the architectural design with the mechanical circulation of the machines and production line. In collaboration with other disciplines like fire fighting=ng engineers and mechanical and electrical engineers.
The structure design was from a steel factory pre-fabricated pieces.