Public Works maintains and enhances the Encinitas way of life.

COTTONWOOD CREEK BASIN & LA COSTA BASIN MAINTENANCE PROJECTS

Advertisement

As part of the Public Works Department’s ongoing drainage infrastructur maintenance program, the Cottonwood Creek Basin maintenance project was completed in January 2022. Following over a year of resource agency coordination, approximately 2,150 cubic yards of sediment and debris were removed from the Cottonwood Creek Basin, adjacent to Cottonwood Creek Park. This effort included cutting back vegetation surrounding the basin and the restoration of critical flood capacity within the basin and larger drainage area.

The La Costa Basin, located along the southern edge of La Costa Avenue and across from the Batiquitos Lagoon, was originally constructed under an emergency permit in 2005. Currently the city is working with appropriate resource agencies to secure required permits prior to the completion of needed maintenance work. February 2023 is the anticipated completion date; however, this timeline is contingent upon a variety of project variables.

CITY HALL EXTERIOR RENOVATION

Phase two of the City Hall improvements began in January 2022 to provide much needed deferred maintenance to the building exterior. A major part of these much needed improvements includes concrete replacement to correct drainage issues as water ponded in the courtyard during rain events. While the concrete is being replaced for practical purposes, it is being replaced with a decorative design along with the walkways that extend from north to south along the front of the building. In addition to the redesigned courtyard, phase two includes new wayfinding signs, landscaping enhancements, replacement of the metal portion of the roof, and electric vehicle chargers.

TREE CITY USA

In the last fiscal year, the City was awarded the designation of Tree City USA for the 11th year in a row. This is a testimony to the City’s commitment to maintaining and expanding a healthy urban forest. During a successful Arbor Day event in April 2022, 100 volunteers joined the City in planting 50 new trees in Cottonwood Creek Park thanks to a generous donation by SDGE. Additionally, the Public Works team planted 430 new trees within the public right of way. The total number of trees in the public right of way is now 22,001.

ORGANICS RECYCLING (SB 1383)

Organics recycling and related programming, defined by Senate Bill 1383 and intended to divert organic waste from landfills to reduce greenhouse gas emissions, has continued to roll out since 2021. Residential organics collection and processing through the City’s franchise waste hauler, EDCO, began in June 2021. In the past year, multi-family residential and commercial generators have been the focus of education and outreach campaigns anchored by a goal to have 100% account enrollment in organics recycling by July 2022. In addition, over the past year the city adopted a new Mandatory Organics Recycling and Edible Food Recovery Ordinance and updated existing Solid Waste and Construction and Demolition Debris Recycling ordinances. Through this update, all generators are required to recycle organics and for specific edible food generators to donate unused edible food to address food scarcity across the region. The city has taken great strides in facilitating and coordinating edible food recovery programs with local generators, with a goal of ensuring all required edible food generators (Tier I and Tier II) be enrolled in a recovery program by 2024.