OVERVIEW PRESENTATION FOR PRRD SUNDANCE AND TAYLOR WIND PROJECTS
David Warner EDF EN Canada Inc.
Ron Percival Avro Wind Energy Inc.
August, 2015
1
28/07/2015
PRESENTATION OVERVIEW i.
Two wind projects represent a potential $1.5 billion dollar investment in the PRRD ii. EDF EN Canada iii. Sundance Wind Project iv. Taylor Wind Project v. Past and Future Environmental Assessment Activities vi. Visual Simulations for Sundance and Taylor Projects
2
28/07/2015
EDF EN – A PURE PLAYER IN GREEN ENERGY GENERATION A MULTI-SEGMENT PLAYER
AN INTERNATIONAL FOOTPRINT
+ Offshore Wind Energy
18 countries
~ 3,009 employees
+ Biomass Biogas + Sea Energy WIND ENERGY
SOLAR ENERGY
Other
North America
Europe
Africa & Middle-East
AMONG THE WORLD LEADERS
AN INTEGRATED OPERATOR Present on all the renewable value chain
Generation activity 7,517 MW gross installed
Among the top 10 global players
2,204 MW gross under construction* Development
5.6 GW developed
Construction
Generation
1.4 GW
3.1 GW
under construction
owned and operated
Operations & Maintenance
9.3 GW operated
9,8 TWh** of green electricity generated in 2014 Complementary activities 2,703 MW developed, built and sold 11,756 MW in operations and maintenance* Key figures at 31 December 2014
MW gross : capacity of power plants in which EDF EN is shareholder | | * For own account and for third-party
3
28/07/2015
SUNDANCE WIND PROJECT Generation capacity up to 250 MW Build and Permitting Schedule:
EA Certificate expected in 2016
First open house – June 2013
Supportive engagement with Treaty 8 First Nations
Build early as 2017 subject to offtake agreement with BC Hydro.
Project located on crown land, approximately 20km north of Tumbler Ridge. Near proposed Site C dam and ramping gas electrical load Represents an investment of more than $600M Jobs:
Approximately 250 during construction
Approximately 10 – 15 during operations
August 2015
4
28/07/2015
TAYLOR WIND PROJECT Generation capacity up to 400 MW Build and Permitting Schedule:
EA Certificate expected in 2016
First open house – June 2013
Supportive engagement with Treaty 8 First Nations
Build early as 2017 subject to offtake agreement with BC Hydro.
Project located on ranch land, approximately 20km south of Taylor and west of Highway 97.
Near proposed Site C dam and ramping gas electrical load
Represents an investment of more than $900M Jobs:
Approximately 350 during construction
Approximately 15 – 20 during operations
August 2015
5
28/07/2015
ENVIRONMENTAL ASSESSMENT ACTIVITIES EDF EN Canada is working closely with First Nations, stakeholders, and government to ensure site investigations are comprehensive, transparent and sensitive to local and regional concerns
On-going Activities • First Nations, Public & Stakeholder Consultation • BC Environmental Assessment process • Submission expected Q4 2015 • Analysis of local features (constraints) • Reporting on results of field studies, including: • Archaeological Resources • Ungulates, fur bearers, fish, amphibians, etc. • Community Infrastructure • Visual Resources • Land and Land Use • Human Health
August 2015
6
28/07/2015
SUNDANCE VISUAL SIMULATIONS – MOOSE LAKE
August 2015
7
28/07/2015
SUNDANCE VISUAL SIMULATIONS – HWY 52
August 2015
8
28/07/2015
SUNDANCE VISUAL SIMULATIONS – GWILLIM LAKE
August 2015
9
28/07/2015
TAYLOR VISUAL SIMULATIONS – ALASKA HIGHWAY
August 2015
10
28/07/2015
TAYLOR VISUAL SIMULATIONS – BRADEN ROAD (N)
August 2015
11
28/07/2015
TAYLOR VISUAL SIMULATIONS – BRADEN ROAD (W)
August 2015
12
28/07/2015
David Warner EDF EN Canada Inc. 416.216.5883 David.Warner@EDF-EN.ca
www.edf-en.ca www.sundancewindproject.ca www.taylorwindproject.ca
Ron Percival Avro Wind Energy 250.285.2304 RPercival@avrowindenery.com
August 2015
13