Energy Capital The Magazine Sep-Oct 2021-Edition 05

Page 70

Infrastructure

to more than 30 homes), that would cost around $700 per charge over 3 years and don’t forget your cost of money. Additionally, most cities are not handing out permits to install DCFCs due to the excessive draw on the grid. Alternative? Build a backyard solar power plant!

EV Charging is MESS-y OZOP Energy Solutions puts electrical demand in perspective before jumping to the at-home rapid charging solution – the NeoGrid™ or “Modular Energy Storage System.” The OZOP NeoGrid is a fully off-grid solution that can work in conjunction with MicroGrids for the purpose of rapidly charging EVs. Think of it this way… Micro-grids, if we put a solar system on one house, it is powered for the moment as long as the sun is out. If we attach a battery to that same house system, it can be powered for a few days. If we now build a network of 20 homes, central storage, renewable energy production and software/ logic that controls the delivery and consumption

70


Turn static files into dynamic content formats.

Create a flipbook
Issuu converts static files into: digital portfolios, online yearbooks, online catalogs, digital photo albums and more. Sign up and create your flipbook.