Energy Resilience CENTRICA ENERGY STORAGE Dynamic Control Solutions Ltd
Essential Element of UK

CENTRICA ENERGY STORAGE

Essential Element of UK Energy Resilience

PRODUCTION: Tommy Atkinson

A key element of the infrastructure area of the Centrica family, Centrica Energy Storage operates the Easington onshore gas processing terminal in East Yorkshire and restarted gas storage operations at the Rough facility in the Southern North Sea in 2022, with a view to bolstering the UK’s energy security and helping to reduce consumer bills.

2 / www.energy-focus.net

INDUSTRY FOCUS: STORAGE

//“Energy is in our DNA,” opens international energy and services company Centrica. “From supplying the gas and coal that powered the industrial revolution, to becoming the market-leading energy services and solutions company we are today, we’ve been at the centre of the UK energy industry for over 200 years.”

Centrica is unique among energy companies in the UK and Ireland, in its operating across the entire energy value chain through a variety of distinct, but complimentary businesses, all of which have a common purpose, the organisation says: “helping you live sustainably, simply, and affordably.”

Formerly Centrica Storage Limited, a recent name change for this pivotal Centrica arm is designed to signify a change in ambition, Centrica Energy Storage (CES+) details. “We wanted

to keep storage in our name as it is at the heart of what we do now, and our plans well into the future,” the company stresses, “but we have larger ambitions outside of storage, including onshore and offshore hydrogen production and fuel-switching our existing operations to hydrogen to minimise our environmental impact.”

ROUGH READY TO ADD RESILIENCE

CES+ operates the Rough gas storage facility in the Southern North Sea, as well as the Easington onshore gas processing terminal in East Yorkshire, an onshore gas reception and treatment terminal, modified between 2011 and 2013 by CES+ to handle gas produced from the York field, at the time the largest known undeveloped gas reserve in the southern North Sea.

“This was the largest single

project within the Easington gas terminal in 20 years,” CES+ explains, “with the plant designed to handle 120 million cubic feet per day of gas, from the York field which will produce enough gas to meet the demands of half a million households.”

The Easington terminal processes gas from the Rough underground gas storage facility, located 18 miles off the coast of East Yorkshire, where storage operations restarted in 2022 following a dormant five years since 2017 to provide critical further energy security in the UK while cutting users’ bills. “Today, Rough provides more than half of the UK’s gas storage - 54 billion cubic feet (bcf) of gas - which is enough to provide the equivalent volume of gas to heat 2.4 million homes over winter,” CES+ states.

“The long-term aim is to turn

4 / www.energy-focus.net
Brokering - Offshore and Renewables Marine Logistics Software Sale & Purchase Vessel Valuations Make Waves Tel: +44 1224 74 77 44 chartering@seabrokers.co.uk www.seabrokers.co.uk The Global Shipbroker Seabrokers Chartering is an independent shipbroking firm focused on the offshore sector, renewable energy as well as aquaculture.

Controls, Automation & Instrumentation Services

Control & Distribution Systems

Wellhead Controls, Valve Actuation Controls, Hydraulic Power Units

Component Supply

Control Valves, Isolation & Block and Bleed Valves, Safety Relief Valves, Pressure Monitoring Equipment, Instrument & Pipe Fittings

Bespoke Engineering / Manufacturing Services

Service Support / Site Services

Control Component Repairs, Spare Parts Supply

CENTRICA ENERGY STORAGE

Supporting Centrica Energy Storage Ltd with Process Control

www.dycos.co.uk

info@dycos.co.uk

Rough into the largest long duration, low-carbon energy storage facility in the world, capable of storing both natural gas and hydrogen with the goal of bolstering the UK’s energy security,” CES+ adds, having last year made huge strides toward this objective in almost doubling gas storage capacity at the UK’s largest such facility.

At the time of reopening Rough for gas storage it was able to store approximately 30 bcf of gas for UK homes and businesses; this further investment in the facility has brought Rough up to the present 54 bcf capability in a major boost to the UK’s energy resilience. Despite diverse gas supplies through connections with Norway and other European countries, alongside three LNG import terminals, the UK has some of the lowest levels of gas storage in Europe at 12 days

average, or 7.5 peak winter days.

By way of comparison, Germany’s stands at 89 days, France’s at 103 days and that of the Netherlands at 123 days.

“The resilience of the UK’s

energy system needs to be substantially improved,” assessed Centrica Group Chief Executive, Chris O’Shea, of the significance of the development. “We are delighted to play our part by further expanding

www.energy-focus.net / 5
Ltd
Dynamic Control Solutions

INDUSTRY FOCUS: STORAGE

SPECIALIST SERVICES UNDERPINNED BY TECHNOLOGY AND GLOBAL MOBILITY

OCCMS’ long standing relationship with Centrica Storage at their UK onshore Gas Processing & Storage terminal, was formed to provide Completions & Commissioning oversight and execution support services. The high-level summary of the scope requirements are as follows:

• Execution oversight of handover from principal contractor.

• Commissioning Test Procedure development and implementation.

• FAT Support.

• Plan and execute pre-commissioning and dynamic commissioning.

• Technical delivery of processes and competence assessed personnel. Support handover to client operations for start-up and ongoing production.

During this project, OCCMS have safely delivered commissioning and completions services for Phases 1 to 4 at our client’s UK based terminal which receives separate and condition natural gas and associated liquids from two separate offshore fields to meet the required specification before transfer of natural gas into the national transmission system (NTS). The processing facilities consisted of an inlet area/separation, onshore compression, dewpointing, filtration and fiscal metering with associated utility and auxiliary supplies.

the UK’s gas storage capacity.

“Rough is not a silver bullet for energy security, but it plays a critical role in increasing capacity and supply confidence over the winter months.

“Rough can help our energy system by storing natural gas when there is a surplus and producing this gas when the country needs it during cold snaps and peak demand.” Rough will, equally, help keep prices down for consumers by balancing the UK’s gas market, injecting gas into the facility when there is excess supply and putting that gas back into the UK’s gas network when customers need it most, keeping prices lower at that point of peak demand; in November came the winter’s first release of stored gas at Rough into the UK grid.

“Customers are struggling with high energy bills which are driven by international energy prices,” O’Shea

During the initial period, various brownfield modifications were undertaken within the onshore plant and included, but not limited to, F&G system modifications which were updated to accommodate the changes within the gas plant.

Following this initial phase, additional gas compression, additional F&G, and methanol recovery and injection facilities were upgraded and or modified as part of the new Humber Gathering System (HGS) and included upgrading receiving facilities for the new Tolmount offshore field.

All construction completions and commissioning execution was controlled and managed through OCCMS’ ORBIT™ completions management system on premise with a dedicated database administrator at the clients facility.

The total onshore hours expended on life of project, including a small proportion for senior leadership oversight, are ~60,000 without a lost time incident, including during the Covid 19 pandemic. “This strong track record is demonstrable of OCCMS’ strong safety leadership & inherently positive behaviours which are prevalent throughout all levels of management and delivery teams alike” stated OCCMS’ Operations Director – Jamie Japp.

For further insights or information on how OCCMS can assist you with your Brownfield Projects, please contact us at: Aberdeen@occms.com

observed at the time. “Gas storage is vital to ensure the UK can manage demand effectively, keeping prices down, and I’m proud of the actions our team has taken over the last 18 months, including our decision to bring Rough back online, to underpin the UK’s energy security. However, we still have the lowest levels of energy storage of the world’s major economies with the ability to store fewer than eight days of peak winter demand and this leaves us susceptible to shocks in international markets,” he countered.

“Gas will continue to be used as a transition fuel for the foreseeable future and we stand ready to invest £2 billion to quadruple the size of the Rough field and make it the world’s biggest methane and hydrogen storage facility, bolstering the UK’s energy security, delivering a net zero electricity system by 2035,

creating 5,000 skilled jobs and decarbonising the UK’s industrial clusters by 2040,” O’Shea explained.

“This world class North Sea asset has the potential to help the UK economy return to a position of being a net exporter of energy once again.”

HYDROGEN TO HUMBER

A co-operation agreement between Centrica and Equinor to explore developing a low-carbon hydrogen production hub at Easington, looks set to further strengthen the region’s growing status as the UK’s foremost hydrogen super location. Under the plan, over the coming decade the Centrica-operated area could transition to a low carbon hydrogen production hub, massively supporting both the Humber’s decarbonisation ambitions

Continues on page 8

6 / www.energy-focus.net
The Safe and Timely Start-Up of our Client’s Assets Specialist services underpinned by technology and global mobility occms.com o mpl

INDUSTRY FOCUS: STORAGE

REWS INTEGRATED VESSEL MONITORING & COLLISION SOLUTION

Often difficult to envisage on a vast expanse of water; shipping accidents are all too common. In the past decade, the second most common cause of shipping incidents reported globally is collision (3,098). In the oil and gas industry particularly, a maritime incident can be catastrophic with detrimental environmental consequences.

The aftermath of these incidents is well documented, but there is a lesser-known theme behind the cause. Reports show that almost 96% of maritime accidents are caused by human error, with fatigue the top cited issue.

With the UK oil and gas workforce expected to decline from 120,000 to around 87,000 by 2030 (in line with production decline and decommissioning activities), significant pressure is placed on the fewer vessels and crews that are left behind. With fewer staff and crews often being placed on unfamiliar vessels, the risk of human error will likely increase.

Ultra provides an integrated collision avoidance monitoring solution, our Radar Early Warning System (REWS) directly improving maritime safety. By using multiple platform-based radar early warning systems the Ultra REWS monitors marine traffic, protecting offshore installations and avoiding maritime incidents.

REWS provides protection 24/7, 365 for one or more platforms with alarm data instantly available to operators strategically located at onshore control centres, on platform, or Emergency Response and Rescue Vessels (ERRV) that react to any incident.

ULTRA REWS:

• Proven radar early warning system (REWS)

• Round the clock monitoring, 365 days a year Integrated system with Radar, Automatic Identification System and CCTV for 360° surveillance

• Capable of protecting multiple assets from an onshore control centre

• VHF voice communications enables control centre operators to contact offshore assets and passing vessels

• 24/7 technical support and help line available

PROTECTING:

• Offshore assets from collision

• Subsea systems from fishing activity

• Man overboard

• 500m safety zone

• Emergency response coordination

Legal obligation to have a collision risk avoidance system Protection around renewable and new energy platforms

This technology is a step change in marine operation safety, providing a full audit trail for incidents, near misses, and learning opportunities. Operational costs are reduced by consolidation/sharing of ERRV and Guard Vessel fleets and removing thousands of personnel risk exposure hours, with potential for multi-client control-centre monitoring for maximum cost efficiency. Simply, offshore operators cannot afford to risk devastating collisions. Ultra REWS provides real-time vessel monitoring that improves marine safety, reduces offshore risks, cuts operational costs, and allows for informed decision making in the most challenging environments.

Continued from page 6

and UK’s achievement of net zero and hydrogen production targets.

Centrica and Equinor predict that the conversion of the Easington Terminal could produce an additional 1GW of low carbon hydrogen production, coupled with the roughly 200MW off-taker demand. Currently, up to one third of the UK’s overall gas supply enters via Easington, which is also Easington positioned close to some of the world’s largest

offshore wind farm developments, offering huge potential for both blue and green hydrogen production.

With the UK government having recently doubled its 2030 hydrogen production ambition to 10GW capacity, and at least half of this figure to come from electrolytic ‘green’ hydrogen, the area is a key location within the Zero Carbon Humber partnership which, it is intended, will provide regional hydrogen and CO2 pipelines between the area’s major energy producers and carbon intensive industries.

“The Humber is in a unique position to lead the way on industrial decarbonisation, and partnering with Centrica to potentially develop a new hydrogen hub at one of the UK’s most significant industrial sites could help to transform this region’s energy mix whilst preserving and creating jobs and skills,” Grete Tveit, Senior Vice President for Low Carbon Solutions at Equinor, expressed, restating Equinor’s ambitions to deliver nearly one fifth

Continues on page 10

8 / www.energy-focus.net

REWS Integrated Vessel Monitoring & Collision Solution

Number 1 defence solution for offshore assets in the North Sea; reducing risks and costs

Autonomously monitors marine traffic; protecting offshore installations and avoiding maritime incidents

Fully aligning with Marine Safety legal requirements

FIND OUT MORE Contact Phil Williams Business Development Manager E phil.williams@ultra-sss.com T 01489 557373 W www.ultra-ic.com

INDUSTRY FOCUS: STORAGE

Continued from page 8

of the national target by generating 1.8GW of hydrogen production within the Humber region by 2028.

“We are delighted to be working in partnership with Equinor to explore opportunities to deliver on our commitments to help the UK transition to net zero as hydrogen will play a key role in achieving this,” O’Shea agreed. “Like Equinor, Centrica is committed to investing in the Humber region, levelling up and de-carbonising industry to create a world leading, green energy-driven, economic hub.”

Mike Whitehead, President of the Hull & Humber Chamber of Commerce, succinctly encapsulated the value of this key partnership. “It’s fantastic to see these two major energy companies seeking to invest and explore ground-

breaking projects in this region, demonstrating our long-standing reputation as the UK’s Energy Estuary.

“Over the coming decades we will need this level of ambition to transition away from fossil fuels whilst creating jobs, boosting skills and attracting inward investment.”

GRAND, GREEN & GLOBAL AMBITIONS

Perfectly encapsulating the wider Centrica’s unbending green focus, the UK’s energy security was dealt a further aid via a deal with Repsol to see Centrica Energy purchase one million tonnes of LNG shipments between 2025 and 2027, to be delivered to the UK’s leading LNG import terminal and the largest in Europe, Grain, in Kent.

“I’m proud that Centrica is continuing to improve the UK’s

security of supply through this deal with Repsol,” O’Shea said. “When our security of supply is threatened, it is customers that lose out, so it’s reassuring that this agreement will ultimately help ensure that those on the front line of the energy crisis have some insulation from price fluctuations.

“Natural Gas is an essential transition fuel in the move to net zero and securing international agreements such as this will be vital if the UK is to reach its ambitious goals. Alongside the other steps we’ve taken to make the UK more resilient – through deals with Delfin Midstream and Equinor – our actions demonstrate our commitment to the UK consumer.”

Somewhat further afield, Centrica Energy, alongside leading renewable energy developer and fund manager Taaleri Energia and Lords LB Asset

Subsurface

10 / www.energy-focus.net
BETTER ENERGY TOGETHER A leading asset lifecycle and engineering technology company delivering sustainable solutions.
www.three60energy.com
Wells Subsea EPCC Operations Products & Solutions
// OUR AMBITIONS ARE GRAND, GREEN AND GLOBAL, AND WE BELIEVE THE FUTURE OF ENERGY MUST BE UNLIMITED AND CLEAN //

Management, a Lithuania-based fund manager, announced the signing in March of a Power Offtake Agreement for the Rokiškis and Jonava wind farms.

Generating 408GWh annually, the wind farms will produce green electricity equivalent to the consumption of approximately 197,000 households, consequently offsetting 123,000 tonnes of CO2e emissions every year.

Following on from its ambitious commercial strategy to expand the business across new borders and deliver on green growth ambitions, Centrica is working to support the application of merchant-based instruments and manage risks, the company explained, ultimately enabling long-term returns for investors who are bringing new green electricity into the grid.

“We’re excited to further build on our strong cooperation with Taaleri Energia, expanding our relationship beyond the Finnish, Swedish, and Norwegian markets to now include Lithuania as well,” furthered Kristian Gjerløv-Juel, vice president of renewable energy trading and optimisation at Centrica Energy. “Our commitment to delivering services and solutions that support the growth of sustainable energy systems across Europe is unwavering, and it’s fantastic to be on that journey alongside some of the leading developers and fund managers in the renewables industry.”

The agreement marks Centrica Energy’s first renewable power purchase agreement secured in Lithuania, a market that presents

Expert Well Examination Well Integrity Verification Engineering Consultancy

significant potential for the buildout, management, and optimisation of new renewable generation, and closely follows its first agreement in Estonia, bringing its portfolio of wind and solar assets under management in the Baltic states to a total of 168MW.

A key element of Centrica’s sustainable operating plan is the commitment to supporting every customer to live more sustainably, in its bid to become a net zero business by 2045 and help each of its customers to achieve same by 2050. “We are a leading renewable energy trading company,” the organisation resumes, “and our mission is to drive the green transition while offering sustainable and predictable energy costs for suppliers and off-takers. In short, we call ourselves energy movers by nature.”

“We are devoted to being up to

date on energy advances to help our clients and using current energy forms as transitionary tools towards a new energy reality. Our ambitions are grand, green and global, and we believe the future of energy must be unlimited and clean.

“We see our ultimate role as the switch that accelerates the green transition by leading the development of a sustainable symbiotic energy market.”

Read more about Centrica Energy Storage in the upcoming edition of Energy Focus and hear exclusively from MD Martin Scargill.

www.energy-focus.net / 11 CENTRICA ENERGY STORAGE
WWW.CENTRICA.COM
info@cdint.co.uk | 01224 636420

Published by CMB Media Group

Chris Bolderstone – General Manager

E. chris@cmb-media.co.uk

Kiln House, Fuel Studios, Pottergate, Norwich NR2 1DX

T. +44 20 3097 1743

www.cmb-media.co.uk

CMB Media Group does not accept responsibility for omissions or errors. The points of view expressed in articles by attributing writers and/ or in advertisements included in this magazine do not necessarily represent those of the publisher. Any resemblance to real persons, living or dead is purely coincidental. Whilst every effort is made to ensure the accuracy of the information contained within this magazine, no legal responsibility will be accepted by the publishers for loss arising from use of information published. All rights reserved. No part of this publication may be reproduced or stored in a retrievable system or transmitted in any form or by any means without the prior written consent of the publisher.

©

Media Group Ltd 2024 AS FEATURED IN ENERGY FOCUS MARCH 2024 TSG Charge / Centrica Energy Storage Harbour Energy Harlyn Solutions Rapid Rollout Will See Global Nuclear Capacity Triple by 2050 ALSO IN THIS ISSUE: Exclusive Interview with Dr Sama Bilbao Leon, Director General of the World Nuclear Association
CMB

Turn static files into dynamic content formats.

Create a flipbook
Issuu converts static files into: digital portfolios, online yearbooks, online catalogs, digital photo albums and more. Sign up and create your flipbook.