1 minute read
Installed Power Mix Capacity
EQ iSearch
Advertisement
In 2021, the data is added as of April, as 300 MW Sakaka IPP in Sakaka city got commission in Al Jouf province of Saudi Arabia.
Source: IrEnA EQ iSearch
As of Q2 2021, Saudi installed Solar PV projects of above 700 MW, which includes the recently commissioned project of 400 MW Sakaka Solar PV project in Al Jouf Province. Wind Power installed capacity was 3.3 MW, 400 MW of Windfarm at Dumah Al Jandal city were 50% completed and the full completion timeline is 2022. Still, more than 99% of the power mix was contributed from non-renewable sources of energy.