Examensprojekt 04/19

Page 1

History

What used to exist on the site?

Change through time, ortography 1960-2018
History

What exists on the site today?

Recovering Nature

Camping & Parking

Industrial Leftovers

MTB Tracks

Inventory

What exists on the site today?

Established Forest

Returning Vegetation

Inventory

What does the landscape look like?

Inventory

What

Program
I
to achieve? 1:1000 Fine rotating filters in concrete chamber ~3x5 m Water Tower Groundwater Offices & meeting rooms Support Promote The need to design a program & structure with flexibility Open & adaptive framework Services WC Changing Parking etc. Central control room
do
want
Plant serves approx. 10.000 people
6-10
24/7
public Ability to visit & bathe Public bathhouse
& ladders, showers, water cleanliness
Cementa planned reservoir plant 300.000 m3 = ~6.000 people Smöjen large reservoir 500.000 m3 = ~10.000 people Around
employees for
operation Site for the
Docks
Proximity to water & spread
Parking,
services Pedagogi-
experience Consumer Pumping station Outside Surface water Flocculation basin ~2x3x30-40m, slow movement and propellers, bind organic matter, scrapers on bottom Quick & slow sand filters 1m deep, flushed every third day Addition of lime & chlorine, pH value and disinfection, water passes through UV-light Main Building Reservoirs 1 Plant Manager 3-4 Operators 1-3 Maintenance 1-2 Lab Technicians
treatment of landscape
Issue of transparency vs protection
seating, shelter Ecosystem services, reestablishment of nature Public
cal
Careful

Water

Comparison

Gotland (left)

Mainland Sweden (right)

AI generated data

Work in Progress

BURGSVIK

WATER SOURCES

Restricted

Accessible Municipal water

LJUGARN
SLITE FÅRÖSUND
VISBY ROMA

Work in Progress

Work in Progress

Work in Progress

Work in Progress

Turn static files into dynamic content formats.

Create a flipbook
Issuu converts static files into: digital portfolios, online yearbooks, online catalogs, digital photo albums and more. Sign up and create your flipbook.