SIJIE LYU Application for MArch Architecture ARB/RIBA Part 2 Student Number 20121107
TABLE OF CONTENTS
01. 02.
Third year project: Ark 01 02 Degree Sshow model E C T I Ocollage N CONCEPT
M AT E R I A L I T Y
03
EXPERIENCE
01
04
MODULARITY
05
10 03.
Live project: Eco-store for LVMH
04.
Second year project: Urban room
11
Retail
Wo r k s h o p
18
05.
Live installation: making the city
06.
Live installation: Cycle Cross
21 2 7 2 7 2 7
MÖNCHENGLADBACH RATHAUS DER ZUKUNFT
22
STÄDTEBAU Das Vorhaben, ein neues Rathaus für Mönchengladbach im Stadtteil Rheydt zu errichten, bringt die Chance, das städtische Ensemble Rathaus / Marktplatz / Evangelische Hauptkirche konzeptionell neu zu fassen. Der Akt eines morphologischen Eingriffs führt hier zu einem vergrößerten Marktplatz und zur räumlichen Befreiung des historischen Rathauses in die Form des Solitärs (Poskarte aus dem 19. Jahrhundert). Kombiniert mit der Funktion des Konferenzzentrums wird das historische Rathaus jetzt zum Hauptdarsteller auf einer städtebaulichen Bühne (siehe Skizze unten). Es zeugt vom städtischen Leben, auch im Sinne der städtischen Vergangenheit und Zukunft, vor dem Bühnenbild einer großen, geschwungenen Kolonade aus Holzleimbindern. Diese Kolonade bildet eine promenade architecturale zu Stadtsparkasse, Statdteilbibliothek, Bistro und Servicezentrum / Front Office. Das Teilgrundstück der zur Zeit bestehenden Stadtsparkasse wird ebenfalls in städebaulich-morphologischem Maßstab umgestaltet. Hier wird ein nachhaltiges Stellplatz-Konzept in Form von 5 Paternoster-Parktürmen zum städtischen Schauspiel – mit 200 Autos auf minimaler Grundfläche. Diese Parkplätze für Angestellte der Stadtverwaltung sind ausgerüstet mit Elektro-Ladestationen, die von der Photovoltaik-Anlage auf dem Rathaus gespeist werden. Die Vision dahinter ist eine Stadtverwaltung die auf 100% Elektromobilität setzt. Die Paternoster-Parktürme haben eine geringe Masse (Stahlskelett mit Polykarbonat-Fassadenplatten), sind leicht in die Einzelteile zelegbar und lassen sich recyclen, wenn der innerstädtische, ruhende Verkehr eines Tages keine Rolle mehr spielt (entsprechend dem Cradle-to-Cradle-Prinzip). In der Marktstraße, im Sockelgeschoss unter den Parktürmen, befindet sich der öffentliche Teil des Sozialen Rathauses – FB 39, FB 58 und FB53 (diskret von der Rückseite erreichbar). Darüber bietet eine Café-Terrasse die Möglichkeit sich zu setzen und eine Tasse Kaffee unter einem dem Blätterdach von Platanen zu trinken. Ein behutsamer städtebaulicher Eingriff Die Nord-Ost-Ecke des Karstadt-Gebäudes wird leicht zurückgenommen, um die Fassade des neuen Rathausplatzes an der westlichen Gebäudekante des Markplatzes auszurichten. Die daduch bedingte Reduktion der Einzelhandelsflächen um 470 m2 wird kompensiert durch den Zugewinn von 770 m2 im Zuge einer Verlägerung des Karstadtgebäudes nach Norden (283 m2) und nach Süden (548 m2). Karstadt bekommt außerdem einen prominenten, neuen Eingang direkt vom Markplatz (sowie z.B. eine Bratwurstbude mit Außenverkauf in Richtung ‚Mall’ zwischen Rathausplatz und Stresemannstraße).
07.
German model-making skill
08.
Future town hall
Education quarter
10.
Fundo Moray centre
S ALLGEMEINES RATHAUS
TECH
SERVICEZENTRUM
EINZE
BISTROT
KONFERENZZ BISTROT
FUNKTIONALE AUFTEILUNG
STADTSPARKASSE
23
28
29
11.
Off-Grid Dwelling
12.
New Goethe school
POS
EINZE
25
09.
STEL
SANI SOZIA
31
33
Das Soziale Rathaus (4. und 5. Obergeschoss) und das Rathaus (2. und 3. Obergeschoss) befinden sich direkt o bestehenden Einzelhandelsflächen – eingebettet baumbestandenen Dachgarten (Robinia pseudoacacia etc.). Das allgemeine Rathaus befindet sich auf den Geschossen 2 oberhalb des Servicezentrums, welches von der Kolonadense der Mall aus für die Öffentlichkeit zugägnlich ist. Die Stadtsparkasse und die Stadtteilbibliothek schließen sich i im Gebäudeflügel zwischen neuem Rathausplatz und Limitenst
PART 1. LONDON 2015-2018
ACADEMIC DESIGN PROJECTS
Sample works of bachelor studies in Central Saint Martins : BA (Hons) Architecture 2015-2018
COMMERCIAL AREA commercial area
01.
GENTRIFICATION AREA gentrification area
YEAR 3 PROJECT- ARK: WATERFALL OF LIFE
Barbican Centre
Theshard Shard the
BRICK LANE 2017/2018
The theGherkin gherkin
Bricks Buildings brick buildings Graffiti Artists graffiti artists
Markets markets
Abandoned Buildings abandoned buildings
Visitors visitors
Street streetArtists artists Community Garden community gar& City Farm dens & city farms
Poor property Poor property
High-rise area High-rise area There are some official and commercial There are some official and commercial skyscrapers around the Aldgate East.
skyscrapers around the Aldgate East.
Working Class people live in Council
Working people live in educated. Council House,Class most of them are less House, most of them are less educated.
Gentrification Area Gentrification Area There are many retail stores in Brick lane
There areismany retail stores in Brick lane and there a perfect place for arts. and there is a perfect place for arts.
First Impression
activity points in Nomadic Community garden
movable toilets 1.5m*1.5m*2m*4
boat with slide accommodate 10 kids
mobile plants bed 1m*1m*2m
para-carnival dome 6m*6.7m*3.5m
fire place 2.5m*1m*1.2m
green house 1.5m*3m*2m
cafe and offices
Hackney City Farm A range of farm animals and a beautiful organic garden. An award winning cafe opens every day except Monday. Volunteer programmes and regular evening and weekend activities, including upholstery, cycle maintenance, pottery and eco-living courses.
volunteering hire space shop
picnic holiday cafe
eco-area animals wildlife
accessible toilets incubator
Spaitalfields City Farm For all ages and abilities, including volunteering opportunities, environmental education, young farmers’ group, food growing, fresh farm produce, friendly animals, tranquil gardens, a mobile farm service and Eco-Chic market.
volunteering hire space shop
picnic play activity
roving cafe and truck 6m*3m*2.5m
mobile animals wildlife
accessible toilets
wildlife and animals
anim
First Impression of Site: Contrast
Commercial District Vs. Gentrification District When the first time I visited the site, firstly, I went to the Barbican centre area, there are lots of commercial and office high-rise, and when I walk around more, the building heights getting smaller. It turned to an multi-culture area full of artistic atmosphere.
Conclusion There are strong contrast atmosphere in my site. I want to make my building in the similar way, to make it more eye-contracted.
Timeline of Immigration establishment & accessibility
garden areas
communication areas
education programme
users in Nomadic Community garden
gardeners/ local
graffiti artists
musicians/ actors
students/ kids
homeless/ unemployed
visitors
cafe owners
painters/ sculptors
people from local people market
volunteers
managers
farm shop and fish restaurant
storage
animal houses
mal padlocks
City Farms Studies
Ark is a radical proposal to bring the entire gamut of natural, animal, plant, pleasure and food-based processes and experiences back into the hearts of the city, and onto the skyline for everyone, in the most spectacular fashion possible. From petting zoos, to farmer’s markets, allotments, flowers markets, barbarisms, slaughterhouses, community centres, pet centres, aquariums, veterinary clinics, playgrounds, educational areas, its all here, working with, and accelerating tendencies already existing in the local area, with its thriving small group of community farms and allotments. The form of the tower is a triumphant return to the stimulating image of the hanging garden of Babylon, the tower of Babel, the Colosseum and Roman Aqueducts, forms that speak of ambition, endurance and pride in communal infrastructure, as well as hinting at the romance of nature, decay and ruins. The tower has been carefully crafted through an intense technical exploration of the flow of water (the building is a spiralling aqueduct, with water flowing to all parts from a reservoir-pond at the summit) and the material strength of concrete and masonry.
Aqueduct
Arches
Spirals
Animals and Plants
Concept Collage
Main Design Elements
green spaces tower hamlet borough markets communities primary schools public gardens city farm/ gardens
I want to plug in to an existing network of small green spaces throughout the area, and amplify them.
Public Facilities
First Collage Model
Internal View
Axiomatic View of the Ark
Final SchemeKey Plan: Gardens 1:150
Final SchemeKey Plan: Vertical Farm 1:150
Developmen tural Elemen and Compos Strategies
Water canal view water canal view
Lower down garden lower down garden
Get Inspiratio metre model, concept into press my bas use some ele and fit them i
Element 1: Garden Ladder 1. garden ladder
Element 2: Plants around the 2. plants type Tower and Hanging Garden Pots
3: Garden Windows 3.Element garden winone dows
4. garden windows
Element 4: Garden Windows two
5: Ground Floor 5.Element ground Landscape one landscape
Element 6: Market Shop 6. market shop Space
7: Ground Floor 7.Element ground Landscape two landscape
Arches View arches forest
Looking Outside from Arch view from arch Windows windows
Garden Facilities garden facilities
Inside Garden Space: Picnic picnic area Area
shops marketMarket shops
Groundmarkets Floor Market Landopen scape
Roof Top 8. Element roof 8:top
Exploded Axos and Users
Arch arch
Spiral spiral
spiral
Exploded Axos and Users
arch
Spiral spiral
Smart Animals Plants
Vertical Farm
Visitors
aqueduct Aqueduct Ramp ramp Cafe cafe
Balcony balcony
Toilets toilet
Reception reception
storage Stroage
lift Hand Wash Area hand wash area Lift
cafe
In middle of the building. The farm feed the various of animals such as sheep, donkey, chicken, pig and small animals. As a farm, it also helps people learning about the food, nature and environments. The farm setting inspires children and adults to participate in our courses, workshops and lessons and leave with new knowledge, friendships and inspiration. We also receive the school visiting, for children, they can learn knowledge of animals through education programme. For adults, they feed the animals in the farm to share knowledge and skills, build relations and care for their environment. In addition, the farm is home to a hive of bees, which we adopted last year. Farm volunteers would train in bee-keeping and harvest the honey.
aqueduct ramp
Teenager & Kids
storage
court yard
Cafe Locals
reception first aid
education space Education Space
balcony
Reception reception
lift
picnic garden
Picnic area
Animals
Shops shops
Play facilities
Cafe
Wildlife Area Accessible
Artists
Toilets Incubator for schools Mobile farm/garden Play facilities
Plans, Concept Drawing, Axiomatic Drawings Play area
Ma
Sustainable building Animals
Toilets
Mobile farm/garden
Fashi
Shop
Holiday activities
Garden Staff
Wildlife Area
Incubator for schools
picnic/eating Picnic Area/Eating Area
Picnic area
education
Accessible
Animal House animal houses
Garden Staff
Visito
Community soace for hire Locals
Holiday activities Sustainable building
Mobil
toilet
It provides education, trainingToilets on farm and garden techniques. We run practical courses to training the employment and refugees to maintain the farm and gardens also the cookStroage ing skills. We are also able to host corporate volunteers, giving them a fun day out learning how to weed and build pallet furniture. In addition, it is a place which can give opportunity for children to learn about animals and plants when they have the special educational programme in the garden and farm. Also, for the adults to communicate with different people. It creates not only the biological diversity of an area but its social diversity too.
Volunteering
Community soace for hire Shop
As the plants need the daylight for photosynthesis. Would on the top of the buildings. There is a truly universal language in growing food. It’s a lively, functioning community space that offers a range of activities, which is cross-cultural, pan-religious activity done by all ages and genders. Garden is enabling local residents to re-establish their communities, to learn new skills, discover new interests and new purposes.
storage
Lift lift
Users:
Arch arch
Garden:
Education centre: Visitors
Teenager & Kids
Volunteering
Element 9: Pipe Transfer Element 10: Pipe Garden 9. pipe transfer 10. pipe garden Water water
Play area
Art
SuperSection
group helix ramps +arches curved arches Group1: 1: Helix ramps + Curved
Ramps with flat floors ramps with flat floors
22
11
Slope arches + Ramps flat floors slope arches + with ramps with flat floors
Form Fin
sections Sections:
33
Curved arches + slope + floors (also curved arches slope ramps) floors (also ramps)
1
flat floor with ramps surrounded
1
2
sloped floor with ramps surrounded
2
3
3
sloped floor with central lighting space
group Conical + Curved arches Group 2: 2: Conical spiral +spiral Curved arches
Arch Studies and Material Testing Models 44
Curved arches + Conical
Curved arches +
Curved arches + Conical spiral ramps
55
Curved arches + Conical ramps with
ramps with flat floors with flat floors H Conical slope floors ramps with G spiral
F
slope floors
66
Curved arches with long Curved arches with long columns+ columns+ ramps Conical rampsConical with slope floors I with slope floors
4
4
3+7 3+7 Combine and 7totoCombine 3 and37 together test different types of spiral gether to test different types of spiral
Straight arches +Revolving Straight arches +Revolving ramps with flat square floors ramps with flat square floors
5
sloped floor with cone shape
flat floor with cone shape
6
6
sloped floor with columns
A. Wood test model 1 B. Wood test model 2 C. Wood rest model develop D. Preprepared for casting mould E. Silicone casting mould F. plaster casting model G. For ware canal casting H.Brick testing model 1 I. Brick testing model 2
Group 3:3: Square form and stacking different types group Square form and stacking different types
77
5
2+5 2+5 7 Combine 2 5and 5 together squared shape with Combine 2 and together to test quality todifferent test spatial different spatial spiral ramps quality
7
Bringing all my models together, I create 3+7 an architectural language of arched 2+5 forms 2+5 3+7 3 combination of 2 combination for my of tower. and 5 and 7
Conclusion:
After making models, I hav combine with spatial quality
I explored through modelling the spatial implications of combining I explored through modelling the spatial implications of combining various arched shapes. various arched shapes.
+
=
1
Groin vaults groin vaults
=
+
Planar arched space 2 planar arched space The columns fits on a straight vertical line
+
=
Varying vault spans 3 varing vault spans
=
+
Pointed arches 4 pointed arches
+
=
Typology Experimentation
Columns+ extruded arches 5 columns + extruded
arches
A
B
C
D
E
F
G
H
I
Material Testing
natural pond natural pond waterfall tall trees
waterfall forest
community
community cafe vertical farm office
education & offices vertical farm
education
education & offices
markets
markets
reception natural car parkpond
reception square & fountain car park & plants allotments
Programme Kits
natural pond
waterfall cloud wall
skating
garden
farm
market
open market & performance
Programme Diagram
02.
London 2018
DEGREE SHOW MODEL
2
M AT E R I A L I T Y
03.
03
04
EXPERIENCE
MODULARITY
01
U T C O M E S
06
STORE DESIGN
CONCEPT
02
M AT E R I A L I T Y
E N V I R O N M E N TA L
03
EXPERIENCE
U P C Y C LLVMH I N G YEAR 3 LIVE PROJECTECO-STORE
F O R E S S O
04
MODULARITY
05
C O N C E P T S T O R E
PARIS 2017/2018
F O R E S S O
05
L V M H
R U B B E R
G L A S S
L E A T H E R
L E A T H E R
0 4
D E N I M
D E N I M
N I K E
V I N Y L
R U B B E R
U P C Y C L I N G
R E C Y C L E D
A L U M I N I U M
N A
C H I -
B I O
M A R B L E
C A R D B O A R D W A L L
T R I P T Y C H
0 5
03
M AT E R I A L I T Y L U C E N T I A
L U C E N T I A D E S I G N
S O L I D
M AT E R I A L I T Y D E S I G N
01
CONCEPT
04
EXPERIENCE S O L I D
W O O L
03
O R G A N O I D
W O O L
EXPERIENCE
02
M AT E R I A L I T Y
03
05 Up-cycled Outcomes MODULARITY
S T O N E C Y C L I N G
04
EXPERIENCE
T R A S H P R E S S O
MODULARITY
04
MODULARITY
06Research Materiality
STORE DESIGN
S T O N E C Y C L I N G
05
05
01
STORE DESIGN
STORE DESIGN
02
CONCEPT E N V I R O N M E N TA L
06
ENVIRONM
06
ENVIRON
M AT E R I A L I T Y
S t o r y b o a r d
S t o r y b o a r d
Concept Store
Group Members Sijie Lily Max
1
1.
2
2.
3
3.
7
8
03
Luxury Meet Waste “So while consumerism is the love of buying things, materialism is the love of the things themselves”, LVMH is sustainable as items are precious possessions that are passed on from one generation to another, reflecting longevity in contrast to a throw away/fast economy.
longevity workshop/seasonal events/repair/reuse products
layering materials, creating new walls, floors and ceilings
Our project picks up on these qualities and translates it into a piece of architecture, that reuses, gives life to LVMH by-products, prolonging LVMH’s concept of longevity. We are proposing a circular economy where unique and rare materials are saved from being disposed of and up-cycled, crafted into new materials that from sculptural pieces of the store design.
framework for concept transit over time, waste materials are given a new life
framing activities, processes and materials
040404
E XN PC EE NCE RP IE EEX E R IEEERNI C
050505
D UYRL IATRYI T Y M O DMUOLM AO RL IT D U A
concept “slow” for fast city person
EN VOIEN RNM OTN M E N VEI R AN L TEANLT A L NO V INRM E 060606 CONCEPT 01 02
OSR S T O SRTEOSD IE G RTEE D EN SDIEGSNI G N
designing resting points, for discovering the space through the senses M AT E R I A L I T Y
03
EXPERIENCE
04
MODULARITY
05
S t o r y b o a r d
Storyboard 9 9 9
10 10 10
4
5
6
CONCEPT
02
M AT E R I A L I T Y
03
EXPERIENCE
04
MODULARITY
05
STORE DESIGN
06
E N D A R
7
B r a n d s
S e a s o n a l W o r k s h o p s C r a f t m a n s h i p M e t h o d s C o m p r e s s i o n
M e l t i n g
A f t e r L i f e
M i n i
P o p
U p
S t o r e s
C o m m u n i c a t i o n
T o o l
B a k i n g
W e a v i n g
S t o r e
D o n a t i o n L a b s
t o
M a t e r i a l
Calendar Diagram: Spring to Winter
Modularity: Lego Layout
ENVIRONME
View of Interior
The framework creates windows, framing views, brands and materials. Each becoming a portrait of its own. One transitions from an open plan retail space, to the curiosities of the workshop and to the refill bar where a retail experience becomes more of a social event and conversations about reuse, up-cycling and material innovations.
View of Facade
M AT E R I A L I T Y
03
EXPERIENCE
Workshop Level View
04
MODULARITY
05
STORE DESI
Berluti Display
Section with Interior Layout
03 03
A A LT IETRYI A L I T Y
04 04
E X P E REI E XN PC ER EIENCE
First Floor Plan
05 05
M O DPerspective U LMAORDI T UYL A View R I T YLooking Into S T O R ESD T
Workshop
Ground Floor Plan
04.
YEAR 2 PROJECT- URBAN ROOM
TRINITY BUOY WHARF 2016/2017 Trinity House set up an engineering establishment at Trinity buoy wharf to repair and test the new iron buoys. Then coming into use. In 1875 works expanded westwards into the neighbouring property. The neighbouring building to the lighthouse is the chain and buoy store. Lots of artists like sculptor and painters working in the TWB, to create artistic and creative atmosphere in the site. As you can see, the arts work is established all around the site. It has became a place full of the atmosphere of arts. In the future, developer Ballymore wants to open up the water front and have agreed provisional terms with Thames Clippers for a new pier and service. And make more public space and in testing street activity space for the site. They will build some high-rise buildings in North Learmouth Peninsula, and some residential buildings in South Learmouth Peninsula. According to the site analysis, I decided to design a building including a medium-scale theatre, an open theatre, serious of galleries and a public square, which could provide a space for the artists living nearby and also the local people to spend leisure time.
Site Analysis
Public Facilities
Future Area Plan
Conceptual Drawing
Main Sections, Main Plans
View and Models
This is a theatre that are made by concrete and truss to provide a wide space.
There are office and corridor which are made of timber structure and glass.
These truss stricture are made by steel which are take from the existing buildings.
These part involve the reception, toilets, shops and staircase, which are comprised of concrete and glass.
The concrete performance space is open to the square.
This is a gallery that is made by concrete and glass.
The dark video room are made by concrete, no windows and no doors
The public coffee shop is comprised of concrete and steel frame with double glazing.
Above pictures show the structure of rised up space with timber structure and supported by columns.
Above photos show the interior and structure of the theatre, which include the roof truss and sound insulation covered by wood.
6
1, Timber Walls 2, Flat Timber Roof 3, Timber Joist Floor 4, Concrete External Wall 5, Backstage small walls 6, Concrete Roof 7, Warren Truss Structure 8, Concrete Floor 9, Concrete Staircase Floor 10, sound insulation with timber 11, Foundation 12, Columns 13, Double glazing frame
7
4
2
10
1
5
9
8 3
12
11
Section Model
This section model shows the closed theatre and back stage with corridor.
This structure shows the roof with the rooftop planting.
1 roof plants
2 waterproof 3 insulation 4 concrete structure
5 double glaze
6 windows frame
Solid timber floor section
wood-cement particleboard
1 timber joist
1 external concrete wall 2 internal concrete slab 3 insulation
4 waterproof layer
2 timber slab
4 insulation
05.
AAVS: MAKING THE CITY
CHENGDU 2016
‘Marking the City’ brought together students, architects and artists in a nineday program investigating contemporary methodologies for context-specific architectural design and materiality. The programme was hosted by ‘iBox’ which is a temporary cultural hub located in the centre of Chengdu, bringing together local, national and international boutique brands it offers a location for creative discourse to flourish. Constructing a pavilion here against the backdrop of the city of Chengdu offers the potential to engage locals, travellers, designers and the fashionable and invite them to interact. Recycling is a major tenet of industry; restricted by governments, lauded by environmentalists and adopted by the bourgeois as the focus for a sustainable future. In Architecture the world of recycling can provide another level of engagement, one of history and memory. The 2016 ‘Marking the City’ pavilion attempted to construct a space of memory; a pavilion developed through an idea of interaction with the city, resonating with memory of an industrial process, a manufacturing intent or a patina of former use. The pavilion engaged with the city, for use by the people of Chengdu, to view, to use, to climb, to touch, to dismantle and to simply observe. AAVS Director: Stewart Dodd Tutors: Jason Griffith Yang Yang Joan Lemos Wu Xiaofei Dyson Ray Lu Jeroen van Ameijde Yutao Song
06.
YEAR 1 INSTALLATION- BICYCLE OBSTACLES
CSM LONDON 2015 It is a project to set some obstacle for a cycling competition. We were divided into different group to take charge of different part of the competition. For our group, we designed a triangle shape obstacle. And another group designed a pyramid shape on the top. As you can see from the photos on the right, the participants went through it in the different ways,which is quite interesting for us. After the competition, the colour and the shape of the obstacle had been changed.
Group Members Sijie Lyu Sean Brown Peng He Shutong Lin
PART 2. MUENSTER 2019-2020
OFFICE WORK
Sample works during year-out in BOLLES+WILSON : Muenster, Germany 2019-2020
sketch by Peter Wilson Š bolles+wilson
07.
MODEL-MAKING AT BOLLES+WILSON
MUENSTER 2019
Š bolles+wilson
08.
FUTURE TOWN HALL
MOENCHENGLADBACH 2019
7/10
2 7 2 7 2 7
3/10
2 7 2 7 2 7
4/10
2 7 2 7 2 7
±0,00 m +55,40 m ü.NN
D-D
C-C
E-E ße
tstra
Mark
Karstadt m m +0,10 +0,10 m ü.NN m ü.NN +55,50+55,50
+1,10 m +56,50 m ü.NN
Mitarbeiter Sparkasse Wartelounge
Lager
k
Kios
ad
hrr
Fa
(1
G)
Lager
Catering
.U
es
ch nis s ch au Te ath ng R ga les Einozia S
-1,40 m +54,00 m ü.NN
Küche
+
+0,68 m +56,08 m ü.NN
-0,50 m +54,9 m ü.NN -1,90 m +53,50 m ü.NN
-0,10 m +55,30 m ü.NN
Beratung -0,50 m +54,90 m ü.NN
Bespr. 3 -0,50 m +54,90 m ü.NN
Brand M.Z. 00.0.0
A-A
tr.
on
sk
e
ng
ad
sk
Ka
ga
eratung + Erziehungsbologischer Dienst Schulpsych
tur
ulp
Sk
Zu tner
ör
Pf
+1,75 m +57,15 m ü.NN
amt
Gesundheits
-1,45 m +53,95 m ü.NN
Bespr. 4
Anlieferung
-0,50 m +54,90 m ü.NN
H.-Druckerei
SB-Foyer
Handakten
Sparkasse
Anlieferung chologischer
Bibliothek
Dienst
FB 40 | Schulpsy
H.-Druckerei Luft Untersuch.
-0,50 m +54,90 m ü.NN
ung Untersuch von Tieren
TG
f ho hn Ba
Leite
r
n pe up Gr
s.
fo
Sich.
Tee
1 ppe Gru
B-B
Bistro
Street View
Garderobe
umarkt
© bolles+wilson
Rückgabe
In
±0,00 m +55,40 m ü.NN
Luft
a4
Gruppe 2
Per
Frontoffice
-0,90 m +54,50 m ü.NN
Am Ne
raße
KiT
-1,37 m +54,03 m ü.NN
Har
Marktstraße
Harmoniest
B-B
-1,45 m +53,95 m ü.NN
Bistro
moniestraße
Limitenstraße
Material
Luft
Müll
Kopierer +
A-A
Luft
Info
+0,10 m +55,50 m ü.NN
Kop.
Auslage
Ber. Typ 2
-1,45 m +53,95 m ü.NN
Ausstellung
Mitarbeiter Rathaus
C-C
Karstadt
-0,90 m +54,50 m ü.NN
Fahrräder
Schauwerbe + FM
Mehrzw.-Saal
D-D
±0,00 m +55,40 m ü.NN
-0,40 m +55,00 m ü.NN
E-E ße
Stresemannstra Grundrisse
EG
M 1:200
+ 21,80 m
+ 21,25 m
+ 18,00 m
Stadtplatz Marktstraße Wasserspeicher mit Filterbecken
+ 17,75 m
+ 14,75 m
+ 14,20 m + 12,14 m
+ 11,75 m + 10,40 m
+ 8,32 m
+ 8,75 m
K A R S TA D T
SPA R K A SS E
+ 4,50 m
+ 4,50 m K A R S TA D T
K A R S TA D T
K A R S TA D T
K A R S TA D T
K A R S TA D T
K A R S TA D T
K A R S TA D T
K A R S TA D T
K A R S TA D T
K A R S TA D T
K A R S TA D T KARSTADT
+ 1,75 m
+ 0,68 m
± 0,00 m
- 2,20 m
Ansicht
Nord
+ 5,25 m R A T H A U S
Sparkasse
M 1:200
Konferenzzentrum/ Ratskeller
Allg. Rathaus/ Front Office
FAH R R A D
FAH R R A D
B-B
M 1:500
- 1,45 m
- 5,15 m
Karstadt
- 9,40 m
Mitarbeiter Soz./ Techn. Rathaus
Schnitt
FAH R R A D
Kaskade
Weg zum Bahnhof
Soz. Rathaus/ Photovoltaik Servicezentrum
KA R ST AD T
Ansicht
Süd
M 1:500
KiTa
KA R ST AD T
KA R ST AD T
KA R ST AD T
KA R ST AD T
KA R ST AD T
KA R ST AD T
KA R ST AD T
KA R ST AD T
Long Elevations
© bolles+wilson
3/5
2 7 2 7 2 7
nvielfalt
ät. Alle neuen Verbesserung
vielfalt vielfalt
n PV-Anlagen en erhöht die .. Alle neuen Alle erzeugt neuen umen erbesserung erbesserung tät dererzeugt in das
falt
situations- und
PV-Anlagen PV-Anlagen sräumen. ichkeiten für n erhöht die ndeffekt, erhöht die der den verbessern men erzeugt men erzeugt en Dachgärten. ät der in ät der in das das und fördert die nsmöglichkeit
chkeiten für chkeiten für den Fassaden verbessern verbessern
kt zugänglichen TEIGERUNG
smöglichkeit smöglichkeit
EIGERUNG EIGERUNG
5.OG + Photovoltaik-Dach
GARDAROBE
LAGER / KOPIE
NG NVIELFALT
HANDAKTEN TEE
eglichkeiten baeudebrueter
G G VIELFALT VIELFALT lichkeiten lichkeiten aeudebrueter aeudebrueter
4.OG Soziales Rathaus
m Wasser wird mum reduziert. ässerung bzw. der nutzbaren g abgegeben. m Wasser wird m Wasser asser wird der mmelt undwird der um reduziert. um reduziert. en Gründächern werden kann. sserung bzw. sserung bzw. ugeführt werden. erdruck bedient der nutzbaren der nutzbaren sserung an die r umgebenden abgegeben. abgegeben. eichers genutzt melt und der melt eführt, und in der der das erden kann. erden kann. gen auffangen, druck druck bedient bedient serspeicher unter umgebenden ndumgebenden kann für die chers chers genutzt genutzt
Service-Module Eingeschobene, tragende Service-Module (WCs, Lage, Garderoben etc.)in Holzbauweise (Vorfertigung):
Flexible Grenze zwischen Technisches / Allgemeines Rathaus
- Als Kerne im mittleren Bereich der Geschosse = Gebäudeaussteifung - Modulgröße von 12,5 m x 2,5 m = leicht transportabel und mit Kostenersparnis durch verkürzte Bauzeit
2.OG + 3.OG
peichern und im
Technisches Rathaus
en en auffangen, auffangen,
Wasserabgabe egruenung
Eigenversorgung aus PV-Anlage Wasserabgabe Wasserabgabe ruenung ruenung
1.OG
Tragwerk Das neue. Tragwerk folgt nicht dem Kaufhaus-(12m-)Stützenraster, um ein nachhaltigeres neues Tragwerk aus Brettschichtholz-Trägern und -stützen aus einheimischen Hölzern mit 6m-Spannbreite zu ermöglichen:
Allgemeines Rathaus – Ordnungsamt von 1.OG bis 5.OG
- Transferträger über dem 1. Obergeschoss - die zwischen den Trägern entstehenden Hohlräume werden als Substrat-Tröge für den umlaufenden Dachgarten, sowie als Installationsraum genutzt
estaltung ddestaltung Wegen Wegen on on ser ser aus aus nfaellen nfaellen
2.OG
esamtgebäude ie Gebäude so den können. Erwärmung im
samtgebäude samtgebäude samtgebäude ieüberschüsse e Gebäude Gebäude so so e e wie Gebäude auch so zur en können. en können. können. en Erwärmung im im Erwärmung Erwärmung im de im Sommer
Energie wird im eüberschüsse eüberschüsse eüberschüsse wie auch zur wie auch wie auchinzur zur assade die
Treppenhäuser - Fluchtreppenhäuser in Ortbeton (wo erforderlich, auf die bestehenden Treppenhäuser aufgesetzt) - Aufzugskerne und weitere Schächte aus Brettsperrholztafeln, überall wo die Brandschutz-Anforderungen dies erlauben Ausbau-Wände - Nicht-tragende Ausbauwände werden aus vorgefertigten Holztafeln in Holzrahmenbauweise - Einsatz von feuchtigkeitsregulierendem Lehmputz bzw. von Lehm-Ausfachungen (gesundes Raum- und Arbeitsklima)
Eigenversorgung Eigenversorgung aus aus PV-Anlage PV-Anlage
Gestaltung nd Wegen von asser aus enfaellen
CADDY
Tragwerk
- Darüber: neues Tragwerk aus Brettschichtholz-Stützen und -Trägern in Haupttragrichtung, dazwischen Holzhybrid-Deckenplatten = bauteil-aktivierte Stahlbeton-Fertigteilplatten mit Brettschichtholz-Unterzügen
EG
Frontoffice Servicezentrum
ng der Decken e im Sommer e im eskühlung im Sommer Sommer über nergie wird wird im nergie nergie wird im im
die Parktürme ssade in die ssade in ssade in die die r Luftschächte g ktivierung der g der der Decken Decken kühlung über über skühlung kühlung über
die Parktürme die die Parktürme Parktürme Luftschächte Luftschächte Luftschächte
natürliche und öglichen. hen. Holz aus uch Aluminium Basis wie Holz, elte Baustoffe in atürliche und atürliche und sind am Ende glichen. glichen. er Forstwirtschaft en. Holz en. Holz aus aus erverwendung. den. Dämmstoffe ch Aluminium ch Aluminium Unterzügen aus nwollewie eingesetzt asis asis wie Holz, Holz, matisierung zu sind sind am am Ende Ende
1.UG
Erschließung Allgemeines Rathaus
Frontoffice Servicezentrum
Erschließung Technisches + Soziales Rathaus
4.OG
Dachterrasse Stadtteilbibliothek
3.OG
Stadtteilbibliothek
2.ÓG
Stadtteilbibliothek
auten werden in
mit Füllungen betonplatten mit rverwendung. rverwendung. nterzügen aus nterzügen aus em reduzierten s eingehängten matisierung zu matisierung zu ung eingeführt
rf einfach wieder mit Füllungen mit Füllungen Teppiche aus
ien.reduzierten m m reduzierten edeverwertung ng eingeführt ng eingeführt
Teppiche Teppiche aus aus
achhaltig r Region, deverwertung deverwertung als Speichermasse g
ber chhaltig
Stadtteilbibliothek © bolles+wilson
EG
Axiomatic Diagram
Š bolles+wilson
Fountain and Bicycle Parking Place View
Š bolles+wilson
Inside the Co-working Space View
09.
EDUCATION QUARTER O MORAY CENTRE
WITTEN 2019
BAEDEKERSCHULE
+13,8 = 121,3
+9,4 = 116,9
+5,4 = 112,9 DB
±0,00 = 107,5
© bolles+wilson
Elevations, Sections
© bolles+wilson
Street View
10.
PERU 2019
FUNDO MORAY CENTRE
Section AA
IMAGE - The Institute nestles into the landscape – only the stone roof of the Common Room hints at the complex but invisible spaces behind. BUSSES DISSAPEARED - Buses drive directly into the lower level of the court. Here visitors alight and climb to the Flower-Court and Building Entrance. Without buses the court steps form an outdoor tribune for Lectures and Briefings. The buses themselves disappear into a parking bay underneath the Communal Rooms (the three-pointturn of a bus determines the buildings geometry and size).
A. Individual rooms opening to the court B. Flower platform with seat C. Polychrome paving D. Steps up from bus arrival E. Bus parking bay F. Staff facilities (WC, shower, dressing) G. Study room H. Office
Š bolles+wilson GROUND FLOOR (3557.80m a.s.l)
East Elevation
UNDERGROUND ROOMS - The thirty rooms for guests and scholars are embedded in the earth and grass cover and camouflage them). Rooms are minimal but with individual bathroom, study-niche and balcony. An electric fence keeps animals and wanderers away from the crater-like institute. A STUDY ROOM/LIBRARY (with high ceiling and planted light well) is located on a between level at the north-west underground corner (equally accessible from all rooms). Staff service rooms (with linen store) are located on both accommodation floors. An office overlooks the court.
Š bolles+wilson
11.
HARBOUR BASIN
HAMBURG 2019
© bolles+wilson
Harbour View
© bolles+wilson
Street View
Loki-SchmidtStiftung
Loki-SchmidtStiftung
1
2
3
2
3
1
4
2
3
2
1
2
3
3-Zimmer
3-Zimmer
3-Zimmer
5-Zimmer groß Ebene 2
3-Zimmer
3-Zimmer
5-Zimmer groß Ebene 2
3-Zimmer
5-Zimmer groß Ebene 1
3-Zimmer
5-Zimmer groß Ebene 1
2
3
1
1
2
1
1
1
1
OG 2
3
2
3
1
1
OG 2 3-Zimmer
5-Zimmer groß Ebene 1
2
1
1
M 1:200
1
M 1:200
G01 M 1:200
5
2
3
1
2
2
3
2
3
1
3
5
5
2
3
1
2
3-Zimmer
3-Zimmer
3-Zimmer
5-Zimmer groß Ebene 3
3-Zimmer
3-Zimmer
5-Zimmer groß Ebene 3
3-Zimmer
3-Zimmer
5-Zimmer groß Ebene 3
3 2
3
1
2
3-Zimmer
5-Zimmer klein Ebene 1
5-Zimmer klein Ebene 1
5-Zimmer klein Ebene 1
5-Zimmer klein Ebene 1
5-Zimmer klein Ebene 1
5-Zimmer klein Ebene 1
2
3
3
5-Zimmer klein Ebene 1
5-Zimmer klein Ebene 1
2
3
2
3
2
2
2
M 1:200
2
2
M 1:200
2
M 1:200
M 1:200
OG 3 3
OG 3
3
OG 3 3
OG 3
3
3
SN4 5-Zimmer klein Ebene 1
1
1 2
1 2
1
3
1
1 2
1 2
1
3
5-Zimmer klein Ebene 1
3-Zimmer-WG Ebene 1 + Eingang
5-Zimmer klein Ebene 1
5-Zimmer klein Ebene 1
5-Zimmer klein Ebene 1
5-Zimmer groß Ebene 2
1
1
5-Zimmer klein Ebene 2
5-Zimmer klein Ebene 2
5-Zimmer klein Ebene 1
5-Zimmer klein Ebene 2
5-Zimmer klein Ebene 2
5-Zimmer groß Ebene 2 3-Zimmer-WG Ebene 1 + Eingang
5-Zimmer klein Ebene 1
5-Zimmer klein Ebene 1
5-Zimmer klein Ebene 1
5-Zimmer groß 3-Zimmer-WG Ebene 2 Ebene 1 + Eingang
5-Zimmer klein Ebene 1
5-Zimmer klein Ebene 1
5-Zimmer klein Ebene 1
3-Zimmer-WG Ebene 1 + Eingang
5-Zimmer groß Ebene 2
5-Zimmer klein Ebene 1
5-Zimmer klein Ebene 1
5-Zimmer klein Ebene 1
3-Zimmer-WG Ebene 1 + Eingang
1
1 2
1 2
1
3
1 2
1 2
1
3
1 2
1
5
5
4 4
5
5
5
4
5
OG 4 4
5
5
5
OG 4 4 4
5
5
4
4
5
5
5
4 4
5
4
M 1:200
4
4
5
M 1:200
4
M 1:200
4
M 1:200
5
5
4
4
3
1 1
5
Ebene 2
5-Zimmer groß Ebene 2
5-Zimmer groß Ebene 2
2
3
2
3
3
2
4
1
1
2
2
Ebene 2
5-Zimmer groß Ebene 2
5-Zimmer klein Ebene 1
5-Zimmer groß Ebene 2
3-Zimmer-WG Ebene 3
5-Zimmer groß Ebene 2
groß Ebene 3
5-Zimmer groß Ebene 3
OG 6 M 1:200
5-Zimmer groß Ebene 3
5
5
4
5
5
4
3
3
groß Ebene 3
5-Zimmer groß Ebene 3
3-Zimmer-WG Ebene 4
5-Zimmer groß Ebene 3
5-Zimmer klein Ebene 2
272727
4
Baufeld 84a1 - frei finanziertes Wohnen 5-Zimmer klein Ebene 2
5-Zimmer groß Ebene 1
5-Zimmer klein Ebene 2 5-Zimmer groß Ebene 1
5-Zimmer groß Ebene 1
5-Zimmer klein Ebene 2 5-Zimmer groß Ebene 1 5-Zimmer groß Ebene 3 3-Zimmer-WG Ebene 2
5-Zimmer groß Ebene 2
5-Zimmer groß Ebene 2
5-Zimmer groß Ebene 2
5-Zimmer groß Ebene 2
5-Zimmer groß Ebene 2
2
3
G06
2
2
G05 3
3
2
5Zi.
5Zi.
5Zi.
4
1
NIVEAU +4 INTERNE PASSAGE
ACCESS LEVEL
G04
2
3
G06
2
G05
3
G03
3
G04
2
SICHERHEITS TREPPENHAUS
5Zi.
5Zi.
3Zi.
1
2
2
4
1
NIVEAU +4 INTERNE PASSAGE
ACCESS LEVEL
2
3
2
2
2
3Zi.
5Zi.
1
2
2
4
1
5-Zimmer groß Ebene 2
5-Zimmer klein Ebene 1
5-Zimmer groß Ebene 2
3-Zimmer-WG Ebene 3
5-Zimmer groß Ebene 2
SICHERHEITS TREPPENHAUS
5Zi. M 1:200
1
2
4
1
NIVEAU +4
5-Zimmer groß Ebene 2
5-Zimmer klein Ebene 1
5-Zimmer groß Ebene 2
5-Zimmer groß 3-Zimmer-WG Ebene 2 Ebene 3
1
2
2
4
1
5-Zimmer groß Ebene 2
5-Zimmer klein Ebene 1
5-Zimmer groß Ebene 2 3-Zimmer-WG Ebene 3
5-Zimmer groß Ebene 2
5-Zimmer groß Ebene 2
5-Zimmer klein Ebene 1
5-Zimmer groß Ebene 3
5-Zimmer groß Ebene 3
5-Zimmer groß Ebene 3
5-Zimmer groß Ebene 3
5-Zimmer groß Ebene 3
5
5
5
5
4
5
4
5
OG 6 M 1:200
5-Zimmer groß Ebene 3
5-Zimmer groß Ebene 3
3-Zimmer-WG Ebene 3
5-Zimmer klein Ebene 1
3-Zimmer-WG Ebene 3
5-Zimmer groß Ebene 2
5-Zimmer groß Ebene 2
5-Zimmer groß Ebene 2
1
2
5-Zimmer groß Ebene 2
5
5
4
5
4
3
5-Zimmer groß Ebene 3
5-Zimmer groß Ebene 3
5-Zimmer groß 3-Zimmer-WG Ebene 3 Ebene 4
5-Zimmer klein Ebene 2
272727
3
TOWNHAUS 5Zi.
4
5Zi.
4
5-Zimmer groß Ebene 3
5-Zimmer groß Ebene 3
5-Zimmer klein Ebene 2
272727
5-Zimmer groß Ebene 3 3-Zimmer-WG Ebene 4
TOWNHAUS 5Zi.3
4
5-Zimmer groß Ebene 3
WG3TURM TOWNHAUS 3Zi. 5Zi.
5Zi.
5Zi.
5Zi.
4
4
5-Zimmer groß Ebene 3
5-Zimmer klein Ebene 2
272727
3-Zimmer-WG Ebene 4
5-Zimmer groß Ebene 3
TOWNHAUS FLUG 5Zi. 3TREPPE
3Zi.
5-Zimmer groß Ebene 3
WG TURM 3 3Zi. 3Zi.TOWNHAUS 5Zi.
OG 6 M 1:200 5Zi.
5
5-Zimmer groß Ebene 3
4
5
5
5
5
EINGANG
4
5Zi.
5Zi.
3Zi.
4
5Zi.
5-Zimmer groß Ebene 3
4
4
WG TURM
3Zi.
5-Zimmer klein Ebene 2
5-Zimmer groß Ebene 3
5-Zimmer groß Ebene 3
3Zi. GARTEN TOWNHAUS MAISONETTE 5Zi. 5Zi. FLUG TREPPE
3Zi. 5Zi. GARTEN MAISONETTE 5Zi.
5-Zimmer groß Ebene 3
3-Zimmer-WG Ebene 4
5-Zimmer groß Ebene 3
TOWNHAUS FLUG TREPPE 3 5Zi.
3Zi.
3Zi.
TOWNHAUS 3 TURM 3Zi.WG 5Zi. 3Zi. TOWNHAUS 5Zi.
OG 6 M 1:200 5Zi.
5-Zimmer groß Ebene 3
5
frei finanziertes Wohnen
2
5
OG 5 M 1:200 Baufeld 84a1 - frei finanziertes Wohnen
5-Zimmer groß Ebene 1
5-Zimmer groß Ebene 1 5-Zimmer klein Ebene 2
5-Zimmer groß Ebene 1
G06 G02 G05
3
ACCESS LEVEL
3
G03
5-Zimmer groß Ebene 2
5-Zimmer groß Ebene 2
3
2
3
3
G03 OG 5 G01 G04
2
3Zi. ACCESS LEVEL
2
3
2
3
5-Zimmer groß Ebene 2
2
5-Zimmer groß Ebene 2
TOWNHAUS 3Zi. G03 5Zi. 3Zi. TOWNHAUS 5Zi. Freifinanziertes Gebäudeorganization 5Zi. 5Zi. OG 5 MSICHERHEITS 1:200 OG 6 M 1:200 5Zi. TREPPENHAUS
3
INTERNE PASSAGE EG G06 SICHERHEITS5Zi. TREPPENHAUS G02 G05 3Zi. GZW
5-Zimmer groß Ebene 2
5-Zimmer groß Ebene 2
G06 G02 G05 GZW
NIVEAU +4 INTERNE PASSAGE
OG 5 M 1:200 SICHERHEITS TREPPENHAUS Baufeld 84a1 G01 G04 3Zi.
5-Zimmer groß Ebene 1
5-Zimmer groß Ebene 3 3-Zimmer-WG Ebene 2
5-Zimmer groß Ebene 1
5-Zimmer klein Ebene 2
5-Zimmer groß Ebene 1
5-Zimmer groß Ebene 1
5-Zimmer groß 3-Zimmer-WG Ebene 3 2 Ebene
5-Zimmer groß Ebene 1
5-Zimmer klein Ebene 2
5-Zimmer groß Ebene 1
5-Zimmer groß Ebene 1
5-Zimmer 3-Zimmer-WG groß Ebene 2 Ebene 3
4
3
5
OG 5 M 1:200 OG 6 MWohnen 1:200 Baufeld 84a1 - frei finanziertes
5-Zimmer groß Ebene 1
5-Zimmer groß 3-Zimmer-WG Ebene 3 Ebene 2
4
3
1 1
4
3
1 1
5
OG 5 M 1:200 OG 6 MWohnen 1:200 Baufeld 84a1 - frei finanziertes
5-Zimmer groß Ebene 1
3-Zimmer-WG Ebene 2
4
3
1 1
5
5
1
Axiomatic View
4
3
1 1
5
M 1:500 OG 4 M 1:200 5-Zimmer klein Ebene 2
5-Zimmer klein Ebene 2
OG 4 5-Zimmer klein Ebene 2
5-Zimmer klein Ebene 2
OG 4
5-Zimmer klein Ebene 2
5-Zimmer klein Ebene 2
5-Zimmer klein Ebene 2
SN5
G02 G04 G06
M 1:200
M 1:200
3
M 1:200 M 1:200
3
4
2
SN3
OG 2
SN5 SN4
G01 G03 G05
1
1
1
1
1
3
M 1:200 3-Zimmer
SN3
GZW G02 G06 G04
2
3
2
SN2
M 1:200
SN2 SN1
EG G01 G05 G03
3-Zimmer
3-Zimmer
3
1
OG 1
EG
GZW G04 G02 G06
5
5-Zimmer groß Ebene 2
5-Zimmer groß Ebene 2
5-Zimmer groß Ebene 2 5-Zimmer groß Ebene 1
M 1:200 5-Zimmer groß Ebene 2
GZW
EGG03 G01 G05
GZW G02 G04G06
LUFT
EG G01 G03 G05
LUFT
4
5
5
Diagramm Nutzungsverteilung OG 1 GZW G02G04
EG G01G03 2
LUFT LUFT
4
Diagramm Nutzungsverteilung LUFT
G03
SN1
Diagramm Nutzungsverteilung
4
LUFT
4 LUFT
1
LUFT
G05
Zwischengeschoss GZW G02
G02
G02 GZW G04 G06
G01 G03 EG G05
G04
Diagramm Nutzungsverteilung
G06
12.
NEW GOETHE SCHOOL
MARL 2020
Hausanschluss
2BA
2BA ANLIEFERUNG
13.
MÜLL
THE BLACK CAT THEATRE
DORTMUND 2020
Perspective View from Street
© bolles+wilson
B-B
+18,90 m +113,04 m ü .NN +21,96 m +116,10 m ü .NN
6-07 Technik
B-B
14.
B-B
B-B
6-07 Technik
+25,02 m +119,16 m ü .NN
B-B
B-B
B-B
4-8 Proberaum 2
+15,12 m +109,26 m ü .NN
TECHNICAL DRAWINGS 4-05.02
MUENSTER 2019-2020
A-A
4-05.01
Workshop Raum 2
Workshop Raum 1
Große Dachterrasse
C-C
A-A
C-C
A-A
C-C
wooden roof Holzbau-Dachgeschoss Dachgeschoss-Konstruktion (Workshop-Bereich) in leichter BRETTSPERRHOLZ-Bauweise mit robusten sichtbaren Oberflächen , Ausführung der Dachdeckung des Pultdaches als hinterlüftete , metallische Stehfalz-Deckung,Wandbekleidung: WDVS z.B. auf Basis von Weichfaserplatte aus Holz.
suspended Abhangdecken ceilings Nur wo erforderlich: Akustisch wirksame Abhangdecken-Konstruktion mit integrierter Beleuchtung. Leitungsgebundene Zu- und Abluft oberhalb der Abhangdecken mit zentraler
WÄRMERÜCKGEWINNUNG
4-05.02 Workshop Raum 2
main roof Hauptdach Warmdach mit extensiver DACHBEGRÜNUNG zum Regenwasserrückhalt , zur Abflussverzögerung und Speicherung. Durch verschiedenste Pflanzen, Sedum und Gräser , vegetationsfreie Bereiche mit Sandlinsen und Grobkiesflächen , Totholzhaufen und Insekten-Nisthilfen wird ein Maximum an Biodiversität geschaffen. Auf dem Flachdach-Teil des Workshop-Bereichs zusätzliche Anordnung von FOTOVOLTAIK -Paneelen zur main roof Energiegewinnung. ®AIR® outside panelsOF Außenwand - MADEMADE OF AIR
6-01.01
Hinterlüftete Außenwandverkleidung aus CO2-negativen Fassadenpaneelen aus der Carbon-Capture-Industrie, z.B. System made of air® , mit vertikaler Profilierung wie im Bildausschnitt unten gezeigt, Mineralische Wärmedämmung , Stahlbeton-Rohbau, 3 Licht-Features mit Light-Box-Technik auf der Süd-West-Fassade oberhalb der Eingangsfassade.
Kulissenlager
supported Tragsystem system 2-04 Front-ofHouse Hauptbühne
Haupt-Träger in Längsrichtung in den Wandscheiben beiderseits des Zuschauerraums und der Hauptbühne , mit Auskragung bis zur Fassade, nachhaltige HOLZ-HYBRIDDECKENKONSTRUKTION mit Querträgern z.B. aus Bau-Buche oberhalb des Zuschauerraums mit daraufstehenden Stützen im Lagerbereich, gewichtssparende Hohlraumplatten mit 14 m Spannweite unterhalb der Zuschauertribüne Skulptural frei-stehende V-Stützen im Lobbybereich, zur Lastabtragung aus den Hauptträgern .
non load bearing Nicht-tragende Wände wall 1-01 Foyer Hauptbühne Unten
Wo sinnvoll: vorgefertigte modulare BRETTSPERRHOLZ-Wandbauteile zwischen tragenden Rohbau-Elementen; dadurch hohe Flexibilität und Anpassbarkeit bei gleichzeitiger, nachhaltiger Ressourcen-Schonung
T H E
beam facade Pfosten-Riegel-Fassade Pfosten-Riegel-Fassade aus schlanken, vollständig recyclebaren Aluminiumprofilen, sowie DREIFACHVERGLASUNG entsprechend den höchsten Anforderungen an den sommer- und winterlichen Wärmeschutz.
window Fenster
1-01 Eingangs-Foyer
Hochwärmegedämmte Fenster, wo erforderlich mit außenliegendem, in die Fassade integriertem, individuell regelbarem SONNENSCHUTZ als Lamellen-Raffstore mit Tageslichtsteuerung im oberen Drittel. Öffnung der Fenster zur Reinigung von innen, sowie zur individuellen nutzerabhängigen FRISCHLUFTZUFUHR.
B L A C K
C
Lightweight roof Main roof A53 A49
Exterior-wall with vertical wood cladding weiĂ&#x; (RGB 237.235.225), grau (RGB 179.162.143), rosa (RGB 216.189.184) und farblos (sichtbarer Holzfarbton).
A20
Reveal surface
Sekretariat
A28 Lager
Post and beam facade Flat outside wall with core insulation
L4
BĂźro OGS
Window with sun protection Floor construction
A67
Suspended ceilings A13
A27 Lager
A20
Sekretariat
Non-load-bearing partitions
Detailed Technical Drawing + 11,67
membrane roof
18
18
66
2%
66
48
48
2%
2%
2%
19
19
6 15
sun protection
6 15
72
31
31
7
7
72
membrane roof 3,03
3,10
3,03
3,10
cantilevered parts lightweight walls + 7,20
reinforced concrete ceilings energy-saving LED lights opening windows
+ 7,20 11 31
11 42
31
46
46
7
7
3,18
42
3,18
2,64
2,64
brick facade glazed windows + 3,60
+ 3,60 11 30
suspended ceiling
cassette ceiling with integrated building equipment
65
11 41
30
65
69
4
4
68
68
62
curtain wall made of fibre panels with printing + 0,00
Detailed Technical Drawing
underfloor heating
41
69
62
2,50
2,50
1,20
1,20
+ 0,00 20
40
20
77
40
12
12
5
5
77
The construction drawing was developed for Urban Loft Hotel in Cologne which is under the construction now. All the detailed drawings are produced under the senior architect’s cooperation and supervision at Bolles + Wilson.
Fin.
Sijie Lyu ziyilyu@outlook.com student no. 20121107