Lyu sample Portfolio

Page 1

SIJIE LYU Application for MArch Architecture ARB/RIBA Part 2 Student Number 20121107


TABLE OF CONTENTS


01. 02.

Third year project: Ark 01 02 Degree Sshow model E C T I Ocollage N CONCEPT

M AT E R I A L I T Y

03

EXPERIENCE

01

04

MODULARITY

05

10 03.

Live project: Eco-store for LVMH

04.

Second year project: Urban room

11

Retail

Wo r k s h o p

18

05.

Live installation: making the city

06.

Live installation: Cycle Cross

21 2 7 2 7 2 7

MÖNCHENGLADBACH RATHAUS DER ZUKUNFT

22

STÄDTEBAU Das Vorhaben, ein neues Rathaus für Mönchengladbach im Stadtteil Rheydt zu errichten, bringt die Chance, das städtische Ensemble Rathaus / Marktplatz / Evangelische Hauptkirche konzeptionell neu zu fassen. Der Akt eines morphologischen Eingriffs führt hier zu einem vergrößerten Marktplatz und zur räumlichen Befreiung des historischen Rathauses in die Form des Solitärs (Poskarte aus dem 19. Jahrhundert). Kombiniert mit der Funktion des Konferenzzentrums wird das historische Rathaus jetzt zum Hauptdarsteller auf einer städtebaulichen Bühne (siehe Skizze unten). Es zeugt vom städtischen Leben, auch im Sinne der städtischen Vergangenheit und Zukunft, vor dem Bühnenbild einer großen, geschwungenen Kolonade aus Holzleimbindern. Diese Kolonade bildet eine promenade architecturale zu Stadtsparkasse, Statdteilbibliothek, Bistro und Servicezentrum / Front Office. Das Teilgrundstück der zur Zeit bestehenden Stadtsparkasse wird ebenfalls in städebaulich-morphologischem Maßstab umgestaltet. Hier wird ein nachhaltiges Stellplatz-Konzept in Form von 5 Paternoster-Parktürmen zum städtischen Schauspiel – mit 200 Autos auf minimaler Grundfläche. Diese Parkplätze für Angestellte der Stadtverwaltung sind ausgerüstet mit Elektro-Ladestationen, die von der Photovoltaik-Anlage auf dem Rathaus gespeist werden. Die Vision dahinter ist eine Stadtverwaltung die auf 100% Elektromobilität setzt. Die Paternoster-Parktürme haben eine geringe Masse (Stahlskelett mit Polykarbonat-Fassadenplatten), sind leicht in die Einzelteile zelegbar und lassen sich recyclen, wenn der innerstädtische, ruhende Verkehr eines Tages keine Rolle mehr spielt (entsprechend dem Cradle-to-Cradle-Prinzip). In der Marktstraße, im Sockelgeschoss unter den Parktürmen, befindet sich der öffentliche Teil des Sozialen Rathauses – FB 39, FB 58 und FB53 (diskret von der Rückseite erreichbar). Darüber bietet eine Café-Terrasse die Möglichkeit sich zu setzen und eine Tasse Kaffee unter einem dem Blätterdach von Platanen zu trinken. Ein behutsamer städtebaulicher Eingriff Die Nord-Ost-Ecke des Karstadt-Gebäudes wird leicht zurückgenommen, um die Fassade des neuen Rathausplatzes an der westlichen Gebäudekante des Markplatzes auszurichten. Die daduch bedingte Reduktion der Einzelhandelsflächen um 470 m2 wird kompensiert durch den Zugewinn von 770 m2 im Zuge einer Verlägerung des Karstadtgebäudes nach Norden (283 m2) und nach Süden (548 m2). Karstadt bekommt außerdem einen prominenten, neuen Eingang direkt vom Markplatz (sowie z.B. eine Bratwurstbude mit Außenverkauf in Richtung ‚Mall’ zwischen Rathausplatz und Stresemannstraße).

07.

German model-making skill

08.

Future town hall

Education quarter

10.

Fundo Moray centre

S ALLGEMEINES RATHAUS

TECH

SERVICEZENTRUM

EINZE

BISTROT

KONFERENZZ BISTROT

FUNKTIONALE AUFTEILUNG

STADTSPARKASSE

23

28

29

11.

Off-Grid Dwelling

12.

New Goethe school

POS

EINZE

25

09.

STEL

SANI SOZIA

31

33

Das Soziale Rathaus (4. und 5. Obergeschoss) und das Rathaus (2. und 3. Obergeschoss) befinden sich direkt o bestehenden Einzelhandelsflächen – eingebettet baumbestandenen Dachgarten (Robinia pseudoacacia etc.). Das allgemeine Rathaus befindet sich auf den Geschossen 2 oberhalb des Servicezentrums, welches von der Kolonadense der Mall aus für die Öffentlichkeit zugägnlich ist. Die Stadtsparkasse und die Stadtteilbibliothek schließen sich i im Gebäudeflügel zwischen neuem Rathausplatz und Limitenst


PART 1. LONDON 2015-2018

ACADEMIC DESIGN PROJECTS

Sample works of bachelor studies in Central Saint Martins : BA (Hons) Architecture 2015-2018



COMMERCIAL AREA commercial area

01.

GENTRIFICATION AREA gentrification area

YEAR 3 PROJECT- ARK: WATERFALL OF LIFE

Barbican Centre

Theshard Shard the

BRICK LANE 2017/2018

The theGherkin gherkin

Bricks Buildings brick buildings Graffiti Artists graffiti artists

Markets markets

Abandoned Buildings abandoned buildings

Visitors visitors

Street streetArtists artists Community Garden community gar& City Farm dens & city farms

Poor property Poor property

High-rise area High-rise area There are some official and commercial There are some official and commercial skyscrapers around the Aldgate East.

skyscrapers around the Aldgate East.

Working Class people live in Council

Working people live in educated. Council House,Class most of them are less House, most of them are less educated.

Gentrification Area Gentrification Area There are many retail stores in Brick lane

There areismany retail stores in Brick lane and there a perfect place for arts. and there is a perfect place for arts.

First Impression

activity points in Nomadic Community garden

movable toilets 1.5m*1.5m*2m*4

boat with slide accommodate 10 kids

mobile plants bed 1m*1m*2m

para-carnival dome 6m*6.7m*3.5m

fire place 2.5m*1m*1.2m

green house 1.5m*3m*2m

cafe and offices

Hackney City Farm A range of farm animals and a beautiful organic garden. An award winning cafe opens every day except Monday. Volunteer programmes and regular evening and weekend activities, including upholstery, cycle maintenance, pottery and eco-living courses.

volunteering hire space shop

picnic holiday cafe

eco-area animals wildlife

accessible toilets incubator

Spaitalfields City Farm For all ages and abilities, including volunteering opportunities, environmental education, young farmers’ group, food growing, fresh farm produce, friendly animals, tranquil gardens, a mobile farm service and Eco-Chic market.

volunteering hire space shop

picnic play activity

roving cafe and truck 6m*3m*2.5m

mobile animals wildlife

accessible toilets

wildlife and animals

anim


First Impression of Site: Contrast

Commercial District Vs. Gentrification District When the first time I visited the site, firstly, I went to the Barbican centre area, there are lots of commercial and office high-rise, and when I walk around more, the building heights getting smaller. It turned to an multi-culture area full of artistic atmosphere.

Conclusion There are strong contrast atmosphere in my site. I want to make my building in the similar way, to make it more eye-contracted.

Timeline of Immigration establishment & accessibility

garden areas

communication areas

education programme

users in Nomadic Community garden

gardeners/ local

graffiti artists

musicians/ actors

students/ kids

homeless/ unemployed

visitors

cafe owners

painters/ sculptors

people from local people market

volunteers

managers

farm shop and fish restaurant

storage

animal houses

mal padlocks

City Farms Studies


Ark is a radical proposal to bring the entire gamut of natural, animal, plant, pleasure and food-based processes and experiences back into the hearts of the city, and onto the skyline for everyone, in the most spectacular fashion possible. From petting zoos, to farmer’s markets, allotments, flowers markets, barbarisms, slaughterhouses, community centres, pet centres, aquariums, veterinary clinics, playgrounds, educational areas, its all here, working with, and accelerating tendencies already existing in the local area, with its thriving small group of community farms and allotments. The form of the tower is a triumphant return to the stimulating image of the hanging garden of Babylon, the tower of Babel, the Colosseum and Roman Aqueducts, forms that speak of ambition, endurance and pride in communal infrastructure, as well as hinting at the romance of nature, decay and ruins. The tower has been carefully crafted through an intense technical exploration of the flow of water (the building is a spiralling aqueduct, with water flowing to all parts from a reservoir-pond at the summit) and the material strength of concrete and masonry.

Aqueduct

Arches

Spirals

Animals and Plants

Concept Collage

Main Design Elements


green spaces tower hamlet borough markets communities primary schools public gardens city farm/ gardens

I want to plug in to an existing network of small green spaces throughout the area, and amplify them.

Public Facilities

First Collage Model

Internal View


Axiomatic View of the Ark


Final SchemeKey Plan: Gardens 1:150

Final SchemeKey Plan: Vertical Farm 1:150

Developmen tural Elemen and Compos Strategies

Water canal view water canal view

Lower down garden lower down garden

Get Inspiratio metre model, concept into press my bas use some ele and fit them i

Element 1: Garden Ladder 1. garden ladder

Element 2: Plants around the 2. plants type Tower and Hanging Garden Pots

3: Garden Windows 3.Element garden winone dows

4. garden windows

Element 4: Garden Windows two

5: Ground Floor 5.Element ground Landscape one landscape

Element 6: Market Shop 6. market shop Space

7: Ground Floor 7.Element ground Landscape two landscape

Arches View arches forest

Looking Outside from Arch view from arch Windows windows

Garden Facilities garden facilities

Inside Garden Space: Picnic picnic area Area

shops marketMarket shops

Groundmarkets Floor Market Landopen scape

Roof Top 8. Element roof 8:top

Exploded Axos and Users

Arch arch

Spiral spiral

spiral

Exploded Axos and Users

arch

Spiral spiral

Smart Animals Plants

Vertical Farm

Visitors

aqueduct Aqueduct Ramp ramp Cafe cafe

Balcony balcony

Toilets toilet

Reception reception

storage Stroage

lift Hand Wash Area hand wash area Lift

cafe

In middle of the building. The farm feed the various of animals such as sheep, donkey, chicken, pig and small animals. As a farm, it also helps people learning about the food, nature and environments. The farm setting inspires children and adults to participate in our courses, workshops and lessons and leave with new knowledge, friendships and inspiration. We also receive the school visiting, for children, they can learn knowledge of animals through education programme. For adults, they feed the animals in the farm to share knowledge and skills, build relations and care for their environment. In addition, the farm is home to a hive of bees, which we adopted last year. Farm volunteers would train in bee-keeping and harvest the honey.

aqueduct ramp

Teenager & Kids

storage

court yard

Cafe Locals

reception first aid

education space Education Space

balcony

Reception reception

lift

picnic garden

Picnic area

Animals

Shops shops

Play facilities

Cafe

Wildlife Area Accessible

Artists

Toilets Incubator for schools Mobile farm/garden Play facilities

Plans, Concept Drawing, Axiomatic Drawings Play area

Ma

Sustainable building Animals

Toilets

Mobile farm/garden

Fashi

Shop

Holiday activities

Garden Staff

Wildlife Area

Incubator for schools

picnic/eating Picnic Area/Eating Area

Picnic area

education

Accessible

Animal House animal houses

Garden Staff

Visito

Community soace for hire Locals

Holiday activities Sustainable building

Mobil

toilet

It provides education, trainingToilets on farm and garden techniques. We run practical courses to training the employment and refugees to maintain the farm and gardens also the cookStroage ing skills. We are also able to host corporate volunteers, giving them a fun day out learning how to weed and build pallet furniture. In addition, it is a place which can give opportunity for children to learn about animals and plants when they have the special educational programme in the garden and farm. Also, for the adults to communicate with different people. It creates not only the biological diversity of an area but its social diversity too.

Volunteering

Community soace for hire Shop

As the plants need the daylight for photosynthesis. Would on the top of the buildings. There is a truly universal language in growing food. It’s a lively, functioning community space that offers a range of activities, which is cross-cultural, pan-religious activity done by all ages and genders. Garden is enabling local residents to re-establish their communities, to learn new skills, discover new interests and new purposes.

storage

Lift lift

Users:

Arch arch

Garden:

Education centre: Visitors

Teenager & Kids

Volunteering

Element 9: Pipe Transfer Element 10: Pipe Garden 9. pipe transfer 10. pipe garden Water water

Play area

Art


SuperSection


group helix ramps +arches curved arches Group1: 1: Helix ramps + Curved

Ramps with flat floors ramps with flat floors

22

11

Slope arches + Ramps flat floors slope arches + with ramps with flat floors

Form Fin

sections Sections:

33

Curved arches + slope + floors (also curved arches slope ramps) floors (also ramps)

1

flat floor with ramps surrounded

1

2

sloped floor with ramps surrounded

2

3

3

sloped floor with central lighting space

group Conical + Curved arches Group 2: 2: Conical spiral +spiral Curved arches

Arch Studies and Material Testing Models 44

Curved arches + Conical

Curved arches +

Curved arches + Conical spiral ramps

55

Curved arches + Conical ramps with

ramps with flat floors with flat floors H Conical slope floors ramps with G spiral

F

slope floors

66

Curved arches with long Curved arches with long columns+ columns+ ramps Conical rampsConical with slope floors I with slope floors

4

4

3+7 3+7 Combine and 7totoCombine 3 and37 together test different types of spiral gether to test different types of spiral

Straight arches +Revolving Straight arches +Revolving ramps with flat square floors ramps with flat square floors

5

sloped floor with cone shape

flat floor with cone shape

6

6

sloped floor with columns

A. Wood test model 1 B. Wood test model 2 C. Wood rest model develop D. Preprepared for casting mould E. Silicone casting mould F. plaster casting model G. For ware canal casting H.Brick testing model 1 I. Brick testing model 2

Group 3:3: Square form and stacking different types group Square form and stacking different types

77

5

2+5 2+5 7 Combine 2 5and 5 together squared shape with Combine 2 and together to test quality todifferent test spatial different spatial spiral ramps quality

7

Bringing all my models together, I create 3+7 an architectural language of arched 2+5 forms 2+5 3+7 3 combination of 2 combination for my of tower. and 5 and 7

Conclusion:

After making models, I hav combine with spatial quality

I explored through modelling the spatial implications of combining I explored through modelling the spatial implications of combining various arched shapes. various arched shapes.

+

=

1

Groin vaults groin vaults

=

+

Planar arched space 2 planar arched space The columns fits on a straight vertical line

+

=

Varying vault spans 3 varing vault spans

=

+

Pointed arches 4 pointed arches

+

=

Typology Experimentation

Columns+ extruded arches 5 columns + extruded

arches

A

B

C

D

E

F

G

H

I

Material Testing


natural pond natural pond waterfall tall trees

waterfall forest

community

community cafe vertical farm office

education & offices vertical farm

education

education & offices

markets

markets

reception natural car parkpond

reception square & fountain car park & plants allotments

Programme Kits

natural pond

waterfall cloud wall

skating

garden

farm

market

open market & performance

Programme Diagram


02.

London 2018

DEGREE SHOW MODEL


2

M AT E R I A L I T Y

03.

03

04

EXPERIENCE

MODULARITY

01

U T C O M E S

06

STORE DESIGN

CONCEPT

02

M AT E R I A L I T Y

E N V I R O N M E N TA L

03

EXPERIENCE

U P C Y C LLVMH I N G YEAR 3 LIVE PROJECTECO-STORE

F O R E S S O

04

MODULARITY

05

C O N C E P T S T O R E

PARIS 2017/2018

F O R E S S O

05

L V M H

R U B B E R

G L A S S

L E A T H E R

L E A T H E R

0 4

D E N I M

D E N I M

N I K E

V I N Y L

R U B B E R

U P C Y C L I N G

R E C Y C L E D

A L U M I N I U M

N A

C H I -

B I O

M A R B L E

C A R D B O A R D W A L L

T R I P T Y C H

0 5

03

M AT E R I A L I T Y L U C E N T I A

L U C E N T I A D E S I G N

S O L I D

M AT E R I A L I T Y D E S I G N

01

CONCEPT

04

EXPERIENCE S O L I D

W O O L

03

O R G A N O I D

W O O L

EXPERIENCE

02

M AT E R I A L I T Y

03

05 Up-cycled Outcomes MODULARITY

S T O N E C Y C L I N G

04

EXPERIENCE

T R A S H P R E S S O

MODULARITY

04

MODULARITY

06Research Materiality

STORE DESIGN

S T O N E C Y C L I N G

05

05

01

STORE DESIGN

STORE DESIGN

02

CONCEPT E N V I R O N M E N TA L

06

ENVIRONM

06

ENVIRON

M AT E R I A L I T Y

S t o r y b o a r d

S t o r y b o a r d

Concept Store

Group Members Sijie Lily Max

1

1.

2

2.

3

3.

7

8

03


Luxury Meet Waste “So while consumerism is the love of buying things, materialism is the love of the things themselves”, LVMH is sustainable as items are precious possessions that are passed on from one generation to another, reflecting longevity in contrast to a throw away/fast economy.

longevity workshop/seasonal events/repair/reuse products

layering materials, creating new walls, floors and ceilings

Our project picks up on these qualities and translates it into a piece of architecture, that reuses, gives life to LVMH by-products, prolonging LVMH’s concept of longevity. We are proposing a circular economy where unique and rare materials are saved from being disposed of and up-cycled, crafted into new materials that from sculptural pieces of the store design.

framework for concept transit over time, waste materials are given a new life

framing activities, processes and materials

040404

E XN PC EE NCE RP IE EEX E R IEEERNI C

050505

D UYRL IATRYI T Y M O DMUOLM AO RL IT D U A

concept “slow” for fast city person

EN VOIEN RNM OTN M E N VEI R AN L TEANLT A L NO V INRM E 060606 CONCEPT 01 02

OSR S T O SRTEOSD IE G RTEE D EN SDIEGSNI G N

designing resting points, for discovering the space through the senses M AT E R I A L I T Y

03

EXPERIENCE

04

MODULARITY

05

S t o r y b o a r d

Storyboard 9 9 9

10 10 10

4

5

6


CONCEPT

02

M AT E R I A L I T Y

03

EXPERIENCE

04

MODULARITY

05

STORE DESIGN

06

E N D A R

7

B r a n d s

S e a s o n a l W o r k s h o p s C r a f t m a n s h i p M e t h o d s C o m p r e s s i o n

M e l t i n g

A f t e r L i f e

M i n i

P o p

U p

S t o r e s

C o m m u n i c a t i o n

T o o l

B a k i n g

W e a v i n g

S t o r e

D o n a t i o n L a b s

t o

M a t e r i a l

Calendar Diagram: Spring to Winter

Modularity: Lego Layout

ENVIRONME


View of Interior

The framework creates windows, framing views, brands and materials. Each becoming a portrait of its own. One transitions from an open plan retail space, to the curiosities of the workshop and to the refill bar where a retail experience becomes more of a social event and conversations about reuse, up-cycling and material innovations.

View of Facade


M AT E R I A L I T Y

03

EXPERIENCE

Workshop Level View


04

MODULARITY

05

STORE DESI

Berluti Display

Section with Interior Layout


03 03

A A LT IETRYI A L I T Y

04 04

E X P E REI E XN PC ER EIENCE

First Floor Plan

05 05

M O DPerspective U LMAORDI T UYL A View R I T YLooking Into S T O R ESD T

Workshop

Ground Floor Plan


04.

YEAR 2 PROJECT- URBAN ROOM

TRINITY BUOY WHARF 2016/2017 Trinity House set up an engineering establishment at Trinity buoy wharf to repair and test the new iron buoys. Then coming into use. In 1875 works expanded westwards into the neighbouring property. The neighbouring building to the lighthouse is the chain and buoy store. Lots of artists like sculptor and painters working in the TWB, to create artistic and creative atmosphere in the site. As you can see, the arts work is established all around the site. It has became a place full of the atmosphere of arts. In the future, developer Ballymore wants to open up the water front and have agreed provisional terms with Thames Clippers for a new pier and service. And make more public space and in testing street activity space for the site. They will build some high-rise buildings in North Learmouth Peninsula, and some residential buildings in South Learmouth Peninsula. According to the site analysis, I decided to design a building including a medium-scale theatre, an open theatre, serious of galleries and a public square, which could provide a space for the artists living nearby and also the local people to spend leisure time.

Site Analysis


Public Facilities

Future Area Plan


Conceptual Drawing

Main Sections, Main Plans

View and Models


This is a theatre that are made by concrete and truss to provide a wide space.

There are office and corridor which are made of timber structure and glass.

These truss stricture are made by steel which are take from the existing buildings.

These part involve the reception, toilets, shops and staircase, which are comprised of concrete and glass.

The concrete performance space is open to the square.

This is a gallery that is made by concrete and glass.

The dark video room are made by concrete, no windows and no doors

The public coffee shop is comprised of concrete and steel frame with double glazing.

Above pictures show the structure of rised up space with timber structure and supported by columns.

Above photos show the interior and structure of the theatre, which include the roof truss and sound insulation covered by wood.

6

1, Timber Walls 2, Flat Timber Roof 3, Timber Joist Floor 4, Concrete External Wall 5, Backstage small walls 6, Concrete Roof 7, Warren Truss Structure 8, Concrete Floor 9, Concrete Staircase Floor 10, sound insulation with timber 11, Foundation 12, Columns 13, Double glazing frame

7

4

2

10

1

5

9

8 3

12

11

Section Model

This section model shows the closed theatre and back stage with corridor.


This structure shows the roof with the rooftop planting.

1 roof plants

2 waterproof 3 insulation 4 concrete structure

5 double glaze

6 windows frame

Solid timber floor section

wood-cement particleboard

1 timber joist

1 external concrete wall 2 internal concrete slab 3 insulation

4 waterproof layer

2 timber slab

4 insulation


05.

AAVS: MAKING THE CITY

CHENGDU 2016

‘Marking the City’ brought together students, architects and artists in a nineday program investigating contemporary methodologies for context-specific architectural design and materiality. The programme was hosted by ‘iBox’ which is a temporary cultural hub located in the centre of Chengdu, bringing together local, national and international boutique brands it offers a location for creative discourse to flourish. Constructing a pavilion here against the backdrop of the city of Chengdu offers the potential to engage locals, travellers, designers and the fashionable and invite them to interact. Recycling is a major tenet of industry; restricted by governments, lauded by environmentalists and adopted by the bourgeois as the focus for a sustainable future. In Architecture the world of recycling can provide another level of engagement, one of history and memory. The 2016 ‘Marking the City’ pavilion attempted to construct a space of memory; a pavilion developed through an idea of interaction with the city, resonating with memory of an industrial process, a manufacturing intent or a patina of former use. The pavilion engaged with the city, for use by the people of Chengdu, to view, to use, to climb, to touch, to dismantle and to simply observe. AAVS Director: Stewart Dodd Tutors: Jason Griffith Yang Yang Joan Lemos Wu Xiaofei Dyson Ray Lu Jeroen van Ameijde Yutao Song


06.

YEAR 1 INSTALLATION- BICYCLE OBSTACLES

CSM LONDON 2015 It is a project to set some obstacle for a cycling competition. We were divided into different group to take charge of different part of the competition. For our group, we designed a triangle shape obstacle. And another group designed a pyramid shape on the top. As you can see from the photos on the right, the participants went through it in the different ways,which is quite interesting for us. After the competition, the colour and the shape of the obstacle had been changed.

Group Members Sijie Lyu Sean Brown Peng He Shutong Lin


PART 2. MUENSTER 2019-2020

OFFICE WORK

Sample works during year-out in BOLLES+WILSON : Muenster, Germany 2019-2020


sketch by Peter Wilson Š bolles+wilson


07.

MODEL-MAKING AT BOLLES+WILSON

MUENSTER 2019


Š bolles+wilson


08.

FUTURE TOWN HALL

MOENCHENGLADBACH 2019

7/10

2 7 2 7 2 7

3/10

2 7 2 7 2 7

4/10

2 7 2 7 2 7

±0,00 m +55,40 m ü.NN

D-D

C-C

E-E ße

tstra

Mark

Karstadt m m +0,10 +0,10 m ü.NN m ü.NN +55,50+55,50

+1,10 m +56,50 m ü.NN

Mitarbeiter Sparkasse Wartelounge

Lager

k

Kios

ad

hrr

Fa

(1

G)

Lager

Catering

.U

es

ch nis s ch au Te ath ng R ga les Einozia S

-1,40 m +54,00 m ü.NN

Küche

+

+0,68 m +56,08 m ü.NN

-0,50 m +54,9 m ü.NN -1,90 m +53,50 m ü.NN

-0,10 m +55,30 m ü.NN

Beratung -0,50 m +54,90 m ü.NN

Bespr. 3 -0,50 m +54,90 m ü.NN

Brand M.Z. 00.0.0

A-A

tr.

on

sk

e

ng

ad

sk

Ka

ga

eratung + Erziehungsbologischer Dienst Schulpsych

tur

ulp

Sk

Zu tner

ör

Pf

+1,75 m +57,15 m ü.NN

amt

Gesundheits

-1,45 m +53,95 m ü.NN

Bespr. 4

Anlieferung

-0,50 m +54,90 m ü.NN

H.-Druckerei

SB-Foyer

Handakten

Sparkasse

Anlieferung chologischer

Bibliothek

Dienst

FB 40 | Schulpsy

H.-Druckerei Luft Untersuch.

-0,50 m +54,90 m ü.NN

ung Untersuch von Tieren

TG

f ho hn Ba

Leite

r

n pe up Gr

s.

fo

Sich.

Tee

1 ppe Gru

B-B

Bistro

Street View

Garderobe

umarkt

© bolles+wilson

Rückgabe

In

±0,00 m +55,40 m ü.NN

Luft

a4

Gruppe 2

Per

Frontoffice

-0,90 m +54,50 m ü.NN

Am Ne

raße

KiT

-1,37 m +54,03 m ü.NN

Har

Marktstraße

Harmoniest

B-B

-1,45 m +53,95 m ü.NN

Bistro

moniestraße

Limitenstraße

Material

Luft

Müll

Kopierer +

A-A

Luft

Info

+0,10 m +55,50 m ü.NN

Kop.

Auslage

Ber. Typ 2

-1,45 m +53,95 m ü.NN

Ausstellung

Mitarbeiter Rathaus

C-C

Karstadt

-0,90 m +54,50 m ü.NN

Fahrräder

Schauwerbe + FM

Mehrzw.-Saal

D-D

±0,00 m +55,40 m ü.NN

-0,40 m +55,00 m ü.NN

E-E ße

Stresemannstra Grundrisse

EG

M 1:200

+ 21,80 m

+ 21,25 m

+ 18,00 m

Stadtplatz Marktstraße Wasserspeicher mit Filterbecken

+ 17,75 m

+ 14,75 m

+ 14,20 m + 12,14 m

+ 11,75 m + 10,40 m

+ 8,32 m

+ 8,75 m

K A R S TA D T

SPA R K A SS E

+ 4,50 m

+ 4,50 m K A R S TA D T

K A R S TA D T

K A R S TA D T

K A R S TA D T

K A R S TA D T

K A R S TA D T

K A R S TA D T

K A R S TA D T

K A R S TA D T

K A R S TA D T

K A R S TA D T KARSTADT

+ 1,75 m

+ 0,68 m

± 0,00 m

- 2,20 m

Ansicht

Nord

+ 5,25 m R A T H A U S

Sparkasse

M 1:200

Konferenzzentrum/ Ratskeller

Allg. Rathaus/ Front Office

FAH R R A D

FAH R R A D

B-B

M 1:500

- 1,45 m

- 5,15 m

Karstadt

- 9,40 m

Mitarbeiter Soz./ Techn. Rathaus

Schnitt

FAH R R A D

Kaskade

Weg zum Bahnhof

Soz. Rathaus/ Photovoltaik Servicezentrum

KA R ST AD T

Ansicht

Süd

M 1:500

KiTa

KA R ST AD T

KA R ST AD T

KA R ST AD T

KA R ST AD T

KA R ST AD T

KA R ST AD T

KA R ST AD T

KA R ST AD T

Long Elevations

© bolles+wilson


3/5

2 7 2 7 2 7

nvielfalt

ät. Alle neuen Verbesserung

vielfalt vielfalt

n PV-Anlagen en erhöht die .. Alle neuen Alle erzeugt neuen umen erbesserung erbesserung tät dererzeugt in das

falt

situations- und

PV-Anlagen PV-Anlagen sräumen. ichkeiten für n erhöht die ndeffekt, erhöht die der den verbessern men erzeugt men erzeugt en Dachgärten. ät der in ät der in das das und fördert die nsmöglichkeit

chkeiten für chkeiten für den Fassaden verbessern verbessern

kt zugänglichen TEIGERUNG

smöglichkeit smöglichkeit

EIGERUNG EIGERUNG

5.OG + Photovoltaik-Dach

GARDAROBE

LAGER / KOPIE

NG NVIELFALT

HANDAKTEN TEE

eglichkeiten baeudebrueter

G G VIELFALT VIELFALT lichkeiten lichkeiten aeudebrueter aeudebrueter

4.OG Soziales Rathaus

m Wasser wird mum reduziert. ässerung bzw. der nutzbaren g abgegeben. m Wasser wird m Wasser asser wird der mmelt undwird der um reduziert. um reduziert. en Gründächern werden kann. sserung bzw. sserung bzw. ugeführt werden. erdruck bedient der nutzbaren der nutzbaren sserung an die r umgebenden abgegeben. abgegeben. eichers genutzt melt und der melt eführt, und in der der das erden kann. erden kann. gen auffangen, druck druck bedient bedient serspeicher unter umgebenden ndumgebenden kann für die chers chers genutzt genutzt

Service-Module Eingeschobene, tragende Service-Module (WCs, Lage, Garderoben etc.)in Holzbauweise (Vorfertigung):

Flexible Grenze zwischen Technisches / Allgemeines Rathaus

- Als Kerne im mittleren Bereich der Geschosse = Gebäudeaussteifung - Modulgröße von 12,5 m x 2,5 m = leicht transportabel und mit Kostenersparnis durch verkürzte Bauzeit

2.OG + 3.OG

peichern und im

Technisches Rathaus

en en auffangen, auffangen,

Wasserabgabe egruenung

Eigenversorgung aus PV-Anlage Wasserabgabe Wasserabgabe ruenung ruenung

1.OG

Tragwerk Das neue. Tragwerk folgt nicht dem Kaufhaus-(12m-)Stützenraster, um ein nachhaltigeres neues Tragwerk aus Brettschichtholz-Trägern und -stützen aus einheimischen Hölzern mit 6m-Spannbreite zu ermöglichen:

Allgemeines Rathaus – Ordnungsamt von 1.OG bis 5.OG

- Transferträger über dem 1. Obergeschoss - die zwischen den Trägern entstehenden Hohlräume werden als Substrat-Tröge für den umlaufenden Dachgarten, sowie als Installationsraum genutzt

estaltung ddestaltung Wegen Wegen on on ser ser aus aus nfaellen nfaellen

2.OG

esamtgebäude ie Gebäude so den können. Erwärmung im

samtgebäude samtgebäude samtgebäude ieüberschüsse e Gebäude Gebäude so so e e wie Gebäude auch so zur en können. en können. können. en Erwärmung im im Erwärmung Erwärmung im de im Sommer

Energie wird im eüberschüsse eüberschüsse eüberschüsse wie auch zur wie auch wie auchinzur zur assade die

Treppenhäuser - Fluchtreppenhäuser in Ortbeton (wo erforderlich, auf die bestehenden Treppenhäuser aufgesetzt) - Aufzugskerne und weitere Schächte aus Brettsperrholztafeln, überall wo die Brandschutz-Anforderungen dies erlauben Ausbau-Wände - Nicht-tragende Ausbauwände werden aus vorgefertigten Holztafeln in Holzrahmenbauweise - Einsatz von feuchtigkeitsregulierendem Lehmputz bzw. von Lehm-Ausfachungen (gesundes Raum- und Arbeitsklima)

Eigenversorgung Eigenversorgung aus aus PV-Anlage PV-Anlage

Gestaltung nd Wegen von asser aus enfaellen

CADDY

Tragwerk

- Darüber: neues Tragwerk aus Brettschichtholz-Stützen und -Trägern in Haupttragrichtung, dazwischen Holzhybrid-Deckenplatten = bauteil-aktivierte Stahlbeton-Fertigteilplatten mit Brettschichtholz-Unterzügen

EG

Frontoffice Servicezentrum

ng der Decken e im Sommer e im eskühlung im Sommer Sommer über nergie wird wird im nergie nergie wird im im

die Parktürme ssade in die ssade in ssade in die die r Luftschächte g ktivierung der g der der Decken Decken kühlung über über skühlung kühlung über

die Parktürme die die Parktürme Parktürme Luftschächte Luftschächte Luftschächte

natürliche und öglichen. hen. Holz aus uch Aluminium Basis wie Holz, elte Baustoffe in atürliche und atürliche und sind am Ende glichen. glichen. er Forstwirtschaft en. Holz en. Holz aus aus erverwendung. den. Dämmstoffe ch Aluminium ch Aluminium Unterzügen aus nwollewie eingesetzt asis asis wie Holz, Holz, matisierung zu sind sind am am Ende Ende

1.UG

Erschließung Allgemeines Rathaus

Frontoffice Servicezentrum

Erschließung Technisches + Soziales Rathaus

4.OG

Dachterrasse Stadtteilbibliothek

3.OG

Stadtteilbibliothek

2.ÓG

Stadtteilbibliothek

auten werden in

mit Füllungen betonplatten mit rverwendung. rverwendung. nterzügen aus nterzügen aus em reduzierten s eingehängten matisierung zu matisierung zu ung eingeführt

rf einfach wieder mit Füllungen mit Füllungen Teppiche aus

ien.reduzierten m m reduzierten edeverwertung ng eingeführt ng eingeführt

Teppiche Teppiche aus aus

achhaltig r Region, deverwertung deverwertung als Speichermasse g

ber chhaltig

Stadtteilbibliothek © bolles+wilson

EG

Axiomatic Diagram


Š bolles+wilson

Fountain and Bicycle Parking Place View

Š bolles+wilson

Inside the Co-working Space View


09.

EDUCATION QUARTER O MORAY CENTRE

WITTEN 2019

BAEDEKERSCHULE

+13,8 = 121,3

+9,4 = 116,9

+5,4 = 112,9 DB

±0,00 = 107,5

© bolles+wilson

Elevations, Sections

© bolles+wilson

Street View


10.

PERU 2019

FUNDO MORAY CENTRE

Section AA

IMAGE - The Institute nestles into the landscape – only the stone roof of the Common Room hints at the complex but invisible spaces behind. BUSSES DISSAPEARED - Buses drive directly into the lower level of the court. Here visitors alight and climb to the Flower-Court and Building Entrance. Without buses the court steps form an outdoor tribune for Lectures and Briefings. The buses themselves disappear into a parking bay underneath the Communal Rooms (the three-pointturn of a bus determines the buildings geometry and size).

A. Individual rooms opening to the court B. Flower platform with seat C. Polychrome paving D. Steps up from bus arrival E. Bus parking bay F. Staff facilities (WC, shower, dressing) G. Study room H. Office

Š bolles+wilson GROUND FLOOR (3557.80m a.s.l)


East Elevation

UNDERGROUND ROOMS - The thirty rooms for guests and scholars are embedded in the earth and grass cover and camouflage them). Rooms are minimal but with individual bathroom, study-niche and balcony. An electric fence keeps animals and wanderers away from the crater-like institute. A STUDY ROOM/LIBRARY (with high ceiling and planted light well) is located on a between level at the north-west underground corner (equally accessible from all rooms). Staff service rooms (with linen store) are located on both accommodation floors. An office overlooks the court.

Š bolles+wilson


11.

HARBOUR BASIN

HAMBURG 2019

© bolles+wilson

Harbour View

© bolles+wilson

Street View


Loki-SchmidtStiftung

Loki-SchmidtStiftung

1

2

3

2

3

1

4

2

3

2

1

2

3

3-Zimmer

3-Zimmer

3-Zimmer

5-Zimmer groß Ebene 2

3-Zimmer

3-Zimmer

5-Zimmer groß Ebene 2

3-Zimmer

5-Zimmer groß Ebene 1

3-Zimmer

5-Zimmer groß Ebene 1

2

3

1

1

2

1

1

1

1

OG 2

3

2

3

1

1

OG 2 3-Zimmer

5-Zimmer groß Ebene 1

2

1

1

M 1:200

1

M 1:200

G01 M 1:200

5

2

3

1

2

2

3

2

3

1

3

5

5

2

3

1

2

3-Zimmer

3-Zimmer

3-Zimmer

5-Zimmer groß Ebene 3

3-Zimmer

3-Zimmer

5-Zimmer groß Ebene 3

3-Zimmer

3-Zimmer

5-Zimmer groß Ebene 3

3 2

3

1

2

3-Zimmer

5-Zimmer klein Ebene 1

5-Zimmer klein Ebene 1

5-Zimmer klein Ebene 1

5-Zimmer klein Ebene 1

5-Zimmer klein Ebene 1

5-Zimmer klein Ebene 1

2

3

3

5-Zimmer klein Ebene 1

5-Zimmer klein Ebene 1

2

3

2

3

2

2

2

M 1:200

2

2

M 1:200

2

M 1:200

M 1:200

OG 3 3

OG 3

3

OG 3 3

OG 3

3

3

SN4 5-Zimmer klein Ebene 1

1

1 2

1 2

1

3

1

1 2

1 2

1

3

5-Zimmer klein Ebene 1

3-Zimmer-WG Ebene 1 + Eingang

5-Zimmer klein Ebene 1

5-Zimmer klein Ebene 1

5-Zimmer klein Ebene 1

5-Zimmer groß Ebene 2

1

1

5-Zimmer klein Ebene 2

5-Zimmer klein Ebene 2

5-Zimmer klein Ebene 1

5-Zimmer klein Ebene 2

5-Zimmer klein Ebene 2

5-Zimmer groß Ebene 2 3-Zimmer-WG Ebene 1 + Eingang

5-Zimmer klein Ebene 1

5-Zimmer klein Ebene 1

5-Zimmer klein Ebene 1

5-Zimmer groß 3-Zimmer-WG Ebene 2 Ebene 1 + Eingang

5-Zimmer klein Ebene 1

5-Zimmer klein Ebene 1

5-Zimmer klein Ebene 1

3-Zimmer-WG Ebene 1 + Eingang

5-Zimmer groß Ebene 2

5-Zimmer klein Ebene 1

5-Zimmer klein Ebene 1

5-Zimmer klein Ebene 1

3-Zimmer-WG Ebene 1 + Eingang

1

1 2

1 2

1

3

1 2

1 2

1

3

1 2

1

5

5

4 4

5

5

5

4

5

OG 4 4

5

5

5

OG 4 4 4

5

5

4

4

5

5

5

4 4

5

4

M 1:200

4

4

5

M 1:200

4

M 1:200

4

M 1:200

5

5

4

4

3

1 1

5

Ebene 2

5-Zimmer groß Ebene 2

5-Zimmer groß Ebene 2

2

3

2

3

3

2

4

1

1

2

2

Ebene 2

5-Zimmer groß Ebene 2

5-Zimmer klein Ebene 1

5-Zimmer groß Ebene 2

3-Zimmer-WG Ebene 3

5-Zimmer groß Ebene 2

groß Ebene 3

5-Zimmer groß Ebene 3

OG 6 M 1:200

5-Zimmer groß Ebene 3

5

5

4

5

5

4

3

3

groß Ebene 3

5-Zimmer groß Ebene 3

3-Zimmer-WG Ebene 4

5-Zimmer groß Ebene 3

5-Zimmer klein Ebene 2

272727

4

Baufeld 84a1 - frei finanziertes Wohnen 5-Zimmer klein Ebene 2

5-Zimmer groß Ebene 1

5-Zimmer klein Ebene 2 5-Zimmer groß Ebene 1

5-Zimmer groß Ebene 1

5-Zimmer klein Ebene 2 5-Zimmer groß Ebene 1 5-Zimmer groß Ebene 3 3-Zimmer-WG Ebene 2

5-Zimmer groß Ebene 2

5-Zimmer groß Ebene 2

5-Zimmer groß Ebene 2

5-Zimmer groß Ebene 2

5-Zimmer groß Ebene 2

2

3

G06

2

2

G05 3

3

2

5Zi.

5Zi.

5Zi.

4

1

NIVEAU +4 INTERNE PASSAGE

ACCESS LEVEL

G04

2

3

G06

2

G05

3

G03

3

G04

2

SICHERHEITS TREPPENHAUS

5Zi.

5Zi.

3Zi.

1

2

2

4

1

NIVEAU +4 INTERNE PASSAGE

ACCESS LEVEL

2

3

2

2

2

3Zi.

5Zi.

1

2

2

4

1

5-Zimmer groß Ebene 2

5-Zimmer klein Ebene 1

5-Zimmer groß Ebene 2

3-Zimmer-WG Ebene 3

5-Zimmer groß Ebene 2

SICHERHEITS TREPPENHAUS

5Zi. M 1:200

1

2

4

1

NIVEAU +4

5-Zimmer groß Ebene 2

5-Zimmer klein Ebene 1

5-Zimmer groß Ebene 2

5-Zimmer groß 3-Zimmer-WG Ebene 2 Ebene 3

1

2

2

4

1

5-Zimmer groß Ebene 2

5-Zimmer klein Ebene 1

5-Zimmer groß Ebene 2 3-Zimmer-WG Ebene 3

5-Zimmer groß Ebene 2

5-Zimmer groß Ebene 2

5-Zimmer klein Ebene 1

5-Zimmer groß Ebene 3

5-Zimmer groß Ebene 3

5-Zimmer groß Ebene 3

5-Zimmer groß Ebene 3

5-Zimmer groß Ebene 3

5

5

5

5

4

5

4

5

OG 6 M 1:200

5-Zimmer groß Ebene 3

5-Zimmer groß Ebene 3

3-Zimmer-WG Ebene 3

5-Zimmer klein Ebene 1

3-Zimmer-WG Ebene 3

5-Zimmer groß Ebene 2

5-Zimmer groß Ebene 2

5-Zimmer groß Ebene 2

1

2

5-Zimmer groß Ebene 2

5

5

4

5

4

3

5-Zimmer groß Ebene 3

5-Zimmer groß Ebene 3

5-Zimmer groß 3-Zimmer-WG Ebene 3 Ebene 4

5-Zimmer klein Ebene 2

272727

3

TOWNHAUS 5Zi.

4

5Zi.

4

5-Zimmer groß Ebene 3

5-Zimmer groß Ebene 3

5-Zimmer klein Ebene 2

272727

5-Zimmer groß Ebene 3 3-Zimmer-WG Ebene 4

TOWNHAUS 5Zi.3

4

5-Zimmer groß Ebene 3

WG3TURM TOWNHAUS 3Zi. 5Zi.

5Zi.

5Zi.

5Zi.

4

4

5-Zimmer groß Ebene 3

5-Zimmer klein Ebene 2

272727

3-Zimmer-WG Ebene 4

5-Zimmer groß Ebene 3

TOWNHAUS FLUG 5Zi. 3TREPPE

3Zi.

5-Zimmer groß Ebene 3

WG TURM 3 3Zi. 3Zi.TOWNHAUS 5Zi.

OG 6 M 1:200 5Zi.

5

5-Zimmer groß Ebene 3

4

5

5

5

5

EINGANG

4

5Zi.

5Zi.

3Zi.

4

5Zi.

5-Zimmer groß Ebene 3

4

4

WG TURM

3Zi.

5-Zimmer klein Ebene 2

5-Zimmer groß Ebene 3

5-Zimmer groß Ebene 3

3Zi. GARTEN TOWNHAUS MAISONETTE 5Zi. 5Zi. FLUG TREPPE

3Zi. 5Zi. GARTEN MAISONETTE 5Zi.

5-Zimmer groß Ebene 3

3-Zimmer-WG Ebene 4

5-Zimmer groß Ebene 3

TOWNHAUS FLUG TREPPE 3 5Zi.

3Zi.

3Zi.

TOWNHAUS 3 TURM 3Zi.WG 5Zi. 3Zi. TOWNHAUS 5Zi.

OG 6 M 1:200 5Zi.

5-Zimmer groß Ebene 3

5

frei finanziertes Wohnen

2

5

OG 5 M 1:200 Baufeld 84a1 - frei finanziertes Wohnen

5-Zimmer groß Ebene 1

5-Zimmer groß Ebene 1 5-Zimmer klein Ebene 2

5-Zimmer groß Ebene 1

G06 G02 G05

3

ACCESS LEVEL

3

G03

5-Zimmer groß Ebene 2

5-Zimmer groß Ebene 2

3

2

3

3

G03 OG 5 G01 G04

2

3Zi. ACCESS LEVEL

2

3

2

3

5-Zimmer groß Ebene 2

2

5-Zimmer groß Ebene 2

TOWNHAUS 3Zi. G03 5Zi. 3Zi. TOWNHAUS 5Zi. Freifinanziertes Gebäudeorganization 5Zi. 5Zi. OG 5 MSICHERHEITS 1:200 OG 6 M 1:200 5Zi. TREPPENHAUS

3

INTERNE PASSAGE EG G06 SICHERHEITS5Zi. TREPPENHAUS G02 G05 3Zi. GZW

5-Zimmer groß Ebene 2

5-Zimmer groß Ebene 2

G06 G02 G05 GZW

NIVEAU +4 INTERNE PASSAGE

OG 5 M 1:200 SICHERHEITS TREPPENHAUS Baufeld 84a1 G01 G04 3Zi.

5-Zimmer groß Ebene 1

5-Zimmer groß Ebene 3 3-Zimmer-WG Ebene 2

5-Zimmer groß Ebene 1

5-Zimmer klein Ebene 2

5-Zimmer groß Ebene 1

5-Zimmer groß Ebene 1

5-Zimmer groß 3-Zimmer-WG Ebene 3 2 Ebene

5-Zimmer groß Ebene 1

5-Zimmer klein Ebene 2

5-Zimmer groß Ebene 1

5-Zimmer groß Ebene 1

5-Zimmer 3-Zimmer-WG groß Ebene 2 Ebene 3

4

3

5

OG 5 M 1:200 OG 6 MWohnen 1:200 Baufeld 84a1 - frei finanziertes

5-Zimmer groß Ebene 1

5-Zimmer groß 3-Zimmer-WG Ebene 3 Ebene 2

4

3

1 1

4

3

1 1

5

OG 5 M 1:200 OG 6 MWohnen 1:200 Baufeld 84a1 - frei finanziertes

5-Zimmer groß Ebene 1

3-Zimmer-WG Ebene 2

4

3

1 1

5

5

1

Axiomatic View

4

3

1 1

5

M 1:500 OG 4 M 1:200 5-Zimmer klein Ebene 2

5-Zimmer klein Ebene 2

OG 4 5-Zimmer klein Ebene 2

5-Zimmer klein Ebene 2

OG 4

5-Zimmer klein Ebene 2

5-Zimmer klein Ebene 2

5-Zimmer klein Ebene 2

SN5

G02 G04 G06

M 1:200

M 1:200

3

M 1:200 M 1:200

3

4

2

SN3

OG 2

SN5 SN4

G01 G03 G05

1

1

1

1

1

3

M 1:200 3-Zimmer

SN3

GZW G02 G06 G04

2

3

2

SN2

M 1:200

SN2 SN1

EG G01 G05 G03

3-Zimmer

3-Zimmer

3

1

OG 1

EG

GZW G04 G02 G06

5

5-Zimmer groß Ebene 2

5-Zimmer groß Ebene 2

5-Zimmer groß Ebene 2 5-Zimmer groß Ebene 1

M 1:200 5-Zimmer groß Ebene 2

GZW

EGG03 G01 G05

GZW G02 G04G06

LUFT

EG G01 G03 G05

LUFT

4

5

5

Diagramm Nutzungsverteilung OG 1 GZW G02G04

EG G01G03 2

LUFT LUFT

4

Diagramm Nutzungsverteilung LUFT

G03

SN1

Diagramm Nutzungsverteilung

4

LUFT

4 LUFT

1

LUFT

G05

Zwischengeschoss GZW G02

G02

G02 GZW G04 G06

G01 G03 EG G05

G04

Diagramm Nutzungsverteilung

G06


12.

NEW GOETHE SCHOOL

MARL 2020

Hausanschluss

2BA

2BA ANLIEFERUNG

13.

MÜLL

THE BLACK CAT THEATRE

DORTMUND 2020

Perspective View from Street

© bolles+wilson


B-B

+18,90 m +113,04 m ü .NN +21,96 m +116,10 m ü .NN

6-07 Technik

B-B

14.

B-B

B-B

6-07 Technik

+25,02 m +119,16 m ü .NN

B-B

B-B

B-B

4-8 Proberaum 2

+15,12 m +109,26 m ü .NN

TECHNICAL DRAWINGS 4-05.02

MUENSTER 2019-2020

A-A

4-05.01

Workshop Raum 2

Workshop Raum 1

Große Dachterrasse

C-C

A-A

C-C

A-A

C-C

wooden roof Holzbau-Dachgeschoss Dachgeschoss-Konstruktion (Workshop-Bereich) in leichter BRETTSPERRHOLZ-Bauweise mit robusten sichtbaren Oberflächen , Ausführung der Dachdeckung des Pultdaches als hinterlüftete , metallische Stehfalz-Deckung,Wandbekleidung: WDVS z.B. auf Basis von Weichfaserplatte aus Holz.

suspended Abhangdecken ceilings Nur wo erforderlich: Akustisch wirksame Abhangdecken-Konstruktion mit integrierter Beleuchtung. Leitungsgebundene Zu- und Abluft oberhalb der Abhangdecken mit zentraler

WÄRMERÜCKGEWINNUNG

4-05.02 Workshop Raum 2

main roof Hauptdach Warmdach mit extensiver DACHBEGRÜNUNG zum Regenwasserrückhalt , zur Abflussverzögerung und Speicherung. Durch verschiedenste Pflanzen, Sedum und Gräser , vegetationsfreie Bereiche mit Sandlinsen und Grobkiesflächen , Totholzhaufen und Insekten-Nisthilfen wird ein Maximum an Biodiversität geschaffen. Auf dem Flachdach-Teil des Workshop-Bereichs zusätzliche Anordnung von FOTOVOLTAIK -Paneelen zur main roof Energiegewinnung. ®AIR® outside panelsOF Außenwand - MADEMADE OF AIR

6-01.01

Hinterlüftete Außenwandverkleidung aus CO2-negativen Fassadenpaneelen aus der Carbon-Capture-Industrie, z.B. System made of air® , mit vertikaler Profilierung wie im Bildausschnitt unten gezeigt, Mineralische Wärmedämmung , Stahlbeton-Rohbau, 3 Licht-Features mit Light-Box-Technik auf der Süd-West-Fassade oberhalb der Eingangsfassade.

Kulissenlager

supported Tragsystem system 2-04 Front-ofHouse Hauptbühne

Haupt-Träger in Längsrichtung in den Wandscheiben beiderseits des Zuschauerraums und der Hauptbühne , mit Auskragung bis zur Fassade, nachhaltige HOLZ-HYBRIDDECKENKONSTRUKTION mit Querträgern z.B. aus Bau-Buche oberhalb des Zuschauerraums mit daraufstehenden Stützen im Lagerbereich, gewichtssparende Hohlraumplatten mit 14 m Spannweite unterhalb der Zuschauertribüne Skulptural frei-stehende V-Stützen im Lobbybereich, zur Lastabtragung aus den Hauptträgern .

non load bearing Nicht-tragende Wände wall 1-01 Foyer Hauptbühne Unten

Wo sinnvoll: vorgefertigte modulare BRETTSPERRHOLZ-Wandbauteile zwischen tragenden Rohbau-Elementen; dadurch hohe Flexibilität und Anpassbarkeit bei gleichzeitiger, nachhaltiger Ressourcen-Schonung

T H E

beam facade Pfosten-Riegel-Fassade Pfosten-Riegel-Fassade aus schlanken, vollständig recyclebaren Aluminiumprofilen, sowie DREIFACHVERGLASUNG entsprechend den höchsten Anforderungen an den sommer- und winterlichen Wärmeschutz.

window Fenster

1-01 Eingangs-Foyer

Hochwärmegedämmte Fenster, wo erforderlich mit außenliegendem, in die Fassade integriertem, individuell regelbarem SONNENSCHUTZ als Lamellen-Raffstore mit Tageslichtsteuerung im oberen Drittel. Öffnung der Fenster zur Reinigung von innen, sowie zur individuellen nutzerabhängigen FRISCHLUFTZUFUHR.

B L A C K

C


Lightweight roof Main roof A53 A49

Exterior-wall with vertical wood cladding weiĂ&#x; (RGB 237.235.225), grau (RGB 179.162.143), rosa (RGB 216.189.184) und farblos (sichtbarer Holzfarbton).

A20

Reveal surface

Sekretariat

A28 Lager

Post and beam facade Flat outside wall with core insulation

L4

BĂźro OGS

Window with sun protection Floor construction

A67

Suspended ceilings A13

A27 Lager

A20

Sekretariat

Non-load-bearing partitions

Detailed Technical Drawing + 11,67

membrane roof

18

18

66

2%

66

48

48

2%

2%

2%

19

19

6 15

sun protection

6 15

72

31

31

7

7

72

membrane roof 3,03

3,10

3,03

3,10

cantilevered parts lightweight walls + 7,20

reinforced concrete ceilings energy-saving LED lights opening windows

+ 7,20 11 31

11 42

31

46

46

7

7

3,18

42

3,18

2,64

2,64

brick facade glazed windows + 3,60

+ 3,60 11 30

suspended ceiling

cassette ceiling with integrated building equipment

65

11 41

30

65

69

4

4

68

68

62

curtain wall made of fibre panels with printing + 0,00

Detailed Technical Drawing

underfloor heating

41

69

62

2,50

2,50

1,20

1,20

+ 0,00 20

40

20

77

40

12

12

5

5

77


The construction drawing was developed for Urban Loft Hotel in Cologne which is under the construction now. All the detailed drawings are produced under the senior architect’s cooperation and supervision at Bolles + Wilson.


Fin.

Sijie Lyu ziyilyu@outlook.com student no. 20121107


Turn static files into dynamic content formats.

Create a flipbook
Issuu converts static files into: digital portfolios, online yearbooks, online catalogs, digital photo albums and more. Sign up and create your flipbook.