1 minute read

GENERAL FUND – LUDMILLA CHIRIAEFF Infrastructure and equipment

Wheter to train local talents or to attract international students, we need your financial support to ensure that our students learn in an inspiring environment.

Help us maintain the infrastructure of the École supérieure and purchase the latest equipment so that our institution stays on the cutting edge and continues to be a top choice for tomorrow’s talent. Help us achieve financial security for urgent maintenance and future work, thanks to the endowment fund.

URGENT WORK – ROOF AND VENTILATION SYSTEM

GOAL $ 1M

The building requires urgent improvements to its ventilation system, while part of the roof needs to be resurfaced. The total cost of this work is significant, and despite government assistance the École supérieure must contribute $175,000 toward these pressing and essential repairs and upgrades.

A WEIGHTY PROJECT: THE EXERCISE ROOM!

The creation of a space dedicated to physical conditioning, the purchase of exercise equipment and dance-specific accessories, as well as professional supervision, will have great benefits for our dancers’ development. Comprehensive training in strength and stamina will allow them to improve their muscular strength and achieve excellence. The investment amounts to $100,000.

Daily access to an exercise room has numerous benefits for an athlete-dancer!

• General strengthening for girls and boys alike

• Specific strengthening for boys to prepare them for pas de deux (duets, portés).

• Injury prevention, maintenance of conditioning and injury rehabilitation.

• Training specific to the physical and athletic requirements of the profession.

This article is from: