PDAM TIRTA DHARMA KOTA MALANG ANALISA KONDISI KEUANGAN DAN ANALISA KELAYAKAN KEUANGAN PENDAHULUAN ATAS USULAN RENCANA INVESTASI REVISI

MARCH 2008 This publication was produced by Development Alternatives, Inc. for review by the United States Agency for International Development under Contract No. 497-M-00-05-00005-00



PDAM TIRTA DHARMA KOTA MALANG ANALISA KONDISI KEUANGAN DAN ANALISA KELAYAKAN KEUANGAN PENDAHULUAN ATAS USULAN RENCANA INVESTASI

REVISI

Title:

Program, activity, or project number: Strategic objective number: Sponsoring USAID office and contract number:

PDAM Tirta Dharma - Analisa Kondisi Keuangan dan Analisa Kelayakan Keuangan Pendahuluan Atas Usulan Rencana Investasi - Revisi. Environmental Services Program, DAI Project Number: 5300201. SO No. 2, Higher Quality Basic Human Services Utilized (BHS). USAID/Indonesia, Contract number: 497-M-00-05-00005-00.

Contractor name:

DAI.

Date of publication:

March 2008.



TABLE OF CONTENTS LIST OF TABLE ........................................................................................................................IV LIST OF ACRONYMS ...............................................................................................................V 1.

PENDAHULUAN............................................................................................................... 1

2.

ANALISA KINERJA HISTORIS (2004-2008)................................................................... 2 2.1. PRODUKSI DAN PERMINTAAN ..................................................................................................................2 2.2. KINERJA KEUANGAN .................................................................................................................................4 2.2.1. Pendapatan ......................................................................................................................................................4 2.2.2. Biaya Rutin .......................................................................................................................................................5 2.2.3. Tarif....................................................................................................................................................................5 2.2.4. Rasio Lancar dan Arus Kas..........................................................................................................................7 2.3. PINJAMAN BERJALAN DAN KEMAMPUAN MEMBAYAR PINJAMAN ..........................................................7

3.

ANGGARAN 2008 ............................................................................................................. 9 3.1. 3.2.

4.

ANALISA USULAN INVESTASI ................................................................................... 11 4.1. 4.2.

5.

PRODUKSI DAN PENJUALAN AIR ..............................................................................................................9 PENDAPATAN DAN BIAYA ........................................................................................................................9 TARGET FISIK DAN BIAYA ...................................................................................................................... 11 RENCANA PEMBIAYAAN......................................................................................................................... 14

HASIL UTAMA PROYEKSI KEUANGAN .................................................................... 15 5.1. ASUMSI..................................................................................................................................................... 17 5.1.1. Biaya Modal .................................................................................................................................................. 17 5.1.2. Proyeksi Produksi dan Permintaan Air.................................................................................................. 18 5.1.3. Biaya Rutin .................................................................................................................................................... 19 5.1.4. Analisa Tarif .................................................................................................................................................. 20 5.1.5. Pembagian Laba ke Pemda ...................................................................................................................... 20 5.2. INDIKATOR KELAYAKAN ....................................................................................................................... 20 5.3. HASIL-HASIL KEUANGAN ....................................................................................................................... 20

6. PERBANDINGAN INDIKATOR PENCAPAIAN KEUANGAN DI ANTARA 3 SKENARIO PEMBIAYAAN..................................................................................................... 21 6.1. 6.2. 6.3. 6.4. 7.

KESIMPULAN DAN SARAN.......................................................................................... 25 7.1. 7.2.

8.

DEBT SERVICE COVERAGE (KEMAMPUAN MEMBAYAR PINJAMAN) .................................................... 21 RASIO LANCAR ....................................................................................................................................... 22 KAS= #JUMLAH BULAN BIAYA OPERASI DAN PEMELIHARAAN .......................................................... 22 DEBT SERVICE ......................................................................................................................................... 23 KESIMPULAN ............................................................................................................................................ 25 SARAN ..................................................................................................................................................... 26

LAMPIRAN ....................................................................................................................... 28 LAMPIRAN A: NOTULEN RAPAT DENGAN PDAM KOTA MALANG............................................... 28 LAMPIRAN B: NOTULEN RAPAT DENGAN PDAM KOTA MALANG ............................................... 29 LAMPIRAN C: JADWAL PEMBAYARAN PINJAMAN PDAM KOTA MALANG ................................. 32 LAMPIRAN D: PROGRAM INVESTASI PDAM KOTA MALANG ........................................................... 33 LAMPIRAN E: USULAN PERUBAHAN JADWAL PELAKSANAAN PEKERJAAN PDAM KOTA MALANG ............................................................................................................................................................. 37 LAMPIRAN F: PROYEKSI KEBUTUHAN AIR .............................................................................................. 42 LAMPIRAN G: PROYEKSI KEUANGAN SKEMA PEMBIAYAAN OBLIGASI UNTUK INVESTASI.. 44


PDAM TIRTA DHARMA - ANALISA KONDISI KEUANGAN DAN ANALISA KELAYAKAN KEUANGAN PENDAHULUAN ATAS USULAN RENCANA INVESTASI - REVISI

LAMPIRAN H: PROYEKSI KEUANGAN SKEMA PEMBIAYAAN OBLIGASI UNTUK INVESTASI

DAN PELUNASAN PINJAMAN........................................................................................................................ 48

LAMPIRAN I: PROYEKSI KEUANGAN SKEMA PEMBIAYAAN PINJAMAN KOMERSIAL ............... 53 LAMPIRAN J: PENGHITUNGAN KELAYAKAN INVESTASI ................................................................... 57 LAMPIRAN K: PERHITUNGAN “PRESENT VALUE” BIAYA PINJAMAN (DLM RP JUTA).................. 58

ENVIRONMENTAL SERVICES PROGRAM WWW.ESP.OR.ID

III


LIST OF TABLE TABLE 1: RINCIAN KAPASITAS PRODUKSI DAN DISTRIBUSI .......................................................................................3 TABLE 2: PRODUKSI DAN PERMINTAAN AIR ..............................................................................................................3 TABLE 3: SAMBUNGAN DAN PEMAKAIAN AIR ............................................................................................................4 TABLE 4: BIAYA OPERASI DAN PEMELIHARAAN PDAM (RP JUTA) ...........................................................................5 TABLE 5: BIAYA PER UNIT PDAM (RP PER M3 AIR TERJUAL PADA HARGA KONSTAN 2006)...............................5 TABLE 6: PERBANDINGAN TARIF LAMA DAN BARU ...................................................................................................6 TABLE 7: PENCAPAIAN TARIF (PER M3 AIR TERJUAL) ...............................................................................................7 TABLE 8: RASIO LANCAR DAN ARUS KAS...................................................................................................................7 TABLE 9: INDIKATOR KEMAMPUAN MEMBAYAR PINJAMAN ......................................................................................8 TABLE 10: PRODUKSI DAN PENJUALAN AIR (2008) ..................................................................................................9 TABLE 11: PERKIRAAN KINERJA KEUANGAN PDAM TAHUN 2008 ...................................................................... 10 TABLE 12: BIAYA PER UNIT PDAM 2007-2008 (RP PER M3 AIR TERJUAL – HARGA KONSTAN 2007) ........... 10 TABLE 13: JADWAL PEMASANGAN SAMBUNGAN BARU ......................................................................................... 11 TABLE 14: PERKIRAAN BIAYA INVESTASI (DLM. RP JUTA)..................................................................................... 13 TABLE 15: PERKIRAAN BIAYA INVESTASI - 3 TAHUN (DLM RP JUTA) ................................................................... 13 TABLE 16: RENCANA PEMBIAYAAN (DLM RP JUTA)............................................................................................... 14 TABLE 17: INDIKASI KOMPONEN OBLIGASI (DLM RP JUTA NOMINAL) ............................................................... 14 TABLE 18: HASIL PROYEKSI KEUANGAN DAN INDIKATOR UTAMA SKEMA PEMBIAYAAN DENGAN OBLIGASI (UNTUK INVESTASI) (DLM RP JUTA) .............................................................................................................. 15 TABLE 19: INDIKATOR KEUANGAN UTAMA SKEMA PEMBIAYAAN DENGAN OBLIGASI (UNTUK INVESTASI + PELUNASAN UTANG) ........................................................................................................................................ 16 TABLE 20: RENCANA PEMBIAYAAN DAN JADWAL PENARIKAN PINJAMAN (LM RP JUTA)................................... 16 TABLE 21: SKEDUL AMORTISASIPINJAMAN (DLM RP JUTA).................................................................................. 16 TABLE 22: HASIL PROYEKSI KEUANGAN DAN INDIKATOR UTAMA SKEMA PEMBIAYAAN DENGAN PINJAMAN KOMERSIAL........................................................................................................................................................ 17 TABLE 23: BIAYA MODAL RATA-RATA TERTIMBANG (WEIGHTED AVERAGE COST OF CAPITAL .................... 18 TABLE 24: PROYEKSI KAPASITAS PRODUKSI, DISTRIBUSI DAN KEHILANGAN AIR ................................................ 19 TABLE 25: PROYEKSI JUMLAH SAMBUNGAN DAN KEBUTUHAN AIR ...................................................................... 19 TABLE 26: INDIKATOR KELAYAKAN ......................................................................................................................... 20 TABLE 27: RINGKASAN PERBANDINGAN ................................................................................................................. 24



LIST OF ACRONYMS DDI DSCR ESP FIFO FIRR lcd l/sec NPV NRW PDAM Rp USAID WACC

-

Direktorat Dana Investasi (Investment Financing Directorate of the Ministry of Finance) Debt Service Coverage Ratio Environmental Services Program First In First Out Financial Internal Rate of Return liters per capita per day liters per second Net Present Value Non-Revenue Water Perusahaan Daerah Air Minum (local/municipal water supply enterprise) Rupiah (currency of the Republic of Indonesia) United States Agency for International Development Weighted Average Cost of Capital



1. PENDAHULUAN Laporan ini menyajikan penilaian terhadap rencana investasi PDAM Kota Malang, disusun dengan dukungan Environmental Services Program (ESP) yang didanai oleh United States Agency for International Development (USAID). Laporan ini dimaksudkan untuk pada akhirnya menjadi dasar mobilisasi dana pinjaman, baik dari pasar modal maupun bank komersial, untuk membiayai pelaksanaan rencana investasi tersebut. Berikut adalah beberapa referensi yang digunaka dalam penyusunan laporan ini: • • • •

Laporan Keuangan PDAM Kota Malang yang sudah diaudti untuk tahun 2004 - 2006 Laporan Keuangan tahun 2007 yang belum diaudit Rencana Kerja dan Anggaran tahun 2008 Corporate Plan (Rencana Pengembangan Usaha) 2005-2009.

Selain itu, beberapa kunjungan ke kantor PDAM Kota Malang dilakukan pada bulan-bulan Maret dan April 2008 untuk membahas mengenai rencana investasi untuk tahun 2009-2012 dan asumsi-asumsi yang akan digunakan dalam analisa, dengan beberapa pejabat bagian keuangan dan teknik. Laporan ini mempelajari bagaimana rencana investasi yang dibuat akan mempengaruhi operasional perusahaan air minum dari sudut keuangan. Untuk itu dibuat proyeksi keuangan untuk 10 tahun mendatang. Pada tanggal 13 Maret 2008, hasil awal proyeksi keuangan disajikan kepada manajemen PDAM, yang dilanjutkan dengan diskusi. Dalam diskusi tersebut asumsi-asumsi yang mendasari pembuatan proyeksi dibahas, disetujui maupun diubah.. Pada tanggal 3 April 2008, dilakukan presentasi berikutnya kepada Manajemen PDAM dan Dewan Pengawas untuk memperlihatkan hasil analisa dan proyeksi keuangan atas rencana investasi, dengan menggunakan dua laternatif pendanaan, yaitu obligasi dan pinjaman komersial. Catatan hasil diskusi dan presentasi di atas dapat dilihat pada Lampiran A laporan ini. Laporan ini pada dasarnya terdiri dari beberapa bagian sebagai berikut: • Kinerja historis PDAM dari tahun 2004 - 2007 • Rencana Kerja dan Anggaran 2008 • Rencana Investasi 2009-2012 • Hasil-hasil utama proyeksi keuangan, termasuk indikator-indikator kelayakan rencana investasi • Kesimpulan dan saran atas usulan rencana investasi dan pengelolaan perusahaan air minum di masa-masa yang akan datang.



PDAM TIRTA DHARMA - ANALISA KONDISI KEUANGAN DAN ANALISA KELAYAKAN KEUANGAN PENDAHULUAN ATAS USULAN RENCANA INVESTASI - REVISI

2. ANALISA KINERJA HISTORIS (2004-2008) Dalam penyajian berikut ini, angka-angka untuk tahun 2004-2006 didasarkan pada laporanlaporan keuangan yang sudah diaudit. Sedangkan untuk tahun 2007didasarkan pada laporan operasional PDAM bulan Desember 2007 yang belum diaudit.

2.1. PRODUKSI DAN PERMINTAAN Pada tahun 2005 PDAM memperoleh surat ijin pengambilan air atau SIPA yang memperbolehkan PDAM mengambil air sebanyak 2,058 liter per detik dari total 15 sumber. PDAM kemuadian membangun instalasi produksi untuk mengeksploitasi sumber –sumber tersebut, yang terakhir adalah Wendit III dengan kapasitas 480 l/dtk. Realisasi produksi tahun 2005 sekitar 40.1 juta m3, atau sama dengan kapasitas produksi 1,272.12 l/dtk. Wendit I dan Wendit II tetap merupakan tulang punggung produksi PDAM dengan kontribusi 62% dari total produksi 2005. Namun kedua fasilitas tersebut sudah tua: Wendit I dibangun pada tahun 1982 dan Wendit II di tahun 1992. Masing-masing memiliki kapasitas desain 480 l/detik, namun sebagaimana fasilitas produksi lainnya, hasilnya telah menurun sepanjang tahun hingga hanya menjadi 400 l/detik untuk Wendit I dan 388 l/detik untuk Wendit II. Wendit III selesai dibangun dan mulai dioperasikan pada permulaan kuartal IV tahun 2005, sehingga kontribusinya terhadap produksi air PDAM hanya ekuivalen dengan 36.9 l/detik. Pda saat ini instalasi tersebut hanya menghasilkan maksimum 240 l/detik karena baru 2 buah pompa dari 4 buah yang dibutuhkan yang sudah terpasang. Berdasarkan realisasi produksi tahun 2005, sumber-sumber air PDAM terdiri dari air tanah 4.6%, mata air 18.8%, dan air permukaan 76.6%. Berdasarkan lokasi, 68.9% sumber air berada di wilayah administrasi Kabupaten Malang, 19.4% di Kota Batu, dan hanya 11.7% di Kota Malang sendiri. Tabel 1 di bawah ini menunjukkan rincian volume dan kapasitas produksi dan distribusi PDAM Kota Malang.

ENVIRONMENTAL SERVICES PROGRAM WWW.ESP.OR.ID

2


PDAM TIRTA DHARMA - ANALISA KONDISI KEUANGAN DAN ANALISA KELAYAKAN KEUANGAN PENDAHULUAN ATAS USULAN RENCANA INVESTASI - REVISI

Table 1: Rincian Kapasitas Produksi dan Distribusi No. Name of Facility 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15

Binangun Pipa Lama Binangun Pipa Baru Karangan Sumbersari Wendit I Wendit II Wendit III Banyuning Badut I Badut II Badut III Sumbersari I Sumbersari II Istana Dieng TPA Supit Urang Total

Production Distribution Type of (m3) (m3) Source 2,817,454 4,712,685 1,176,649 457,273 12,604,053 12,246,695 1,164,240 3,080,435 51,382 454,425 574,470 83,374

2,676,581 4,477,051 1,117,817 434,409 11,973,850 11,634,360 1,106,028 2,926,413 48,813 431,704 545,747 79,205

510,466 183,825 40,117,426

484,943 174,634 38,111,555

Location

Spring Spring Surface water Surface water Surface water Surface water Surface water Surface water Groundwater Groundwater Groundwater Groundwater Groundwater Groundwater Groundwater

Kota Malang Kota Batu Kab Malang Kab Malang Kab Malang Kab Malang Kab Malang Kota Batu Kota Malang Kota Malang Kota Malang Kota Malang Kota Malang Kota Malang Kota Malang

Capacity (l/sec) 89.34 149.44 37.31 14.50 399.67 388.34 36.92 97.68 1.63 14.41 18.22 2.64 0.00 16.19 5.83 1,272.12

Lama pelayanan sudah 24 jam di sebagian besar area pelayanan. Namun karena masih kekurangan reservoir, tekanan air menjadi tidak merata, hanya sambungan yang paling dekat dengan pipa induk mendapatkan pasokan yang stabil. Tingkat kehilangan air berkisar antara 29% di tahun 200 4 dan 2005, meningkat tajam menjadi 42.1% di tahun 2006 dan tetap tinggi pada 41.8% di tahun 2007. Faktor pemanfaatan kapasitas mencapai 85.6% di tahun 2007, menunjukkan bahwa masih ada cukup kapasitas untuk pemasangan sambungan baru. Data kapasitas produksi PDAM dan aspek-aspek terkait ditunjukkan pada Tabel 2 berikut:. Table 2: Produksi dan Permintaan Air 2004 Kapasitas terpasang (l/dtk) Kapasitas Produksi (l/dtk) Volume Produksi (m3/tahun) Volume Distribusi (m3/tahun) Jumlah Air Terjual (m3/tahun) Kehilangan Air (%) Rasio Produksi:Konsumsi Faktor Pemanfataan Kapasitas

1,558 1,288 40,618 38,964 27,667 29.0% 1.03 82.7%

2005 1,558 1,266 39,925 38,112 27,153 28.8% 1.09 81.3%

2006 1,558 1,304 41,123 39,060 22,613 42.1% 1.37 83.7%

2007 1,558 1,334 42,074 40,057 23,314 41.8% 1.05 85.6%

2008 Budget 1,558 1,334 42,074 40,057 24,078 39.9% 1.05 85.6%

Kota Malang berpenduduk 815,920 persons pada tahun 2007 dengan perkiraan pertumbuhan penduduk setiap tahun 0.99%. Dalam rangka optimalisasi kapasitas produksi yang baru dioperasikan, corporate plan PDAM menargetkan penambahan sambungan baru sebanyak 5.000 sambungan di tahun 2005, 8.000 sambungan baru masing-masing di tahun 2006 dan 2007, 7.000 sambungan di tahun 2008, dan 5.000 sambungan di tahun 2009. Namun pada kenyantaannya, rata-rata jumlah sambungan hanya bertambah dengan 2% setiap tahun sejak 2004, berkisar antara 1.750 hingga 2.018 ENVIRONMENTAL SERVICES PROGRAM WWW.ESP.OR.ID

3


PDAM TIRTA DHARMA - ANALISA KONDISI KEUANGAN DAN ANALISA KELAYAKAN KEUANGAN PENDAHULUAN ATAS USULAN RENCANA INVESTASI - REVISI

sambungan karena terjadinya penundaan pemasangan pipa jaringan distribusi. PDAM berhasil memasang sekitar 31 km pipa distribusipada tahun 2008 dan menargetkan penambahan sambungan sebanyak 3.389 buah atau 4% di tahun 2008. Sambungan rumah tangga mewakili hampir 90% dari total sambungan langganan dan 85% konsumsi air di tahun 2007. PDAM menghitung cakupan pelayanan berdasarkan jumlah anggota keluarga 6 orang per sambungan rumah dan 100 orang untuk setiap kran umum. Pada tahun 2007 cakupan pelayanan mencapai 81% dari jumlah penduduk (kota atau wilayah pelayanan?). Dengan demikian cakupanpelayanan dalam tiga tahun terakhir hanya meningkat sebanyak satu persen (1%). Konsumsi rumah tangga menurun dari 138 l/dtk di tahun 2005 menjadi hanya 112l/dtk di tahun 2007. Konsumsi rata-rata menurun dari 27 m3/samb/bulan di tahun 2005 menjadi sekitar 22 m3/samb/bulan di tahun 2008. Penurunan ini terjadi mulai tahun 2006, dengan beberapa kemungkinan penyebabnya: (i) Kenaikan pelayayan penyediaan air dari 16 jam menjadi 24 jam. Pelanggan yang sebelumnya mendapatkan pelayanan kurang dari 24 jam tidak lagi menggunakan bak penambung air. (ii) Meter air tidak akurat. Hal ini juga menjelaskan terjadi peningkatan kebocoran air yang tinggi di tahun 2006, selain adanya perbaikan pipa distirbusi. Data pelanggan dan pemakaian air ebrsih dapat dilohjat pada Tabel 3 berikut. Table 3: Sambungan dan Pemakaian Air 2004 Sosial Domestik Rata-rata konsumsi domestic (m3/bulan) Non-Domestik Rata-rata konsumsi (m3/bulan) Jumlah Sambungan Rata-rata konsumsi Kenaikan sambungan per tahun

1,508 76,174 26.1 3,581 56.2 81,263 28.4

2005 1,634 77,871 24.8 3,566 66.3 83,071 27.2 1,808

2006 1,659 79,598 19.9 3,832 57.0 85,089 22.1 2,018

2007 1,700 81,214 20.2 3,926 53.9 86,840 22.4 1,751

2008 1,714 84,302 20.1 4,213 52.2 90,229 22.2 3,389

2.2. KINERJA KEUANGAN 2.2.1.

PENDAPATAN

PDAM berhasil mempertahankan oeprasional yang menghasilkan keuntungan setiap tahun selama periode yang dikaji. Namun laba bersih sedikit menurun pada tahun 2006 sekitar 6% meskipun telah diebrlakukan tarif baru pada tahun 2005. Hal ini disebabkan terjadinya penurunan jumlah air yang terjual dari 27,153 juta m3 di tahun 2005 menjadi 22,613 juta m3 di tahun 2006. Kondisi inimembaik pada tahun 2007 ketika PDAM memberlakukan tarif baru lagi mulai January 2007, mengikuti pedoman penentuan tarif Permendagri 23/2006. Berdasarkan data yang sudah diaudit, laba bersih tahun 2007 sebesar Rp13.858 juta, atau meningkat 40% dibandingkan laba bersih di tahun 2006 sebesar Rp 9.871juta, dengan kenaikan nominal atas tarif rata-rata sebesar 23%.

ENVIRONMENTAL SERVICES PROGRAM WWW.ESP.OR.ID

4


PDAM TIRTA DHARMA - ANALISA KONDISI KEUANGAN DAN ANALISA KELAYAKAN KEUANGAN PENDAHULUAN ATAS USULAN RENCANA INVESTASI - REVISI

2.2.2.

BIAYA RUTIN

Biaya pegawai merupakan komponen biaya terbesar, rata-rata sekitar 46.6% dari total biaya oeprasional. Biaya administrasi umum, energi/bahan bahan dan pemeliharaan masing-masing memberikan sumbangan yang cukup besar yaitu 15.3%, 21.6%, dan 12.5%. Table 4: Biaya Operasi dan Pemeliharaan PDAM (Rp juta) 2004

2005 %

Pegawai

2007 (Un-audited)

2006 %

%

Average

%

%

16,919

49.8%

18,651

46.9%

19,463

44.6%

20,391

45.2%

46.6%

7,100

20.9%

8,883

22.3%

9,876

22.7%

9,294

20.6%

21.6%

86

0.3%

79

0.2%

150

0.3%

174

0.4%

0.3%

Pemeliharaan

3,630

10.7%

4,679

11.8%

6,407

14.7%

5,883

13.0%

12.5%

Adm. Umum

Energi/bahan bakar Bahan Kimia

5,188

15.3%

6,022

15.1%

6,259

14.4%

7,390

16.4%

15.3%

Penyisihan Piutang

363

1.1%

424

1.1%

0

0.0%

512

1.1%

1.1%

Air Baku

666

2.0%

1,053

2.6%

1,435

3.3%

1,476

3.3%

3.3%

33,951

100.0%

39,790

100.0%

43,590

100.0%

45,118

100.0%

100.0%

Total

Dalam harga konstan 2006, biaya operasional per m3 air terjual rata-rata meningkat sebesar 6% selama periode yang dianalisa. Kenaikan terbesar pada 33% terjadi pada bahan kimia, diikuti dengan kenaikan biaya air baku dan pemeliharaan masing-masing sebesar 28% dan 17%. Rata-rata kenaikan yang tinggi ini terutama disebabkan karena terjadinya kenaikan biaya per unit air terjual pada tahun 2006 karena penurunan volume pemakaian air dari 27m3/samb/bulan menjadi hanya 22m3/samb/bulan. Data biaya operasi dan pemeliharaan PDAM per m3 air terjual ditunjukkan pada tabel 4 berikut ini:. Table 5: Biaya per Unit PDAM (Rp per m3 Air Terjual pada Harga Konstan 2006) 2004

2005

2006

2007 (Un-audited)

Inc./(Dec.) 2005

2006

2007

Ave

Pegawai

763.4

732.2

860.7

817.4

-4%

18%

-5%

Energi/Bahan Bakar

320.4

348.7

436.8

372.6

9%

25%

-15%

6%

3.9

3.1

6.6

7.0

-20%

115%

5%

33% 17%

Kimia

3%

Pemeliharaan

163.8

183.7

283.3

235.8

12%

54%

-17%

Adm. Umum

234.1

236.4

276.8

296.3

1%

17%

7%

8%

30.1

41.3

63.4

59.2

37%

54%

-7%

28%

1,515.6

1,545.5

1,927.6

1,788.1

2%

25%

-7%

6%

2%

25%

-7%

Air Baku Total % perubahan per tahun

2.2.3.

TARIF

Sebagaimana dijelaskan di atas, efektif mulai 1 January 2007, diberlakukan tarif air baru dengan mengkuti pedomanpenentuan tarif Permendagri 23/2006. Perbandingan struktur tarif air yang lama dengan yang baru ditunjukkan pada Tabel 5 berikut:

ENVIRONMENTAL SERVICES PROGRAM WWW.ESP.OR.ID

5


PDAM TIRTA DHARMA - ANALISA KONDISI KEUANGAN DAN ANALISA KELAYAKAN KEUANGAN PENDAHULUAN ATAS USULAN RENCANA INVESTASI - REVISI

Table 6: Perbandingan Tarif Lama dan Baru JENIS PELANGGAN

KELOMPOK I SOSIAL

KELOMPOK II RUMAH TANGGA

KELOMPOK III INSTITU SI

IA Fasilitas umum IB Institusi sosial IC Puskesmas, BLK

IIA Sangat sederhana IIB Sederhana IIC Menengah IID Sepjg jln utama, komples elit IIE Ruko IIIA Sekolah (negeri/swasta) IIIB Instansi Pemerintah, kantor perwakilan negara asing

TARIF LAMA (Berlaku 1 April 2005) dalam Rp 0-10 m3 11-20 m3 >20 m3 1,050

1,150

1,250

1,050

1,250

1,300

1,050

1,300

1,600

1,300

2,050

2,900

1,600 1,750

2,150 2,550

3,250 3,600

1,900

2,750

4,000

2,150

2,900

5,550

1,600

2,550

3,650

JENIS PELANGGAN

KELOMPOK I

KELOMPOK II

KELOMPOK III 1,900

2,750

4,550

S-A Fasilitas umum S-B Institusi sosial S-C Puskesmas, BLK HH-A: lebar jalan < 3m HH-B: lebar jalan 3-6 m

HH-C: lebar jalan 6 -9 m

HH-D: Sepjg jln utama, komples elit HH-E: Ruko Inst A: Universitas negeri/swasta) Inst B: Kntr pem dan RS Com A: lebar jalan 6-8 m Com B: lebar jalan 8-10 m Com C: lebar jalan >10 m Com D: BUMN/BUMD, bank swasta Ind A: Industri Kecil Ind B: Industri Besar

IVA Sepanjang jln tersier KELOMPOK IV NIAGA

KELOMPOK V INDUSTRI

TANKI AIR

AIR CURAH

IVB Sepanjang jln sekunder IVC Sepanjang jln utama IVD BUMN/BUMD Bank Swasta IVA Industri Kecil IV B Industri Besar

KEL. 1 KEL 2 KEL. 3 KEL. 4 KEL. 5 0-50,000 M3 >50,000 M3

3,400

4,250

1,250

1,550

1,250

1, 600

1,250

1,900

1,500

2,300

1,700

2,800

1,900

3,000

2,300

3,600

2,600

3,800

2,300

3,800

2,600

5,700

3,800

5,700

6,100

7,600

7,200

8,700

8,000

9,500

8,700

10,300

9,900

12,200

Keterangan

Dengan struktur tarif baru ini, minimum pembayaran untuk minimum konsumsi 10 m3 tidak diberlaku-kan lagi

6,450 8,150

5,700

6,450

5,800

7,750

9,050

6,450

9,050

10,100

7,650

8,400

10,750

8,650

10,100

12,250

Jarak (km) >10-20 46,000 82,000 110,000 170,000 336,000

>20 50,000 116,000 182,000 258,000 430,000

0-10 42,000 52,000 76,000 136,000 306,000 1,300 1,950

TARIF BARU (Berlaku 1 Jan 2007 dalam Rp 0-10 m3 >10 m3

Spesial: tidak termasuk dalam KELOMPOKI, Ii dan III

Tari air ditentukan atas dasar kesepakatan

KELOMPOK IV

ENVIRONMENTAL SERVICES PROGRAM WWW.ESP.OR.ID

Jarak (km) 0-10 >10 TANKI AIR KEL. 1 KEL. 2 KEL. 3

50,000 58,000 85,000

55,000 88,000 125,000

6


PDAM TIRTA DHARMA - ANALISA KONDISI KEUANGAN DAN ANALISA KELAYAKAN KEUANGAN PENDAHULUAN ATAS USULAN RENCANA INVESTASI - REVISI

PDAM Kota Malang telah secara konsisten melakukan penyesuaian tarif air minum setiap 2 tahun sekali. Karena itu kajian ini mencakup 2 kali penyesuaian tarif, yaitu di tahun 2005 dan yang terakhir di akhir tahun 2006. Secara riil kenaikan tarif rata-rata pada tahun 2007 sebesar 18% yang berdampak paa kenaikan laba bersih sebesar 40%. Peneysuaian tarif berikutnya direncanakan pada tahun 2009, sebesar 20%. Setiap tahun selama periode yang dikaji, rata-rata tarif selalu berada di atas tingkat pemulihan biaya sebagaimana didefiniskan dalam Permendagri 23/2006 dan berhasil mendapatkan tingkat keuntungan yang layak sebagaimana ditunjukkan dalamTabel 6.. Table 7: Pencapaian Tarif (Per m3 Air Terjual) 2004

Kenaikan Tarif Rata-rata (%) Tarif Rata-rata (Rp) Tarif Dasar (Rp) Full Cost Recovery Permendagri 23/2006) Pencapaian Full-Cost Recovery (%) Tarif Penuh (biaya Opr+Depr+Bunga+10% ROA) Pencapaian Tarif Penuh (%)

2.2.4.

2005

2006

2007 (Un-audited)

1,734

31% 2,280

23% 2,799

18% 3,303

1,427

1,874

2,451

2,568

121%

122%

114%

129%

1,529

1,991

2,583

2,726

113%

115%

108%

121%

RASIO LANCAR DAN ARUS KAS

Rasio lancar PDAM bagus di tahun 2004 dan 2005, masing-masing sebesar 3.44 dan 2.58, namun turun menjadi 0.69 di tahun 2006 dan bahkan lebih rendah lagi pada 0.6 di tahun 2007 pada waktu dua pinjaman (dari BNI dan PT Sumber Kencana Perkasa) jatuh tempo pada tahun 2006. Akibatnya posisi kas selalu pada level yang mengkhawatirkan, jauh di bawah level minimum yang diminta yaitu 1.5 – lihat Tabel 8. Table 8: Rasio Lancar dan Arus Kas 2004 Rasio Lancar Kas = #jumlah bln operasional

2005

3.44 0.72

2.58 0.31

2006 0.69 0.16

2007 (Un-audited) 0.60 0.67

2.3. PINJAMAN BERJALAN DAN KEMAMPUAN MEMBAYAR PINJAMAN Pada akhir tahun 2007, PDAM Kota Malang memiliki saldo pinjaman sebesar Rp25,974 juta, yang terdiri dari: •

Pinjaman dari Direktorat Dana Investasi (DDI), Departemen Keuangan, berdasarkan kontrak No. RDA 60/DDI/1991 dengan nilai pinjaman Rp 10.056 juta. Pinjaman tersebut memiliki jangka waktu pembayaran 30 tahun, termasuk masa tenggang 5 tahun dantingkat bunga per tahun 9%. Saldo utang di tahun 2007 sebesar Rp3.154 juta, Rp 2.345 juta di antaranya adalah pokok dan selebihnya Rp 0,809 juta adalah akumulasi bunga. Pinjaman ini dijadwalkan lunas pada tanggal 1 November 2011.

ENVIRONMENTAL SERVICES PROGRAM WWW.ESP.OR.ID

7


PDAM TIRTA DHARMA - ANALISA KONDISI KEUANGAN DAN ANALISA KELAYAKAN KEUANGAN PENDAHULUAN ATAS USULAN RENCANA INVESTASI - REVISI

•

•

Kekurangan pembayaran kepada PT Sumber Kencana Perkasa untuk pembangunan fasilitas produksi Wendit III sejumlah Rp 19,245 juta, dimana kedua pihak setuju bahwa PDAM akan membayar jumlah tersebut secara mengangsur mulai bulan Desember 2005 dengan tingkat bunga 11% per tahun. Angsuran tersebut dijadwalkan selesai pada akhir 2008. Sisa utang berjalan pada akhir tahun 2007 berjumlah Rp4,500 juta. Pinjaman dari Bank Negara Indonesia (BNI) sebesar Rp 26,719 juta dengan tingkat bunga 15.5% per tahun (mengambang) dan jangka waktu pembayaran 93 bulan termasuk masa tenggang 21 bulan. Pinjaman ini diharapkan lunas pada tahun 2011. Pinjaman ini ditarik dalam 2 tahapan, pertama sebesar Rp13,500 juta, yang dilakukan pada tahun 2004 dan sisanya pada 2005. Pembayaran pinjaman ini sudah dimulai pada tahun 2006. Saldo pinjaman pada akhir tahun 2007 sebesar Rp18,319 juta.

Jadwal pembayaran pinjaman PDAM dapat dilihat pada Lampiran C. Selama ini PDAM bisa memenuhi kewajiban pembayaran pokok pinjaman dan bunga yang jatuh tempo atas pinjaman-pinjaman di atas secara tepat waktu. Debt service coverage ratio PDAM tetap berada di level yang aman, meskipun menurun dari 3.63 pada tahun 2006 menjadi 2.25 pada tahun 2007. Sedangkan rasio utang terhadap modal sedikit bervariasi, berkisar antara 41.1% hingga 60.6%, sebagaimana tampak pada tabel 9 berikut. Table 9: Indikator Kemampuan Membayar Pinjaman 2004 DSCR Rasio Utang thd. Modal

2005

34.80 41.1%

ENVIRONMENTAL SERVICES PROGRAM WWW.ESP.OR.ID

25.04 60.6%

2006 3.63 56.9%

2007 (Un-audited) 2.25 47.3%

8



PDAM TIRTA DHARMA - ANALISA KONDISI KEUANGAN DAN ANALISA KELAYAKAN KEUANGAN PENDAHULUAN ATAS USULAN RENCANA INVESTASI - REVISI

3. ANGGARAN 2008 3.1. PRODUKSI DAN PENJUALAN AIR PDAM memperkirakan produksi dan penjualan air pada tahun 2008 tidak akan jauh berbeda dengan tahun 2007. Dengan anggapan arata-rata pemakaian air masih sama dengan tahun 2007, dengan tambahan sambungan baru sebanyak 3.389 unit, produksi air diperkirakan sebesar 42,074 m3 dan volume air terjual 24,078 m3. Tingkat kehilangan air diperkirakan 39.9%, turun 2% dari tahun 2007 sebagai hasil penggantian beberapa pipa distribusi dan meter air. Tingkat pemanfaatan produksi tetap 85.6%. Table 10: Produksi dan Penjualan Air (2008) 2007 Kapasitas Terpasang (l/dtk) Kapasitas Produksi (l/dtk) Volume Produksi (m3/tahun) Volume Distribusi (m3/tahun) Volume Air Terjual (m3/tahun) Tingkat Kehilangan Air (%) Rasio Produksi thd Konsumsi Pemanfaatan Kapasitas Jumlah Sambungan Penambahan Sambungan

1,558 1,334 42,074 40,057 23,314 41.8% 1.05 85.6% 86,840

2008 Budget 1,558 1,334 42,074 40,057 24,078 39.9% 1.05 85.6% 90,229 3,389

Berdasarkan rencana investasi yang disusun oleh bagian teknik, sebanya 3.389 sambungan baru akan dipasang pada tahun 2008. Dengan demikina jumlah sambungan akan meningkat menjadi 90,229, dimana 95% merupakan rumah tangga.. Rasio cakupan pelayanan akan mencapai 82.4% dari jumlah penduduk di wilayah pelayanan.

3.2. PENDAPATAN DAN BIAYA PDAM memproyeksikan laba bersih akan sedikit menurun sebesar 2% dari Rp13,858 juta di tahun 2007 menjadi Rp 12,292 juta di tahun 2008, disebabkan adanya kenaikan biaya pegawai dan tarif air baku. PDAM merencanakan kenaikan gaji sebesar 15% setiap tahun (tidak termasuk tunjangan). PDAM Kota Malang saat ini sedang menyiapkan amandemen kesepakatan atas tarif air baku dengan Kota Batu dan Kabupaten Malang. Diperkirakan kenaikan tarif air baku akan mengakibatkan kenaikan biaya air baku sebesar 30%.. Proyeksi PDAM untuk tahun 2008 ditunjukkan pada Tabel 11:

ENVIRONMENTAL SERVICES PROGRAM WWW.ESP.OR.ID

9


PDAM TIRTA DHARMA - ANALISA KONDISI KEUANGAN DAN ANALISA KELAYAKAN KEUANGAN PENDAHULUAN ATAS USULAN RENCANA INVESTASI - REVISI

Table 11: Perkiraan Kinerja Keuangan PDAM tahun 2008

Pendapatan Air Pendapatan Non-Air Pendapatan Operasional Biaya Operasional Pendapatan Non-Operasional (neto) EBITDA Pajak Pendapatan Laba Bersih Tarif Rata-rata (Rp.m3) Biaya Rata-rata (Rp.m3) Rasio Lancar Rasio Utang:Modal DSCR #Hari Perputaran Piutang Kas= # Juml. Bln Biaya Operasional Pencapaian Full Cost Recovery

Actual 2007 77,005 2,216 79,221 45,118 150 34,253 5,641 13,858 3,303 2,568 0.60 47.3% 2.25 45 0.67 124%

Budget 2008 75,472 5,297 80,768 49,675 121 31,215 5,241 12,292 3,134 2,631 1.14 39.4% 2.29 50 0.09 101%

Table 12: Biaya per Unit PDAM 2007-2008 (Rp per m3 Air Terjual – harga konstan 2007) 2007 Realisasi Pegawai Energi Kimia Pemeliharaan Adm. Umum Air Baku Total

874.6 398.6 7.5 252.3 317.0 63.3 1,913.3

ENVIRONMENTAL SERVICES PROGRAM WWW.ESP.OR.ID

20078 RKAP 976.4 361.9 9.3 206.2 241.5 121.5 1,916.8

Naik/Turu n 12% -9% 25% -18% -24% 92% 0.2%

10


PDAM TIRTA DHARMA - ANALISA KONDISI KEUANGAN DAN ANALISA KELAYAKAN KEUANGAN PENDAHULUAN ATAS USULAN RENCANA INVESTASI - REVISI

4. ANALISA USULAN INVESTASI 4.1. TARGET FISIK DAN BIAYA Sebelumnya rencana investasi PDAM terdiri dari 3 komponen: perluasan jaringan pipa distribusi sepanjang 126.113 m; pembangunan delapan (8) buah reservoir dengan total kapasitas 8,250 m3; dan pemasangan empat (4) buah pompa dengan total kapasitas 395 l/dtk; dan direncanakan akan dilaksanakan selama periode 2005 – 2009. PDAM memutuskan untuk menunda pelaksanaanya hingga tahun 2007 karena dana tidak mencukupi untuk melaksanakan seluruh program dan tidak tersedianya sumber pendanaan dari luar. Meskipun demikian, untuk bisa memenuhi kebutuhan permintaan air besih, beberapa komponen dalam rencana investasi telah dikerjakan, antara lain pembangunan tiga (3) buah reservoir dengan total kapasitas 2.750 m3 pada tahun 2007; perluasan jaringan pipa distribusi sepanjang 50.495 di tahun 2007 dan pemasangan pompa kapasitas 110 l/dtk. Sumber dananya berasal dari Pemda dan dana internal kas PDAM. Tahun ini, 2008, satu pinjaman akan lunas, oleh karena iu PDAM berniat untuk melnajutlkan pelaksanaan rencana investasi yang tertunda. Rencana investasi yang telah disusun dikaji kembali dan ditambahkan beberapa komponen kegiatan berdasarkan kebutuhan yang berkembang saat ini. Rencana pelaksanaan dijadwalkan pada periode 2009-2012. Rencana investasi yang yang telah diperbaharui terdiri dari: perluasan jaringan distribusi dengan panjang total 68.477m; pembangunan empat (4) reservoirs dengantotal kapasitas 8.000m3; pemasangan 15 buah pompa dengan kapasitas berkisar antara 20 hingga 110 l/dtk; rehabilitasi 10.243m pipa asbes; program penurunan kehilangan air dan pemasangan Asset Information Management System. Berdasarkan data dari bagian perencanaan teknis PDAM, sejumlah 20.000 sambungan baru direncanakan akan dipasang selama periode 2009 hingga 2012, sebagaimana ditunjukkan pada Tabel 13. Table 13: Jadwal Pemasangan Sambungan Baru

Penambahan per tahun Kumulatif

2009

2010

2011

2012

2013

4,000 4,000

5,000 9,000

5,000 14,000

5,000 19,000

1,000 20,000

PDAM mentargetkan jumlah sambungan sudah mencapai 110.000 sambungan langganan pada tahun 2013 untuk mencapai target MDG yaitu 90% ckupan pelayanan. Selain itu PDAM juga akan menjalankan program penambahan sambungan langganan secara rutin selama dan sesuadah periode investasi tersebut dan diperkirakan akan ada penambahan tetap sbanyak 100 buah sambungan baru setiap tahun dari tahun 2014 dan seterusnya. Rencana investasi yang disusun oleh bagian perencanaan teknis dan litbang PDAM, volume danperkiraan biayanya, disajikan pada Lampiran D dalam laporan ini. Total biaya dasar rencana investasi sekitar Rp 109,527 juta. Dari jumlah itu 20% Rp 22.000 juta adalah untuk pembangunan reservoir, jaringan pipa distribusi 38% atau Rp41.963 juta, pompa 10% atau Rp11.081 juta dan 31% sisanya atau Rp34.,484 juta untuk rehabilitasi pipa distribusi, pemasangan jaringan pipa tersier untuk sambungan rumah, program penurunan tingkat kehilangan air dan pemasangan Asset Information Management System. ENVIRONMENTAL SERVICES PROGRAM WWW.ESP.OR.ID

11


PDAM TIRTA DHARMA - ANALISA KONDISI KEUANGAN DAN ANALISA KELAYAKAN KEUANGAN PENDAHULUAN ATAS USULAN RENCANA INVESTASI - REVISI

WILAYAH PELAYANAN SISTEM UTAMA

RES. BANGKON

kel. bale arjosari

ds. tasikmadu

ds. tunggulwulung

kel. polowijen

kel. tanjungsekar

kel. arjosari kel. tlogomas kel. mojolangu

RES. TLOGOMAS kel. dinoyo

kel. merjosari

kel. purwodadi

RES. MOJOLANGU

kel. jatimulyo

kel. blimbing

kel. tulusrejo

RES. BETEK

kel. pandanwangi

kel. ktw gede

kel. Karang besuki

kel. penanggungan kel. sumbersari

kel. purwantoro kel. lowokwaru

WENDIT 1

kel. samaan

kel. pisang candi

kel. rampal clkt

kel. bunulrejo

kel. Oro oro dowo

kel.

gading kasri kel. klojen kel. kesatrian kel. bareng kel. kauman

kel. bandulan kel.

kel. kasin

tanjungrejo kel. mulyorejo

kel. cemorokandang kel. sukoharjo

kel. sukun

kel. jodipan

kel. polehan kel. madyopuro

kel. kotalama

kel. ciptomulyo

kel. Bandung rejosari

kel. sawojajar

kel. kdl dalem

kel. lesanpuro kel. Kedung kandang

kel. mergosono

RES. BURING

kel. Bakalan Krajan

kel. buring kel. gadang

kel.

kel. bumiayu

kebonsari kel. wonokoyo

WILAYAH PELAYANAN RESERVOIR TLOGOMAS

kel. tlogowaru

WILAYAH PELAYANAN RESERVOIR BETEK WILAYAH PELAYANAN RESERVOIR MOJOLANGU

kel. arjowinangun

WILAYAH PELAYANAN RESERVOIR BURING WILAYAH PELAYANAN RESERVOIR BANGKON WILAYAH PELAYANAN WENDIT I

ENVIRONMENTAL SERVICES PROGRAM WWW.ESP.OR.ID

12


PDAM TIRTA DHARMA - ANALISA KONDISI KEUANGAN DAN ANALISA KELAYAKAN KEUANGAN PENDAHULUAN ATAS USULAN RENCANA INVESTASI - REVISI

Rincian rencana investasi per tahun per komponen biaya disajikan pada Tabel 14 berikut ini Table 14: Perkiraan Biaya Investasi (Dlm. Rp Juta) Jenis

2008

2009

2010

2011

2012

Total

Reservoir Pipa Pompa Pipa Tersier Program NRW AIMS Total, Harga Dasar Kontingensi Keuangan Total, Harga Berlaku

0 3,927 3,366 2,315 0 0 9,608 0

5,500 8,790 7,715 2,315 0 0 24,320 1,702

2,750 17,962 0 2,315 0 9,500 32,527 4,713

13,750 5,216 0 2,315 9,650 0 30,931 6,961

0 9,827 0 2,315 0 0 12,142 3,774

22,000 45,723 11,081 11,573 9,650 9,500 109,527 17,150

% of Total 16% 34% 8% 7% 9% 7% 81% 19%

9,608

26,023

37,240

37,891

15,916

126,677

100%

Catatan: - Harga dasar menggunakan harga 2008. - Harga satuan sudah termasuk kontingensi fisik dan perkiraan biaya DED untuk reservoir

Mengenai rencana pendanaan untuk pelaksanaan rencana investasi ini, PDAM ingin mendapatkan dana dari pasar modal apabila kinerja keuangannya memenuhi syarat (indikasi peringkat minimum yang diminta adalah BBB atau A-). Oleh karena itu pemeringkatan perusahaan akan dilakukan pada bulan April-Mei 2008. Namun demkian, pelaksanaan pembangunan dengan waktu lebih dari 3 tahun kurang sesuai untuk pendanaan melalui pasar modal. Oleh karena itu periode pelaksanaan dipercepat menjadi 3 tahun, dari 2009 sampai 2011, yang secara teknis memungkinkan (lihat rincian pada Lampiran E) Rencana investasi per tahun dengan demikian menjadi sebagai berikut . Table 15: Perkiraan Biaya Investasi - 3 tahun (Dlm Rp Juta) Jenis

2009

2010

2011

Reservoir Pipa Pompa Pipa Tersier Program NRW AIMS Total, Harga Dasar Kontingensi Keuangan

5,500 12,717 11,081 4,629 0 0 33,928 2,375

16,500 29,777 0 3,472 4,825 9,500 54,574 9,284

0 3,229 0 3,472 4,825 0 11,526 2,594

22,000 45,723 11,081 11,573 9,650 9,500 109,527 14,253

% of Total 18% 37% 9% 8% 9% 8% 88% 12%

Total, Harga Berlaku

36,303

73,358

14,120

123,780

100%

ENVIRONMENTAL SERVICES PROGRAM WWW.ESP.OR.ID

Total

13


PDAM TIRTA DHARMA - ANALISA KONDISI KEUANGAN DAN ANALISA KELAYAKAN KEUANGAN PENDAHULUAN ATAS USULAN RENCANA INVESTASI - REVISI

4.2. RENCANA PEMBIAYAAN Untuk mendapatkan gambaran mengenai skema pembiayaan bagi pelaksanaan rencana investasi di atas, ada dua alternatif pembiayaan yang dikaji. Penerbitan obligasi merupakan piihan pertama apabila kondisi kinerja keuangan PDAM memenuhi syarat untuk memasuki pasar modal. Pilihan kedua adalah pinjaman dari bank komersial domestik apabila pemeringkatan perusahaan menunjukkan hasil sebaliknya. Sumber dana eksternal ini diusulkan untuk membiayai sekitar 74% atau Rp 91.597 juta dari total biaya investasi. Kebutuhan selebihnya diharapkan akan ditutup dengan suntikan dana sebagai penyertaan modal dari Pemda dan penghasilan kas PDAM. Simulasi untuk masing-masing jenis pendanaan telah dilakukan dan proyeksiknya disajikan dalam lampiran-lampiran dalam laporan ini. Table 16: Rencana Pembiayaan (Dlm Rp Juta) Uraian Pinjaman: (Bank Komersial /Obligasi) Penyertaan Modal Pemda Kas PDAM

Total

91,597 24,756 7,427 123,780

% Total

74.0% 20.0% 6.0% 100.0%

2009

26,864 7,261 2,178 36,303

2010

54,285 14,672 4,401 73,358

2011

10,449 2,824 847 14,120

Porsi pendanaan di atas masih bersifat indikatif meskipun PDAM sudah mengkonfirmasi porsi pendanaan yang menjadi bagiannya. Pemerintah Daerah saat ini sedang memproses Perda mengenai tambahan penyertaan modal bagi PDAM sebesar Rp75 milyar (perkiraan). Pembahasan selanjutnya untuk mengambil keputusan mengenai jumlah dan proses penurunan dana dijadwalkan pada bulan Agustus 2008 sesudah Pilkasa Walikota pada bulan Juni 2008. Obligasi Pelaksanaan rencana investasi adakan didanai melalui penerbitan obligasi yang diperkirakan akan dimobilisasi pada semester pertama tahun 2009, pada tingkat bunga pasar yang berlaku, diasumsikan 12.5% per tahun dan dengan jangka waktu 10 tahun. PDAM harus mengalokasikan dana cadangan (sinking fund) sebesar 10% dari nilai obligasi untuk menjamin tersedianya cukup dana untuk membayar pokok obligasi yang akan jatuh tempo pada akhir periode obligasi. Ada dua (2) skenario yang mungkin untuk penggunaan dana dari obligasi: i. Untuk membiayai investasi ii. Untuk membiayai investasi dan melunasi pinjaman yang ada saat ini. Pinjaman yang akan dilunasi dengan obligasi adalah pinjaman dari BNI dengan saldo sebesar lebih kurang Rp13.9 juta. Table 17: Indikasi Komponen Obligasi (Dlm Rp Juta Nominal) Investasi Jumlah Fee Underwriter Fee Pemeringkat Enhancer fee Biaya penerbitan obligasi Nilai Obligasi

2.00% 0.74% 2.42% 2.24%

ENVIRONMENTAL SERVICES PROGRAM WWW.ESP.OR.ID

91,597 1,832 675 2,217 2,052 98,373

Investasi + Refinance 105,517 2,110 777 2,554 2,364 113,322 14


PDAM TIRTA DHARMA - ANALISA KONDISI KEUANGAN DAN ANALISA KELAYAKAN KEUANGAN PENDAHULUAN ATAS USULAN RENCANA INVESTASI - REVISI

5. HASIL UTAMA PROYEKSI KEUANGAN Pembahasan difokuskan pada tahun-tahun 2009 hingga 2018, karena merupakan rentang waktu yang kritis berkaitan dengan pelansakaan investasi dan jangka waktu obligasi. Tabel di bawah ini menunjukkan proyeksi keuangan untuk skema pembiayaan dengan obligasi yang digunakan hanya untuk membiayai investasi.. Table 18: Hasil Proyeksi Keuangan dan Indikator Utama Skema Pembiayaan dengan Obligasi (untuk investasi) (dlm Rp juta) Tahun 2009 Water Revenue

2010

2011

2012

2013

2014

2016

2017

92,988 104,866 120,499 136,399 154,570 168,255 184,405 199,766 219,050

Non-Water Revenues

6,812

Total Operating Rev. Operating Expenses

65,971

72,578

81,281

89,468

98

14,352

1,277

1,975

3,311

6,018

Non Operating Rev. (nett)

2015

8,311

8,539

9,672

4,465

3,056

3,359

3,630

2018 237,507

3,986

4,401

99,799 113,177 129,038 146,071 159,035 171,311 187,764 203,396 223,036

241,908

58,828

150,611

98,551 110,435 121,710 134,295 13,982

24,162

36,837

32,971

EBITDA

41,069

61,558

57,738

66,766

72,878

78,778

91,312 105,849 125,578

124,267

EBIT

31,377

51,865

45,461

50,087

55,353

60,859

72,972

87,059 106,306

104,480

EBT

16,917

38,065

32,513

37,633

42,898

48,405

60,518

74,605

93,852

92,026

Corporate Tax

5,050 11,867

11,395 26,671

9,729 22,784

11,265 26,368

12,845 30,054

14,497 33,909

18,130 42,388

22,356 52,248

28,131 65,722

27,583 64,443

3,482 3,107

3,760 3,208

4,112 3,337

4,440 3,594

4,844 3,744

5,235 4,012

5,733 4,391

6,206 4,751

6,799 5,153

7,366 5,671

63.26%

62.91% 60.23% 59.59%

57.88%

58.57%

59.89% 60.93%

61.31%

63.41%

83.15% 8.14 53.9% 69.2% 2.17 19,761 2.08 12.8% 48

79.05% 75.79% 75.59% 1.77 1.92 2.59 44.1% 39.8% 37.0% 60.0% 54.7% 52.1% 3.80 3.55 4.07 19,344 17,961 12,297 3.18 3.21 3.02 25.4% 18.9% 19.3% 46 45 45

75.11% 3.52 34.4% 49.4% 4.50 12,297 3.29 19.4% 45

75.26% 4.39 31.8% 46.7% 4.95 12,297 3.56 20.2% 45

75.22% 75.20% 4.93 5.42 29.1% 26.3% 43.9% 40.8% 5.93 7.08 12,297 12,297 4.13 4.78 23.0% 26.2% 45 45

74.44% 5.76 23.5% 37.5% 8.65 12,297 5.67 30.0% 45

75.59% 4.58 0.0% 0.0% 8.50 110,670 2.41 27.1% 45

2.6 123%

4.2 122%

8.0 122%

9.9 122%

9.2 90%

Net Profit Average Tariff (Rp.m3) Average Cost (Rp.m3) Operating Ratio: - O&M Costs/Water Rev. - O&M+Depr+Int. Costs/Operating Rev. Current Ratio Debt Ratio to Total Assets Debt:Debt+Equity Ratio EBIT/Interest Debt Service DSCR Net profit/water revenue #Days Acc. Receivable Cash= No. of Months of Operating Costs FCR Achievement

9.6 114%

1.2 118%

0.6 122%

1.1 122%

6.0 122%

Dengan menggunakan asumsi yang sama, penggunaan obligasi untuk membiayai investasi dan untuk melunasi pinjaman berjalan memberikan hasil yang sedikit berbeda dilihat dari indikator keuangan yang dihasilkan. Perbedaan yang tampak jelas adalah pada tiga (3) indikator keuangan yang paling terpengaruh dengan skema pembiayaan yang digunakan, yaitu: (i) DSCR, (ii) Rasio Lancar, dan (iii) Kas=#Jumlah Bulan Biaya Operasional.

ENVIRONMENTAL SERVICES PROGRAM WWW.ESP.OR.ID

15


PDAM TIRTA DHARMA - ANALISA KONDISI KEUANGAN DAN ANALISA KELAYAKAN KEUANGAN PENDAHULUAN ATAS USULAN RENCANA INVESTASI - REVISI

Posisi ketiga indikator dengan skema obligasi kedua adalah sebagai berikut: Table 19: Indikator Keuangan Utama Skema Pembiayaan dengan Obligasi (untuk investasi + pelunasan utang) Tahun

Current Ratio Debt Service DSCR Cash= No. of Months of Operating Costs

2009

2010

2011

2012

2013

2014

2015

2016

2017

2018

9.05 31,149 1.32

2.19 16,413 3.87

2.64 15,110 3.82

3.20 14,166 2.62

4.05 14,165 2.86

4.77 14,165 3.20

5.27 14,165 3.68

5.72 14,165 4.24

6.03 4.57 14,165 127,487 4.99 2.06

10.2

2.6

2.4

2.5

3.6

5.0

6.6

8.4

10.1

8.8

Pinjaman Bank Komersial Persyaratan pinjaman didsarkan pada pengalaman PDAM Kota Malang dalam mendapatkan dana dari sumber yang sama. Jangka waktu pembayaran tujuh (7) tahun termasuk masa tenggang 2 tahun. Tingkat bunga yang berlaku saat ini 14%. Penarikan pinjaman diasumsikan dilakukan pada awal tahun 2009, sesuai dengan dimulainya pelaksanan rencana investasi, sebagaimana ditunjukkan pada Tabel 20 di bawah ini. Table 20: Rencana Pembiayaan dan Jadwal Penarikan Pinjaman (lm Rp Juta)

Penarikan Pinjaman Penyertaan Modal Pemda Kas PDAM Total

2009

2010

2011

Total

% Total

26,864 7,261 2,178

54,285 14,672 4,401

10,449 2,824 847

91,597 24,756 7,427

74.0% 20.0% 6.0%

36,303

73,358

14,120

123,780

100.0%

Berdasarkan asumsi persyaratan, skedul amortisasi pinjaman ditunjukkan pada tabel 21. Table 21: Skedul Amortisasi Pinjaman (Dlm Rp Juta)

Penarikan Pinjaman per tahun Kumulatif Penarikan

2009

2010

2011

26,864

54,285

10,449

2012

2013

2014

2015

2016

26,864

81,149

91,597

0

0

16,793

18,319

18,319

18,319

18,319

1,527

Bunga

3,448

10,728

11,722

9,297

6,732

4,168

1,603

18

Saldo

26,864

81,149

74,805

56,485

38,166

19,846

1,527

0

Total Debt Service

3,448

10,728

28,515

27,617

25,052

22,487

19,922

1,544

Amortisasi

Penggunaan pinjaman komersial akan mempengaruhi posisi kas secara negatif pada tiga (3) tahun pertama periode pinjaman sebagaimana tampak dalam tabel 22 berikut..

ENVIRONMENTAL SERVICES PROGRAM WWW.ESP.OR.ID

16


PDAM TIRTA DHARMA - ANALISA KONDISI KEUANGAN DAN ANALISA KELAYAKAN KEUANGAN PENDAHULUAN ATAS USULAN RENCANA INVESTASI - REVISI

Table 22: Hasil Proyeksi Keuangan dan Indikator Utama Skema Pembiayaan dengan Pinjaman Komersial Tahun 2009 Water Revenue

92,988

Non-Water Revenues

6,812

Total Operating Rev. Operating Expenses

99,799

Non Operating Rev. (nett)

58,828

2010

2011

104,866 120,499

2012

2013

2014

2015

2016

2017

2018

168,255 184,405 199,766 219,050 237,507

136,399

154,570

8,539

9,672

4,465

113,177 129,038

146,071

159,035

171,311 187,764 203,396 223,036 241,908

81,281

89,468

98,551 110,435 121,710 134,295 150,611

8,311 65,971

72,578

3,056

3,359

3,630

98

652

1,212

1,932

2,811

3,846

5,020

41,069

47,858

57,672

66,723

72,378

76,606

82,349

88,045 109,146 130,186

EBIT

31,377

38,166

45,802

50,451

55,259

59,093

64,416

69,662

EBT

25,766

26,092

33,586

41,153

48,526

54,926

62,813

69,644

90,281 110,805

Corporate Tax

7,705 18,061

7,803 18,289

10,051 23,535

12,321 28,832

14,533 33,993

16,453 38,473

18,819 43,994

20,868 48,776

27,059 63,222

33,217 77,589

3,482 2,776

3,760 3,146

4,112 3,299

4,440 3,478

4,844 3,552

5,235 3,741

5,733 4,041

6,206 4,352

6,799 4,754

7,366 5,272

63.26%

62.91%

60.23%

59.59%

57.88%

58.57%

59.89%

60.93%

61.31%

63.41%

74.28% 1.25 27.1% 43.4% 5.59 10,912 3.76 19.4% 48

77.52% 1.36 40.1% 55.0% 3.16 17,775 2.69 17.4% 46

74.91% 0.96 33.5% 48.1% 3.75 34,179 1.69 19.5% 45

73.15% 0.92 25.1% 38.5% 5.43 27,617 2.42 21.1% 45

71.25% 1.31 16.6% 27.3% 8.21 25,052 2.89 22.0% 45

70.18% 1.78 8.4% 14.7% 14.18 22,487 3.41 22.9% 45

69.22% 2.22 0.6% 1.2% 40.19 19,922 4.13 23.9% 45

68.89% 68.67% 70.27% 3.14 3.80 4.41 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 3,911 #DIV/0! #DIV/0! 1,544 57.01 #DIV/0! #DIV/0! 24.4% 28.9% 32.7% 45 45 45

(0.8) 126%

(0.9) 119%

(2.0) 112%

(2.3) 124%

(1.2) 128%

0.1 129%

1.5 131%

Average Tariff (Rp.m3) Average Cost (Rp.m3) Operating Ratio: - O&M Costs/Water Rev. O&M+Depr+Int. Costs/Operating Rev. Current Ratio Debt Ratio to Total Assets Debt:Debt+Equity Ratio EBIT/Interest Debt Service DSCR Net profit/water revenue #Days Acc. Receivable Cash= No. of Months of Operating Costs FCR Achievement

4.3 131%

20,405

4,401

EBITDA

Net Profit

6,359

3,986

38,889

90,281 110,805

7.3 131%

10.3 128%

5.1. ASUMSI 5.1.1.

BIAYA MODAL

Biaya modal dihitung berdasarkan kombinasi sumber-sumber dana sebagaimana ditunjukkan dalam rencana pembiayaan. Porsi pinjaman bisa berasal dari bank koemrsial atau melalui penerbitan obligasi. Bunga dari pinjaman bank komersial diperkirakan sebesar 14.0%, sedangkan dari obligasi 10-tahun sebesar 12.5%. Dana dari PDAM dan penyertaan modal Pemda diharapkan akan menghasilkan “return on equity” 10%. Atas dasar perhitungan ini rata-rata biaya modal (weighted average cost of capital=WACC) untuk alternatif pembiayaan dengan pinjaman komersial adalah sebesar 13.0%, sedangkan dengan obligasi sebesar 11.9% sebagaimana ditunjukkan pada Tabel 23.

ENVIRONMENTAL SERVICES PROGRAM WWW.ESP.OR.ID

17


PDAM TIRTA DHARMA - ANALISA KONDISI KEUANGAN DAN ANALISA KELAYAKAN KEUANGAN PENDAHULUAN ATAS USULAN RENCANA INVESTASI - REVISI

Table 23: Biaya Modal Rata-rata Tertimbang (Weighted Average Cost of Capital WACC Weighting Nominal Cost WACC WACC Weighting Nominal Cost WACC

5.1.2.

Pinjaman Komersial 74.0% 14.0% 10.4% Obligasi

Dana Pemda/PDAM 26.0% 10.0% 2.6% Dana Pemda/PDAM

Total 100.0% 13.0% Total

74.0% 12.5%

26.0% 10.0%

100.0%

9.3%

2.6%

11.9%

PROYEKSI PRODUKSI DAN PERMINTAAN AIR

Sebagian dari rencana investasi yang diusulkan adalah pemasangan delapan (8) pompa tambahan masing-masing dengan kapaitas 110 l/dtk di Wendit dan 4 unit di Mojolangu dengan kapasitas masing-masing 100 l/dtk dan beberapa pompa dengan kapaistas yang lebih kecil (20 l/dtk) di Badut, Istana Dieng dan Supit Urang. Karena itu total kapasitas produksi, diproyeksikan meningkat menjadi 1,480 l/dtk pada akhir periode proyek di tahun 2011 atau 146 l/dtk lebih besar dari kapasitas produksi di tahun 2008 sebesar 1,334 l/dtk. Tingkat kehilangan air 41.8% di tahun 2007, ditargetkan turun menjadi 39.9% di tahun 2008 dan sesudahnya diproyeksikan akan menurun secara bertahap sebesar 2% setiap tahun hingga mencapai 29.9% di tahun 2013 dan akhirnya 20% di tahun 2018. Pemasangan 20.000 unit sambungan baru akan selesai pada tahun 2013. Tambahan sambungan baru sesudahnya akan didapat dari program pemasaran sambungan PDAM yang selama ini sudah berjalan. Pemakaian air per orang, sebagaimana diperkirakan oleh PDAM, masih akan relatif rendah sebesar 123 liter per hari selama periode proyeksi, meskipun sudah menignkat 10% dibanding saat ini. Pemakaian air per pelanggan diperkirakan akan meningkat menjadi 23.4 m3 per bulan di tahun 2009, selanjutnya secara bertahap meningkat menjadi 24.3 m3 pada tahun 2014 dan bertahan pada angka tersebut untuk tahun-tahun selanjutnya. Cakupan pelayanan akan meningkat menjadi 91.0% pada tahun 2013 tetapi akan menurun menjadi 87% menjelang akhir periode proyeksi karena hanya akan ada sedikit tambahan sambungan baru sesudah tahun 2013. Dengan demikian berarti masih ada cukup peluang untuk memperluas sistem di dalam wilayah kota. Tingkat pemanfaatan kapasitas produksi berada dalam kisaran 85% hingga 96% terutama karena perkiraan pemakaian air yang konservatif dan penurunan tingkat kehilangan air.. Tabel 24 menunjukkan gambaran perkiraan tingkat produksi, distribusi, pemakaian air dan kehilangan air.

ENVIRONMENTAL SERVICES PROGRAM WWW.ESP.OR.ID

18


PDAM TIRTA DHARMA - ANALISA KONDISI KEUANGAN DAN ANALISA KELAYAKAN KEUANGAN PENDAHULUAN ATAS USULAN RENCANA INVESTASI - REVISI

Table 24: Proyeksi Kapasitas Produksi, Distribusi dan Kehilangan Air 2009 1,402 44,220 42,995 27,464 26,704 37.9% 1.03 90%

Production Capacity (l/sec) Production Volume (m3/year) Distribution Volume (m3/year) Volume Sold to Consumers (m3/year) Water demand (m3/year) Water Losses (%) Ratio of Production to Consumption Plant Utilization Factor (%)

2010 1,480 46,676 43,506 29,924 27,891 35.9% 1.07 95%

2011 1,480 46,676 44,329 30,857 29,305 33.9% 1.05 95%

2012 1,480 46,676 45,103 31,791 30,719 31.9% 1.03 95%

2013 1,480 46,676 45,510 32,724 31,907 29.9% 1.03 95%

Data proyeksi jumlah sambungan dan kebutuhan air sampai dengan tahun 2013 dapat dilihat pada Tabel 25 di bawah ini. Table 25: Proyeksi Jumlah Sambungan dan Kebutuhan Air Jumlah Pelanggan

2009

2010

2011

2012

2013

2014

2015

2016

2017

2018

94,229

99,229

104,229

109,229

110,229

110,329

110,429

110,529

110,629

110,729

Sambungan Baru Rata-rata Konsumsi (m3/samb/bulan)

4,000

5,000

5,000

5,000

1,000

100

100

100

100

100

23.6

23.4

23.4

23.4

24.1

24.3

24.3

24.3

24.3

24.3

Produksi (000 m3)

44,220

46,676

46,676

46,676

46,676

46,676

46,676

46,676

46,676

46,676

Distribusi (000 m3)

42,995

43,506

44,329

45,103

45,510

44,569

43,402

42,297

41,248

40,251

Air Terjual (000 m3)

26,704

27,891

29,305

30,719

31,907

32,138

32,165

32,191

32,218

32,245

38%

36%

34%

32%

30%

28%

26%

24%

22%

20%

Proyeksi Kehilangan Air

5.1.3.

BIAYA RUTIN

Berikut adalah asumsi biaya rutin yang diguanakn dalam pembuatan proyeksi: • Biaya pegawai: PDAM berniat mempertahankan jumlah karyawan sebanyak 500 orang di tahun 2009 dan untuk tahun-tahun selanjutnya selama periode proyeksi. Rasio jumlah karyawan terhadap jumlah pelanggan 5.25 per 1,000 sambungan, diharapkan akan dicapai pada tahun 2009 dan secara bertahap turun menjadi 4.5 di tahun 2018. Menjadi kebijakan manajemen untuk menaikkan gaji karyawan setiap tahun sebesar 15%. Komponen gaji besarnya lebih kurang 50% dari total biaya pegawai. Kenaikan tunjangan dilakukan sekali waktu dengan besaran yang bervariasi. Berdasarkan hal itu diasumsikan biaya pegawai setiap tahun meningkat sebesar 12.5% atau secara riil 5.5%. • Listrik dan Bahan Kimia: Meskipun situasi harga produk minyak saat ini masih tinggi, namun PDAM mengkonfirmasikan bahwa eknaikan tarif listrik hanya akan diberlakukan terutama pada golongan rumah tangga. Sedangkan kenaikan harga yang tinggi pada beberapa jenis bahan kimia tertentu tidak akan banyak berpengaruh terhadap PDAM karena sebagian besar sumber air yang digunakan adalah mata air. Oleh kaerna itu, harga kedua jenis biaya tersebut diproyeksikan meningkat sejalan dengan tingkat inflasi per tahun. • Pemeliharaan: Diasumsikan 3.8% dari aktiva tetap produktif, sama dengan rata-rata biaya selama periode 2004-2008. • Administrasi Umum: Porsi biaya ini terhadap biaya pegawai akan dikurangi ,enjadi 30% untuk peningkatan efisiensi pada tahun 2009 dan diharapkan akan tetap selama periode proyeksi. • Air Baku. Saat ini Pemda Kota Batu, Kab. Malang sedang mereview MOU dengan PDAM Kota Malang dalam kaitannya dengan tarif air baku yang baru. Diperkirakan dengan adanya perubahan tarif tersebut biaya retribusi air baku akan naik dengan 30% pada tahun 2009 dan akan dilakukan setiap 3 tahun sekali. ENVIRONMENTAL SERVICES PROGRAM WWW.ESP.OR.ID

19


PDAM TIRTA DHARMA - ANALISA KONDISI KEUANGAN DAN ANALISA KELAYAKAN KEUANGAN PENDAHULUAN ATAS USULAN RENCANA INVESTASI - REVISI

5.1.4.

ANALISA TARIF

PDAM telah sepakat untuk melakukan penyesuaian tarif nominal setiap 2 tahun sekali sebesar 20%, yang biasanya mulai berjalan enam atau tujuh bulan setelah kenaikan tariff disitujui. Dengan tingkat kenaikan ini, rata-rata tariff selalu mencapai level “full-cost recovery�. Untuk penyesuaian taif pada tahun 2007 PDAM telah mengacu pada pedoman penghitungan tarif yang baru yaitu Permendagri 23/2006 yang menunjukkan hanya dua (2) blok konsumsi.

5.1.5.

PEMBAGIAN LABA KE PEMDA

PDAM mempunyai kewajiban memberikan 55% dari laba bersih setiap tahun kepada Pemda, yang diharapkan akan dikembalikan kepada PDAM sebagai tambahan penyertaan modal Pemda untuk membiayai kegiatan-kegiatan investasi PDAM yang diperlukan untuk meningkatkan pelayanannya. Didalam proyeksi keuangan Pemda diharapkan akan mereinvestasikan 50% dari pembagian laba yang diterima untuk membantu PDAM melaksanakan rencana investasi yang telah dibuat..

5.2. INDIKATOR KELAYAKAN Berdasarkan asumsi-asumsi yang telah dijelaskan sebelumnya, rencana investasi dengan menggunakan kedua skema pembiayaan keduanya menunjukkan tingkat kelayakan dengan net present value (NPV) positive di atas Rp 65 juta dan financial internal rate of return (FIRR) di atas 20%. Rencana tersebut tetap layak meskipun seandainya terjadi kenaikan biaya investasi dan kenaikan biaya operasi dan pemeliharaan sebesar 10%. Begitu juga ketika kenaikan pendapatan lebih rendah 10% dari yang diharapkan atau adanya penundaan pelaksanaan pembangunan sehingga penerimaan pendapatan tertunda. Perhitungan FIRR disajikan di Lampiran J. Indikator kelayakan rencana investasi pada kondisi dasar dan bila berada pada kondisi yang berbeda dapat dilihat pada Tabel 26. Table 26: Indikator Kelayakan Obligasi WACC=11.9%

Kondisi Dasar 10% Kenaikan Biaya Investasi dan O&P 10% Penurunan Kenaikan Pendapatan Satu Tahun Penundaan Kenaikan Pendapatan

NPV 76,429 46,301 38,658 29,108

FIRR 24.9% 19.7% 19.2% 16.3%

Pinjaman Komersial WACC=13.0%

NPV 84,196 51,518 43,098 35,750

FIRR 23.3% 18.4% 17.9% 15.5%

5.3. HASIL-HASIL KEUANGAN Proyeksi keuangan ketiga laporan keuangan utama untuk setiap skema pembiayaan, obligasi dan pinjaman komersial, akan disajikan sebagai Lampiran. Ketiga laporan keuangan utama tersebut adalah: Laporan Rugi Laba, Laporan Sumber dan Penggunaan Dana dan Neraca.

ENVIRONMENTAL SERVICES PROGRAM WWW.ESP.OR.ID

20


PDAM TIRTA DHARMA - ANALISA KONDISI KEUANGAN DAN ANALISA KELAYAKAN KEUANGAN PENDAHULUAN ATAS USULAN RENCANA INVESTASI - REVISI

6. PERBANDINGAN INDIKATOR PENCAPAIAN KEUANGAN DI ANTARA 3 SKENARIO PEMBIAYAAN Bagian ini terutama menyajikan data dan grafik indicator/rasio-rasio keuangan utama yang dihasilkan dari setiap scenario pembiayaan untuk memperlihatkan perbedaannya.

6.1. DEBT SERVICE COVERAGE (KEMAMPUAN MEMBAYAR PINJAMAN) DSCR Financing Scenarios

2009

2010

2011

2012

2013

2014

2015

2016

2017

2018

Obligasi - Investasi Obligasi – investasi + pelunasan utang

2.08

3.18

3.21

3.02

3.29

3.56

4.13

4.78

5.67

2.41

1.32

3.87

3.82

2.62

2.86

3.20

3.68

4.24

4.99

2.06

Pinjaman Komersial

2.01

3.69

1.96

2.42

2.89

3.41

4.13

57.01

-

-

30.0

25.0

D S C R

20.0

15.0

10.0

5.0

‐ 2009

2010

2011

O bligas i ‐ inves tas i

2012

2013

2014

2015

O bligas i ‐ inves tas i+ refinanc e

ENVIRONMENTAL SERVICES PROGRAM WWW.ESP.OR.ID

2016

2017

2018

P injaman B ank

21


PDAM TIRTA DHARMA - ANALISA KONDISI KEUANGAN DAN ANALISA KELAYAKAN KEUANGAN PENDAHULUAN ATAS USULAN RENCANA INVESTASI - REVISI

6.2. RASIO LANCAR Rasio Lancar Skenario Pembiayaan

2009

2010

2011

2012

2013

2014

2015

2016

2017

2018

Obligasi - Investasi Obligasi – investasi + pelunasan utang

8.14

1.77

1.92

2.59

3.52

4.39

4.93

5.42

5.76

4.58

9.05

2.19

2.64

3.20

4.05

4.77

5.27

5.72

6.03

4.57

Pinjaman Komersial

0.52

1.07

0.96

0.92

1.31

1.78

2.22

3.14

3.80

4.41

2013

2014

10.0 9.0 8.0

R AS IO L ANC AR

7.0 6.0 5.0 4.0 3.0 2.0 1.0 ‐ 2009

2010

2011

O bligas i ‐ inves tas i

2012

2015

O bligas i ‐ inves tas i+ refinanc e

2016

2017

2018

P injaman B ank

6.3. KAS= #JUMLAH BULAN BIAYA OPERASI DAN PEMELIHARAAN Kas= #Jumlah Bulan Biaya Operasi dan Pemeliharaan Skenario Pembiayaan 2009 2010 2011 2012 2013 Obligasi - Investasi Obligasi – investasi + pelunasan utang Pinjaman Komersial

2014

2015

2016

2017

2018

9.55

1.23

0.63

1.10

2.61

4.23

6.03

7.96

9.91

9.15

10.19

2.64

2.45

2.45

3.58

5.00

6.61

8.36

10.14

8.80

(3.16)

(1.68)

(2.00)

(2.27)

(1.24)

0.11

1.46

4.29

7.28

10.39

ENVIRONMENTAL SERVICES PROGRAM WWW.ESP.OR.ID

22


PDAM TIRTA DHARMA - ANALISA KONDISI KEUANGAN DAN ANALISA KELAYAKAN KEUANGAN PENDAHULUAN ATAS USULAN RENCANA INVESTASI - REVISI

12.0 10.0

# B UL AN K AS

8.0 6.0 4.0 2.0 ‐ 2009

2010

2011

2012

2013

2014

2015

2016

2017

2018

(2.0) (4.0) O bligas i ‐ inves tas i

O bligas i ‐ inves tas i+ refinanc e

P injaman B ank

6.4. DEBT SERVICE Debt Service Skenario Pembiayaan Obligasi - Investasi Obligasi – investasi + pelunasan utang Pinjaman Komersial

2014

2015

2016

19,761 19,344 17,961 12,297

12,297 12,297

12,297

12,297

12,297 110,670

31,149 16,413 15,110 14,166

14,165 14,165

14,165

14,165

14,165 127,487

20,432 12,975 29,460 27,617

25,052 22,487

19,922

1,544

2009

2010

2011

2012

2013

2017

2018

0

0

50,000 45,000 40,000 35,000

R p. juta

30,000 25,000 20,000 15,000 10,000 5,000 0 2009

2010

2011

2012

P injaman K omers ial

ENVIRONMENTAL SERVICES PROGRAM WWW.ESP.OR.ID

2013

2014

2015

2016

O bligas i

23


PDAM TIRTA DHARMA - ANALISA KONDISI KEUANGAN DAN ANALISA KELAYAKAN KEUANGAN PENDAHULUAN ATAS USULAN RENCANA INVESTASI - REVISI

100,000

80,000

R p. juta

60,000

40,000

20,000

0 2009

2010

2011

2012

2013

2014

2015

2016

(20,000)

(40,000) K .K as ‐ K omers ial

K .K as ‐ O bligas i

Table 27: Ringkasan Perbandingan Indikasi

DSCR Rasio Lancar Jumlah bulan kas NPV/FIRR *) PV (Pokok+Bunga+ Biaya2 Tetap) **) Tingkat Bunga Jk. Waktu Pinjaman Masa Tenggang

OBLIGASI investasi + Investasi pelunasan utang 2.08 -3.29 1.32 - 3.87 1.77 - 8.14 2.19 - 9.05 0.63 - 9.55 2.45 - 10.19

PINJAMAN KOMERSIAL 1.96 - 3.69 0.52 - 1.31 (3.16) - 1.24

84,196/23.3% 144,847

76,429/24.9% 106,419

12.5% 10 tahun 9 tahun, pokok dibayar di th -10

14% 7 tahun Max 2 tahun

*) Lihat perhitungan di Lampiran J **) Lihat perhitungan di Lampiran K

ENVIRONMENTAL SERVICES PROGRAM WWW.ESP.OR.ID

24


PDAM TIRTA DHARMA - ANALISA KONDISI KEUANGAN DAN ANALISA KELAYAKAN KEUANGAN PENDAHULUAN ATAS USULAN RENCANA INVESTASI - REVISI

7. KESIMPULAN DAN SARAN 7.1. KESIMPULAN Dari pembahasan di atas, berikut adalah kesimpulan yang bisa dibuat: •

PDAM Kota Malang akan bisa mempertahankan kondisi keuangan yang sehat dengan adanya investasi baru dan dampak keuangan yang dihasilkan. Laba bersih positif akan dihasilkan setiap tahun selama periode proyeksi 10 tahun, demikian juga dengan indikator-indikator keuangan yang lain. Namun demikian ada satu aspek yang perlu diperhatikan, yaitu biaya pegawai yang relatif tinggi dikaitkan dengan total biaya tahun sebelumnya. 1

Tanpa peningkatan jaringan distribusi yang berarti, akan sulit bagi PDAM untuk mencapai target kinerjanya. Demikian pula apabila target penurunan tingkat kehilangan air tidak terlaksana, maka target peningkatan pendapatan air akan sulit dicapai. .

Dengan adanya kapasitas jaringan distribusi yang terbatas dan tingkat kehilangan air yang tinggi, rencana investasi yang diusulkan sangat mendesak untuk dilaksanakan. Rencana investasi tersebut termasuk di antaranya, pemasangan pompa-pompa tambahan untuk Wendhit agar bisa beroperasi pada kapasitas penuh.

Atas dasar asumsi-asumsi biaya dan peningkatan pendapatan, rencana investasi yang diusulkan layak. Analisa kelayakan keuangan yang dilakukan menghasilkan NPV positif dan FIRR yang melampaui WACC.

Pemilihan skema pendanaan sangat bergantung pada jadwal pelaksanaan rencana investasi. Obligasi baik digunakan untuk periode pelaksanaan pekerjaan yang lebih pendek, karena dengan periode yang lebih panjang dari 2 tahun akan ada dana obligasi yang menganggur dan menimbulkan biaya keuangan.

Rencana investasi yang diusulkan secara keuangan bisa dilakukan oleh PDAM. Meskipun porsi pinjaman yang direncanakan cukup besar, tapi hasil proyeksi keuangan menunjukkan bahwa PDAM akan mampu membayar kewajiban yang timbul, sebagaimana terlihat dari DSCR yang secara konsisten lebih tinggi dari minimum yang disyaratkan..

1

Permendagri 2/2007 tentang Organ dan Kepegawaian Perusahaan Daerah Air Minum, pasal 12 ayat 5, menyatakan bahwa total biaya untuk Direksi, Badan Pengawas, penghasilanpegawai dan biaya tenaga ekrja lainnya tidak boleh melebihi 40% dari total biaya berdasarkan realisasi Anggaran Perusahaan Tahun Anggaran yang lalu. ENVIRONMENTAL SERVICES PROGRAM WWW.ESP.OR.ID

25


PDAM TIRTA DHARMA - ANALISA KONDISI KEUANGAN DAN ANALISA KELAYAKAN KEUANGAN PENDAHULUAN ATAS USULAN RENCANA INVESTASI - REVISI

7.2. SARAN Berikut adalah saran yang diusulkan agar hal-hal yang telah disimpulkan di atas benar-benar bisa tercapai: •

Merumuskan dan melaksanakan rencana tindak menuju efisiensi biaya pegawai. Biaya pegawai yang cukup tinggi dikaitkan dengan total realisasi biaya pada tahun anggaran bisa menjadi perhatian calon pemberi pinjaman dan mungkin akan meminta PDAM bersedia menentukan strategi melakukan efisiensi biaya. Rencana pemberian kenaikan gaji kepada pegawai akan lebih menarik apabila didasarkan pada prestasi kerja karena akan mendorong motivasi kerja, daripada kenaikan rutin setiap tahun sebesar 15% ke semua pegawai.

Mengambil langka-langkah yang lebih agresif dan proaktif untuk memasarkan sambungan baru. Sambungan baru sangat diperlukan baik untuk melengkapi pelaksanaan rencana investasi maupun untuk menghasilkan kenaikan pendapatan yang telah diproyeksikan. Usaha keras terutama perlu dilakukan untuk bisa mencapai target sambungan baru selama lima tahun ke depan yang cukup ambisius dibandingkan dengan catatan tentang data sambungan baru yang terealisir selama ini.

Melakukan survei kebutuhan nyata (real demand survey). Hasil survey akan memperkuat target-target dalam rencana investasi dan akan membantu pembuatan anggaran yang lebih realistis di tahun-tahun mendatang.

Menyiapkan perangkat-perangkat pengaman untuk menjamin agar asumsiasumsi yang digunakan dalam proyeksi keuangan bisa terpenuhi. PDAM harus bisa yakin bahwa kenaikan tarif yang dijadwalkan setiap 2 tahun sekali dengan minimum kenaikan 18% benar-benar bisa dilaksanakan dan memastikan bahwa struktur tariff yang dibuat antar kelompok pelanggan akan menghasilkan rata-rata tariff yang sesuai dengan target kenaikan yang diharapkan. Namum apabila kenaikan tariff rata-rata setiap tahun bisa mencapai 3% di atas tingkat inflasi, yang kurang lebih bisa didapat dengan kenaikan tariff 25% setiap 2 tahun, akan bisa lebih menjaga posisi keuangan PDAM (misal seandainya Pemda tidak bisa menginvestasikan kembali paling tidak 50% dari pembagian laba yang diterima).

Mendapatkan komitmen Pemda untuk menginvestasikan kembali ke PDAM 100% pembagian laba dari PDAM yang telah diterima, untuk menjamin ketersediaan dana di PDAM pada level yang aman pada setiap akhir tahun, atau PDAM tidak memberikan dividend tetapi menawarkan sejumlah tingkat pengembalian modal (return on equity) yang bisa diterima kepada Pemda.

Menyiapkan perangkat-perangkat pengaman untuk mengatasi kemungkinan terjadi hal yang sebaliknya dari yang direncanakan dalam pelaksanaan rencana investasi. Untuk menjamin ketepatan pelaksanaan pembangunan PDAM harus bekerjasama dengan kontraktor yang bermutu. PDAM harus bersedia untuk membatasi tender hanya bagi kontraktor yang bermutu dan memasukkan klausul denda untuk keterlambatan penyelesaian pekerjaan dalam perjanjian pekerjaan.

Dalam kaitannya dengan keinginan PDAM untuk menerbitkan obligasi untuk membiayai pelaksanaan rencana investasi, maka untuk mengoptimalkan penggunaan dana obligasi dan ENVIRONMENTAL SERVICES PROGRAM WWW.ESP.OR.ID

26


PDAM TIRTA DHARMA - ANALISA KONDISI KEUANGAN DAN ANALISA KELAYAKAN KEUANGAN PENDAHULUAN ATAS USULAN RENCANA INVESTASI - REVISI

meminimalkan biaya keuangan yang timbul dari selisih antara tingkat bunga obligasi dengan tingkat bunga deposito, PDAM perlu mempertimbangkan saran berikut ini: •

Mempercepat pelaksanaan pembangunan menjadi dua (2) tahun; dengan porsi investasi di tahun pertama yang lebih besar dari tahun kedua;

Apabila jangka waktu pembangunan 3-tahun tetap dirasa lebih tepat, maka Pemda dan/atau PDAM mendanai lebih dahulu kebutuhan investasi pada tahun pertama dan hasil penerbitan obligasi digunakan untuk mendanai kebutuhan investasi pada tahun kedua dan ketiga, atau

Kebutuhan investasi pada tahun pertama dibiayai melalui pinjaman komersial, obligasi diterbitkan kemudian untuk membiayai kebutuhan investasi tahun kedua dan ketiga dam untuk melunasi pinjaman komersial pada tahun pertama.

Satu hal yang penting, PDAM harsu menyusun rencana investasi berdasarkan prioritas dan membuat jadwal pelaksanaan yang terinci, yang bisa diterima baik dari prespektif teknik maupaun keuangan. Apabila PDAM dan Pemda tidak merasa yakin dengan ketiga skema pembiayaan di atas, alternatif lain yang ada adalah membiayai seluruh kebutuhan biaya investasi dengan modal sendiri dan pinjaman komersial. Namun jumlah pinjaman sebaiknya lebih rendah (prioritas pada investasi yang paling mendesak) untuk mengurangi beban kas.

ENVIRONMENTAL SERVICES PROGRAM WWW.ESP.OR.ID

27



PDAM TIRTA DHARMA - ANALISA KONDISI KEUANGAN DAN ANALISA KELAYAKAN KEUANGAN PENDAHULUAN ATAS USULAN RENCANA INVESTASI - REVISI

8. LAMPIRAN LAMPIRAN A: NOTULEN RAPAT DENGAN PDAM KOTA MALANG Date Time Place

: : :

March 17-18, 2008 9:00 – 11:30 AM PDAM Kota Malang

The purpose of the meeting was to do data checking and discuss on technical details and assumptions used in the financial analysis and projection model. The meeting was attended by the Technical Director, General Director, Managers and key staffs, either from technical or financial departments. The first day was used to show the first draft of finpro based on data provided by PDAM and discuss several issues as follows: (1) Implementation Schedule of the investment. PDAM formerly proposed 5-year period of implementation from 2008-2012. Considering the timing and possibility to finance through capital market, PDAM agreed to squeeze the period to 3 tahun. (2) Though number of population was taken from Laporan Kinerja PDAM, the R&D staff needed to recheck the figure. For member of family it’s agreed to use 6 instead of 7 from budget 2008. PDAM should use regional data instead of PU standard to calculate the service coverage. (3) Average meter cubic water konsumsi per connection would be kept lower than previously targeted in budget 2008 considering that the actual konsumsi in 2007 was only 22.1 m3, much lower than the target at 25m3. Konsumsi for year 2009 is projected to increase by 10% as the result of water meter replacement. (4) The UFW is projected to decrease by 2% every year starting from 2009, as the result of pipes and water meter replacement. (5) The days of account receivable will be projected at 45 days. The Dirum said that it was difficult to make it faster than that. (6) Tariff adjustment will be done every 2 tahun between 18 to 20%, consistent with the plan in the Corporate Plan. (7) Regarding financing plan, the Dirum explained that currently PDAM and Pemda were working on Perda on Pemda’s equity to PDAM. PDAM expected to get around Rp75 billion from Pemda. PDAM itself will allocate between 6 - 8 billion every year for the investment. (8) Several data were checked, corrected and adjusted, especially data on customers (no of connection, water sold and water bills). The second day was to revise finpro based on discussion/correction/inputs and present the result to PDAM. A copy was given to PDAM to give them a chance to study the finpro and to look more thoroughly at the data and assumptions. PDAM would work on it and email it to ESP asap. Next Steps: • Present the first outlook of the investment feasibility to PDAM and Badan Pengawas by the end of March or early April 2008.

ENVIRONMENTAL SERVICES PROGRAM WWW.ESP.OR.ID

28


PDAM TIRTA DHARMA - ANALISA KONDISI KEUANGAN DAN ANALISA KELAYAKAN KEUANGAN PENDAHULUAN ATAS USULAN RENCANA INVESTASI - REVISI

LAMPIRAN B: NOTULEN RAPAT DENGAN PDAM KOTA MALANG Tanggal Waktu Tempat Agenda Peserta

: : : : :

April 3, 2008 10:00 – 12:00 AM, 07:00 – 09:00 PM PDAM Kota Malang Presentasi draft pre-FS Dewan Pengawas PDAM Kota Malang Para Direktur dan Manajer PDAM Kota Malang ESP

Presentasi dibagi dalam 2 (dua) sesi, dimana sesi pertama adalah pertemuan dengan Direksi dan Manajer serta beberapa staff PDAM Kota Malang dengan tujuan untuk klarifikasi data dan masukan-masukan lainnya. Sedangkan pertemuan kedua adalah pertemuan dengan Badan Pengawas PDAM Kota Malang yang dilaksanakan pada pukul 19.00. Ketua Badan Pengawas diwakili oleh Asisten Sekretaris Daerah, sedangkan anggota dan sekretaris Badan Pengawas hadir. Pertemuan Pertama : Poppy Lestari mewakili ESP menyajikan presentasi Pra-FS dan parameter kuangan. Berikut ini adalah beberapa catatan dalam pertemuan tersebut : • Jumlah bulan kas terhadap bulan operasional yang rendah akan berdampak buruk pada upaya penerbitan obligasi? Analisa jumlah kas terhadap bulan operasional pada periode eksisting menunjukan nilai dibawah 1 bulan. •

Kehilangan air tahun 2006 meningkat tajam. Hal ini disebabkan antara lain oleh 3 hal: - Perbaikan jaringan; - Meter air tidak akurat, - Peningkatan jam pelayanan menjadi 24 jam. Wilayah-wilayah yang sebelumnya mendapatkan pelayanan 16 jam atau kurang dari 24 jam biasa menggunakan bak penampung untk menampung air. Dengan pelayanan 24 jam mereka tidak perlu menampung ari lagi karena air bisa didapat setiap saat.

Perbedaan dalam cakupan pelayanan antara hasil perhitungan dalam Finpro dengan laporan PDAM disebabkan perbedaan rumus yang digunakan. PDAM mengalikan semua jumlah sambungan dengan rata-rata jumlah anggota keluarga; sedangan rumus dalam Finpro adalah jumlah sambungan rumah dan kran umum. Penjelasan ESP mengenai hal ini bisa diterima dengan baik oleh PDAM.

Klarifikasi jumlah tenaga kerja dan biaya tenaga kerja PDAM setuju dengan data eksisting yang ada dan angka proyeksi yang digunakan. Kenaikan 15% atas biaya personil hanya dikenakan kepada gaji, yang merupakan 50% dari seluruh biaya tenaga kerja.

Biaya air baku tahun 2008, Peningkatan biaya air baku disebabkan mulai diberlakukannya tarif air baku dengan Kabupaten Kota Batu per Januari tahun 2008 sebesar Rp. 70/m3. MOU antara PDAM

ENVIRONMENTAL SERVICES PROGRAM WWW.ESP.OR.ID

29


PDAM TIRTA DHARMA - ANALISA KONDISI KEUANGAN DAN ANALISA KELAYAKAN KEUANGAN PENDAHULUAN ATAS USULAN RENCANA INVESTASI - REVISI

dan Pemda Batu akan segera diselesaikan. Demikian juga dengan Kab. Malang meminta kenaikan tarif air baku dari Rp50 menjadi Rp65 per m3juga terjadi kenaikan, sehingga rata-rata kenaikan retibusi air baku adalah sebesar 30%. •

Mengenai asumsi kenaikan biaya listrik, Direksi menyampaikan bahwa kenaikan tarif yang akan datang diberlakukan terutama untuk golongan rumah tangga, diharapkan tarif industri tidak akan terjadi kenaikan riil yang signifikan.

Klarifikasi PDAM tentang ijin penggunaan tanah untuk pemasangan pipa, bahwa biaya yang terkait dengan hal tersebut telah termasuk dalam nilai investasi.

Mekanisme tender proyek dapat dilakukan dengan metode “Fixed Price” untuk mengantisipasi resiko peningkatan biaya investasi karena adanya perubahan harga

PDAM memberikan klarifikasi bahwa biaya DED telah diperhitungkan dalam perkiraan biaya investasi., begitu juga dengan kontingensi fisik.

Penambahan sambungan dikoreksi dengan mengurangi target tahun 2009 dan menambah target tahun sesudahnya. Disepakati proyeksi penambahan pelanggan baru akan dikoreksi dengan sambungan Setiap tahun PDAM memperkirakan adanya tambahan pelanggan baru antara sekitar 4,000 hingga 5,000 sambungan, sambungan baru pada tahun 2009 sehingga target dan tingkat optimalisasi sambungan baru sebesarsebanyak 20 ribu akan dapat dicapai dalam waktu 4-5 tahunpada tahun 2013.

Kebutuhan dana yang bersumber dari penyertaan Pemda. Penyertaan Pemda sedang dalam proses untuk Perda. Komitmen Pemda sebesar Rp75 milyar telah disetujui oleh 4 fraksi dari 6 fraksi di DPRD. Keputusan pemberian penyertaan Pemda tersebut dalam jumlah sekaligus atau bertahapparsial tergantung Perda yang akan diputuskan nantinya. Keputusan menunggu hasil Pilkada sekitar bulan Agustus 2008.

Penjadwalan pelaksanaan proyek dan prioritisasi program akan dibicarakan pada pertemuan mendatang secara lebih rinci.

Pertemuan kedua dengan Dewan Pengawas Berikut ini adalah beberapa catatan dalam pertemuan tersebut. • Apakah ada fee untuk pendampingan management? Pendampingan manajemen nantinya dilakukan oleh Wali Amanat dan nilai tersebut sudah termasuk dalam fee wali amanat yang dibayar per tahunnya. •

Apakah biaya sudah diestimasi kenaikannya? Seperti air baku? Semua unsur biaya operasional telah diproyeksikan peningkatan per tahunnya. Paramater yang digunakan adalah inflasi dan estimasi dari PDAM (Biaya tenaga kerja dan air baku).

Pernyataan dari Badan Pengawas terkait dengan komitmen penyertaan modal dari Pemda, tahun 2008 adalah tahun kritis bagi Pemda untuk memenuhi bisa kebutuhan pendanaan PDAM. Rp. 5 milyar per tahun tampaknya akan sangat sulit untuk diimplementasikan.

Apakah program ini selaras dengan corporate plan? Ya, dan sudah masuk dalam Rencana Induk (Master Plan) yang disusun dalam periode Corporate Plan.

ENVIRONMENTAL SERVICES PROGRAM WWW.ESP.OR.ID

30


PDAM TIRTA DHARMA - ANALISA KONDISI KEUANGAN DAN ANALISA KELAYAKAN KEUANGAN PENDAHULUAN ATAS USULAN RENCANA INVESTASI - REVISI

Hendaknya rencana investasi ini didukung dengan kajian terhadap potensi pelanggannya, mengingat bahwa data historis menunjukan adanya penurunan tingkat konsumsi pelanggan.

Bagaimana sistem tender untuk penerbitan obligasi? ESP akan membantu dalam hal persiapan dan pelaksanaan tender dalam rangka penerbitan obligasi.

Kebutuhan investasi dan pembiayaannya hendaknya dibuat dengan perencanaan yang matang dalam jangka panjang dan selaras dengan Corporate Plan. Sehingga tidak terkesan rencana investasi yang ada dibuat dengan perencanaan yang tidak matang.

Berikut ini adalah tanggapan dari Dirut PDAM terkait dengan pertanyaan Badan Pengawas. • PDAM Kota Malang untuk mempertahankan tingkat pelayanan, perlu mengganti pipa pompa air yang sudah tua dan , mengganti meter air yang tidak akurat, . Ssehingga untuk itu perlu ada upaya perbaikan dengan merencanakan investasi baru. •

Penurunan konsumsi air antara lain disebabkan: − dikarenakan adanya penurunan konsumsi industri dengan bebasnya pengambilan air tanah dan pengawasan yang kurang.

Kapasitas produksi yang ada sekarang telah melebihi kapasitas (idle), investasi peningkatan kapasitas ini didanai dengan pinjaman BNI. Seiring dengan penurunan tingkat konsumsi, maka untuk mengoptimalkan kapasitas yang idle telah disiapkan rencana pengembangan pelayanan (penambahan sambungan baru). Disamping itu telah disiapkan juga analisa tentang kelayakan investasi dan alternatif yang paling ekonomis dari sisi pendanaannya.

PDAM dalam bulan ini mencanangkan program promosi dengan menurunkan biaya sambungan baru dari Rp1.25 juta menjadi Rp. 1 juta (PDAM subsidi Rp. 250 ribu). Saat ini sudah terdaftar Target sambungan per bulan 70070 calon pelanggan (tercapai dalam waktu 1 bulan). PDAM memberikan program angsuran 3 bulan dengan pembayaran pertama 50%.

ENVIRONMENTAL SERVICES PROGRAM WWW.ESP.OR.ID

31


PDAM TIRTA DHARMA - ANALISA KONDISI KEUANGAN DAN ANALISA KELAYAKAN KEUANGAN PENDAHULUAN ATAS USULAN RENCANA INVESTASI - REVISI

LAMPIRAN C: JADWAL PEMBAYARAN PINJAMAN PDAM KOTA MALANG 2005 Pinjaman DDI Saldo Utang Pembayaran Pokok Pembayaran Bunga Pembayaran Bunga Masa Tenggang Pinjaman PT Sumber Kencana Perkasa Saldo Utang Pembayaran Pokok Pembayaran Bunga Pinjaman BNI Saldo Utang Pembayaran Pokok Pembayaran Bunga

2006

2007

2008

2009

2010

2011

4,355 670 382

3,685 670 321

3,015 670 260

2,345 670 199

1,675 670 137

1,005 670 76

335 335 15

231

231

231

231

231

231

116

17,505 1,005 637

16,500 6,000 1,985

10,500 6,000 1,118

4,500 4,500 271

26,719

26,719 4,000 4,153

22,719 4,400 3,470

18,319 4,400 2,753

13,919 4,400 2,020

9,519 4,800 1,270

4,719 4,719 479

ENVIRONMENTAL SERVICES PROGRAM WWW.ESP.OR.ID

32


PDAM TIRTA DHARMA - ANALISA KONDISI KEUANGAN DAN ANALISA KELAYAKAN KEUANGAN PENDAHULUAN ATAS USULAN RENCANA INVESTASI - REVISI

LAMPIRAN D: PROGRAM INVESTASI PDAM KOTA MALANG No. A 1

2

3

LOKASI

ESTIMASI BIAYA ( Rp.)

VOLUME

2008

2009

JADWAL PELAKSANAAN 2010

2011

2012

Sistem Pelayanan Reservoir Tlogomas Pengadaan & Pemasangan Jaringan Pipa f 100 mm f 250 mm f 300 mm

1,049,769,600.00 920.00 1,250.00 510.00

m' m' m'

82,731,000.00 587,606,250.00 379,432,350.00

Betek Pengadaan & Pemasangan Jaringan Pipa f 150 mm f 150 mm f 200 mm f 200 mm f 200 mm f 200 mm f 250 mm f 300 mm f 350 mm

900.00 440.00 900.00 1,500.00 1,740.00 500.00 800.00 900.00 2,810.00

m' m' m' m' m' m' m' m' m'

167,805,000.00 82,038,000.00 273,017,250.00 455,028,750.00 527,833,350.00 151,676,250.00 376,068,000.00 669,586,500.00 3,709,200,000.00

Pekerjaan Reservoir

2,000.00

m3

5,500,000,000.00

Mojolangu Pengadaan & Pemasangan Jaringan Pipa f 150 mm f 150 mm f 150 mm f 150 mm f 200 mm f 200 mm f 200 mm f 200 mm

82,731,000 587,606,250 379,432,350

11,912,253,100.00 167,805,000 82,038,000 273,017,250 455,028,750 527,833,350 151,676,250 376,068,000 669,586,500 1,854,600,000

1,854,600,000

5,500,000,000

11,425,339,400.00 400.00 1,000.00 1,860.00 500.00 1,100.00 2,210.00 800.00 450.00

m' m' m' m' m' m' m' m'

Pompa Submersible 100 lt/dt, head 82 m', 132 KW, 3 x 380 Volt, 50 Hz, 2800 rpm, DOL

4.00

unit

Panel Pompa CU3, 132 KW, 50 Hz

4.00

unit

ENVIRONMENTAL SERVICES PROGRAM WWW.ESP.OR.ID

74,580,000.00 186,450,000.00 346,797,000.00 93,225,000.00 333,687,750.00 670,409,025.00 242,682,000.00 136,508,625.00

74,580,000 186,450,000 346,797,000

1,800,000,000.00

1,800,000,000

1,016,000,000.00

1,016,000,000

93,225,000 333,687,750 670,409,025 242,682,000 136,508,625

33


PDAM TIRTA DHARMA - ANALISA KONDISI KEUANGAN DAN ANALISA KELAYAKAN KEUANGAN PENDAHULUAN ATAS USULAN RENCANA INVESTASI - REVISI

No.

LOKASI Transformator Daya 1000 KVA, 3 x 20 KV / 3 x 380 Volt

1.00

unit

Crane kapasitas 5 ton lengkap dengan tiang

1.00

unit

7.00 2.00 6.00 2,000.00

unit unit unit m3

Butterfly Valve f 8" Meter Air Digital ( Aqua Prove) Meter Air Digital f 8" - f 12" Pekerjaan Reservoar 4

5

ESTIMASI BIAYA ( Rp.)

VOLUME

125,000,000.00

125,000,000

125,000,000.00

125,000,000

105,000,000.00 220,000,000.00 450,000,000.00 5,500,000,000.00

Buring Pengadaan & Pemasangan Jaringan Pipa f 150 mm f 150 mm f 150 mm f 150 mm f 150 mm f 150 mm f 200 mm f 200 mm f 200 mm f 200 mm f 250 mm f 300 mm f 300 mm f 300 mm f 300 mm f 350 mm f 500 mm f 500 mm

800.00 360.00 400.00 320.00 2,300.00 800.00 2,100.00 500.00 2,300.00 3,300.00 1,300.00 650.00 2,250.00 1,020.00 2,900.00 1,820.00 4,527.00 2,500.00

m' m' m' m' m' m' m' m' m' m' m' m' m' m' m' m' m' m'

149,160,000.00 67,122,000.00 74,580,000.00 59,664,000.00 428,835,000.00 149,160,000.00 637,040,250.00 151,676,250.00 697,710,750.00 1,001,063,250.00 611,110,500.00 483,590,250.00 1,673,966,250.00 758,864,700.00 2,157,556,500.00 2,402,400,000.00 6,722,595,000.00 3,712,500,000.00

Pekerjaan Reservoar Buring III Buring IV

2,000.00 2,000.00

m3 m3

5,500,000,000.00 5,500,000,000.00

Wendit Pengadaan & Pemasangan Jaringan Pipa f 150 mm f 150 mm f 150 mm f 400 mm

2008

2009

JADWAL PELAKSANAAN 2010

2011

2012

105,000,000 220,000,000 450,000,000 2,750,000,000

2,750,000,000

32,938,594,700.00 149,160,000 67,122,000 74,580,000 59,664,000 428,835,000 149,160,000 637,040,250 151,676,250 697,710,750 1,001,063,250 611,110,500 483,590,250 1,673,966,250 758,864,700 2,157,556,500 2,402,400,000 3,361,297,500 3,712,500,000

3,361,297,500

5,500,000,000 5,500,000,000

14,884,450,500.00 1,200.00 1,630.00 1,860.00 5,050.00

m' m' m' m'

ENVIRONMENTAL SERVICES PROGRAM WWW.ESP.OR.ID

223,740,000.00 303,913,500.00 346,797,000.00 7,070,000,000.00

223,740,000 303,913,500 3,535,000,000

346,797,000 3,535,000,000

34


PDAM TIRTA DHARMA - ANALISA KONDISI KEUANGAN DAN ANALISA KELAYAKAN KEUANGAN PENDAHULUAN ATAS USULAN RENCANA INVESTASI - REVISI

No.

LOKASI Pompa Submersible 110 lt/dt, head 90 m' 147 KW, 3 x 380 Volt, 50 Hz, 2900 rpm, DOL Panel Pompa CU3, 147 KW, 50 Hz Transformator Daya 1250 KVA, 50 Hz 3 x 20 KV / 3 x 220 Volt Magnet Contactor SN 400 Magnet Contactor SN 300 Butterfly Valve f 8" Butterfly Valve f 12" Crane kapasitas 5 ton Meter Air Digital f 6" - f 8" Bak / sumuran pompa submersible Wendit II

6

7

8

9

10

Bangkon Pengadan & Pemasangan Jaringan Pipa f 100 mm f 150 mm f 200 mm f 300 mm Badut Pompa Submersible 20 lt/dt, 15 KW beserta Panel-panel

Istana Dieng Pompa Submersible 20 lt/dt, 15 KW beserta Panel-panel Supit Urang Pompa Submersible 20 lt/dt, 15 KW beserta Panel-pane REHAB JARINGAN PIPA ASBES f 100 mm f 150 mm f 150 mm f 150 mm f 150 mm

VOLUME 8.00

ESTIMASI BIAYA ( Rp.)

2008

2009

JADWAL PELAKSANAAN 2010

2011

2012

unit

8.00

unit

2.00

unit

6.00 6.00 6.00 8.00 1.00 2.00

unit unit unit unit unit unit

6.00

unit

3,000.00 700.00 900.00 2,500.00

m' m' m' m'

3,652,000,000.00

3,652,000,000

1,792,000,000.00

1,792,000,000

300,000,000.00

300,000,000

75,000,000.00 66,000,000.00 90,000,000.00 200,000,000.00 15,000,000.00 150,000,000.00

75,000,000 66,000,000 90,000,000 200,000,000 15,000,000 150,000,000

600,000,000.00

600,000,000

2,533,269,750.00 269,775,000.00 130,515,000.00 273,017,250.00 1,859,962,500.00

269,775,000 130,515,000 273,017,250 1,859,962,500

100,000,000.00 1.00

unit

100,000,000.00

100,000,000

100,000,000.00 1.00

unit

100,000,000.00

100,000,000

100,000,000.00 1.00

unit

418.00 1,202.00 222.00 425.00 544.00

m' m' m' m' m'

ENVIRONMENTAL SERVICES PROGRAM WWW.ESP.OR.ID

100,000,000.00

100,000,000

3,760,189,620.00 37,588,650.00 224,112,900.00 41,391,900.00 79,241,250.00 101,428,800.00

224,112,900 41,391,900

37,588,650

79,241,250 101,428,800

35


PDAM TIRTA DHARMA - ANALISA KONDISI KEUANGAN DAN ANALISA KELAYAKAN KEUANGAN PENDAHULUAN ATAS USULAN RENCANA INVESTASI - REVISI

No.

LOKASI f 150 mm f 150 mm f 150 mm f 150 mm f 150 mm f 150 mm f 150 mm f 150 mm f 250 mm f 250 mm f 300 mm f 300 mm f 400 mm

B

C

D

ESTIMASI BIAYA ( Rp.) 30,950,700.00 59,291,100.00 198,755,700.00 206,586,600.00 42,883,500.00 79,614,150.00 26,103,000.00 50,341,500.00 683,973,675.00 260,427,090.00 297,594,000.00 589,980,105.00 749,925,000.00

VOLUME 166.00 318.00 1,066.00 1,108.00 230.00 427.00 140.00 270.00 1,455.00 554.00 400.00 793.00 505.00

m' m' m' m' m' m' m' m' m' m' m' m' m'

Sistem Pelayanan Tersier (SR) Reservoir Tlogomas Reservoir Mojolangu Reservoir Betek Reservoir Buring Reservoir Bangkon Reservoir Wendit I Program NRW Peralatan Analisa NRW Penggantian Meter Air Manajemen Tekanan ( PRV + Timer ) Program AIMS Asset Information Management System ( A I M S )

2,941,200,000.00 1,998,000,000.00 891,000,000.00 2,487,600,000.00 1,057,200,000.00 2,198,400,000.00

40,000 -

-

unit -

9,650,000,000.00 2,650,000,000.00 6,000,000,000.00 1,000,000,000.00

-

9,500,000,000.00 9,500,000,000.00

109,527,266,670.00

ENVIRONMENTAL SERVICES PROGRAM WWW.ESP.OR.ID

2008

2009

JADWAL PELAKSANAAN 2010

2011

2012 30,950,700

59,291,100 198,755,700 206,586,600 42,883,500 79,614,150 26,103,000 50,341,500 683,973,675 260,427,090 297,594,000 589,980,105 749,925,000

588,240,000 399,600,000 178,200,000 497,520,000 211,440,000 439,680,000

588,240,000 399,600,000 178,200,000 497,520,000 211,440,000 439,680,000

588,240,000 399,600,000 178,200,000 497,520,000 211,440,000 439,680,000

588,240,000 399,600,000 178,200,000 497,520,000 211,440,000 439,680,000

588,240,000 399,600,000 178,200,000 497,520,000 211,440,000 439,680,000

21,280,577,500.00

12,141,952,620.00

2,650,000,000 6,000,000,000 1,000,000,000

9,500,000,000

9,607,677,525.00

33,820,127,175.00

32,676,931,850.00

36


PDAM TIRTA DHARMA - ANALISA KONDISI KEUANGAN DAN ANALISA KELAYAKAN KEUANGAN PENDAHULUAN ATAS USULAN RENCANA INVESTASI - REVISI

LAMPIRAN E: USULAN PERUBAHAN JADWAL PELAKSANAAN PEKERJAAN PDAM KOTA MALANG No. A 1

2

3

LOKASI

VOLUME

ESTIMASI BIAYA ( Rp.)

2009

2010

2011

Sistem Pelayanan Reservoir Tlogomas Pengadaan & Pemasangan Jaringan Pipa f 100 mm f 250 mm f 300 mm

1,049,769,600 920.00 1,250.00 510.00

m' m' m'

82,731,000 587,606,250 379,432,350

Betek Pengadaan & Pemasangan Jaringan Pipa f 150 mm f 150 mm f 200 mm f 200 mm f 200 mm f 200 mm f 250 mm f 300 mm f 350 mm

900.00 440.00 900.00 1,500.00 1,740.00 500.00 800.00 900.00 2,810.00

m' m' m' m' m' m' m' m' m'

167,805,000 82,038,000 273,017,250 455,028,750 527,833,350 151,676,250 376,068,000 669,586,500 3,709,200,000

Pekerjaan Reservoir

2,000.00

m3

5,500,000,000

Mojolangu Pengadaan & Pemasangan Jaringan Pipa f 150 mm f 150 mm f 150 mm f 150 mm f 200 mm f 200 mm f 200 mm f 200 mm

82,731,000 587,606,250 379,432,350

11,912,253,100 167,805,000 82,038,000 273,017,250 455,028,750 527,833,350 151,676,250 376,068,000 669,586,500 3,709,200,000 5,500,000,000

11,425,339,400 400.00 1,000.00 1,860.00 500.00 1,100.00 2,210.00 800.00 450.00

ENVIRONMENTAL SERVICES PROGRAM WWW.ESP.OR.ID

m' m' m' m' m' m' m' m'

74,580,000 186,450,000 346,797,000 93,225,000 333,687,750 670,409,025 242,682,000 136,508,625

74,580,000 186,450,000 346,797,000 93,225,000 333,687,750 670,409,025 242,682,000 136,508,625 37


PDAM TIRTA DHARMA - ANALISA KONDISI KEUANGAN DAN ANALISA KELAYAKAN KEUANGAN PENDAHULUAN ATAS USULAN RENCANA INVESTASI - REVISI

No.

4

ESTIMASI BIAYA ( Rp.)

LOKASI

VOLUME

Pompa Submersible 100 lt/dt, head 82 m', 132 KW, 3 x 380 Volt, 50 Hz, 2800 rpm, DOL Panel Pompa CU3, 132 KW, 50 Hz Transformator Daya 1000 KVA, 3 x 20 KV / 3 x 380 Volt Crane kapasitas 5 ton lengkap dng tiang Butterfly Valve f 8" Meter Air Digital ( Aqua Prove ) Meter Air Digital f 8" - f 12" Pekerjaan Reservoar

4.00

unit

1,800,000,000

1,800,000,000

4.00

unit

1,016,000,000

1,016,000,000

1.00

unit

1.00 7.00 2.00 6.00 2,000.00

unit unit unit unit m3

125,000,000 125,000,000 105,000,000 220,000,000 450,000,000 5,500,000,000

125,000,000 125,000,000 105,000,000 220,000,000 450,000,000

Buring Pengadaan & Pemasangan Jaringan Pipa f 150 mm f 150 mm f 150 mm f 150 mm f 150 mm f 150 mm f 200 mm f 200 mm f 200 mm f 200 mm f 250 mm f 300 mm f 300 mm f 300 mm f 300 mm f 350 mm f 500 mm f 500 mm

800.00 360.00 400.00 320.00 2,300.00 800.00 2,100.00 500.00 2,300.00 3,300.00 1,300.00 650.00 2,250.00 1,020.00 2,900.00 1,820.00 4,527.00 2,500.00

m' m' m' m' m' m' m' m' m' m' m' m' m' m' m' m' m' m'

149,160,000 67,122,000 74,580,000 59,664,000 428,835,000 149,160,000 637,040,250 151,676,250 697,710,750 1,001,063,250 611,110,500 483,590,250 1,673,966,250 758,864,700 2,157,556,500 2,402,400,000 6,722,595,000 3,712,500,000

Pekerjaan Reservoar Buring III Buring IV

2,000.00 2,000.00

m3 m3

5,500,000,000 5,500,000,000

2009

2010

2011

5,500,000,000

32,938,594,700

ENVIRONMENTAL SERVICES PROGRAM WWW.ESP.OR.ID

149,160,000 67,122,000 74,580,000 59,664,000 428,835,000 149,160,000 637,040,250 151,676,250 697,710,750 1,001,063,250 611,110,500 483,590,250 1,673,966,250 758,864,700 2,157,556,500 2,402,400,000 6,722,595,000 3,712,500,000 5,500,000,000 5,500,000,000 38


PDAM TIRTA DHARMA - ANALISA KONDISI KEUANGAN DAN ANALISA KELAYAKAN KEUANGAN PENDAHULUAN ATAS USULAN RENCANA INVESTASI - REVISI

No. 5

LOKASI Wendit Pengadaan & Pemasangan Jaringan Pipa f 150 mm f 150 mm f 150 mm f 400 mm

VOLUME

1,200.00 1,630.00 1,860.00 5,050.00

m' m' m' m'

8.00

unit

8.00

unit

2.00

unit

6.00 6.00 6.00 8.00 1.00 2.00 6.00

unit unit unit unit unit unit unit

Panel Pompa CU3, 147 KW, 50 Hz Transformator Daya 1250 KVA, 50 Hz, 3 x 20 KV / 3 x 220 Volt Magnet Contactor SN 400 Magnet Contactor SN 300 Butterfly Valve f 8" Butterfly Valve f 12" Crane kapasitas 5 ton Meter Air Digital f 6" - f 8" Bak / sumuran pompa submersible Wendit II

7

Bangkon Pengadaan & Pemasangan Jaringan Pipa f 100 mm f 150 mm f 200 mm f 300 mm

2009

2010

2011

14,884,450,500

Pompa Submersible 110 lt/dt, head 90 m' 147 KW, 3 x 380 Volt, 50 Hz, 2900 rpm, DOL

6

ESTIMASI BIAYA ( Rp.)

223,740,000 303,913,500 346,797,000 7,070,000,000

3,535,000,000

3,652,000,000

3,652,000,000

1,792,000,000

1,792,000,000

300,000,000

300,000,000

75,000,000 66,000,000 90,000,000 200,000,000 15,000,000 150,000,000 600,000,000

75,000,000 66,000,000 90,000,000 200,000,000 15,000,000 150,000,000 600,000,000

3,000.00 700.00 900.00 2,500.00

m' m' m' m'

2,533,269,750 269,775,000 130,515,000 273,017,250 1,859,962,500

1.00

unit

100,000,000 100,000,000

Badut Pompa Submersible 20 lt/dt, 15 KW beserta Panel-panel

ENVIRONMENTAL SERVICES PROGRAM WWW.ESP.OR.ID

223,740,000 303,913,500 346,797,000 3,535,000,000

269,775,000 130,515,000 273,017,250 1,859,962,500 100,000,000

39


PDAM TIRTA DHARMA - ANALISA KONDISI KEUANGAN DAN ANALISA KELAYAKAN KEUANGAN PENDAHULUAN ATAS USULAN RENCANA INVESTASI - REVISI

No. 8

9

10

B

Istana Dieng Pompa Submersible 20 lt/dt, 15 KW beserta Panel-panel

1.00

unit

ESTIMASI BIAYA ( Rp.) 100,000,000 100,000,000

Supit Urang Pompa Submersible 20 lt/dt, 15 KW beserta Panel-panel

1.00

unit

100,000,000 100,000,000

418.00 1,202.00 222.00 425.00 544.00 166.00 318.00 1,066.00 1,108.00 230.00 427.00 140.00 270.00 1,455.00 554.00 400.00 793.00 505.00

m' m' m' m' m' m' m' m' m' m' m' m' m' m' m' m' m' m'

3,760,189,620 37,588,650 224,112,900 41,391,900 79,241,250 101,428,800 30,950,700 59,291,100 198,755,700 206,586,600 42,883,500 79,614,150 26,103,000 50,341,500 683,973,675 260,427,090 297,594,000 589,980,105 749,925,000

LOKASI

REHAB JARINGAN PIPA ASBES f 100 mm f 150 mm f 150 mm f 150 mm f 150 mm f 150 mm f 150 mm f 150 mm f 150 mm f 150 mm f 150 mm f 150 mm f 150 mm f 250 mm f 250 mm f 300 mm f 300 mm f 400 mm

VOLUME

Sistem Pelayanan Tersier (SR) Reservoir Tlogomas Reservoir Mojolangu Reservoir Betek Reservoir Buring Reservoir Bangkon Reservoir Wendit I

ENVIRONMENTAL SERVICES PROGRAM WWW.ESP.OR.ID

2,941,200,000 1,998,000,000 891,000,000 2,487,600,000 1,057,200,000 2,198,400,000

2009

2010

2011

100,000,000

100,000,000

37,588,650.00 224,112,900 41,391,900 79,241,250.00 101,428,800.00 30,950,700.00 59,291,100 198,755,700.00 206,586,600 42,883,500.00 79,614,150.00 26,103,000.00 50,341,500.00 683,973,675.00 260,427,090.00 297,594,000.00 589,980,105.00 749,925,000.00 1,176,480,000 799,200,000 356,400,000 995,040,000 422,880,000 879,360,000

882,360,000 599,400,000 267,300,000 746,280,000 317,160,000 659,520,000

882,360,000 599,400,000 267,300,000 746,280,000 317,160,000 659,520,000 40


PDAM TIRTA DHARMA - ANALISA KONDISI KEUANGAN DAN ANALISA KELAYAKAN KEUANGAN PENDAHULUAN ATAS USULAN RENCANA INVESTASI - REVISI

No. C

D

LOKASI Program NRW Peralatan Analisa NRW Penggantian Meter Air Manajemen Tekanan (PRV+Timer)

VOLUME

40,000.00 -

Program AIMS Asset Information Management System ( A I MS)

unit -

ESTIMASI BIAYA ( Rp.) 9,650,000,000 2,650,000,000 6,000,000,000 1,000,000,000

2010 1,325,000,000 3,000,000,000 500,000,000

2011 1,325,000,000 3,000,000,000 500,000,000

9,500,000,000 -

-

9,500,000,000 109,527,266,670

ENVIRONMENTAL SERVICES PROGRAM WWW.ESP.OR.ID

2009

9,500,000,000 33,927,804,700.00

64,073,634,850.00

11,525,827,120.00

41


PDAM TIRTA DHARMA - ANALISA KONDISI KEUANGAN DAN ANALISA KELAYAKAN KEUANGAN PENDAHULUAN ATAS USULAN RENCANA INVESTASI - REVISI

LAMPIRAN F: PROYEKSI KEBUTUHAN AIR Sambungan 2004

2005

2006

Realisasi 2007

Anggaran 2008

815,920

824,977

2009

2010

2011

2012

2013

2014

2015

2016

2017

2018

UMUM Jumlah Penduduk Kotamadya (Jiwa) Tingkat Pertumbuhan Penduduk Anggota Keluarga/Pelanggan Jumlah orang terlayani oleh kran umum/SU Jumlah Penduduk Yang Terlayani Tingkat Cakupan Pelayanan

789,349 0.00%

798,104 1.11%

806,963 1.11%

0.74%

0.99%

833,114 0.99%

841,330 0.99%

849,628 0.99%

858,008 0.99%

866,471 0.99%

875,016 0.99%

883,647 0.99%

892,362 0.99%

901,163

910,051

0.99%

0.99%

6

6

6

6

6

6

6

6

6

6

6

6

6

6

6

100

100

100

100

100

100

100

100

100

100

100

100

100

100

100

611,174

633,176

646,140

659,936

680,146

701,410

727,990

754,570

781,150

786,466

787,066

787,666

788,266

788,866

789,466

77%

79%

80%

81%

82%

84%

87%

89%

91%

91%

90%

89%

88%

88%

87%

PENAMBAHAN PELANGGAN Kelompok I

0

126

25

41

14

135

169

169

169

34

0

0

0

0

0

Kelompok II

0

1,697

1,727

1,616

3,088

3,544

4,430

4,430

4,430

886

100

100

100

100

100

Kelompok III

0

(130)

17

0

47

0

0

0

0

0

0

0

0

0

0

Kelompok IV

0

98

259

99

223

321

401

401

401

80

0

0

0

0

0 0

Kelompok V

0

(3)

(2)

1

5

0

0

0

0

0

0

0

0

0

Kelompok VI

0

0

0

0

0

0

0

0

0

0

0

0

0

0

0

Kelompok Khusus

0

20

(8)

(6)

12

0

0

0

0

0

0

0

0

0

0

0

0

0

0

0

0

0

0

0

0

0

0

0

0

0

0

0

0

0

0

0

0

3,389

4,000

5,000

5,000

5,000

1,000

100

100

100

100

100

Penambahan Pelanggan

0

1,808

2,018

1,751

PELANGGAN Kelompok I

1,508

1,634

1,659

1,700

1,714

1,849

2,018

2,187

2,356

2,390

2,390

2,390

2,390

2,390

2,390

Kelompok II

76,174

77,871

79,598

81,214

84,302

87,846

92,276

96,706

101,136

102,022

102,122

102,222

102,322

102,422

102,522

Kelompok III

555

425

442

442

489

489

489

489

489

489

489

489

489

489

489

Kelompok IV

2,980

3,078

3,337

3,436

3,659

3,980

4,381

4,782

5,183

5,263

5,263

5,263

5,263

5,263

5,263

Kelompok V

44

41

39

40

45

45

45

45

45

45

45

45

45

45

45

Kelompok VI

0

0

0

0

0

0

0

0

0

0

0

0

0

0

0

Kelompok Khusus

2

22

14

8

20

20

20

20

20

20

20

20

20

20

20

0

0

0

0

0

0

0

0

0

0

0

0

0

0

0

0

0

0

0

0

0

0

90,229

94,229

99,229

104,229

109,229

110,229

110,329

110,429

110,529

110,629

110,729

Pelanggan Akhir

81,263

83,071

85,089

ENVIRONMENTAL SERVICES PROGRAM WWW.ESP.OR.ID

86,840

42


PDAM TIRTA DHARMA - ANALISA KONDISI KEUANGAN DAN ANALISA KELAYAKAN KEUANGAN PENDAHULUAN ATAS USULAN RENCANA INVESTASI - REVISI

Permintaan & Produksi Air 2004

2005

Realisasi 2007

2006

Anggaran 2008

2009

2010

2011

2012

2013

2014

2015

2016

2017

2018

PERMINTAAN AIR Proyeksi Kenaikan Konsumsi Air (%) Proyeksi penjualan air dari pelanggan baru (%)

0%

0%

0%

0%

0%

10%

0%

0%

0%

0%

0%

0%

0%

0%

0%

-28%

-225%

40%

22.54%

0.02%

20.00%

20.00%

20.00%

20.00%

20.00%

20.00%

20.00%

20.00%

20.00%

20.00%

PROYEKSI KONSUMSI AIR (m3/SR/Bln)

145

138

110

112

112

Kelompok I

79.4

59.5

50.5

51.7

53.2

123 58.6

58.6

58.6

58.6

58.6

58.6

58.6

58.6

58.6

58.6

Kelompok II

26.1

24.8

19.9

20.2

20.1

22.1

22.1

22.1

22.1

22.1

22.1

22.1

22.1

22.1

22.1 291.3

Kelompok III

76.1

219.8

269.6

282.1

264.8

291.3

291.3

291.3

291.3

291.3

291.3

291.3

291.3

291.3

Kelompok IV

38.4

31.6

25.1

23.1

22.5

24.8

24.8

24.8

24.8

24.8

24.8

24.8

24.8

24.8

24.8

Kelompok V

62.5

79.3

68.4

33.3

29.6

32.6

32.6

32.6

32.6

32.6

32.6

32.6

32.6

32.6

32.6

-

-

-

-

-

-

-

-

-

-

20,916.7

1,928.0

922.6

812.5

337.5

337.5

337.5

337.5

337.5

337.5

337.5

337.5

337.5

337.5

337.5

28.37

27.24

22.15

22.37

22.24

23.62

23.42

23.43

23.44

24.12

24.27

24.27

24.27

24.27

24.27

Kelompok VI Kelompok Khusus

Rata-rata PROYEKSI PERMINTAAN AIR PER THN (000 m3) Kelompok I

1,436

1,166

1,006

1,054

1,095

1,223

1,323

1,442

1,561

1,660

1,680

1,680

1,680

1,680

1,680

Kelompok II

23,815

23,152

18,986

19,719

20,344

22,567

23,554

24,730

25,906

26,894

27,088

27,114

27,141

27,167

27,194

Kelompok III

507

1,121

1,430

1,496

1,554

1,709

1,709

1,709

1,709

1,709

1,709

1,709

1,709

1,709

1,709

Kelompok IV

1,374

1,166

1,004

951

988

1,106

1,206

1,325

1,444

1,544

1,563

1,563

1,563

1,563

1,563

Kelompok V

33

39

32

16

16

18

18

18

18

18

18

18

18

18

18

Kelompok VI

-

-

-

-

-

0

0

0

0

0

0

0

0

0

0

502

509

155

78

81

81

81

81

81

81

81

81

81

81

81

27,667

27,153

22,613

23,314

24,078

26,704

27,891

29,305

30,719

31,907

32,138

32,165

32,191

32,218

32,245

Kelompok Khusus Total Permintaaan (000 m3)

PROYEKSI KONSUMSI AIR PER THN (000 m3) Kelompok I

1,436

1,166

1,006

1,054

1,095

1,223

1,323

1,442

1,561

1,660

1,680

1,680

1,680

1,680

1,680

Kelompok II

23,815

23,152

18,986

19,719

20,344

22,567

23,554

24,730

25,906

26,894

27,088

27,114

27,141

27,167

27,194

Kelompok III

507

1,121

1,430

1,496

1,554

1,709

1,709

1,709

1,709

1,709

1,709

1,709

1,709

1,709

1,709

Kelompok IV

1,374

1,166

1,004

951

988

1,106

1,206

1,325

1,444

1,544

1,563

1,563

1,563

1,563

1,563

Kelompok V

33

39

32

16

16

18

18

18

18

18

18

18

18

18

18

Kelompok VI

-

0

0

0

0

0

0

0

0

0

0

0

0

0

0

502

509

155

78

81

81

81

81

81

81

81

81

81

81

81

27,667

27,153

22,613

23,314

24,078

26,704

27,891

29,305

30,719

31,907

32,138

32,165

32,191

32,218

32,245

1,558

1,558

1,558

1,558

1,558

1,558

1,558

1,558

1,558

1,558

1,558

1,558

1,558

1,558

1,558

0

0

0

0

0

0

0

0

0

0

0

0

0

0

0

1,558

1,558

1,558

1,558

1,558

1,558

1,558

1,558

1,558

1,558

1,558

1,558

1,558

1,558

1,558

Kelompok Khusus Total Konsumsi Air (000 m3)

PRODUKSI Kapasitas sumber/terpasang (lt/dt) Tambahan kapasitas (lt/dt) Total kapasitas (lt/dt) Kapasitas pemakaian (lt/dt)

1,288

1,266

1,304

1,334

1,334

1,402

1,480

1,480

1,480

1,480

1,480

1,480

1,480

1,480

1,480

% tingkat kehilangan air

29.0%

28.8%

42.1%

41.8%

39.9%

37.9%

35.9%

33.9%

31.9%

29.9%

27.9%

25.9%

23.9%

21.9%

19.9%

Kapasitas sumber ( 000 m3)

49,133

49,133

49,133

49,133

49,133

49,133

49,133

49,133

49,133

49,133

49,133

49,133

49,133

49,133

49,133

Kapasitas produksi ( 000 m3)

40,618

39,925

41,123

42,074

42,074

44,220

46,676

46,676

46,676

46,676

46,676

46,676

46,676

46,676

46,676

Jumlah Distribusi (000 m3)

38,964

38,112

39,060

40,057

40,057

42,995

43,506

44,329

45,103

45,510

44,569

43,402

42,297

41,248

40,251

95.0%

95.0%

95.0%

% pemanfaatan kapasitas

82.7%

81.3%

83.7%

85.6%

85.6%

90.0%

95.0%

95.0%

95.0%

95.0%

95.0%

95.0%

Jumlah air siap dijual ( 000 m3) setelah kehilangan air

28,409

29,644

31,083

24,488

25,290

27,464

29,924

30,857

31,791

32,724

33,658

34,591

35,525

36,458

37,392

Jumlah permintaan air ( 000 m3)

27,667

27,153

22,613

23,314

24,078

26,704

27,891

29,305

30,719

31,907

32,138

32,165

32,191

32,218

32,245

107%

105%

103%

103%

105%

108%

110%

113%

116%

% tingkat pelayanan air

103%

109%

137%

105%

105%

103%

Proyek

ENVIRONMENTAL SERVICES PROGRAM WWW.ESP.OR.ID

43


PDAM TIRTA DHARMA - ANALISA KONDISI KEUANGAN DAN ANALISA KELAYAKAN KEUANGAN PENDAHULUAN ATAS USULAN RENCANA INVESTASI - REVISI

LAMPIRAN G: PROYEKSI KEUANGAN SKEMA PEMBIAYAAN OBLIGASI UNTUK INVESTASI

FINANCIAL PROJECTION 2). New Project

Project Scenario

Term of Commercial Loan

2

Period

Funding Scenario

2 2). Bond

Interest Rate Masa Tenggang

2007

2008

2009

Financial Effective tarif increase(#month) Tariff Increase Projection Average Tariff Cash + Deposit Minimum Cash Net Profit Incremental Cash Balance Control

Rp./m3 Rp.million Rp.million Rp.million Rp.million

Debt Service

Rp.million

Expansion Investment Cost Fee Trusstee & rating Routine Investment

Rp.million Rp.million Rp.million

Additional Customer Acc.Add.Customer

Connection Connection

Bond Scenario * Serie A * Serie B

Composition

Cross Check Investmen & Funding Commercial Loan/Bond Pemda Equity PDAM

0% 100%

7 tahun

2010

2011

14% 2 tahun

2012

2013

2014

2015

2016

2017

2018

6

6

6

6

6

6

6

6

20% 3,482 55,940 17,806 11,867 55,556 (0)

0% 3,760 8,142 17,928 27,628 (47,798) (0)

20% 4,112 4,836 16,169 22,804 (3,306) 0

0% 4,440 8,771 17,179 26,388 3,934 (0)

20% 4,844 22,010 18,298 30,075 13,239 (0)

0% 5,235 39,587 19,764 34,088 17,577 (0)

20% 5,733 61,999 21,154 42,605 22,412 (0)

0% 6,206 90,086 22,705 52,506 28,087 (0)

20% 6,799 125,467 73,903 66,025 35,381 (0)

0% 7,366 128,243 20,512 64,802 2,777 (0)

19,761

19,344

17,961

12,297

12,297

12,297

12,297

12,297

12,297

110,670

0.0

43,079 0 0

73,358 157 0

14,120 157 0

0 157 6,554

0 157 7,013

0 157 7,504

0 157 8,029

0 157 8,591

0 157 9,192

0 157 9,836

3,389 3,389

4,000 7,389

5,000 12,389

5,000 17,389

5,000 22,389

1,000 23,389

100 23,489

100 23,589

100 23,689

100 23,789

100 23,889

0.00

0.00

0.00

3,134 384 17,133 12,292 1,763

0.0

Interest 11.5% 12.5%

Period 5.00 10.00

0.00

6

6

Issuance 1-Dec-08 1-Dec-08

0.00

74% 20% 6%

ENVIRONMENTAL SERVICES PROGRAM WWW.ESP.OR.ID

44


PDAM TIRTA DHARMA - ANALISA KONDISI KEUANGAN DAN ANALISA KELAYAKAN KEUANGAN PENDAHULUAN ATAS USULAN RENCANA INVESTASI - REVISI

Income Statement 2004

2005

Realisasi 2007

2006

Anggaran 2008

2009

2010

2011

2012

2013

2014

2015

2016

2017

2018

REVENUE (IDR million) Water Sales Administration & meter rental Water Revenue New Connection Fees Other Operating Revenues Total Other Revenues Total Revenues

47,967

60,917

27%

14%

16%

14%

14%

10%

10%

9%

10%

9%

56,759

63,774

63,489

80,424

91,635

105,907

121,107

138,366

152,036

167,360

182,705

201,120

219,561

0

984

6,527

13,231

11,982

12,564

13,231

14,593

15,293

16,204

16,219

17,045

17,061

17,930

17,946

47,967

61,901

63,286

77,005

75,472

92,988

104,866

120,499

136,399

154,570

168,255

184,405

199,766

219,050

237,507

1,830

2,265

4,904

2,216

3,123

5,211

6,513

6,513

7,490

1,498

150

172

172

172

198

844

1,163

1,322

0

2,174

1,601

1,797

2,026

2,182

2,967

2,906

3,187

3,458

3,814

4,202

2,674

3,428

6,226

2,216

5,297

6,812

8,311

8,539

9,672

4,465

3,056

3,359

3,630

3,986

4,401

50,641

65,328

69,512

79,221

80,768

99,799

113,177

129,038

146,071

159,035

171,311

187,764

203,396

223,036

241,908

9%

8%

10%

OPERATING EXPENSES (IDR million) Personnel Power Chemical

16,919

18,651

19,463

20,391

25,156

27,965

31,461

35,394

39,818

44,795

50,395

56,694

63,781

71,753

80,722

7,100

8,883

9,876

9,294

9,323

11,204

12,654

13,540

14,488

15,502

16,587

17,748

18,990

20,320

21,742

241

296

334

469

502

537

574

Maintenance

3,630

4,679

6,407

5,883

5,311

6,137

6,932

7,417

7,936

8,492

9,086

9,722

10,403

11,131

11,910

General & Administrative

5,188

86

6,022

79

6,259

150

7,390

174

6,222

8,390

9,438

10,618

358

11,945

383

13,439

410

15,118

438

17,008

19,134

21,526

24,217

Bad Debts

363

424

0

512

291

560

638

738

843

964

1,059

1,166

1,272

1,401

1,529

Raw water

666

1,053

1,435

1,476

3,130

4,276

4,513

4,513

5,867

5,867

5,867

7,628

7,628

7,628

9,916

0

0

0

0

0

0

0

0

0

0

0

0

0

0

0

0

0

0

0

0

0

0

0

0

0

33,951

39,790

43,590

45,118

49,675

58,828

65,971

72,578

81,281

89,468

98,551

110,435

121,710

134,295

150,611

12%

10%

12%

10%

10%

12%

10%

10%

12%

2.0

Annual Take or pay Bulk Treated Water Charge -

2.0

Annual Take or pay Bulk Treated Water Charge - East

Total Operating Expenses

Profit

16,689

25,539

25,922

34,103

31,094

40,971

47,206

56,461

64,790

69,567

72,760

77,330

81,686

88,741

91,296

Non Operating Revenues

366

588

277

343

247

0

15,610

1,185

1,869

3,192

6,110

14,108

24,327

37,047

33,232

Non Operating Expenses

(212)

(218)

(127)

(193)

(126)

98

110

121

136

149

165

184

203

224

251

EBITDA Depreciation

16,844

25,909

26,071

34,253

31,215

41,069

62,926

57,767

66,795

72,908

79,034

91,622

106,216

126,012

124,780

5,054

10,063

5,642

9,564

10,459

9,692

9,692

12,277

16,678

17,526

17,919

18,340

18,790

19,272

19,787

EBIT

11,790

15,845

20,429

24,689

20,756

31,377

53,234

45,490

50,117

55,382

61,115

73,283

87,426

106,740

104,993

484

1,035

6,183

5,190

3,223

2,163

1,346

494

0

0

0

0

0

0

0

Interest - ……… Area

0

0

0

0

0

0

0

0

0

0

0

Trustee Fee

0

0

79

79

79

79

79

79

79

79

79

Interest

Rating Fee

0

Bond Interest - Series A

0

0

0

0

0

0

0

0

0

0

0

Bond Interest - Series B

0

12,297

12,297

12,297

12,297

12,297

12,297

12,297

12,297

12,297

12,297

EBT Corporate Tax Net Profit

0

79

79

79

79

79

79

79

79

79

11,306

14,811

14,246

19,499

17,533

16,917

39,433

32,541

37,662

42,928

48,661

60,829

74,972

94,286

92,539

3,297 8,009

4,575 10,235

4,376 9,871

5,641 13,858

5,241 12,292

5,050 11,867

11,805 27,628

9,737 22,804

11,274 26,388

12,854 30,075

14,573 34,088

18,224 42,605

22,467 52,506

28,261 66,025

27,737 64,802

0

Net Profit Distribution 0.55 Pemda

11,274

26,247

21,664

25,069

28,571

32,384

40,475

49,880

62,724

61,562

0

6,527

15,196

12,542

14,514

16,541

18,748

23,433

28,878

36,314

35,641

0.10

Employees

0

1,187

2,763

2,280

2,639

3,007

3,409

4,261

5,251

6,603

6,480

0.05

General Reserve

0

593

1,381

1,140

1,319

1,504

1,704

2,130

2,625

3,301

3,240

0.10

Social & Education Reserve

0

1,187

2,763

2,280

2,639

3,007

3,409

4,261

5,251

6,603

6,480

0.15

Pension Reserve

0

1,780

4,144

3,421

3,958

4,511

5,113

6,391

7,876

9,904

9,720

12,292

593

1,381

1,140

1,319

1,504

1,704

2,130

2,625

3,301

3,240

EAT after Profit Distribution

ENVIRONMENTAL SERVICES PROGRAM WWW.ESP.OR.ID

45


PDAM TIRTA DHARMA - ANALISA KONDISI KEUANGAN DAN ANALISA KELAYAKAN KEUANGAN PENDAHULUAN ATAS USULAN RENCANA INVESTASI - REVISI

Cash Flow Report 2004

2005

Realisasi 2007

2006

Anggaran 2008

1 2009

2 2010

3 2011

4 2012

5 2013

6 2014

7 2015

8 2016

9 2017

10 2018

SOURCES OF FUNDS (IDR million) EBT + Interest Non Operating revenue income Net Profit Customer Deposit Reserve

13,393

20,963

21,546

28,462

25,853

35,921

35,401

46,723

53,517

56,713

58,187

59,106

59,220

60,480

63,560

155

370

149

150

121

98

15,720

1,306

2,005

3,341

6,274

14,293

24,530

37,271

33,484

13,547

21,333

21,696

28,612

25,974

36,019

51,121

48,029

55,521

60,055

64,461

73,399

83,749

97,751

97,043

144

130

343

240

300

315

315

66

7

7

7

7

7

0

5,962

6,278

6,924

7,257

7,689

7,696

8,088

8,096

8,508

8,516

0

8,667

(7,812)

Water Meter Fee

7,261

14,672

2,824

0

0

0

0

0

0

0

Local Government Equity - Reinvestment

0

0

3,263

7,598

6,271

7,257

8,271

9,374

11,716

14,439

18,157

PDAM Equity

Local Government Equity - New Investment

0

0

0

0

0

0

0

0

0

0

0 18,157

Total Equity

0

0

0

0

0

7,261

17,935

10,422

6,271

7,257

8,271

9,374

11,716

14,439

Total Debt

0

0

0

0

0

98,373

0

0

0

0

0

0

0

0

0

0

0

0

0

0

Commercial Bank Loans

0

0

0

0

0

0

0

0

0

0

Bond - Seri A

0

0

0

0

0

0

0

0

0

0

0

Bond - Seri B

0

98,373

0

0

0

0

0

0

0

0

0

147,855

75,634

65,691

69,364

75,067

80,434

90,868

103,569

120,706

123,724

0

Total Sources of Funds

22,214

13,521

21,840

28,743

26,317

0

6,776

0

0

0

0

0

43,079

APPLICATIONS OF FUNDS (IDR million) New Investment

0

Bonds Issuance Fee Total Investment Routine Investment

36,303

73,358

14,120

0

0

0

0

0

0

73,358

14,120

0

0

0

0

0

0

0

0

0

0

6,554

7,013

7,504

8,029

8,591

9,192

9,836

Trustee Fee

0

0

79

79

79

79

79

79

79

79

79

Rating Fee

0

0

79

79

Sinking Fund - Bond Series A

0

0

0

0

0

0

0

0

0

Sinking Fund - Bond Series B

0

0

0

9,837

9,837

9,837

9,837

9,837

9,837

(59,024)

43,079

73,515

14,277

16,549

17,007

17,498

18,024

18,586

19,187

(49,031)

Total Investment Expenditure

0

0

0

0

0

0

1,005

10,000

10,400

79

79

79

79

79

79

79 0

Existing Loans Principal Repayment

5,170

0

0

0

0

0

0

0

Interest

484

1,035

6,183

5,190

3,223

2,163

1,346

494

0

0

0

0

0

0

0

Total

484

0

1,035

7,188

15,190

13,623

7,465

5,301

7,047

5,701

5,664

0

0

0

0

0

0

0

-

-

Bond - Series B Principal Repayment Interest Total Total Debt Service

484

1,035

7,188

Working Capital (exclud. Cash)

9,644

3,159

(7,833)

Increase/decrease assets and liabilities

4,631

(258)

(542)

-

0

0

0

0

0

0

0

0

0

0

0

12,297

12,297

12,297

12,297

12,297

12,297

12,297

12,297

12,297

12,297

12,297

12,297

12,297

12,297

12,297

12,297

12,297

12,297

12,297

110,670

19,344

12,297

12,297

12,297

110,670

(1,026)

(1,748)

(2,721)

-

15,190

13,623

19,761

17,961

12,297

12,297

12,297

(3,003)

12,250

7,489

(4,992)

4,045

940

1,179

467

(1,320)

7,405

9,256

9,256

9,256

1,851

185

7,894

185

185

98,373

3,625

185

185

2008 Budget Adjustments : Tax

0

Water Meter Reserve

0

5,962

6,278

6,924

7,257

7,689

7,696

8,088

8,096

8,508

8,516

Pemda Dividends

0

6,527

15,196

12,542

14,514

16,541

18,748

23,433

28,878

36,314

35,641

Employee reserve

0

1,187

2,763

2,280

2,639

3,007

3,409

4,261

5,251

6,603

6,480

General Reserve

0

0

0

0

0

0

0

0

0

0

Social and Education Reserve

0

0

0

0

0

0

0

0

0

0

0

Pension Reserve

0

890

2,072

1,710

1,979

2,256

2,557

3,195

3,938

4,952

4,860

24,553

92,299

123,432

68,997

65,430

61,828

62,857

68,456

75,482

85,324

120,947

Total Applications of Funds Annual Increase (Decrease) Cash (Beginning of Year) Cash (End Of Year)

14,760

3,936

(1,187)

7,454

9,586

23,026

8,661

1,763

55,556

(47,798)

(3,306)

3,934

13,239

17,577

22,412

28,087

35,381

2,777

0

2,031

1,018

591

2,513

384

55,940

8,142

4,836

8,771

22,010

39,587

61,999

90,086

125,467

2,031

1,018

591

2,513

384

55,940

8,142

4,836

8,771

22,010

39,587

61,999

90,086

125,467

128,243

ENVIRONMENTAL SERVICES PROGRAM WWW.ESP.OR.ID

20,081

0

46


PDAM TIRTA DHARMA - ANALISA KONDISI KEUANGAN DAN ANALISA KELAYAKAN KEUANGAN PENDAHULUAN ATAS USULAN RENCANA INVESTASI - REVISI

Balance Sheet 2004

2005

Realisasi 2007

2006

Budget 2008

2009

2010

2011

2012

2013

2014

2015

2016

2017

2018

Assets (IDR million) 384

17,806

73,903

20,512

Short Term Investments

0

0

0

0

0

38,135

0

0

0

3,711

19,823

40,845

67,380

51,563

107,731

Short Term Investment - Reserves

Cash & Bank

2,031 0

1,018 0

591 0

2,513 0

0

890

2,962

8,142

4,672

4,836

6,652

8,771

18,298 8,907

11,464

19,764

14,659

21,154

18,597

22,705

23,549

28,409

0

0

0

0

9,837

19,675

29,512

39,349

49,187

59,024

0

7,037

9,443

8,676

7,812

10,264

12,253

13,399

14,914

16,882

19,131

20,825

22,824

24,725

27,111

29,396

0

3,950

0

0

837

837

1,162

1,336

1,512

1,713

1,865

2,044

2,214

2,428

2,633

Trustee Reserve Sinking Fund Accounts Receivable Other Accounts Receivable Inventory Advance Payments Total Current Assets Land

32

43

99

118

95

95

121

164

173

176

181

185

190

195

200

5,053

6,654

7,720

4,303

8,915

9,106

10,212

11,235

12,582

13,849

15,255

17,095

18,840

20,789

23,314

14,153

21,109

17,086

14,746

20,495

79,121

35,998

37,157

56,408

85,462

118,688

158,155

203,838

258,562

212,195

976

976

976

1,672

1,351

1,351

1,351

1,351

1,351

1,351

1,351

1,351

1,351

1,351

1,351

Fixed Assets in operation

81,123

144,136

150,356

160,053

161,538

161,538

204,617

277,974

292,094

298,648

305,661

313,165

321,193

329,784

338,977

Accumulated Depreciation

(51,890)

(61,791)

(69,697)

(79,261)

(85,275)

(94,967)

(104,660)

(116,936)

(133,615)

(151,141)

(169,060)

(187,399)

(206,189)

(225,461)

(245,248)

30,208

83,320

81,635

82,463

77,614

67,921

101,308

162,389

159,830

148,858

137,952

127,116

116,355

105,674

18,103

435

1,980

0

0

43,079

73,358

14,120

6,554

7,013

7,504

8,029

8,591

9,192

9,836

2,677

2,419

1,877

9,771

8,451

15,856

25,112

34,368

43,624

45,476

45,661

45,846

46,031

46,216

46,401

65,141

107,284

102,578

106,980

106,560

205,977

235,776

248,034

266,416

286,808

309,804

339,146

374,815

419,645

363,512

Net Book Value Work In Progress Other Fixed Assets Total Assets

95,080

Liabilities & Equity (IDR million) 5,262

4,319

506

206

404

2,914

746

2,129

2,297

2,453

2,657

2,850

3,063

3,343

3,608

3,904

4,287

Taxes Payable

Operation Accounts Payable

1,556

2,615

6,262

5,947

5,285

5,050

11,805

9,737

11,274

12,854

14,573

18,224

22,467

28,261

27,737

Long Term Debt - Current Portion

1,127

693

12,861

11,386

9,878

0

0

0

0

0

0

0

0

0

Other Accounts Payable

Leasing - Current Portion Total Current Liabilities Long Term Debt

922

4,672

2,117

5,537

6,209

6,831

7,650

8,421

9,275

10,394

11,455

12,640

14,175

0

0

0

0

0

0

0

0

0

0

0

0

0

0

0

0

4,111

8,186

24,789

24,566

18,025

12,716

20,312

19,021

21,581

24,124

26,912

31,960

37,530

44,804

46,200

18,457

48,182

26,742

21,672

16,172

10,871

5,170

(0)

(0)

(0)

(0)

(0)

(0)

(0)

(0)

Commercial Bank Loan - East

0

0

0

0

0

0

0

0

0

0

0

0

0

0

Bond

0

0

0

0

0

98,373

98,373

98,373

98,373

98,373

98,373

98,373

98,373

98,373

0

Other Long Term Debt

0

0

0

0

0

0

0

0

0

0

0

0

0

0

0

Total Long Term Debt

18,457

48,182

26,742

21,672

16,172

109,244

103,543

98,373

98,373

98,373

98,373

98,373

98,373

98,373

Customer Deposit's

8,667

854

998

1,129

1,472

1,712

2,012

2,327

2,642

2,708

2,714

2,721

2,728

2,736

Social and Education Reserve

0

0

0

0

0

1,187

3,950

6,230

8,869

11,876

15,285

19,546

24,796

0

(0) 2,743

31,399

37,879

Pension Reserve

0

0

0

0

0

1,780

5,924

9,345

13,303

17,814

22,928

29,318

37,194

47,098

56,818

Reserve Water Meter Fees

0

10,688

11,268

13,017

18,076

18,076

18,076

18,076

18,076

18,076

18,076

18,076

18,076

18,076

18,076

5,878

7,652

8,833

9,828

12,718

12,718

12,718

12,718

12,718

12,718

12,718

12,718

12,718

12,718

12,718

Other Liabilities

Reserve Production Fund

14,545

19,195

21,099

23,974

32,266

35,473

42,680

48,696

55,608

63,193

71,722

82,380

95,513

112,027

128,235

Total Liabilities

37,112

75,563

72,630

70,212

66,463

157,433

166,534

166,090

175,562

185,690

197,007

212,713

231,416

255,204

174,434

6,102

6,102

7,102

10,061

12,402

19,662

37,597

48,019

54,290

61,547

69,817

79,192

90,908

105,347

123,504

Pemda Equity Central Government Equity Fixed Assets Revaluation Surplus Other Equity Reserve Fund General Reserve Adjustment Net Profit (last year)

0

0

0

0

0

0

0

0

0

0

0

0

0

0

0

1,955

1,955

1,955

1,955

1,955

1,955

1,955

1,955

1,955

1,955

1,955

1,955

1,955

1,955

1,955

0

0

0

0

0

0

0

0

0

0

0

0

0

0

0

0

0

0

0

0

12,287

12,881

14,262

15,402

16,722

18,225

19,930

22,060

24,685

27,987

12,056

13,429

11,020

11,532

13,453

14,046

15,428

16,568

17,887

19,391

21,095

23,226

25,851

29,152

32,392

0

0

0

0

0

7,916

10,235

9,871

13,220

12,287

593

1,381

1,140

1,319

1,504

1,704

2,130

2,625

3,301

3,240

Equity & Reserves

28,029

31,721

29,948

36,768

40,097

48,544

69,242

81,944

90,854

101,118

112,798

126,432

143,399

164,441

189,078

Total Liabilities & Equity

65,141

107,283

102,578

106,980

106,560

205,977

235,776

248,034

266,416

286,808

309,804

339,146

374,815

419,645

363,512

Net Income (Loss) for current year

ENVIRONMENTAL SERVICES PROGRAM WWW.ESP.OR.ID

0

0

0

0

0

0

0

0

0

0

47


PDAM TIRTA DHARMA - ANALISA KONDISI KEUANGAN DAN ANALISA KELAYAKAN KEUANGAN PENDAHULUAN ATAS USULAN RENCANA INVESTASI - REVISI

LAMPIRAN H: PROYEKSI KEUANGAN SKEMA PEMBIAYAAN OBLIGASI UNTUK INVESTASI DAN PELUNASAN PINJAMAN

FINANCIAL PROJECTION 2). New Project

Project Scenario

Term of Commercial Loan

2

Period

Funding Scenario

2 2). Bond

Interest Rate Masa Tenggang

2007

2008

2009

Financial Effective tarif increase(#month) Tariff Increase Projection Average Tariff Cash + Deposit Minimum Cash Net Profit Incremental Cash Balance Control

Rp./m3 Rp.million Rp.million Rp.million Rp.million

Debt Service

Rp.million

Expansion Investment Cost Fee Trusstee & rating Routine Investment

Rp.million Rp.million Rp.million

Additional Customer Acc.Add.Customer

Connection Connection

Bond Scenario * Serie A * Serie B

Composition

Cross Check Investmen & Funding Commercial Loan/Bond Pemda Equity PDAM

0% 100%

7 tahun

2010

2011

2012

6

6

20% 3,482 59,420 16,340 10,559 59,035 (0)

0% 3,760 16,645 16,503 27,661 (42,775) (0)

20% 4,112 17,162 17,104 21,449 517 0

31,149

16,413

0.0

44,108 0 0

3,389 3,389

4,000 7,389

3,134 384 22,827 12,292 1,763

0.0

Interest 11.5% 12.5%

Period 5.00 10.00

0.00

14% 2 tahun

6

2013 6

2014

2015

2016

2017 6

2018

6

6

6

6

6

0% 4,440 18,881 18,113 24,982 1,719 (0)

20% 4,844 30,072 19,233 28,894 11,191 (0)

0% 5,235 46,842 20,698 34,719 16,769 (0)

20% 5,733 68,058 22,088 43,080 21,216 (0)

0% 6,206 94,784 23,640 52,712 26,726 (0)

20% 6,799 128,620 82,312 65,912 33,836 (0)

0% 7,366 123,678 20,512 62,217 (4,942) (0)

15,110

14,166

14,165

14,165

14,165

14,165

14,165

127,487

73,358 181 0

14,120 181 0

0 181 6,554

0 181 7,013

0 181 7,504

0 181 8,029

0 181 8,591

0 181 9,192

0 181 9,836

5,000 12,389

5,000 17,389

5,000 22,389

1,000 23,389

100 23,489

100 23,589

100 23,689

100 23,789

100 23,889

0.00

0.00

0.00

Issuance 1-Dec-08 1-Dec-08

0.00

74% 20% 6%

ENVIRONMENTAL SERVICES PROGRAM WWW.ESP.OR.ID

48


PDAM TIRTA DHARMA - ANALISA KONDISI KEUANGAN DAN ANALISA KELAYAKAN KEUANGAN PENDAHULUAN ATAS USULAN RENCANA INVESTASI - REVISI

Income Statement 2004

2005

Realisasi 2007

2006

Anggaran 2008

2009

2010

2011

2012

2013

2014

2015

2016

2017

2018

REVENUE (IDR million) Water Sales Administration & meter rental Water Revenue New Connection Fees Other Operating Revenues Total Other Revenues Total Revenues

47,967

60,917

27%

14%

16%

14%

14%

10%

10%

9%

10%

9%

56,759

63,774

63,489

80,424

91,635

105,907

121,107

138,366

152,036

167,360

182,705

201,120

219,561

0

984

6,527

13,231

11,982

12,564

13,231

14,593

15,293

16,204

16,219

17,045

17,061

17,930

17,946

47,967

61,901

63,286

77,005

75,472

92,988

104,866

120,499

136,399

154,570

168,255

184,405

199,766

219,050

237,507

1,830

2,265

4,904

2,216

3,123

5,211

6,513

6,513

7,490

1,498

150

172

172

172

198

844

1,163

1,322

0

2,174

1,601

1,797

2,026

2,182

2,967

2,906

3,187

3,458

3,814

4,202

2,674

3,428

6,226

2,216

5,297

6,812

8,311

8,539

9,672

4,465

3,056

3,359

3,630

3,986

4,401

50,641

65,328

69,512

79,221

80,768

99,799

113,177

129,038

146,071

159,035

171,311

187,764

203,396

223,036

241,908

9%

8%

10%

OPERATING EXPENSES (IDR million) Personnel

16,919

18,651

19,463

20,391

25,156

27,965

31,461

35,394

39,818

44,795

50,395

56,694

63,781

71,753

80,722

7,100

8,883

9,876

9,294

9,323

11,204

12,654

13,540

14,488

15,502

16,587

17,748

18,990

20,320

21,742

86

79

150

174

241

296

334

358

383

410

438

469

502

537

574

Maintenance

3,630

4,679

6,407

5,883

5,311

6,137

6,932

7,417

7,936

8,492

9,086

9,722

10,403

11,131

11,910

General & Administrative

24,217

Power Chemical

5,188

6,022

6,259

7,390

6,222

8,390

9,438

10,618

11,945

13,439

15,118

17,008

19,134

21,526

Bad Debts

363

424

0

512

291

560

638

738

843

964

1,059

1,166

1,272

1,401

1,529

Raw water

666

1,053

1,435

1,476

3,130

4,276

4,513

4,513

5,867

5,867

5,867

7,628

7,628

7,628

9,916

0

0

0

0

0

0

0

0

0

0

0

0

0

0

0

0

0

0

0

0

0

0

0

0

0

33,951

39,790

43,590

45,118

49,675

58,828

65,971

72,578

81,281

89,468

98,551

110,435

121,710

134,295

150,611

12%

10%

12%

10%

10%

12%

10%

10%

12%

2.0

Annual Take or pay Bulk Treated Water Charge -

2.0

Annual Take or pay Bulk Treated Water Charge - East

Total Operating Expenses

Profit

16,689

25,539

25,922

34,103

31,094

40,971

47,206

56,461

64,790

69,567

72,760

77,330

81,686

88,741

91,296

Non Operating Revenues

366

588

277

343

247

0

17,549

1,203

1,813

3,459

8,966

16,741

26,576

38,839

31,494

Non Operating Expenses

(212)

(218)

(127)

(193)

(126)

98

110

121

136

149

165

184

203

224

251

41,069

64,865

57,785

66,739

73,175

81,891

94,255

108,466

127,804

123,042

EBITDA Depreciation

16,844

25,909

5,054

10,063

EBIT

11,790

15,845

484

1,035

6,183

Interest

26,071

34,253

31,215

5,642

9,564

10,459

9,692

9,692

12,339

16,740

17,587

17,981

18,401

18,852

19,333

19,849

20,429

24,689

20,756

31,377

55,172

45,447

49,999

55,588

63,910

75,854

89,614

108,471

103,193

5,190

1,346

494

3,223

2,163

Interest - ……… Area

0

0

0

0

0

0

0

0

0

0

0

Trustee Fee

0

0

91

91

91

0

91

0

91

0

91

0

91

0

91

0

91

0

91

Rating Fee

0

0

91

91

91

91

91

91

91

91

Bond Interest - Series A

0

0

0

0

0

0

0

0

0

0

0

Bond Interest - Series B

0

14,165

14,165

14,165

14,165

14,165

14,165

14,165

14,165

14,165

14,165

EBT Corporate Tax Net Profit

11,306

14,811

14,246

19,499

17,533

15,048

39,480

30,606

35,652

41,241

49,563

61,507

75,267

94,124

88,846

3,297 8,009

4,575 10,235

4,376 9,871

5,641 13,858

5,241 12,292

4,490 10,559

11,819 27,661

9,157 21,449

10,671 24,982

12,347 28,894

14,844 34,719

18,427 43,080

22,555 52,712

28,212 65,912

26,629 62,217

0

10,031

26,278

20,377

23,732

27,449

32,983

40,926

50,077

62,616

59,107

0

5,807

15,213

11,797

13,740

15,892

19,096

23,694

28,992

36,252

34,220 6,222

Net Profit Distribution 0.55 Pemda 0.10

Employees

0

1,056

2,766

2,145

2,498

2,889

3,472

4,308

5,271

6,591

0.05

General Reserve

0

528

1,383

1,072

1,249

1,445

1,736

2,154

2,636

3,296

3,111

0.10

Social & Education Reserve

0

1,056

2,766

2,145

2,498

2,889

3,472

4,308

5,271

6,591

6,222

0.15

Pension Reserve

0

1,584

4,149

3,217

3,747

4,334

5,208

6,462

7,907

9,887

9,333

12,292

528

1,383

1,072

1,249

1,445

1,736

2,154

2,636

3,296

3,111

EAT after Profit Distribution

ENVIRONMENTAL SERVICES PROGRAM WWW.ESP.OR.ID

49


PDAM TIRTA DHARMA - ANALISA KONDISI KEUANGAN DAN ANALISA KELAYAKAN KEUANGAN PENDAHULUAN ATAS USULAN RENCANA INVESTASI - REVISI

Cash Flow Report 2004

2005

Realisasi 2007

2006

Anggaran 2008

1 2009

2 2010

3 2011

4 2012

5 2013

6 2014

7 2015

8 2016

9 2017

10 2018

SOURCES OF FUNDS (IDR million) EBT + Interest Non Operating revenue income Net Profit Customer Deposit Reserve

13,393

20,963

21,546

28,462

25,853

36,482

35,387

47,304

54,120

57,220

57,916

58,902

59,131

60,529

155

370

149

150

121

98

17,659

1,325

1,949

3,608

9,131

16,926

26,779

39,063

31,745

13,547

21,333

21,696

28,612

25,974

36,580

53,046

48,629

56,069

60,828

67,047

75,828

85,910

99,592

96,413

144

130

343

240

300

315

315

66

7

7

7

7

7

0

5,962

6,278

6,924

7,257

7,689

7,696

8,088

8,096

8,508

8,516

0

8,667

(7,812)

Water Meter Fee Local Government Equity - New Investment

64,668

7,261

14,672

2,824

0

0

0

0

0

0

0

Local Government Equity - Reinvestment

0

0

2,904

7,607

5,898

6,870

7,946

9,548

11,847

14,496

18,126

PDAM Equity

0

0

0

0

0

0

0

0

0

0

0 18,126

Total Equity

0

0

0

0

0

7,261

17,575

10,431

5,898

6,870

7,946

9,548

11,847

14,496

Total Debt

0

0

0

0

0

113,322

0

0

0

0

0

0

0

0

0

0

0

0

0

0

0

0

0

0

0

0

0

0

0

0

Commercial Bank Loans Bond - Seri A

0

0

0

0

0

0

0

0

0

0

0

Bond - Seri B

0

113,322

0

0

0

0

0

0

0

0

0

26,317

163,365

77,200

66,299

69,539

75,453

82,695

93,471

105,860

122,603

123,062

New Investment

0

36,303

73,358

14,120

0

0

0

0

0

0

0

Bonds Issuance Fee

0

7,805

0

44,108

73,358

Total Sources of Funds

22,214

13,521

21,840

28,743

APPLICATIONS OF FUNDS (IDR million)

Total Investment

14,120

0

0

0

0

0

0

0

0

0

0

6,554

7,013

7,504

8,029

8,591

9,192

9,836

Trustee Fee

0

0

0

0

0

0

91

91

91

91

91

91

91

91

91

Rating Fee

0

Routine Investment

0

91

91

Sinking Fund - Bond Series A

0

0

0

0

0

0

0

0

0

Sinking Fund - Bond Series B

0

0

0

11,332

11,332

11,332

11,332

11,332

11,332

(67,993)

73,539

14,301

18,068

18,526

19,017

19,542

20,104

20,706

(57,976)

Total Investment Expenditure

0

0

0

0

0

44,108

0

1,005

10,000

10,400

14,821

91

91

91

91

91

91

91 0

Existing Loans Principal Repayment

901

451

0

0

0

0

0

0

0

Interest

484

1,035

6,183

5,190

3,223

2,163

1,346

494

0

0

0

0

0

0

0

Total

484

0

1,035

7,188

15,190

13,623

16,984

2,247

945

0

0

0

0

0

0

0

113,322

-

-

484

1,035

7,188

Working Capital (exclud. Cash)

9,644

3,159

(7,833)

Increase/decrease assets and liabilities

4,631

Bond - Series B Principal Repayment Interest Total Total Debt Service

-

(258)

(542)

-

0

0

0

0

0

0

0

0

0

0

0

14,165

14,165

14,165

14,165

14,165

14,165

14,165

14,165

14,165

14,165

14,165

14,165

14,165

14,165

14,165

14,165

14,165

14,165

14,165

127,487

16,413

15,110

14,166

14,165

14,165

14,165

14,165

14,165

127,487

(1,633)

(2,584)

-

15,190

13,623

31,149

(3,003)

12,250

8,050

(5,566)

4,640

962

1,082

(310)

(959)

(1,320)

7,405

9,256

9,256

9,256

1,851

185

185

7,894

185

4,684

185

185

2008 Budget Adjustments : Tax

0

Water Meter Reserve

0

5,962

6,278

6,924

7,257

7,689

7,696

8,088

8,096

8,508

8,516

Pemda Dividends

0

5,807

15,213

11,797

13,740

15,892

19,096

23,694

28,992

36,252

34,220

Employee reserve

0

1,056

2,766

2,145

2,498

2,889

3,472

4,308

5,271

6,591

6,222

General Reserve

0

0

0

0

0

0

0

0

0

0

0

Social and Education Reserve

0

0

0

0

0

0

0

0

0

0

0

Pension Reserve

0

792

2,075

1,609

1,874

2,167

2,604

3,231

3,953

4,943

4,666

20,081

24,553

104,329

119,974

65,782

67,820

64,262

65,926

72,255

79,134

88,767

128,004

8,661

1,763

59,035

517

1,719

11,191

16,769

21,216

26,726

33,836

Total Applications of Funds Annual Increase (Decrease) Cash (Beginning of Year) Cash (End Of Year)

14,760

3,936

(1,187)

7,454

9,586

23,026

0

2,031

1,018

591

2,513

384

59,420

16,645

17,162

18,881

30,072

46,842

68,058

94,784

128,620

2,031

1,018

591

2,513

384

59,420

16,645

17,162

18,881

30,072

46,842

68,058

94,784

128,620

123,678

ENVIRONMENTAL SERVICES PROGRAM WWW.ESP.OR.ID

(42,775)

(4,942)

50


PDAM TIRTA DHARMA - ANALISA KONDISI KEUANGAN DAN ANALISA KELAYAKAN KEUANGAN PENDAHULUAN ATAS USULAN RENCANA INVESTASI - REVISI

Balance Sheet 2004

2005

Realisasi 2007

2006

Budget 2008

2009

2010

2011

2012

2013

2014

2015

2016

2017

2018

Assets (IDR million) 384

16,340

18,113

19,233

82,312

20,512

Short Term Investments

0

0

0

0

0

43,080

142

58

768

10,840

26,144

45,970

71,144

46,308

103,166

Short Term Investment - Reserves

Cash & Bank

2,031 0

1,018 0

591 0

2,513 0

0

792

16,503 2,866

17,104 4,475

6,349

8,516

11,120

20,698

14,351

22,088

18,304

23,640

23,248

27,914

0

0

0

0

11,332

22,664

33,997

45,329

56,661

67,993

0

7,037

9,443

8,676

7,812

10,264

12,253

13,399

14,914

16,882

19,131

20,825

22,824

24,725

27,111

29,396

0

3,950

0

0

837

837

1,162

1,336

1,512

1,713

1,865

2,044

2,214

2,428

2,633

Trustee Reserve Sinking Fund Accounts Receivable Other Accounts Receivable Inventory

32

43

99

118

95

95

121

165

173

177

181

186

190

195

201

5,053

6,654

7,720

4,303

8,915

9,106

10,212

11,235

12,582

13,849

15,255

17,095

18,840

20,789

23,314

14,153

21,109

17,086

14,746

20,495

82,503

44,406

49,286

67,711

96,123

130,084

169,886

215,719

270,384

207,135

976

976

976

1,672

1,351

1,351

1,351

1,351

1,351

1,351

1,351

1,351

1,351

1,351

1,351

Fixed Assets in operation

81,123

144,136

150,356

160,053

161,538

161,538

205,646

279,004

293,124

299,678

306,691

314,194

322,223

330,814

340,006

Accumulated Depreciation

(51,890)

(61,791)

(69,697)

(79,261)

(85,275)

(94,967)

(104,660)

(116,998)

(133,739)

(151,326)

(169,307)

(187,708)

(206,560)

(225,893)

(245,742)

30,208

83,320

81,635

82,463

77,614

67,921

102,337

163,357

160,736

149,702

138,735

127,837

117,014

106,272

Advance Payments Total Current Assets Land

Net Book Value Work In Progress Other Fixed Assets Total Assets

95,615

18,103

435

1,980

0

0

44,108

73,358

14,120

6,554

7,013

7,504

8,029

8,591

9,192

9,836

2,677

2,419

1,877

9,771

8,451

15,856

25,112

34,368

43,624

45,476

45,661

45,846

46,031

46,216

46,401

65,141

107,284

102,578

106,980

106,560

210,389

245,214

261,131

278,625

298,314

321,983

351,597

387,355

432,064

358,987

Liabilities & Equity (IDR million) 5,262

4,319

506

206

404

2,914

746

2,129

2,297

2,453

2,657

2,850

3,063

3,343

3,608

3,904

4,287

Taxes Payable

Operation Accounts Payable

1,556

2,615

6,262

5,947

5,285

4,490

11,819

9,157

10,671

12,347

14,844

18,427

22,555

28,212

26,629

Long Term Debt - Current Portion

1,127

693

12,861

11,386

9,878

0

0

0

0

0

0

0

0

0

0

0

0

0

0

0

0

0

0

0

0

0

0

0

0

0

18,441

20,978

23,618

27,183

32,164

37,618

44,756

45,092

Other Accounts Payable

Leasing - Current Portion Total Current Liabilities Long Term Debt Commercial Bank Loan - East

922

4,672

2,117

5,537

6,209

4,111

8,186

24,789

24,566

18,025

12,156

20,325

18,457

48,182

26,742

21,672

16,172

1,352

450

0

0

0

0

0

0

6,831

7,650

8,421

9,275

10,394

11,455

12,640

(0)

(0)

(0)

(0)

(0)

(0)

(0)

0

0

0

0

0

0

0

0

14,175

(0) 0

Bond

0

0

0

0

0

113,322

113,322

113,322

113,322

113,322

113,322

113,322

113,322

113,322

0

Other Long Term Debt

0

0

0

0

0

0

0

0

0

0

0

0

0

0

0

Total Long Term Debt

18,457

48,182

26,742

21,672

16,172

114,674

113,773

113,322

113,322

113,322

113,322

113,322

113,322

113,322

Customer Deposit's

8,667

854

998

1,129

1,472

1,712

2,012

2,327

2,642

2,708

2,714

2,721

2,728

(0)

2,736

2,743

Social and Education Reserve

0

0

0

0

0

1,056

3,822

5,967

8,465

11,354

14,826

19,134

24,406

30,997

37,218

Pension Reserve

0

0

0

0

0

1,584

5,733

8,950

12,698

17,032

22,239

28,701

36,608

46,495

55,828

13,017

18,076

18,076

18,076

18,076

18,076

18,076

18,076

18,076

18,076

5,878

7,652

8,833

9,828

12,718

12,718

12,718

12,718

12,718

12,718

12,718

12,718

12,718

12,718

12,718

Other Liabilities

Reserve Water Meter Fees

14,545

19,195

21,099

23,974

32,266

35,146

42,361

48,038

54,599

61,888

70,575

81,352

94,537

111,022

126,583

Total Liabilities

37,112

75,563

72,630

70,212

66,463

161,975

176,459

179,801

188,899

198,828

211,079

226,838

245,477

269,100

171,675

6,102

6,102

7,102

10,061

12,402

19,662

37,237

47,668

53,567

60,436

68,382

77,930

89,777

104,273

122,399

Reserve Production Fund

Pemda Equity Central Government Equity Fixed Assets Revaluation Surplus Other Equity Reserve Fund General Reserve Adjustment Net Profit (last year)

0

10,688

11,268

18,076

18,076

0

0

0

0

0

0

0

0

0

0

0

0

0

0

0

1,955

1,955

1,955

1,955

1,955

1,955

1,955

1,955

1,955

1,955

1,955

1,955

1,955

1,955

1,955

0

0

0

0

0

0

0

0

0

0

0

0

0

0

0

0

0

0

0

0

12,287

12,815

14,198

15,271

16,520

17,965

19,701

21,855

24,490

27,786

12,056

13,429

11,020

11,532

13,453

13,981

15,364

16,436

17,685

19,130

20,866

23,020

25,656

28,951

32,062

0

0

0

0

0

7,916

10,235

9,871

13,220

12,287

528

1,383

1,072

1,249

1,445

1,736

2,154

2,636

3,296

3,111

Equity & Reserves

28,029

31,721

29,948

36,768

40,097

48,413

68,755

81,330

89,727

99,486

110,904

124,760

141,878

162,965

187,312

Total Liabilities & Equity

65,141

107,283

102,578

106,980

106,560

210,389

245,214

261,131

278,625

298,314

321,983

351,597

387,355

432,064

358,987

Net Income (Loss) for current year

ENVIRONMENTAL SERVICES PROGRAM WWW.ESP.OR.ID

0

0

0

0

0

0

0

0

0

0

51


PDAM TIRTA DHARMA - ANALISA KONDISI KEUANGAN DAN ANALISA KELAYAKAN KEUANGAN PENDAHULUAN ATAS USULAN RENCANA INVESTASI - REVISI

Balance Sheet 2004

2005

Realisasi 2007

2006

Budget 2008

2009

2010

2011

2012

2013

2014

2015

2016

2017

2018

Assets (IDR million) 2,031

1,018

591

2,513

384

17,806

8,142

4,836

8,771

18,298

19,764

21,154

22,705

73,903

20,512

Short Term Investments

Cash & Bank

0

0

0

0

0

38,135

0

0

0

3,711

19,823

40,845

67,380

51,563

107,731

Short Term Investment - Reserves

0

0

0

0

28,409

0

890

2,962

4,672

6,652

8,907

11,464

14,659

18,597

23,549

0

0

0

0

9,837

19,675

29,512

39,349

49,187

59,024

0

10,264

12,253

13,399

14,914

16,882

19,131

20,825

22,824

24,725

27,111

29,396

Trustee Reserve Sinking Fund Accounts Receivable Other Accounts Receivable Inventory

7,037 0

9,443 3,950

8,676 0

7,812 0

837

837

1,162

1,336

1,512

1,713

1,865

2,044

2,214

2,428

2,633

32

43

99

118

95

95

121

164

173

176

181

185

190

195

200

5,053

6,654

7,720

4,303

8,915

9,106

10,212

11,235

12,582

13,849

15,255

17,095

18,840

20,789

23,314

14,153

21,109

17,086

14,746

20,495

79,121

35,998

37,157

56,408

85,462

118,688

158,155

203,838

258,562

212,195

976

976

976

1,672

1,351

1,351

1,351

1,351

1,351

1,351

1,351

1,351

1,351

1,351

1,351

Fixed Assets in operation

81,123

144,136

150,356

160,053

161,538

161,538

204,617

277,974

292,094

298,648

305,661

313,165

321,193

329,784

338,977

Accumulated Depreciation

(51,890)

(61,791)

(69,697)

(79,261)

(85,275)

(94,967)

(104,660)

(116,936)

(133,615)

(151,141)

(169,060)

(187,399)

(206,189)

(225,461)

(245,248)

30,208

83,320

81,635

82,463

77,614

67,921

101,308

162,389

159,830

148,858

137,952

127,116

116,355

105,674

18,103

435

1,980

0

0

43,079

73,358

14,120

6,554

7,013

7,504

8,029

8,591

9,192

9,836

2,677

2,419

1,877

9,771

8,451

15,856

25,112

34,368

43,624

45,476

45,661

45,846

46,031

46,216

46,401

65,141

107,284

102,578

106,980

106,560

205,977

235,776

248,034

266,416

286,808

309,804

339,146

374,815

419,645

363,512

Advance Payments Total Current Assets Land

Net Book Value Work In Progress Other Fixed Assets Total Assets

95,080

Liabilities & Equity (IDR million) 5,262

4,319

506

206

404

2,914

746

2,129

2,297

2,453

2,657

2,850

3,063

3,343

3,608

3,904

4,287

Taxes Payable

Operation Accounts Payable

1,556

2,615

6,262

5,947

5,285

5,050

11,805

9,737

11,274

12,854

14,573

18,224

22,467

28,261

27,737

Long Term Debt - Current Portion

1,127

693

12,861

11,386

Other Accounts Payable

Leasing - Current Portion Total Current Liabilities Long Term Debt

922

4,672

2,117

9,878

5,537

0

6,209

0

6,831

0

7,650

0

8,421

0

9,275

0

10,394

0

11,455

0

12,640

14,175

0

0

0

0

0

0

0

0

0

0

0

0

0

0

0

0

0

4,111

8,186

24,789

24,566

18,025

12,716

20,312

19,021

21,581

24,124

26,912

31,960

37,530

44,804

46,200

18,457

48,182

26,742

21,672

16,172

10,871

5,170

(0)

(0)

(0)

(0)

(0)

(0)

(0)

(0)

Commercial Bank Loan - East

0

0

0

0

0

0

0

0

0

0

0

0

0

0

Bond

0

0

0

0

0

98,373

98,373

98,373

98,373

98,373

98,373

98,373

98,373

98,373

0

Other Long Term Debt

0

0

0

0

0

0

0

0

0

0

0

0

0

0

0

Total Long Term Debt

18,457

48,182

26,742

21,672

16,172

109,244

103,543

98,373

98,373

98,373

98,373

98,373

98,373

98,373

Customer Deposit's

8,667

854

998

1,129

1,472

1,712

2,012

2,327

2,642

2,708

2,714

2,721

2,728

0

(0)

2,736

2,743

Social and Education Reserve

0

0

0

0

0

1,187

3,950

6,230

8,869

11,876

15,285

19,546

24,796

31,399

37,879

Pension Reserve

0

0

0

0

0

1,780

5,924

9,345

13,303

17,814

22,928

29,318

37,194

47,098

56,818

13,017

18,076

18,076

18,076

18,076

18,076

18,076

18,076

18,076

18,076

5,878

7,652

8,833

9,828

12,718

12,718

12,718

12,718

12,718

12,718

12,718

12,718

12,718

12,718

12,718

Other Liabilities

Reserve Water Meter Fees

14,545

19,195

21,099

23,974

32,266

35,473

42,680

48,696

55,608

63,193

71,722

82,380

95,513

112,027

128,235

Total Liabilities

37,112

75,563

72,630

70,212

66,463

157,433

166,534

166,090

175,562

185,690

197,007

212,713

231,416

255,204

174,434

6,102

6,102

7,102

10,061

12,402

19,662

37,597

48,019

54,290

61,547

69,817

79,192

90,908

105,347

123,504

Reserve Production Fund

Pemda Equity Central Government Equity Fixed Assets Revaluation Surplus Other Equity Reserve Fund General Reserve Adjustment Net Profit (last year) Net Income (Loss) for current year

0

10,688

11,268

18,076

18,076

0

0

0

0

0

0

0

0

0

0

0

0

0

0

0

1,955

1,955

1,955

1,955

1,955

1,955

1,955

1,955

1,955

1,955

1,955

1,955

1,955

1,955

1,955

0

0

0

0

0

0

0

0

0

0

0

0

0

0

0

0

0

0

0

0

12,287

12,881

14,262

15,402

16,722

18,225

19,930

22,060

24,685

27,987

12,056

13,429

11,020

11,532

13,453

14,046

15,428

16,568

17,887

19,391

21,095

23,226

25,851

29,152

32,392

0

0

0

0

0

0

0

0

0

0

0

0

0

0

0

7,916

10,235

9,871

13,220

12,287

593

1,381

1,140

1,319

1,504

1,704

2,130

2,625

3,301

3,240

Equity & Reserves

28,029

31,721

29,948

36,768

40,097

48,544

69,242

81,944

90,854

101,118

112,798

126,432

143,399

164,441

189,078

Total Liabilities & Equity

65,141

107,283

102,578

106,980

106,560

205,977

235,776

248,034

266,416

286,808

309,804

339,146

374,815

419,645

363,512

ENVIRONMENTAL SERVICES PROGRAM WWW.ESP.OR.ID

52


PDAM TIRTA DHARMA - ANALISA KONDISI KEUANGAN DAN ANALISA KELAYAKAN KEUANGAN PENDAHULUAN ATAS USULAN RENCANA INVESTASI - REVISI

LAMPIRAN I: PROYEKSI KEUANGAN SKEMA PEMBIAYAAN PINJAMAN KOMERSIAL

FINANCIAL PROJECTION 2). New Project

Project Scenario

2

Funding Scenario

3 3). Commercial Credit

Term of Commercial Loan Period

Masa Tenggang

2007

2008

2009

Financial Effective tarif increase(#month) Tariff Increase Projection Average Tariff Cash + Deposit Minimum Cash Net Profit Incremental Cash Balance Control

Rp./m3 Rp.million Rp.million Rp.million Rp.million

Debt Service

Rp.million

Expansion Investment Cost Fee Trusstee & rating Routine Investment

Rp.million Rp.million Rp.million

Additional Customer Acc.Add.Customer

Connection Connection

Bond Scenario * Serie A * Serie B

Composition

Cross Check Investmen & Funding Commercial Loan/Bond Pemda Equity PDAM

0% 100%

7 tahun

Interest Rate

2010

2011

14% 2 tahun

2012

2013

2014

2015

2016

2017

2018

6

6

6

6

6

6

6

6

6

6

20% 3,482 (13,954) 14,621 18,061 (14,339) (0)

0% 3,760 (10,185) 23,678 18,289 3,769 (0)

20% 4,112 (13,574) 23,829 23,535 (3,389) 0

0% 4,440 (16,922) 23,556 28,832 (3,347) (0)

20% 4,844 (10,190) 23,394 33,993 6,732 (0)

0% 5,235 982 23,576 38,473 11,172 (0)

20% 5,733 14,809 15,778 43,994 13,827 (0)

0% 6,206 47,963 16,557 48,776 33,153 (0)

20% 6,799 91,375 18,568 63,222 43,412 (0)

0% 7,366 144,016 20,512 77,589 52,641 (0)

20,432

12,975

29,460

27,617

25,052

22,487

19,922

1,544

0

0

0.0

36,303 0 0

73,358 0 0

14,120 0 0

0 0 6,554

0 0 7,013

0 0 7,504

0 0 8,029

0 0 8,591

0 0 9,192

0 0 9,836

3,389 3,389

4,000 7,389

5,000 12,389

5,000 17,389

5,000 22,389

1,000 23,389

100 23,489

100 23,589

100 23,689

100 23,789

100 23,889

0.00

0.00

0.00

3,134 384 17,469 12,292 1,763

0.0

Interest 11.5% 12.5%

Period 5.00 10.00

0.00

Issuance 1-Dec-08 1-Dec-08

0.00

74% 20% 6%

ENVIRONMENTAL SERVICES PROGRAM WWW.ESP.OR.ID

53


PDAM TIRTA DHARMA - ANALISA KONDISI KEUANGAN DAN ANALISA KELAYAKAN KEUANGAN PENDAHULUAN ATAS USULAN RENCANA INVESTASI - REVISI

Income Statement 2004

2005

Realisasi 2007

2006

Anggaran 2008

2009

2010

2011

2012

2013

2014

2015

2016

2017

2018

REVENUE (IDR million) Water Sales Administration & meter rental Water Revenue New Connection Fees Other Operating Revenues Total Other Revenues Total Revenues

47,967

60,917

56,759

63,774

63,489

27%

14%

16%

14%

14%

10%

10%

9%

10%

9%

80,424

91,635

105,907

121,107

138,366

152,036

167,360

182,705

201,120

219,561

0

984

6,527

13,231

11,982

12,564

13,231

14,593

15,293

16,204

16,219

17,045

17,061

17,930

17,946

47,967

61,901

63,286

77,005

75,472

92,988

104,866

120,499

136,399

154,570

168,255

184,405

199,766

219,050

237,507

1,830

2,265

4,904

2,216

3,123

5,211

6,513

6,513

7,490

1,498

150

172

172

172

198

844

1,163

1,322

0

2,174

1,601

1,797

2,026

2,182

2,967

2,906

3,187

3,458

3,814

4,202

2,674

3,428

6,226

2,216

5,297

6,812

8,311

8,539

9,672

4,465

3,056

3,359

3,630

3,986

4,401

50,641

65,328

69,512

79,221

80,768

99,799

113,177

129,038

146,071

159,035

171,311

187,764

203,396

223,036

241,908

9%

8%

10%

OPERATING EXPENSES (IDR million) Personnel Power Chemical

16,919

18,651

19,463

20,391

25,156

27,965

31,461

35,394

39,818

44,795

50,395

56,694

63,781

71,753

80,722

7,100

8,883

9,876

9,294

9,323

11,204

12,654

13,540

14,488

15,502

16,587

17,748

18,990

20,320

21,742

86

79

150

174

241

296

334

358

383

410

438

469

502

537

574

Maintenance

3,630

4,679

6,407

5,883

5,311

6,137

6,932

7,417

7,936

8,492

9,086

9,722

10,403

11,131

11,910

General & Administrative

5,188

6,022

6,259

7,390

6,222

8,390

9,438

10,618

11,945

13,439

15,118

17,008

19,134

21,526

24,217

Bad Debts

363

424

0

512

291

560

638

738

843

964

1,059

1,166

1,272

1,401

1,529

Raw water

666

1,053

1,435

1,476

3,130

4,276

4,513

4,513

5,867

5,867

5,867

7,628

7,628

7,628

9,916

0

0

0

0

0

0

0

0

0

0

0

0

0

0

0

0

0

0

0

0

0

0

0

0

0

33,951

39,790

43,590

45,118

49,675

58,828

65,971

72,578

81,281

89,468

98,551

110,435

121,710

134,295

150,611

12%

10%

12%

10%

10%

12%

10%

10%

12%

2.0

Annual Take or pay Bulk Treated Water Charge -

2.0

Annual Take or pay Bulk Treated Water Charge - East

Total Operating Expenses

Profit

16,689

25,539

25,922

34,103

31,094

40,971

47,206

56,461

64,790

69,567

72,760

77,330

81,686

88,741

91,296

Non Operating Revenues

366

588

277

343

247

0

542

1,091

1,797

2,662

3,681

4,836

6,155

20,181

38,638

Non Operating Expenses

(212)

(218)

(127)

(193)

(126)

98

110

121

136

149

165

184

203

224

251

41,069

47,858

57,672

66,723

72,378

76,606

82,349

88,045

109,146

130,186

EBITDA Depreciation

16,844 5,054

10,063

5,642

9,564

10,459

9,692

9,692

11,870

16,272

17,119

17,512

17,933

18,383

18,865

19,381

EBIT

11,790

15,845

20,429

24,689

20,756

31,377

38,166

45,802

50,451

55,259

59,093

64,416

69,662

90,281

110,805

484

1,035

6,183

5,190

3,223

2,163

1,346

494

0

0

0

0

0

0

0

Interest - ……… Area

0

3,448

10,728

11,722

9,297

6,732

4,168

1,603

18

0

0

Trustee Fee

0

0

0

0

0

0

0

0

0

0

0

Rating Fee

0

0

0

0

0

0

0

0

0

0

0

Bond Interest - Series A

0

0

0

0

0

0

0

0

0

0

Interest

25,909

26,071

34,253

Bond Interest - Series B EBT Corporate Tax Net Profit

31,215

0

0

0

0

0

0

0

0

0

0

0

0

11,306

14,811

14,246

19,499

17,533

25,766

26,092

33,586

41,153

48,526

54,926

62,813

69,644

90,281

110,805

3,297 8,009

4,575 10,235

4,376 9,871

5,641 13,858

5,241 12,292

7,705 18,061

7,803 18,289

10,051 23,535

12,321 28,832

14,533 33,993

16,453 38,473

18,819 43,994

20,868 48,776

27,059 63,222

33,217 77,589

Net Profit Distribution Pemda

0

17,158

17,375

22,358

27,391

32,294

36,549

41,795

46,337

60,060

73,709

0

9,934

10,059

12,944

15,858

18,696

21,160

24,197

26,827

34,772

42,674

0.10

Employees

0

1,806

1,829

2,353

2,883

3,399

3,847

4,399

4,878

6,322

7,759

0.05

General Reserve

0

903

914

1,177

1,442

1,700

1,924

2,200

2,439

3,161

3,879

0.10

Social & Education Reserve

0

1,806

1,829

2,353

2,883

3,399

3,847

4,399

4,878

6,322

7,759

0.15

Pension Reserve

0

2,709

2,743

3,530

4,325

5,099

5,771

6,599

7,316

9,483

11,638

12,292

903

914

1,177

1,442

1,700

1,924

2,200

2,439

3,161

3,879

0.55

EAT after Profit Distribution

ENVIRONMENTAL SERVICES PROGRAM WWW.ESP.OR.ID

54


PDAM TIRTA DHARMA - ANALISA KONDISI KEUANGAN DAN ANALISA KELAYAKAN KEUANGAN PENDAHULUAN ATAS USULAN RENCANA INVESTASI - REVISI

Cash Flow Report 2004

2005

Realisasi 2007

2006

Anggaran 2008

1 2009

2 2010

3 2011

4 2012

5 2013

6 2014

7 2015

8 2016

9 2017

10 2018

SOURCES OF FUNDS (IDR million) EBT + Interest Non Operating revenue income

13,393

20,963

21,546

28,462

25,853

33,266

39,403

46,410

52,469

55,034

56,307

58,511

60,818

61,682

58,080

155

370

149

150

121

98

652

1,212

1,932

2,811

3,846

5,020

6,359

20,405

38,889

13,547

21,333

21,696

28,612

25,974

33,365

40,055

47,622

54,402

57,845

60,153

63,530

67,177

82,087

96,969

144

130

343

240

300

315

315

66

7

7

7

7

7

0

5,962

6,278

6,924

7,257

7,689

7,696

8,088

8,096

8,508

8,516

Local Government Equity - New Investment

0

7,261

14,672

2,824

0

0

0

0

0

0

0

Local Government Equity - Reinvestment

0

0

4,967

5,030

6,472

7,929

9,348

10,580

12,098

13,413

17,386

Net Profit Customer Deposit Reserve

8,667

(7,812)

Water Meter Fee

PDAM Equity Total Equity

0

Total Debt

0

0

0

0

0

0

0

0

0

0

0

0

0

0

0

7,261

19,638

7,853

6,472

7,929

9,348

10,580

12,098

13,413

17,386

0

0

0

0

0

26,864

54,285

10,449

0

0

0

0

0

0

0

0

0

0

0

0

26,864

54,285

10,449

0

0

0

0

0

0

0

Bond - Seri A

0

0

0

0

0

0

0

0

0

0

0

Bond - Seri B

0

0

0

0

0

0

0

0

0

0

0

73,691

120,557

73,163

68,445

73,529

77,204

82,206

87,378

104,015

122,878

Commercial Bank Loans

Total Sources of Funds

22,214

13,521

21,840

28,743

26,317

73,358

14,120

0

0

0

0

0

0

0

0

0

0

0

0

0

0

36,303

73,358

14,120

0

0

0

0

0

0

0

APPLICATIONS OF FUNDS (IDR million) New Investment

0

Bonds Issuance Fee Total Investment

36,303

Routine Investment

0

0

0

6,554

7,013

7,504

8,029

8,591

9,192

9,836

Trustee Fee

0

0

0

0

0

0

0

0

0

0

0

Rating Fee

0

0

0

0

0

0

0

0

0

0

Sinking Fund - Bond Series A

0

0

0

0

0

0

0

0

0

Sinking Fund - Bond Series B

0

0

0

0

0

0

0

0

0

36,303

73,358

14,120

6,554

7,013

7,504

8,029

8,591

9,192

Total Investment Expenditure

0

0

0

0

0

0 0 (1,495) 8,341

Existing Loans Principal Repayment

0

0

1,005

10,000

10,400

14,821

901

451

0

0

0

0

0

0

0

Interest

484

1,035

6,183

5,190

3,223

2,163

1,346

494

0

0

0

0

0

0

0

Total

484

1,035

7,188

15,190

13,623

16,984

2,247

945

0

0

0

0

0

0

0

-

-

Bond - Series B Principal Repayment

0

Interest Total Total Debt Service

0

0 484

1,035

7,188

Working Capital (exclud. Cash)

9,644

3,159

(7,833)

Increase/decrease assets and liabilities

4,631

(258)

(542)

-

-

0

0 -

13,623

12,975

(3,003)

12,250

4,834

1,661

(1,320)

7,405

9,256

0

0 -

15,190

7,894

20,432

0

0 -

29,460 (271) 9,256

0

0 27,617

0

0 25,052

0

0 22,487

0

0 19,922

0

0 -

0

0

0

-

1,544

206

547

267

258

446

9,256

1,851

185

185

185

0

0

(3,118)

(3,056)

185

185

2008 Budget Adjustments : Tax

0

Water Meter Reserve

0

5,962

6,278

6,924

7,257

7,689

7,696

8,088

8,096

8,508

8,516

Pemda Dividends

0

9,934

10,059

12,944

15,858

18,696

21,160

24,197

26,827

34,772

42,674

Employee reserve

0

1,806

1,829

2,353

2,883

3,399

3,847

4,399

4,878

6,322

7,759

General Reserve

0

0

0

0

0

0

0

0

0

0

Social and Education Reserve

0

0

0

0

0

0

0

0

0

0

0

Pension Reserve

0

1,355

1,372

1,765

2,162

2,550

2,885

3,300

3,658

4,742

5,819

24,553

88,030

116,788

76,552

71,793

66,797

66,032

68,378

54,225

60,603

70,237

11,172

13,827

33,153

43,412

52,641

982

14,809

47,963

91,375

14,809

47,963

91,375

144,016

Total Applications of Funds Annual Increase (Decrease) Cash (Beginning of Year) Cash (End Of Year)

14,760

3,936

(1,187)

7,454

9,586

23,026

8,661

1,763

0

2,031

1,018

591

2,513

2,031

1,018

591

2,513

384

ENVIRONMENTAL SERVICES PROGRAM WWW.ESP.OR.ID

20,081

(14,339) 384 (13,954)

(3,389)

(3,347)

(13,954)

3,769

(10,185)

(13,574)

(16,922)

6,732

(10,185)

(13,574)

(16,922)

(10,190)

(10,190) 982

0

55


PDAM TIRTA DHARMA - ANALISA KONDISI KEUANGAN DAN ANALISA KELAYAKAN KEUANGAN PENDAHULUAN ATAS USULAN RENCANA INVESTASI - REVISI

Balance Sheet 2004

2005

Realisasi 2007

2006

Budget 2008

2009

2010

2011

2012

2013

2014

2015

2016

2017

2018

Assets (IDR million) 18,568

20,512

Short Term Investments

0

0

0

0

0

0

0

0

0

0

0

0

31,406

72,806

123,503

Short Term Investment - Reserves

Cash & Bank

2,031 0

1,018 0

591 0

2,513 0

384 0

(13,954) 1,355

(10,185) 2,726

(13,574) 4,491

(16,922) 6,654

(10,190) 9,203

12,089

982

15,388

14,809

19,047

16,557

23,788

29,607

0

0

0

0

0

0

0

0

0

0

7,037

9,443

8,676

7,812

10,264

12,253

13,399

14,914

16,882

19,131

20,825

22,824

24,725

27,111

0

3,950

0

0

837

837

1,162

1,336

1,512

1,713

1,865

2,044

2,214

2,428

Trustee Reserve Sinking Fund Accounts Receivable Other Accounts Receivable Inventory Advance Payments Total Current Assets Land

(1,495) 29,396 2,633

32

43

99

118

95

95

117

160

169

172

177

181

186

191

196

5,053

6,654

7,720

4,303

8,915

9,106

10,212

11,235

12,582

13,849

15,255

17,095

18,840

20,789

23,314

14,153

21,109

17,086

14,746

20,495

9,691

17,431

18,562

20,876

33,880

51,192

72,341

112,974

165,682

227,667

976

976

976

1,672

1,351

1,351

1,351

1,351

1,351

1,351

1,351

1,351

1,351

1,351

1,351

Fixed Assets in operation

81,123

144,136

150,356

160,053

161,538

161,538

197,841

271,199

285,318

291,872

298,885

306,389

314,418

323,009

332,201

Accumulated Depreciation

(51,890)

(61,791)

(69,697)

(79,261)

(85,275)

(94,967)

(104,660)

(116,530)

(132,802)

(149,921)

(167,433)

(185,366)

(203,750)

(222,615)

(241,995)

30,208

83,320

81,635

82,463

77,614

67,921

94,532

156,019

153,867

143,302

132,802

122,373

112,019

101,744

18,103

435

1,980

0

0

36,303

73,358

14,120

6,554

7,013

7,504

8,029

8,591

9,192

9,836

2,677

2,419

1,877

9,771

8,451

15,856

25,112

34,368

43,624

45,476

45,661

45,846

46,031

46,216

46,401

65,141

107,284

102,578

106,980

106,560

129,772

210,433

223,069

224,922

229,670

237,159

248,589

279,615

322,834

375,460

Net Book Value Work In Progress Other Fixed Assets Total Assets

91,556

Liabilities & Equity (IDR million) Operation Accounts Payable

5,262

4,319

506

206

404

2,914

746

2,129

2,297

2,453

2,657

2,850

3,063

3,343

3,608

3,904

4,287

Taxes Payable

1,556

2,615

6,262

5,947

5,285

7,705

7,803

10,051

12,321

14,533

16,453

18,819

20,868

27,059

33,217

Long Term Debt - Current Portion

1,127

693

12,861

11,386

9,878

0

0

0

0

0

0

0

0

0

Other Accounts Payable

Leasing - Current Portion Total Current Liabilities Long Term Debt

922

4,672

2,117

5,537

6,209

6,831

7,650

8,421

9,275

10,394

11,455

12,640

14,175

0

0

0

0

0

0

0

0

0

0

0

0

0

0

0

0

4,111

8,186

24,789

24,566

18,025

15,371

16,309

19,335

22,628

25,803

28,792

32,556

35,931

43,603

51,679

18,457

48,182

26,742

21,672

16,172

1,352

450

(0)

(0)

(0)

Commercial Bank Loan - East

0

0

0

0

0

26,864

81,149

74,805

56,485

38,166

19,846

1,527

(0)

(0)

(0)

Bond

0

0

0

0

0

0

0

0

0

0

0

0

0

0

0

Other Long Term Debt

0

0

0

0

0

0

0

0

0

0

0

0

0

0

0

Total Long Term Debt

18,457

48,182

26,742

21,672

16,172

28,216

81,599

74,804

56,485

38,165

19,846

1,526

Customer Deposit's

8,667

854

998

1,129

1,472

1,712

2,012

2,327

2,642

2,708

2,714

2,721

Social and Education Reserve

0

0

0

0

0

1,806

3,635

(0)

5,989

(0)

8,872

(0)

12,271

(0)

16,118

(0)

20,518

(0) 2,728 25,395

(0)

(0)

2,736

2,743

31,718

39,476

Pension Reserve

0

0

0

0

0

2,709

5,453

8,983

13,308

18,407

24,178

30,777

38,093

47,576

59,215

Reserve Water Meter Fees

0

10,688

11,268

13,017

18,076

18,076

18,076

18,076

18,076

18,076

18,076

18,076

18,076

18,076

18,076

5,878

7,652

8,833

9,828

12,718

12,718

12,718

12,718

12,718

12,718

12,718

12,718

12,718

12,718

12,718

Other Liabilities

Reserve Production Fund

14,545

19,195

21,099

23,974

32,266

37,021

41,894

48,092

55,615

64,180

73,805

84,810

97,011

112,824

132,228

Total Liabilities

37,112

75,563

72,630

70,212

66,463

80,608

139,802

142,231

134,729

128,149

122,442

118,893

132,942

156,427

183,908

6,102

6,102

7,102

10,061

12,402

19,662

39,301

47,154

53,626

61,555

70,903

81,483

93,582

106,995

124,381

0

0

0

0

0

0

0

0

0

0

0

0

0

0

0

1,955

1,955

1,955

1,955

1,955

1,955

1,955

1,955

1,955

1,955

1,955

1,955

1,955

1,955

1,955

0

0

0

0

0

0

0

0

0

0

0

0

0

0

0

Pemda Equity Central Government Equity Fixed Assets Revaluation Surplus Other Equity Reserve Fund General Reserve Adjustment Net Profit (last year)

0

0

0

0

0

12,287

13,190

14,105

15,282

16,723

18,423

20,347

22,546

24,985

28,146

12,056

13,429

11,020

11,532

13,453

14,356

15,270

16,447

17,889

19,589

21,512

23,712

26,151

29,312

33,191

0

0

0

0

0

7,916

10,235

9,871

13,220

12,287

903

914

1,177

1,442

1,700

1,924

2,200

2,439

3,161

3,879

Equity & Reserves

28,029

31,721

29,948

36,768

40,097

49,164

70,631

80,838

90,193

101,521

114,717

129,696

146,672

166,408

191,553

Total Liabilities & Equity

65,141

107,283

102,578

106,980

106,560

129,772

210,433

223,069

224,922

229,670

237,159

248,589

279,615

322,834

375,460

Net Income (Loss) for current year

ENVIRONMENTAL SERVICES PROGRAM WWW.ESP.OR.ID

0

0

0

0

0

0

0

0

0

0

56


PDAM TIRTA DHARMA - ANALISA KONDISI KEUANGAN DAN ANALISA KELAYAKAN KEUANGAN PENDAHULUAN ATAS USULAN RENCANA INVESTASI - REVISI

LAMPIRAN J: PENGHITUNGAN KELAYAKAN INVESTASI ALTERNATIF PEMBIAYAAN Tahun 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20

2009 2010 2011 2012 2013 2014 2015 2016 2017 2018 2019 2020 2021 2022 2023 2024 2025 2026 2027 2028

OBLIGASI Pengeluaran Investasi O&M 43,078.5*) 8,554.9 73,357.9 14,234.2 14,119.6 18,695.7 24,112.4 28,372.2 32,568.2 37,838.3 41,925.3 46,028.0 51,311.0 47,954.2 44,817.0 41,885.0 39,144.9 36,584.0 34,190.7 31,953.9 29,863.4 27,909.8 26,083.9

Discount Rate WACC 11.9% Ket: *) tmsk biaya penerbitan obligasi

PINJAMAN KOMERSIAL Pendapatan 16,370.3 25,674.6 36,756.0 46,481.4 56,396.1 61,825.4 67,838.2 72,340.4 78,097.1 82,370.6 94,714.7 88,518.4 82,727.5 77,315.4 72,257.4 67,530.3 63,112.4 58,983.5 55,124.8 51,518.5 FIRR NPV

ENVIRONMENTAL SERVICES PROGRAM WWW.ESP.OR.ID

Arus Kas Bersih (35,263.1) (61,917.6) 3,940.7 22,369.0 28,023.9 29,257.2 29,999.9 30,415.2 32,069.0 31,059.6 46,760.5 43,701.4 40,842.4 38,170.5 35,673.4 33,339.6 31,158.5 29,120.1 27,215.0 25,434.6 23.3% 84,195.9

Pengeluaran Investasi O&M 36,302.8 8,554.9 73,357.9 14,234.2 14,119.6 18,695.7 24,112.4 28,372.2 32,568.2 37,838.3 41,925.3 46,028.0 51,311.0 47,954.2 44,817.0 41,885.0 39,144.9 36,584.0 34,190.7 31,953.9 29,863.4 27,909.8 26,083.9

13.0%

Pendapatan 16,370.3 25,674.6 36,756.0 46,481.4 56,396.1 61,825.4 67,838.2 72,340.4 78,097.1 82,370.6 94,714.7 88,518.4 82,727.5 77,315.4 72,257.4 67,530.3 63,112.4 58,983.5 55,124.8 51,518.5 FIRR NPV

Arus Kas Bersih (28,487.3) (61,917.6) 3,940.7 22,369.0 28,023.9 29,257.2 29,999.9 30,415.2 32,069.0 31,059.6 46,760.5 43,701.4 40,842.4 38,170.5 35,673.4 33,339.6 31,158.5 29,120.1 27,215.0 25,434.6 24.9% 76,429.0

57


PDAM TIRTA DHARMA - ANALISA KONDISI KEUANGAN DAN ANALISA KELAYAKAN KEUANGAN PENDAHULUAN ATAS USULAN RENCANA INVESTASI - REVISI

LAMPIRAN K: PERHITUNGAN “PRESENT VALUE” BIAYA PINJAMAN (DLM RP JUTA) OPSI PEMBIAYAAN

Total

1 2009

2 2010

3 2011

4 2012

5 2013

6 2014

7 2015

8 2016

9 2017

10 2018

Pinjaman Komersial Pokok Bunga Provisi Kredit Total PV

91,597 47,715 1,494 140,807 106,419

3,448 134 3,582

10,728 406 11,133

16,793 11,722 374 28,889

18,319 9,297 282 27,899

18,319 6,732 191 25,243

18,319 4,168 99 22,586

18,319 1,603 8 19,930

1,527 18

-

-

1,544

-

-

Obligasi Pokok Bunga B. Penerbitan Sinking Fund Trustee Pendp.bunga Total PV

98,373 122,966 6,776 1,417 (12,395) 217,137 144,847

12,297 6,776 19,072

12,297

12,297

12,297

12,297

12,297

12,297

12,297

12,297

98,373 12,297

157 12,454

157 12,454

9,837 157 22,291

9,837 157 (590) 21,701

9,837 157 (1,180) 21,111

9,837 157 (1,771) 20,521

9,837 157 (2,361) 19,930

9,837 157 (2,951) 19,340

(59,024) 157 (3,541) 48,262

Pinjaman Komersial Obligasi Selisih

Total Biaya PV Nominal 140,807 106,419 144,847 217,137 (40,551) (76,330)

ENVIRONMENTAL SERVICES PROGRAM WWW.ESP.OR.ID

58



ENVIRONMENTAL SERVICES PROGRAM Ratu Plaza Building, 17th. Fl. Jl. Jend. Sudirman No. 9 Jakarta 10270 Indonesia Tel. +62-21-720-9594 Fax. +62-21-720-4546 www.esp.or.id


Turn static files into dynamic content formats.

Create a flipbook
Issuu converts static files into: digital portfolios, online yearbooks, online catalogs, digital photo albums and more. Sign up and create your flipbook.