SANTA MARTA HARBOR RAILWAY ACCESS, COLOMBIA

Page 1

Previous feasibility study of the infrastructure construction for the reactivation of the railway freight transport between Santa Marta harbor and the Maritime Terminal in Colombia. Special importance is given to coal transportation, stressing in a quality loading, stocking and unloading processes. The study includes: •

Legal basis for the Public-Private Association.

Permeability study of the Santa Marta neighborhoods and identification of the critical points of the MamatocoPuerto railway stretch.

Demand and supply study on the previous feasibility stage.

Estimated cost and financing sources .

Project exploitation and operational study.

• Aerial photograph of the work area. • Proposed plan for Santa Marta Harbor access.

SANTA MARTA HARBOR RAILWAY ACCESS

REVIOUS FEASIBILITY STUDY Colombia, 2011-2012


Turn static files into dynamic content formats.

Create a flipbook
Issuu converts static files into: digital portfolios, online yearbooks, online catalogs, digital photo albums and more. Sign up and create your flipbook.