ARCH 562 路 SYSTEMS STUDIO 路 WINTER 2013
116 W Huron St Douglas Kelbaugh-Lars Graebner-Studio Joseph Cernugel, Ethan Dome, Jie Liu
NW Perspective Rendering
ARCH 562 路 SYSTEMS STUDIO 路 WINTER 2013
116 W Huron St Douglas Kelbaugh-Lars Graebner-Studio Joseph Cernugel, Ethan Dome, Jie Liu
SW Perspective Rendering
SITE SQUARE FOOTAGE: BUILDING SQUARE FOOTAGE: FAR: HEIGHTS: SQUARE FOOTAGE OF RESTAURANT: GRAND BALLROOM: TOTAL CONFERENCE: RESIDENTIAL: UNIT COUNT:
31,225 sf 192,110 sf 6.15 150' TOTAL, 35' PODIUM 4,810 sf 6,445 sf 8,685 sf 111,390 sf 145 TOTAL 75 HOTEL 70 ONE-BEDROOM
ARCH 562 路 SYSTEMS STUDIO 路 WINTER 2013
116 W Huron St Douglas Kelbaugh-Lars Graebner-Studio Joseph Cernugel, Ethan Dome, Jie Liu
1. Site 1 - 14 stories
2. Site 2 - 16 stories 8
3. 100 South Main St
10
9
pace
St
ington St
m
ey St
ey St
7 11
ey St
treet
Vital Records
n Street
Circuit Court
5 4
1
2
3
12
- office space
6. 215 West Washington St
- bank
- Public Parking System
4. 111 North Ashley St 7. 123 North Ashley St
- 2 floor commercial space
ey St
- 11 stories
- 5 stories
- 99 residences
St
5. 101 North Main St
- 7 stories
- 10 stories
6
Urban Situation
- Amper LLC
8. 201 North Ashley St - Residencial Area
9. 201 North Ashley St - Residencial Area
10. 117 East Ann Street - Washtenaw County Vital Records
11. 101 East Huron Street - Washtenaw County Circuit Court
12. 102 S Main St - 3 stories - bank
ARCH 562 路 SYSTEMS STUDIO 路 WINTER 2013
116 W Huron St Douglas Kelbaugh-Lars Graebner-Studio Joseph Cernugel, Ethan Dome, Jie Liu
Site Plan
ARCH 562 路 SYSTEMS STUDIO 路 WINTER 2013
116 W Huron St Douglas Kelbaugh-Lars Graebner-Studio Joseph Cernugel, Ethan Dome, Jie Liu
Massing Diagram
M A X I M U M F. A . R . A N D 1 2 0 ' H E I G H T W I T H A 2 0 ' SEPERATION TO ALLOW FOR LIGHT TO OCCUPANTS OF ONE NORTH MAIN
ADDITION OF BALLROOM SPACE INTO SECOND FLOOR
ADDED EMPHASIS TO BALLROOM BY ADDING A CLEARSTORY AS THE THIRD FLOOR AND GLASS TO THE FIRST FLOOR
EXTEND HOTEL OVER PARKING GARAGE TO CREATE A PORTE-COCHERE FOR THE ENTRYWARY, AND "CLAIM" THE PARKING GARAGE AS PART OF THE PROJECT
TO EMPHASIZE THE HORIZONTAL OF THE HOTEL AND THE EXISTING BUS DEPOT, THE SOUTH FACADE OF THE FIRST TWO FLOORS IS PUSHED BACK 10 FEET FROM THE PROPERTY LINE
ADD A ROOFTOP LOUNGE AND GARDEN TO "CAP" OFF THE BUILDING
EXTEND PODIUM INTO FIRST TWO FLOORS OF THE PARKING GARAGE TO CREATE AN ENTRY WAY BETWEEN THE TWO BUILDINGS
ARCH 562 路 SYSTEMS STUDIO 路 WINTER 2013
116 W Huron St Douglas Kelbaugh-Lars Graebner-Studio Joseph Cernugel, Ethan Dome, Jie Liu
West Elevation
ARCH 562 路 SYSTEMS STUDIO 路 WINTER 2013
116 W Huron St Douglas Kelbaugh-Lars Graebner-Studio Joseph Cernugel, Ethan Dome, Jie Liu
Section A
ARCH 562 路 SYSTEMS STUDIO 路 WINTER 2013
116 W Huron St Douglas Kelbaugh-Lars Graebner-Studio Joseph Cernugel, Ethan Dome, Jie Liu
South Elevation
ARCH 562 路 SYSTEMS STUDIO 路 WINTER 2013
116 W Huron St Douglas Kelbaugh-Lars Graebner-Studio Joseph Cernugel, Ethan Dome, Jie Liu
Section B
ARCH 562 路 SYSTEMS STUDIO 路 WINTER 2013
116 W Huron St Douglas Kelbaugh-Lars Graebner-Studio Joseph Cernugel, Ethan Dome, Jie Liu
1st + 2nd Floor Plan
ARCH 562 路 SYSTEMS STUDIO 路 WINTER 2013
116 W Huron St Douglas Kelbaugh-Lars Graebner-Studio Joseph Cernugel, Ethan Dome, Jie Liu
Section Perspective
ARCH 562 路 SYSTEMS STUDIO 路 WINTER 2013
116 W Huron St Douglas Kelbaugh-Lars Graebner-Studio Joseph Cernugel, Ethan Dome, Jie Liu
Ballroom Rendering
ARCH 562 路 SYSTEMS STUDIO 路 WINTER 2013
116 W Huron St Douglas Kelbaugh-Lars Graebner-Studio Joseph Cernugel, Ethan Dome, Jie Liu
2nd Floor Garden Rendering
A ARCH 562 · SYSTEMS STUDIO · WINTER 2013
116 W Huron St Douglas Kelbaugh-Lars Graebner-Studio Joseph Cernugel, Ethan Dome, Jie Liu 17’-0”
TYPICAL FLOOR PLAN
Residential Floor Plans
3RD FLOOR PLAN A
B
B
B
16’-4”
B
A
A
ARCH 562 · SYSTEMS STUDIO · WINTER 2013
116 W Huron St Douglas Kelbaugh-Lars Graebner-Studio Joseph Cernugel, Ethan Dome, Jie Liu BEDROOM
Unit Types
BEDROOM
TRANSLUCENT GLASS BATHTUB & SINK
OFFICE
TRANSLUCENT GLASS BATHTUB & SINK
SHOWER & TOILET
SHOWER & TOILET
DESK DESK
BATH LIVING DINING
KITCHEN
LIVING
TRANSLUCENT GLASS SEAT
KITCHEN
DINING
BED
HALF BATH
10’-2”
19’-3 3/16”
32’-0”
13’-2 11/16”
5’-7 1/2”
13’-8 11/16”
7’-7 13/16”
12’-0”
3’-1”
6’-4”
24’-0”
37’-10”
10’-3”
4’-6”
9’-3” 6’-5 3/4”
7’-0”
19’-6” 39’-0”
8’-6” 26’-1 1/2”
ARCH 562 路 SYSTEMS STUDIO 路 WINTER 2013
116 W Huron St Douglas Kelbaugh-Lars Graebner-Studio Joseph Cernugel, Ethan Dome, Jie Liu
Roof Deck GYM
GYM
MECHANICAL MECHANICAL ROOM ROOM
STORAGE ROOM STORAGE ROOM
KITCHEN
KITCHEN
ARCH 562 路 SYSTEMS STUDIO 路 WINTER 2013
116 W Huron St Douglas Kelbaugh-Lars Graebner-Studio Joseph Cernugel, Ethan Dome, Jie Liu
Wall Section-North
HORIZONTAL CONNECTION BAR
HORIZONTAL CONNECTION BAR
VERTICAL LOUVER GUARDRAIL DECKING TOPPING SLAB RIGID FOAM INSULATION GUARDRAIL ANCHOR BOLT
VERTICAL LOUVER GUARDRAIL DECKING TOPPING SLAB RIGID FOAM INSULATION GUARDRAIL ANCHOR BOLT
PLASTER LOUVER MOUNTING BRACKET
LOUVER MOUNTING BRACKET
GLASS GUARDRAIL
MULLION
RADIANT HEATING/COOLING SYSTEM
FLASHING INSULATION
STEEL ANGLE BOLT
STEEL ANGLE BOLT
STEEL ANGLE WITH LOUVER TRACK
STEEL ANGLE WITH LOUVER TRACK
VERTICAL LOUVER
HORIZONTAL LOUVER
DOUBLE GLAZING
DOUBLE GLAZING
WOOD FLOORING SUBFLOOR CONCRETE
RADIANT HEATING/COOLING SYSTEM WOOD FLOORING SUBFLOOR CONCRETE
ARCH 562 路 SYSTEMS STUDIO 路 WINTER 2013
116 W Huron St Douglas Kelbaugh-Lars Graebner-Studio Joseph Cernugel, Ethan Dome, Jie Liu
Wall Section-West
HORIZONTAL CONNECTION BAR
HORIZONTAL CONNECTION BAR
VERTICAL LOUVER GUARDRAIL DECKING TOPPING SLAB RIGID FOAM INSULATION GUARDRAIL ANCHOR BOLT
VERTICAL LOUVER GUARDRAIL DECKING TOPPING SLAB RIGID FOAM INSULATION GUARDRAIL ANCHOR BOLT
PLASTER LOUVER MOUNTING BRACKET
LOUVER MOUNTING BRACKET
GLASS GUARDRAIL
MULLION
RADIANT HEATING/COOLING SYSTEM
FLASHING INSULATION
STEEL ANGLE BOLT
STEEL ANGLE BOLT
STEEL ANGLE WITH LOUVER TRACK
STEEL ANGLE WITH LOUVER TRACK
VERTICAL LOUVER
HORIZONTAL LOUVER
DOUBLE GLAZING
DOUBLE GLAZING
WOOD FLOORING SUBFLOOR CONCRETE
RADIANT HEATING/COOLING SYSTEM WOOD FLOORING SUBFLOOR CONCRETE
ARCH 562 路 SYSTEMS STUDIO 路 WINTER 2013
116 W Huron St Douglas Kelbaugh-Lars Graebner-Studio Joseph Cernugel, Ethan Dome, Jie Liu
Details Rendering
ARCH 562 路 SYSTEMS STUDIO 路 WINTER 2013
116 W Huron St Douglas Kelbaugh-Lars Graebner-Studio Joseph Cernugel, Ethan Dome, Jie Liu
Mechanical Diagram
ARCH 562 路 SYSTEMS STUDIO 路 WINTER 2013
116 W Huron St Douglas Kelbaugh-Lars Graebner-Studio Joseph Cernugel, Ethan Dome, Jie Liu
Structural Plan
ARCH 562 路 SYSTEMS STUDIO 路 WINTER 2013
116 W Huron St Douglas Kelbaugh-Lars Graebner-Studio Joseph Cernugel, Ethan Dome, Jie Liu
Structural Diagram
ARCH 562 路 SYSTEMS STUDIO 路 WINTER 2013
116 W Huron St Douglas Kelbaugh-Lars Graebner-Studio Joseph Cernugel, Ethan Dome, Jie Liu
Circulation Diagram
ARCH 562 路 SYSTEMS STUDIO 路 WINTER 2013
116 W Huron St Douglas Kelbaugh-Lars Graebner-Studio Joseph Cernugel, Ethan Dome, Jie Liu
Model Photos
ARCH 562 路 SYSTEMS STUDIO 路 WINTER 2013
116 W Huron St Douglas Kelbaugh-Lars Graebner-Studio Joseph Cernugel, Ethan Dome, Jie Liu
Model Photos
ARCH 562 路 SYSTEMS STUDIO 路 WINTER 2013
116 W Huron St Douglas Kelbaugh-Lars Graebner-Studio Joseph Cernugel, Ethan Dome, Jie Liu
Model Photos
ARCH 562 路 SYSTEMS STUDIO 路 WINTER 2013
116 W Huron St Douglas Kelbaugh-Lars Graebner-Studio Joseph Cernugel, Ethan Dome, Jie Liu
Unit Models
ARCH 562 路 SYSTEMS STUDIO 路 WINTER 2013
116 W Huron St Douglas Kelbaugh-Lars Graebner-Studio Joseph Cernugel, Ethan Dome, Jie Liu
Unit Models