Architecture Portfolio

Page 1

P O R T F O L I O ERIKA TOSCANO


TABLE OF CONTENTS • CURRICULUM VITAE............................................................................... 2

• NATIONAL MUSEUM of THE SUPREME COURT.......................... 3 CBDS Studio | Spring 2018

• HYBRID on H STREET............................................................................. 7 Hybrid Studio | Fall 2017

• MIXED-USE REDEVELOPMENT......................................................... 11 Sustainability Studio | Spring 2017

• GEORGETOWN BOATHOUSE............................................................ 15 Scanned with CamScanner

Studio Project | Fall 2016

• HAND SKETCHES................................................................................... 19


CURRICULUM VITAE ERIKA TOSCANO 10toscanojaramillo@cua.edu (703) 472 6470

ABOUT ME: Recently graduated ‘cum laude’ from The Catholic University of America. I am a member of Tau Sigma Delta - National Honor Society of Architecture. I am looking forward to starting my architecture professional career.

EDUCATION

WORK EXPERIENCE

• BACHELOR OF SCIENCE IN ARCHITECTURE The Catholic University of America | Aug 2016 - May 2018

• CREW & SIGN TEAM MEMBER Trader Joe’s | August 2017- Present

• ASSOCIATE’S DEGREE IN ARCHITECTURE Northern VA Community College | Aug 2011 - May 2014

• CAD DRAFTER

• ADVANCED HS DIPLOMA McLean High School | Sep 2008 - June 2011

• ASSISTANT MANAGER

SKILLS

LANGUAGE SKILLS

AutoCAD

Revit Illustrator Indesign SketchUp

US Inspect | March 2016- February 2017 Garage | November 2015 - March 2016

ENGLISH 100%

SPANISH 100%

ITALIAN 70%

PhotoShop

Climate Con. | CURRICULUM VITAE |

2


NATIONAL MUSUEM OF T H E S U P R E M E C O U R T WEB OF MINDS

OUR DESIGN IS INSPIRED BY THE WAY THE SUPREME COURT JUSTICES GUIDE EACH OTHER WHEN CONSIDERING A CASE. THESE CASES ARE REPRESENTED IN OUR DESIGN BY THE PRIMARY BUILDING FORM, WHEREAS THE PEOPLE AND PLACES THAT MAKE EACH CASE UNIQUE ARE REPRESENTED BY THE TWO SECONDARY BUILDING FORMS. THESE FORMS ARE LINKED THROUGH A SERIES OF WEB CONNECTIONS WHICH REPRESENT THE INFLUENCE THAT THE SUPREME COURT JUSTICE’S HAVE UPON EACH OTHER. THE SUSTAINABLE SYNERGY FOR OUR DESIGN IS WATER CONSERVATION BECAUSE IT RELIES ON THE CONNECTION BETWEEN OUR DESIGN AND THE ENVIRONMENT.


Jeff

60’

erso

nD

r.

St .

12’

96’

14th St.

• CONTRIBUTION: 1. As team leader, I organized and assigned tasks to other team members based on their strengths. 2. Design and complete floor plans according to our concept, code and requirements. 3. Designing our section and site plan. 4. Designing presentation boards for jury’s throughout the semester and the final competition board. 5. Completing sectional and spatial model. 6. Completing the Document Set with another team member. 7. Creating section detail that emphasized our green roof and mat slab.

36’

th

• PROGRAM: Exhibition Spaces Museum Shop Cafe Library Lecture Hall Archives Office Spaces Loading Dock Conference Rooms

SITE PLAN

15

• LOCATION: National Mall, Washington DC

Inde

pend

ence

St.

| CBDS - SPRING 2018 |

4


$

FLOOR PLANS 24’

8’

72’

56’

COAT CHECK

M

M

83

'1

ARCHIVE STORAGE

DN

W

KITCHEN

UP

W

PERMANENT EXHIBITION @ -18’-0”

IT ER. JR.

M

VESTIBULE

DELIVERY/ STORAGE

W

O.T.B

M

LOBBY @ 0’-0” W

O.T.B

CAFE @ 0’-0”

EXHIBITION STORAGE TEMPORARY EXHIBITION @ -30’-0”

EXHIBITION SPACE BELOW @ -30’-0”

O.T.B

ARCHIVE SPACE @ -15’-0”

O.T.B

JR. ER.

IT

83 '1

MECHANICAL ROOM

PROJECTION ROOM

5 | CBDS - SPRING 2018 |

ER.

O.T.B

BOOKSTORE

VESTIBULE STORAGE

LECTURE HALL

LOWER LEVEL 1

$

/2:(5 /(9(/

$

LOADING DOCK @ -2’-0”

M

WATER ROOM

LOWER LEVEL 2

/2:(5 /(9(/

IT

JR.

ELECTRICAL ROOM

FREIGHT ELEVATOR

W

PERMANENT EXHIBITION BELOW @ -25’-0”

FIRE PUMP ROOM

PERMANENT EXHIBITION @ -25’-0”

O.T.B

LOBBY @ 0’-0”

FREIGHT ELEVATOR

FREIGHT ELEVATOR

IT

O.T.B

IT

UP

UP

ATRIUM @ 0’-0”

VESTIBULE

JR. ER.

JR. ER.

0$,1 /(9(/

GROUND LEVEL

STOR.


SECTION DETAIL 3’

1’

9’

5’

A OFFICE

M

STOR.

OPEN TO BELOW

OFFICE

M

ER. JR. LIBRARY @ 15’-0”

CONFERENCE ROOM

OBSERVATION AREA @ 15’-0”

W

83

CONFERENCE CONFERENCE ROOM ROOM

UPPER LEVEL 2 ROOF BEYOND WILLOW OAK TREE

W

GREEN ROOF @ 34’-0”

ALUMINUM COPING

UP

LOUNGE @ 25’-0”

OPEN TO BELOW

OPEN TO BELOW

JR. ER.

IT

WOOD BLOCKING 8” CARBON NEUTRAL CONCRETE PVC MEMBRANE

T.O.S. UPPER LEVEL 1 ROOF 34' - 0"

OPEN TO BELOW

OFFICE OFFICES @ 15’-0”

W

IT

ER.

JR. STORAGE

M

SHOWER

FREIGHT ELEVATOR

ADMIN. OFFICE

WORKSPACE

CONFERENCE ROOM

OPEN TO BELOW

GREEN ROOF @ 34’-0”

UPPER LEVEL 1

'1

DN CONFERENCE ROOM

UPPER LEVEL 2

PLANTING 30” DEEP SOIL WIND BLANKET & BIODEGRABLE DETENTION PINS 4” RIGID INSULATION 12” CARBON NEUTRAL CONCRETE CONCRETE CAPSTONE SEPARATION/GEOTEXTILE FABRIC DRAINAGE & WATER RETENTION AERATION MAT 4” RIGID INSULATION PROTECTION COURSE FLUID APPLIED WATERPROOFING NEOPRENE FLASHING SHEET FLUID APPLIED WATERPROOFING

Library 301

6” COMPOSITE ROOF DECKING WALL BEYOND

19’-0”

OFFICE IT

B

6” SHIM

T.O.S. UPPER LEVEL 1 15' - 0" 18” HVAC DUCT TYP. WOOD VENEER DROPPED CEILING TYP.

833(5 /(9(/

Cafe 213

SECTION 6’

NORTH ENTRANCE RAMP BEYOND

EDGE BASE TYP.

T.O.S. MAIN LEVEL 0' - 0"

42’ 30’

BIOSWALE BELOW MAIN LEVEL

GREEN ROOF COLLECTS RAINWATER FOR IRRIGATION

PHOTOVOLTAICS ON ROOF DECREASE ENERGY CONSUMPTION OF THE MUSEUM’S ENERGY USE

BIORETENTION BASIN COLLECTS RAINWATER FROM BUILDING FACADE

GROUND LEVEL 4’-0” BELOW MAIN LEVEL SOIL FILTER FABRIC

NATIVE FOLIAGE MINIMIZES NEED FOR IRRIGATION

Archives

12” DRAINAGE STONE DRAINAGE BD.

100

PROTECTION BD.

-18’-0”

18’

15’-0”

RECESSED LIGHTING TYP.

LOWER LEVEL 1 BEYOND -15' - 0" T.O.S. LOWER LEVEL 2 -18' - 0"

7

LOUNGE

LIBRARY

Archive Storage 002

-12’-0”

$

CONCRETE SLAB WATER STOPS

ATRIUM

T.O.S. LOWER LEVEL 2 -30' - 0"

LOBBY

WATER PROTECTION 2” THICK MUD SLAB DRAINAGE SYSTEM ARCHIVE SPACE PERMANENT EXHIBITION

T.O. MAT SLAB -35' - 6" UNDERSLAB DRAINAGE SYSTEM GRAVEL MAT FOUNDATION

EXHIBITION STORAGE

TEMPORARY EXHIBITION

| CBDS - SPRING 2018 |

6


HYBRID ON H S T R E E T THE SHIFT IN CULTURE AND HISTORY THAT H STREET HAS EXPERIENCED THROUGHOUT THE YEARS, INFLUENCED THE DESIGN FOR THIS HYBRID BUILDING. INCORPORATING THE NECESSARY COMMERCIAL SPACES AND LIVING SPACES WILL ALLOW FOR THIS UNIQUE COMMUNITY TO GROW.


SITE PLAN 72’

144’

120’

7TH ST.

24’

H STREET

| HYBRID STUDIO - FALL 2017 |

8


FLOOR PLANS 18’

6’

36’

30’

.

.

GROUND LEVEL

SECOND LEVEL

ELEVATIONS 12’

6’

SOUTH ELEVATION

9 | HYBRID STUDIO - FALL 2017 |

30’ 24’

WEST ELEVATION


DN

THIRD LEVEL

FOURTH LEVEL

FIFTH LEVEL

SECTION 12’ 6’

30’ 24’

| HYBRID STUDIO - FALL 2017 |

10


MIXED-USED R E D E V E L O P M E N T I N B R O O K L A N D

THERE IS A VOID IN THE BROOKLAND COMMUNITY. IN ORDER TO RE-ESTABLISH A SENSE OF COMMUNITY , IT IS NECESSARY TO INCORPORTE MULTI-FAMILY LIVING SPACES, GREEN FEATURES FOR A SUSTAINABLE WAY OF LIFE AND PUBLIC GREEN SPACES TO CREATE SOCIAL CONNECTIVITY AREAS.


SITE PLAN 66’

132’

110’

10TH ST. NE

MONROE ST NE

9TH ST. NE

22’

LAWRENCE ST.

| SUSTAINABILITY STUDIO - SPRING 2017 |

12


FLOOR PLANS 6’

APARTMENT UNITS 24’

12’

42’

18’

20’

4’

30’

www.autodesk.com/revit

Consultant Address Address Address Phone

1 A125

3.

2.

1.

5.

Consultant Address Address Address Phone

STUDIO

ONE BEDROOM

Consultant Address Address Address Phone

Consultant Address Address Address Phone

1. LOBBY

4.

2. CLOTHING STORE

Consultant Address Address Address Phone

N

3. LAUNDRYMATE 4.COFFE SHOP A120

A120 1

5.COMMUNITY CENTER

1

GROUND LEVEL

No.

Description

Date

TWO BEDROOM

1

1

A122

A122

Owner

Proje Date Draw Chec

Project Name

Project Number Date Drawn By Checked By

SECOND LEVEL

13 | SUSTAINABILITY STUDIO -

THIRD LEVEL

SPRING 2017 |

Scale

THREE BEDROOM

Project Number Issue Date Author Checker

A116

1/16" = 1'-0"

4/24/2017 3:12:49 PM

Unnamed

Scale


SYNERGY SECTION 12’

28’

4’

20’

PROTECTIVE OVERHANGS

INTERIOR GREEN WALL PROVIDES THERMAL INSULATION AND REDUCES AMBIENT TEMPERATURE

STORMWATER RETENTION TANK PROVIDES WATER FOR ROOF GARDEN, COMMUNITY GARDEN & GREEN WALL THROUGH PUMP

NATURAL DAYLIGHTIING CLERESTORY WINDOWS ON NORTH & WEST FACADE GREEN ROOF WITH WATER RETENTION

SOLAR ENERGY PROVIDES THERMAL COMFORT THROUGH BUILDINGS ORIENTATION

NATURAL CROSS VENTILATION WITH EXHAUST FAN ON CLERESTORY ROOF

COMMUNITY GARDEN

ONSITE RENEWABLE ENERGYGEOTHERMAL PUMPS HEAT & COOLS WATER THROUGH SOILS TEMPERATURE

ONSITE PERMEABILITY HARDSCAPES PERMEABLE PAVERS

| SUSTAINABILITY STUDIO - SPRING 2017 |

14


GEORGETOWN B O A T H O U S E THE WATERFRONT IN GEORGETOWN HAS A WAVY RIBBON-LIKE STRUCTURE THAT GUIDES ITS VISITORS TO CONTINUE THROUGHOUT THE PATH AND WALK ALONG THE WATER. THIS DESIGN PROVIDES A CONNECTION BETWEEN NATURE AND STRUCTURE.


SITE PLAN 45’

15’

90’

75’

DN

| BOATHOUSE STUDIO - FALL 2016 |

16


FLOOR PLANS 18’

6’

36’

30’

Tools

Materials

---

Gear --UP

Construction

Caretaker Apt. Mech.

Administrative Office DN

UP

Boat Storage

Open to Below

UP

UP

Kitchen

Lounge

Open to Below

-

Snack Room

Open to Below

-

Open to Below

GROUND LEVEL

SECONDLEVEL

ELEVATIONS 120’

60’

20’

SOUTH ELEVATION

17 | BOATHOUSE STUDIO - FALL 2016 |

EAST ELEVATION 1

Elevation 3 - a 1/8" = 1'-0"

100’

Meeting Room Meeting Room

DN


SECTION 18’

6’

36’

30’

1

Section 5 1/8" = 1'-0"

| BOATHOUSE STUDIO - FALL 2016 |

18


Scanned with CamScanner

GAMBLE HOUSE - GREENE & GREENE

DODGE HOUSE - IRVING GILL

CRANE LIBRARY

19 | HAND SKETCHES |

VILLA ROTONDA - PALLADIO

Scanned with CamScanner

Scanned with CamScanner

DOUGLAS HOUSE - RICHARD MEIER

Scanned with CamScanner

Scanned with CamScanner

DISNEY CONCERT HALL - FRANK GEHRY

Scanned with CamScanner

HAND SKETCHES

WORKERS HOUSING


THANK YOU


Turn static files into dynamic content formats.

Create a flipbook
Issuu converts static files into: digital portfolios, online yearbooks, online catalogs, digital photo albums and more. Sign up and create your flipbook.