P O R T F O L I O ERIKA TOSCANO
TABLE OF CONTENTS • CURRICULUM VITAE............................................................................... 2
• NATIONAL MUSEUM of THE SUPREME COURT.......................... 3 CBDS Studio | Spring 2018
• HYBRID on H STREET............................................................................. 7 Hybrid Studio | Fall 2017
• MIXED-USE REDEVELOPMENT......................................................... 11 Sustainability Studio | Spring 2017
• GEORGETOWN BOATHOUSE............................................................ 15 Scanned with CamScanner
Studio Project | Fall 2016
• HAND SKETCHES................................................................................... 19
CURRICULUM VITAE ERIKA TOSCANO 10toscanojaramillo@cua.edu (703) 472 6470
ABOUT ME: Recently graduated ‘cum laude’ from The Catholic University of America. I am a member of Tau Sigma Delta - National Honor Society of Architecture. I am looking forward to starting my architecture professional career.
EDUCATION
WORK EXPERIENCE
• BACHELOR OF SCIENCE IN ARCHITECTURE The Catholic University of America | Aug 2016 - May 2018
• CREW & SIGN TEAM MEMBER Trader Joe’s | August 2017- Present
• ASSOCIATE’S DEGREE IN ARCHITECTURE Northern VA Community College | Aug 2011 - May 2014
• CAD DRAFTER
• ADVANCED HS DIPLOMA McLean High School | Sep 2008 - June 2011
• ASSISTANT MANAGER
SKILLS
LANGUAGE SKILLS
AutoCAD
Revit Illustrator Indesign SketchUp
US Inspect | March 2016- February 2017 Garage | November 2015 - March 2016
ENGLISH 100%
SPANISH 100%
ITALIAN 70%
PhotoShop
Climate Con. | CURRICULUM VITAE |
2
NATIONAL MUSUEM OF T H E S U P R E M E C O U R T WEB OF MINDS
OUR DESIGN IS INSPIRED BY THE WAY THE SUPREME COURT JUSTICES GUIDE EACH OTHER WHEN CONSIDERING A CASE. THESE CASES ARE REPRESENTED IN OUR DESIGN BY THE PRIMARY BUILDING FORM, WHEREAS THE PEOPLE AND PLACES THAT MAKE EACH CASE UNIQUE ARE REPRESENTED BY THE TWO SECONDARY BUILDING FORMS. THESE FORMS ARE LINKED THROUGH A SERIES OF WEB CONNECTIONS WHICH REPRESENT THE INFLUENCE THAT THE SUPREME COURT JUSTICE’S HAVE UPON EACH OTHER. THE SUSTAINABLE SYNERGY FOR OUR DESIGN IS WATER CONSERVATION BECAUSE IT RELIES ON THE CONNECTION BETWEEN OUR DESIGN AND THE ENVIRONMENT.
Jeff
60’
erso
nD
r.
St .
12’
96’
14th St.
• CONTRIBUTION: 1. As team leader, I organized and assigned tasks to other team members based on their strengths. 2. Design and complete floor plans according to our concept, code and requirements. 3. Designing our section and site plan. 4. Designing presentation boards for jury’s throughout the semester and the final competition board. 5. Completing sectional and spatial model. 6. Completing the Document Set with another team member. 7. Creating section detail that emphasized our green roof and mat slab.
36’
th
• PROGRAM: Exhibition Spaces Museum Shop Cafe Library Lecture Hall Archives Office Spaces Loading Dock Conference Rooms
SITE PLAN
15
• LOCATION: National Mall, Washington DC
Inde
pend
ence
St.
| CBDS - SPRING 2018 |
4
$
FLOOR PLANS 24’
8’
72’
56’
COAT CHECK
M
M
83
'1
ARCHIVE STORAGE
DN
W
KITCHEN
UP
W
PERMANENT EXHIBITION @ -18’-0”
IT ER. JR.
M
VESTIBULE
DELIVERY/ STORAGE
W
O.T.B
M
LOBBY @ 0’-0” W
O.T.B
CAFE @ 0’-0”
EXHIBITION STORAGE TEMPORARY EXHIBITION @ -30’-0”
EXHIBITION SPACE BELOW @ -30’-0”
O.T.B
ARCHIVE SPACE @ -15’-0”
O.T.B
JR. ER.
IT
83 '1
MECHANICAL ROOM
PROJECTION ROOM
5 | CBDS - SPRING 2018 |
ER.
O.T.B
BOOKSTORE
VESTIBULE STORAGE
LECTURE HALL
LOWER LEVEL 1
$
/2:(5 /(9(/
$
LOADING DOCK @ -2’-0”
M
WATER ROOM
LOWER LEVEL 2
/2:(5 /(9(/
IT
JR.
ELECTRICAL ROOM
FREIGHT ELEVATOR
W
PERMANENT EXHIBITION BELOW @ -25’-0”
FIRE PUMP ROOM
PERMANENT EXHIBITION @ -25’-0”
O.T.B
LOBBY @ 0’-0”
FREIGHT ELEVATOR
FREIGHT ELEVATOR
IT
O.T.B
IT
UP
UP
ATRIUM @ 0’-0”
VESTIBULE
JR. ER.
JR. ER.
0$,1 /(9(/
GROUND LEVEL
STOR.
SECTION DETAIL 3’
1’
9’
5’
A OFFICE
M
STOR.
OPEN TO BELOW
OFFICE
M
ER. JR. LIBRARY @ 15’-0”
CONFERENCE ROOM
OBSERVATION AREA @ 15’-0”
W
83
CONFERENCE CONFERENCE ROOM ROOM
UPPER LEVEL 2 ROOF BEYOND WILLOW OAK TREE
W
GREEN ROOF @ 34’-0”
ALUMINUM COPING
UP
LOUNGE @ 25’-0”
OPEN TO BELOW
OPEN TO BELOW
JR. ER.
IT
WOOD BLOCKING 8” CARBON NEUTRAL CONCRETE PVC MEMBRANE
T.O.S. UPPER LEVEL 1 ROOF 34' - 0"
OPEN TO BELOW
OFFICE OFFICES @ 15’-0”
W
IT
ER.
JR. STORAGE
M
SHOWER
FREIGHT ELEVATOR
ADMIN. OFFICE
WORKSPACE
CONFERENCE ROOM
OPEN TO BELOW
GREEN ROOF @ 34’-0”
UPPER LEVEL 1
'1
DN CONFERENCE ROOM
UPPER LEVEL 2
PLANTING 30” DEEP SOIL WIND BLANKET & BIODEGRABLE DETENTION PINS 4” RIGID INSULATION 12” CARBON NEUTRAL CONCRETE CONCRETE CAPSTONE SEPARATION/GEOTEXTILE FABRIC DRAINAGE & WATER RETENTION AERATION MAT 4” RIGID INSULATION PROTECTION COURSE FLUID APPLIED WATERPROOFING NEOPRENE FLASHING SHEET FLUID APPLIED WATERPROOFING
Library 301
6” COMPOSITE ROOF DECKING WALL BEYOND
19’-0”
OFFICE IT
B
6” SHIM
T.O.S. UPPER LEVEL 1 15' - 0" 18” HVAC DUCT TYP. WOOD VENEER DROPPED CEILING TYP.
833(5 /(9(/
Cafe 213
SECTION 6’
NORTH ENTRANCE RAMP BEYOND
EDGE BASE TYP.
T.O.S. MAIN LEVEL 0' - 0"
42’ 30’
BIOSWALE BELOW MAIN LEVEL
GREEN ROOF COLLECTS RAINWATER FOR IRRIGATION
PHOTOVOLTAICS ON ROOF DECREASE ENERGY CONSUMPTION OF THE MUSEUM’S ENERGY USE
BIORETENTION BASIN COLLECTS RAINWATER FROM BUILDING FACADE
GROUND LEVEL 4’-0” BELOW MAIN LEVEL SOIL FILTER FABRIC
NATIVE FOLIAGE MINIMIZES NEED FOR IRRIGATION
Archives
12” DRAINAGE STONE DRAINAGE BD.
100
PROTECTION BD.
-18’-0”
18’
15’-0”
RECESSED LIGHTING TYP.
LOWER LEVEL 1 BEYOND -15' - 0" T.O.S. LOWER LEVEL 2 -18' - 0"
7
LOUNGE
LIBRARY
Archive Storage 002
-12’-0”
$
CONCRETE SLAB WATER STOPS
ATRIUM
T.O.S. LOWER LEVEL 2 -30' - 0"
LOBBY
WATER PROTECTION 2” THICK MUD SLAB DRAINAGE SYSTEM ARCHIVE SPACE PERMANENT EXHIBITION
T.O. MAT SLAB -35' - 6" UNDERSLAB DRAINAGE SYSTEM GRAVEL MAT FOUNDATION
EXHIBITION STORAGE
TEMPORARY EXHIBITION
| CBDS - SPRING 2018 |
6
HYBRID ON H S T R E E T THE SHIFT IN CULTURE AND HISTORY THAT H STREET HAS EXPERIENCED THROUGHOUT THE YEARS, INFLUENCED THE DESIGN FOR THIS HYBRID BUILDING. INCORPORATING THE NECESSARY COMMERCIAL SPACES AND LIVING SPACES WILL ALLOW FOR THIS UNIQUE COMMUNITY TO GROW.
SITE PLAN 72’
144’
120’
7TH ST.
24’
H STREET
| HYBRID STUDIO - FALL 2017 |
8
FLOOR PLANS 18’
6’
36’
30’
.
.
GROUND LEVEL
SECOND LEVEL
ELEVATIONS 12’
6’
SOUTH ELEVATION
9 | HYBRID STUDIO - FALL 2017 |
30’ 24’
WEST ELEVATION
DN
THIRD LEVEL
FOURTH LEVEL
FIFTH LEVEL
SECTION 12’ 6’
30’ 24’
| HYBRID STUDIO - FALL 2017 |
10
MIXED-USED R E D E V E L O P M E N T I N B R O O K L A N D
THERE IS A VOID IN THE BROOKLAND COMMUNITY. IN ORDER TO RE-ESTABLISH A SENSE OF COMMUNITY , IT IS NECESSARY TO INCORPORTE MULTI-FAMILY LIVING SPACES, GREEN FEATURES FOR A SUSTAINABLE WAY OF LIFE AND PUBLIC GREEN SPACES TO CREATE SOCIAL CONNECTIVITY AREAS.
SITE PLAN 66’
132’
110’
10TH ST. NE
MONROE ST NE
9TH ST. NE
22’
LAWRENCE ST.
| SUSTAINABILITY STUDIO - SPRING 2017 |
12
FLOOR PLANS 6’
APARTMENT UNITS 24’
12’
42’
18’
20’
4’
30’
www.autodesk.com/revit
Consultant Address Address Address Phone
1 A125
3.
2.
1.
5.
Consultant Address Address Address Phone
STUDIO
ONE BEDROOM
Consultant Address Address Address Phone
Consultant Address Address Address Phone
1. LOBBY
4.
2. CLOTHING STORE
Consultant Address Address Address Phone
N
3. LAUNDRYMATE 4.COFFE SHOP A120
A120 1
5.COMMUNITY CENTER
1
GROUND LEVEL
No.
Description
Date
TWO BEDROOM
1
1
A122
A122
Owner
Proje Date Draw Chec
Project Name
Project Number Date Drawn By Checked By
SECOND LEVEL
13 | SUSTAINABILITY STUDIO -
THIRD LEVEL
SPRING 2017 |
Scale
THREE BEDROOM
Project Number Issue Date Author Checker
A116
1/16" = 1'-0"
4/24/2017 3:12:49 PM
Unnamed
Scale
SYNERGY SECTION 12’
28’
4’
20’
PROTECTIVE OVERHANGS
INTERIOR GREEN WALL PROVIDES THERMAL INSULATION AND REDUCES AMBIENT TEMPERATURE
STORMWATER RETENTION TANK PROVIDES WATER FOR ROOF GARDEN, COMMUNITY GARDEN & GREEN WALL THROUGH PUMP
NATURAL DAYLIGHTIING CLERESTORY WINDOWS ON NORTH & WEST FACADE GREEN ROOF WITH WATER RETENTION
SOLAR ENERGY PROVIDES THERMAL COMFORT THROUGH BUILDINGS ORIENTATION
NATURAL CROSS VENTILATION WITH EXHAUST FAN ON CLERESTORY ROOF
COMMUNITY GARDEN
ONSITE RENEWABLE ENERGYGEOTHERMAL PUMPS HEAT & COOLS WATER THROUGH SOILS TEMPERATURE
ONSITE PERMEABILITY HARDSCAPES PERMEABLE PAVERS
| SUSTAINABILITY STUDIO - SPRING 2017 |
14
GEORGETOWN B O A T H O U S E THE WATERFRONT IN GEORGETOWN HAS A WAVY RIBBON-LIKE STRUCTURE THAT GUIDES ITS VISITORS TO CONTINUE THROUGHOUT THE PATH AND WALK ALONG THE WATER. THIS DESIGN PROVIDES A CONNECTION BETWEEN NATURE AND STRUCTURE.
SITE PLAN 45’
15’
90’
75’
DN
| BOATHOUSE STUDIO - FALL 2016 |
16
FLOOR PLANS 18’
6’
36’
30’
Tools
Materials
---
Gear --UP
Construction
Caretaker Apt. Mech.
Administrative Office DN
UP
Boat Storage
Open to Below
UP
UP
Kitchen
Lounge
Open to Below
-
Snack Room
Open to Below
-
Open to Below
GROUND LEVEL
SECONDLEVEL
ELEVATIONS 120’
60’
20’
SOUTH ELEVATION
17 | BOATHOUSE STUDIO - FALL 2016 |
EAST ELEVATION 1
Elevation 3 - a 1/8" = 1'-0"
100’
Meeting Room Meeting Room
DN
SECTION 18’
6’
36’
30’
1
Section 5 1/8" = 1'-0"
| BOATHOUSE STUDIO - FALL 2016 |
18
Scanned with CamScanner
GAMBLE HOUSE - GREENE & GREENE
DODGE HOUSE - IRVING GILL
CRANE LIBRARY
19 | HAND SKETCHES |
VILLA ROTONDA - PALLADIO
Scanned with CamScanner
Scanned with CamScanner
DOUGLAS HOUSE - RICHARD MEIER
Scanned with CamScanner
Scanned with CamScanner
DISNEY CONCERT HALL - FRANK GEHRY
Scanned with CamScanner
HAND SKETCHES
WORKERS HOUSING
THANK YOU