1 minute read

Castle improvement

Next Article
Price checker

Price checker

HUERCAL-OVERA Castle has been improved in a bid to become more attractive to visitors.

Different works have taken place to improve the use of energy in the castle with the installation of solar panels which will reduce the consumption of electricity and lower the electricity bills.

New LED lighting has also been installed throughout the environment.

In addition, accessibility has been improved and enhanced with the installation of new signage, and informative and interpretive panels in the castle.

The castle has a new image that includes ways to access information with audio guides in different languages and QR codes, promotional material offline, and the improvement of toilets and shade in the rest area.

The mayor, Domingo Fernandez, confirmed: “We will

This article is from: