
1 minute read
Beach upgrade
ment of a whopping €1.1 million is expected to be completed in approximately 10 months.
The mayor, Victor Navas Perez, confirmed that: “Every year we suffer the consequences of easterly and westerly storms, which end up reducing the capacity of our beaches due to the loss of sand: in a tourist municipality like ours it is important to implement measures to help stabilise the coastline.”
The work will consist of extending the existing 80 metrelong breakwater be tween the two beaches which is expected to solve the erosion problems and improve this area.”
Benalmadena was originally a village growing around a mine, the name was given to the town by the Arabs. Benalmadena means ‘son of the mines’.