1 minute read

Penultimate round

Next Article
Future of freight

Future of freight

ON Saturday, April 15, the Al‐munecar Municipal Swimming Pool hosted the penultimate round of the Provincial Winter Swimming Circuit.

The penultimate event of the Winter Swimming Circuit was organised by the Al‐munecar Municipal Sports De‐partment with the collabora‐tion of the Sports Delegation of the Provincial Council of Granada.

Hundreds of swimmers from all over the province of Granada participated in this event.

The best swimmers from the event will be in the final to be held in Armilla on May 5.

ALMERIA’S Beach Plan 2023 starts on May 1.

Almeria City Council has awarded a wave of contracts, of which works will already be evident, with an invest‐ment of almost €200,000.

One of the contracts is for the improvement of the in‐formation totems along the promenades to Cabo de Ga‐ta, at a cost of €45,012.

Their renovation, due to the deterioration caused by their proximity to the sea or acts of vandalism, will be used for the inclusion of a LED‐SOLAR backlighting and electrification system, as well as the new corporate image of Almeria Ciudad.

Another contract, valued at €47,432, is for the im ‐provement of the 20 toilet modules on the beaches.

The contract also includes the repair of pergolas, plat‐forms and walkways and the improvement of the accessi‐bility of shaded areas on the beaches of El Palmeral, Costacabana, El Toyo, Reta‐mar and Cabo de Gata.

The sum of €48,098 will be used to repair the lifeguard buildings on the beaches of Cabo de Gata, Retamar and Nueva Almeria.

This article is from: