
1 minute read
Admission reserved Good job Slam dunk
when the storm tank was inaugurated and the end of March.
This was not the case before the infrastructure was opened, as the existing Coll d’en Rabassa purification plant was unable to deal with the sudden surge of water.
The storm tank and collector will be further reinforced with a new purification plant and submarine outfall due to be built by the central Spanish government next to the Comm d’en Rabassa installations and which will double the current capacity, putting an end once and for all to the historic problem of wastewater discharges into the bay.