1 minute read

On the big screen €4M facelift

Next Article
Next generation

Next generation

LA MATA has been awarded funding amounting to almost €4 million to upgrade its promenade and replace all the lights with LED technology models.

The project comprises of two sections and almost one linear kilometre of work.

The Northern Section, between the northern boundary of the municipality of Torrevieja (opposite the Acequion de La Mata canal) and the Plaza de Encarnacion Puchol, has a length of

ALICANTE has confirmed the renovation and modernisation of the sand sports area of San Juan Beach has now been completed.

Visitors will notice the installation of new equipment for physical exercise, gym, bodybuilding and athletics equipment, as well as updated volleyball posts, handball goals and Beach Soccer accessories.

The sand sports facili ­

310 metres.

The second section, known as the Central Section, between the south of the Plaza de Encarnacion Puchol and the Avenida de Los Europeos, has a length of 660 linear metres.

The work will include the complete repair of the pedestrian path in these two sections which are in poor condition, as well as the replacement of the existing light points in the three sections with LED technology models.

ORIHUELA is proud of its tourist attractions and is set to be included in a short film about the Alicante region which will be broadcast on trains, buses and regional and local television.

The 30­minute film takes a tour of the province of Alicante and will dedicate about 10 minutes to Orihuela.

Orihuela’s councillor for Tourism, Maria Garcia, confirmed: “This programme is a good opportunity to show the attractions of our municipality to people who re­

This article is from: