E va n W a r d e r
PORTFOLIO
Academic | Competition | Professional
C O N T E N TS
P O ST - I N DUST R I A L R I V E R COMPREHENSIVE THESIS
-Page 4-
WAT E R S A F E T Y PUBLIC CANOPY/AQUEDUCT
-Page 16-
B R I DG I N G T H E G A P MIXED-USE OFFICE BUILDING
-Page 24-
R E N E WA L A N D R E T E N T I O N GREENWAY PARK
-Page 36-
E V O LV E CLIFTON YOUTH LIBRARY
-Page 48-
320 RIVERSIDE DRIVE HOUSE RENOVATION AND ADDITION
-Page 56-
3
Evan Warder
POST-INDUSTRIAL RIVER Hybrid Productive System in Chicago Thesis Proposal
Through the integration of a new industrial model, riverfront post-industrial sites can maintain their productive character, provide necessary jobs to surrounding communities, avoid gentrification, restore ecology, and reinstate the importance of industrial river corridors in a city’s economic and social system. Using the Chicago post-industrial riverfront as a case study to introduce a new industry, specifically a model of intensive food production that requires a range of labor, merged with programs that are both tied to the industry (restaurant, market) and those that address the needs and deficiencies in the community (schools, community center, and public green space) that bridges the existing neighborhood to the riverfront. Urban farming reduces the dependence on external food systems and their carbon footprint when a critical mass is attained while also providing a range of labor and skill jobs. Once tested, this system can be used throughout the city to provide a sustainable source of vegetables, fish, and needed jobs that supplies many struggling areas of the city.
4
The Post-Industrial Chicago River: A Social, Productive, and Ecological Urban Structure
Corridor Vision- Food Industry Network
Corridor Vision- Ecological + Public Space
Urban Vision- River as Urban Structure
Chicago: A Scalable System A proposal for a system that addresses the needs of the entire city, the localized industrial corridor, and eventually the specific site. By asserting the river as a core structure for resources, transportation, and public space, this proposal can bring a sustainable future to the city.
5
Evan Warder
Chicago + Fisk Powerplan
Case Study: Fisk Powerplant Applying this system at a localized scale becomes imperative to fully understand the possibilities of the new vision. The initial test site being proposed is the Fisk Powerplant, a site layered with history and possibilities. It’s evolution can be a model for future sites along the entire river and redefined the idea of Post-Industrial architecture.
Post-Industrial River
6
Existing + Demo
River + Canal Remediation
Vegetation- Urban Forest
Phase II Developments
Site Evolution
7
Evan Warder
Industrial Layout- Fish Tanks
Canals- From Inlet to Tributary
8
School + Canal Section Level 1+2
Level 4
Level 6
7.
1. 5.
1.
6.
1.
2. 4.
2.
4.
3.
4.
5.
3. 2.
mmunity Space
5.
1. Library
3.
1. Gymnasium
2. Classroom
on Suite
2. Locker Room
3. Breakout/study Room 8.
3. Storage
4. Locker Space
4. Gym Office
5. Indoor Gather + Play Space
5. Science Lab
6.
6. Outdoor Breakout Space
te
uite
5’
Level 3
25’
5’
Level 5
25’
5’
Level 7
6.
4. 7.
5.
4. 1.
1. 3.
3.
2.
2.
1.
r
1. Classroom
1. Classroom
ce
2. Breakout/study Room 2.
o
5.
2. Meeting Room
3. Locker Space 4. Outdoor Breakout Space 5. Outdoor Classroom
assrom
udy Space
5’
School Plans
9
Evan Warder
25’
5’
25’
5’
50’
Fisk Vision Site Plan
Post-Industrial River
10
Elementary School Approach
11
Evan Warder
Post-Industrial River
12
Chicago River
Riverwalk
Theater
Aeroponics Shell Aquaculture Lab Restaurant
Aquaculture System The insertion of the sustainable industry of aquaculture, the cultivation of a critical mass of Steelhead trout. The fish tanks use filtration and sludge systems that will maintain clean water and use the organic waste to fertilize plants in a hydroponics system. This symbiotic system will reduce energy costs and maximize profit. The remaining programs sit above the new ground plane established by the fish tanks and integrate seamlessly with the existing structures, giving them renewed purpose. The canals are transformed alongside with a natural marsh terracing system allowing cleaning of the water and a closer interaction with the water.
Aquaculture Structure
13
Evan Warder
Picnic/Courtyard
Kitchen
Fisk Museum
New Storage Tanks
Cafe
Playground
Industrial Explore
Market
Court
Elementary School
Canal Sections
Post-Industrial River
14
15
Evan Warder
WA T E R S A F E T Y Public Canopy/Aqueduct in Jaipur, India Research Studio
An examination of the densest part of Jaipur. The Walled City, also known as the Old City or the Pink City is facing crisis, as the lack of infrastructure and dilapidated systems cannot support the exponential population increase. Water scarcity, depleting groundwater levels, and extreme population densities are among the concerns Jaipur is facing. To combat this growing issue, a return to the historic methods in Jaipur of rainwater collection must be put as a priority. By transitioning the current reliance on the Bisalpur Dam for water supply to the use of the water that falls directly on the city itself, Jaipur can begin to reverse the continued depletion of resources. The execution of this vision will be done in two parts of the system: the first being the collection of rainwater and distribution of resources through a canopy system, and the second as a central water tank. The example shown is that of specific moments in the Walled City, however, this system is replicable and capable of being used throughout the entirety of the city.
Team: Casey Last
16
Water Crisis Research Top: A map indicating the population density and water supply of Jaipur. As a growing city, the water supply has been outsourced to a dam that is quickly running out of water. In summer of 2019, the city was only 10 days short of running out of all water. This map also indicates the major pipelines of water supply and water towers which do not cover the full extent of the city, especially the high density regions. Right: Street conditions which involve informal zones undefined between the street and buildings. Lack of unified water drainage and storm water systems.
17
Evan Warder
B
B1 B1
B1
B A1
A
A1
A A1
A B1
A1
B B1
B B
B1
B B1 B1
EXISTING
Large Storage
Master Plan Proposal Top: A map of the historic walled city as the test site for a new system in the highest density in the city. Using the natural topography to bring the water along the new aqueduct to the gates in which water can be stored. Right: The existing water system in which water is being brought only from a dam. The new system will add to this by collecting rain water, storing it, and distributing it, all while providing public space.
Pumping Station Water from Bisulpar Dam
Distribution to Homes + Businesses
PROPOSED
Large Storage
Rainwater Collection
Distribution to Homes + Businesses Public Space Filtration Large Storage
Supplementary Water Supply
Pumping Station Water from Bisulpar Dam
Water Safety
18
cad-block.com
cad-block.com
cad-block.com
cad-block.com
cad-block.com
cad-block.com
Canopies: A New Typology The canopy system has ability to tap into roof drains and bring rain water to filter and storage. The infrastructure also provides pressurized water supply, tenant signage, internet/cable/electric lines, street lighting, and underground updates of stormwater and sewage systems.
19
Evan Warder
1
ROOF COLLECTION
2
RAIN WATER AQUEDUCT
3
WATER SUPPLY
4
SIGNAGE
5
INTERNET
6
CABLE
7
ELECTRIC
8
LIGHTING
9
STREET LIGHTING
10 TRASH COLLECTION 11 STORM WATER 12 PIPED SEWAGE
9 5 6 7 3
1
8
2 4
10
12
11
Proposed Street Plan Formalize zones, public space, shading, infrastructural core.
Water Safety
20
THE WATERGATE: WATER TOWER AND REVIVAL OF PUBLIC CITY GATES 21
Evan Warder
Water Safety
22
23
Evan Warder
BRIDGING THE GAP Mixed-use Office Building in New Orleans, LA
The French Quarter of New Orleans is defined by what was originally a military fort. Today, it exists as the cultural core for individuals who are seeking to experience this vibrant city. Most of the buildings in the Quarter date back centuries and have served as housing or entertainment throughout their history. The mixed-use office program of this new building allows for a contemporary typology to be developed in an uncommon void within the dense, urban context. This building is designed to embrace the multiple identities of New Orleans, from the dynamics between tourists and locals to the contrast of old and new buildings. Unique in its positioning, the building faces two streets while existing buildings occupy the street corner. In referencing the context, the building splits to create a public courtyard, providing a lively space that gains access to public programs and defines a core for the floors above.
24
City of Courtyards
5, O 400 pe f n t² G M ro in un . d Sp a
ce
Inspired by the nature of courtyards in the French Quarter stemming from the historical development of buildings on each block needing to bring air and light into their spaces, this building uses the form of a courtyard as well.
50’ Max.
As the site is filled and split for function, it is formed around the central courtyard as well as multiple light wells. This not only creates a visual connection between levels but allows natural air and light to penetrate the entire building without sacrificing sustainable practices.
de ca nt Fa nme g i Al
Zoning Analysis
25
Evan Warder
Extrude
Split
Insert
Subtract
Bridging the Gap
26
1st Floor
2nd Floor
Retail, Auditorium, Bar/Lobby, Art Gallery, Cafe,
Flexible Coworking Space, Cell offices, Library,
Office Lobbies
Kitchen, Meeting Rooms, Lounge
Street Access + Crossing
27
Evan Warder
3rd Floor
4th Floor
Flexible Coworking Space, Cell offices, Library,
Tenant office space, Meeting Rooms, Event space/
Kitchen, Meeting Rooms, Lounge
Flex Space, Kitchen, Reception/Gallery
Natural Light + Workspace
Bridging the Gap
28
Courtyard Entry Experience
29
Evan Warder
Bridging the Gap
30
31
Evan Warder
Type A- Flat Facade
Type B- Attached Balcony
Type C- Enclosed Balcony
Toulouse Elevation
Chartres Elevation
Language In analyzing the surrounding buildings, it is important to relate typologies of the new building to those of the old. In the French Quarter, most of the buildings follow one of three strategies from a flat façade, which draws its depth from the openings, to a building with large volumetric balconies which become exterior rooms. The detailed façade facing Chartres street shows the depth of the balconies in their relation to the surrounding typology and how in a contemporary world we can develop these ideas in a sustainable manner with thermal protection.
Bridging the Gap
32
Porosity In relation to the porosity of the French Quarter with its courtyards and balconies, this new office building has both a relative permeability both with its façade and interior functions. The façade becomes a metal screen which creates a porous surface between the interior and exterior. The connectivity and movement in the office with bridges, open stairs, and shared spaces creates a relative porosity of people.
33
Evan Warder
EPDM Single-Ply Roofing Membrane 6” Composite Roof Decking w/insulation
Metal Screen cont.
C
W 18x40 Castellated Beam
Wood Flooring B
Rigid Insulation w/ Metal Flashing
A Perforated Metal Ceiling w/Hangers
ADA Ramp Slope 1:12
8” Concrete Slab Pile Cap
Chartres Axonometric
Chartres Section
Steel Bracket Support Storefront w/ aluminum framing Insulation 6” Decking w/ insulation
6” Composite Decking W 21x62 Steel Girder W 18x40 Castellated Beam
C 15x33.9 Steel Channel
Detail A
Storefront w/ aluminum framing Teflon Thermal Barrier Steel Plate Bracket
6” Composite Decking W 21x62 Steel Girder
C 15x33.9 Steel Channel
L 6x4x1/4 Steel Angle Metal Screen cont. 2x5/8 Steel Flat
HSS 14x6x1/2 Steel Tube W 12x26 Steel Beam
W 18x40 Castellated Beam
Detail B
6” Composite Decking
Detail C
Bridging the Gap
34
35
Evan Warder
R E N E WA L A N D R E T E N T I O N Greenway Park in New Orleans, LA
Since Hurricane Katrina, New Orleans has had to address major aspects of the city that define the resilience of communities and their ability to manage flooding. A space that has become a great opportunity in recent years is the Lafitte Greenway, a line connecting downtown to many neighborhoods. Formerly a canal used for shipping to come into the city from the Gulf of Mexico via Lake Pontchartrain, this area has been largely forgotten as an asset for many years. This seven-block section of this greenway provides an opportunity to give a new public space for the neighborhood while working on flood protection. Within this greenway is an existing drainage canal, bringing runoff from downtown to a pumping station, making this area ideal to allow for overflow of this canal during intense rains in which the pumps cannot remove water from the canal quick enough. How can a greenway provide a pedestrian transportation line through the city, be an asset to the neighborhoods, and retain water in flood events? These aspects are explored in this proposal for the Lafitte Greenway.
36
Community Spaces The site is bordered at one side by the existing canal which provides an opportunity to open for activities on the other side. These spaces can provide activities like sport courts, a shelter for farmers markets, performance space, community gathering spaces, and secluded spaces of nature. The site provides a unique opportunity for a new biodiversity that has been limited throughout the city since the swamps were drained in the previous centuries. The planting zones work from low elevations of swamp grasses and emergent plants to wetland ornamental trees and eventually large shade trees and open fields of grass.
Ground Cover Grass
Shade Trees Wild Grass Emergent Plants/ Ornamental Trees Marsh/Grasses
Shelter, Performance space
Full Site Plan
37
250’
Evan Warder
Recreation Transition
Natural Habitats
Community Gathering space
Renewal and Retention
38
Natrual Wetlends and Retention Space
39
Evan Warder
Renewal and Retention
40
Normal Condition
27,000 Cubic Feet
Site Runoff Condition
87,000 Cubic Feet
10-Year Storm Condition
470,000 Cubic Feet
Water Retention During a normal day, the ground water level maintains three feet of water in the canal and forebay. As rain increases, the site holds the entirety of its own runoff on while the forebay fills into its upper regions. In a 10-year storm, water from the site and canal fill the lower part of the site to temporarily hold half a million cubic feet, preventing flooding in other parts of the city.
41
Evan Warder
No Rain
3’ Ground Water
Heavy Rain
Overflow of Forebay
Forebay Units How is the water from the canal directed into the site? As the canal fills, it flows into a series of pointed forebays which retain and slow the water before overflowing to the rest of the site. These forebays are constructed from a set of precast concrete forms that insert themselves into the landscape while gradually narrowing and providing weirs for water overflow. By using precast units, these can be replicated at differing lengths and be a system for future sites as well. Renewal and Retention
42
St. Louis Canal
Gathering Plinth
Play Area
Lafitte Ave.
Gathering Space Section Bike/Walk Path
Walking Path
Shelter / Community Space / Farmers Market
Shelter Section
Compact Gravel
Marsh Grasses
Emergent Plants
Forebay Section
Marsh/Grasses
Typical Site Section
43
Evan Warder
Emergent Plants/ Ornamental Trees
Wild Grass
Shade Trees
Ground Cover Grass
50’
FABRICATION
3D Prints
Cnc Foam Molds
Hydrocal Pour
Renewal and Retention
44
Lafitte- Forebay
Wood Bench Planks
Precast Seat Support
Precast Weir
8’ 8”
Precast Forebay
1’ 0
”
9’ 0
”
3’
Precast Assembly
Detail Section Section 11 Detail
45
Evan Warder
DetailSection Section 22 Detail
”
10
25
Detail Section Section 33 Detail
Scale Concrete Cast 1/4” = 1’ 0”
Renewal and Retention
46
47
Evan Warder
E V O LV E Youth Library in Clifton, OH
A library where young adults can come together to advance their knowledge by reading while also working hands on in a creative and ever changing environment. This library allows each person to change and develop their surroundings while learning about the fields of construction, engineering, and architecture. This unique library will open up the possibilities for current students to explore new fields and new ideas, bringing creativity and productivity to a growing area. The Clifton neighborhood of Cincinnati has the unique opportunity to develop in a way that can contribute to the economy of the area while also maintaining their identity and core residents. This library would be socially conscious as to not bring displacement to citizens that was experienced in other neighborhoods of Cincinnati. Encouraging each and every community member to participate in its development and ultimately the use and character of the building will ensure that this library will be around for the youth for many years to come.
48
49
ISOLATION
ARTICULATION
Vertical circulation and special program
Placement of vertical circulation and
separated for clear wayfinding and focus on
program promotes visual connections and
movement.
generates movement.
STRUCTURE
FACADE
Structural grid applied to establish
Application of glass facade to allow for
framework to hold special program as well as
guided views and relationship of street to
remaining program elements.
the interior of the building.
Evan Warder
LOBBY + CAFE
Evolve
50
Visual Connection Openings in the floor as well as shifting floor plates allows people on multiple levels see into other levels and promote exploration. These openings also allow for more natural light to penetrate and create a better reading experience.
51
Evan Warder
FACADE ARTICULATION
STRUCTURAL LAYOUT
PANEL MOVEMENT
PANEL PLACEMENT
Evolve
52
BASEMENT
53
Evan Warder
LEVEL 1
LEVEL 2
LEVEL 3
LEVEL 4
LEVEL 5
Evolve
54
55
Evan Warder
320 RIVERSIDE DRIVE House Renovation and Addition Becker Architecture
At the 320 Riverside Drive residence, we were faced with the challenge of remodeling and creating an addition to a house that was originally built over 150 years ago. This required consideration for the previous additions and changes over the lifetime of the house and issues faced by being along the Ohio River. The renovation takes what is currently a complex of four apartments and restores it to the original single-family home. Meeting both historic regulations and the necessary additions to make the home functional and accessible, this house was given new life.
56
REVISIONS: 3'-4"
2'-0"
1'-7"
4'-2"
5'-2"
21'-0"
Elevator
Garage 1
Down
2'-4"
Concrete
3'-6"
Up
DATE
Preliminary Bidding
13'-2"
Down
Existing
ISSUED FOR:
Overhead Door: 9'-0" x 8'-0"
1'-2"
6'-11"
PT 6x6 Post wrapped with 1x trim
New Staircase and Balustrade Existing
8/10/18
3080
2'-0" Egress
New- 2868
New- 2868
Existing
Existing
Existing 1'-10"
8'-2"
11"
1 A03
3'-2"
Window Infill Construction: - 1/2" drywall - 2x6 studs @ 16" o.c. - Min. R-19 batt insulation w/ vapor barrier on warm side 7 " osb sheating w/ Tyvek - 16 - Tooth-in brick to match adjacent
3'-0"
5'-11"
3'-0"
16'-4"
3
6'-1"
2
3'-9"
4
2'-5"
10'-9"
BECKERarchitecture
2
COVINGTON, KENTUCKY, 41011
6'-11"
6'-11" 3'-4"
2068
5
ADDITION and REMODEL
New- 2868
Tile
3'-8"
3'-3"
2868
36"h. Base Cab
6'-10"
12"d. Wall Cab.
4'-0" 36"h. Base Cab.
Hardwood
Cl.
Bath 1
12"d. Wall Cab.
Hardwood
36"h. Base Cab.
Bedroom 1
2068
320 RIVERSIDE DRIVE
1'-2"
Garage 2 Concrete
Cl.
13'-2"
Up
Overhead Door: 9'-0" x 8'-0"
SD
68
3'-8"
4'-0"
17'-5"
1
20
Ref.
Kitchen
New- 2868
1222 Herschel Avenue Cincinnati, OH 45208 Ph: 513.325.9475 John Becker, RA
3068
2868
4'-4"
Dbl. Bowl Sink Base
32" Range w/ hood above
Existing
4'-1"
2'-0" 2'-0"
CO
2'-0"
SD
New- 2656
3080
3'-1"
8'-7"
CO
Down
4'-0"
7'x4' Island (36" h)
Hardwood
2'-9"
6'-0"
15'-2" 1'-3"
1
3'-6"
3'-2"
3'-2" 3'-2"
1'-3"
New- 2880
Existing
1'-7"
New- 2020
SD
Deck above Existing
Living Room
Tile
Hardwood
1
Exist. wood post
7'-1"
Seating Overhang
Down
4
2668 3080
Built-in Shelf
5'-6"
Carriage House
Concrete
Hardwood
Hardwood
Bath 3
New- 2020
Porch
Dining
Living Room
Concrete
4'-1"
5'-0"
Existing
New header w/ steel L's
2
New- 2020
New- 2880
Built-in Shelf
Porch
5'-4"
3'-2"
1'-10"
3'-1"
20'-6"
New- 2020
1'-3"
12'-8"
43'-6"
Built-in Lockers
17'-2"
Hardwood
2'-1"
2'-0"
3'-8"
Built-in Shelf
3'-1"
2'-6"
3068
15'-0"
1'-9"
One hour wall: 58" gyp bd both side (typ at Garage/Carriage House Wall)
Down
New Folding Walls
Hardwood
5 A05
Mudroom
New Folding Walls
2'-7"
New- 3060
SD
4'-0"
68
30
1
Foyer
6'-9"
68
28
Hardwood
3068
Porch
3'-5"
Down
Remodel First Floor Plan Scale: 1/4" = 1'-0"
Existing roof rafters
First Floor Plan
Fireblocking as required 1 2"
gwb ceiling
John D. Becker Registration #: 3510 Expires: 12/31/19
Double 2x4 top plate
WOOD FRAMING NOTES
PLAN NOTES
WOOD HEADER CHART · ALL WOOD IN CONTACT WITH CONCRETE TO BE PRESSURE · 2X4 WALLS = STANDARD HEADER UP TO 6’ (2) 2X10s TREATED. WITH 7/16” OSB IN BETWEEN. · WOOD TRUSS MANUFACTURER TO PROVIDE ENGINEERED · 2X6 WALLS = STANDARD HEADER UP TO 6’ (3) 2X10s DRAWINGS WITH SPACING, TYPE, AND SIZE OF TJI’S AND LVL’S. WITH 7/16” OSB IN BETWEEN. · FIREBLOCKING SHALL BE PROVIDED TO CUT OFF ALL · OPENINGS GREATER THAN 6’ AS NOTED ON PLAN. CONCEALED DRAFT OPENINGS. · FIRE CAULKING PER LOCAL AND STATE CODE REQUIREMENTS. · ALL WINDOWS AND DOORS ON NON LOAD BEARING WALLS TO RECEIVE AN APPROPRIATE SIZED HEADER.
Provide new Smoke Detectors and CO detectors in compliance with R324 and 315 and per the following requirements: Per R314 a. Install a dual sensing (photoelectric and ionization) smoke detector outside of the bedrooms, and a min. of one on every level. b. Install an ionization or dual sensing smoke detector in each bedroom. c. Smoke detectors shall be hardwired and interconnected per RCO 314.5 Per R315 a. Install a carbon monoxide detector outside of the bedrooms or in the common areas outside the bedrooms where the length is less than 10 feet or if more than 10 feet add one outside of each bedroom.
2 3
4
5
GFCI Outlets to be provided at Bathrooms and Kitchen Microwave range hood to be exhausted per manufacturer's installation requirements and per Section M1503 of the Kentucky Residential Code
8/10/2018
EXISTING
2x4 wall w/studs @ 16" o.c. 2x4 sill plate, secure to joist or solid blocking
DATE
WALL LEGEND
gwb, both sides Varies
1
1 2"
PROJECT NO.
SHEET NAME
NEW
First Floor Plan
Existing floor system, provide blocking for new framing as needed
REVISIONS DRAWING NO.
4" gutter
Provide new bathroom exhaust fans. Fans must vent directly to the outside.
A.03
10'-11"
2
If glass is used on tub/shower enclosures, the glass must be tempered
2'-7" 3'-11"
5'-9"
A03
Typical Non-Loadbearing Partition Wall Scale: 1/2" = 1'-0"
3'-0"
SD
CO
1
Parapet
ISSUED FO
Existing New- 3060
Preliminary Biddin
6'-5"
Elevator
Open to Below
68
5 A05
2868
30 3'-3"
1'-4"
16 68
Hardwood
Down
Sitting Room
New- 3050
Utility
Hall
Roof Slope
3'-5"
3'-4"
Hardwood
Up
12'-7"
68
16
Existing
New- 3060
4'-7"
4'-0"
Study
2'-3"
Roof Below Ballasted
3'-2"
Hardwood
12'-8"
1'-10"
Hardwood
3'-6"
New- 3056
4'-10"
4'-2"
1
CO
10'-4"
2868
9'-9"
Cl.
Cl.
2'-6"
Existing
6'-2"
6'-1" 8'-2"
1'-1"
5'-8"
1
Arbor Above
SD
2868
Walk In Closet Tile
2668
Bedroom 2
Cl. Laundry Hardwood
Hardwood
Bath 2
3'-6"
Tile
2668
Deck Wood
Down
4'-7"
7'-1"
Tile
5
7'-1"
2'-11"
3'-6"
Master Bath
2868
2868
6'-4"
Existing
Existing
3'-2" 3'-9"
3068
ADDITION and REMODEL
4'-5"
68
2868
1'-7" 3'-8"
28
1'-10"
Existing
68
30
Down
2'-4"
Extend porch railing to match adjacent.
8'-2"
68
28
3'-7"
2868
Wood
Cl.
1'-8"
6'-1"
2'-8"
4'-8"
1'-4"
12'-8"
Existing
2868
20'-0"
Deck
5
SD
1222 Herschel Avenue
SD
Master Bedroom
BECKERarchitecture
8"
1
New- 3056
Egress
Existing
3068
1'-9"
Hardwood
Egress
New- 3068
Existing
2
Existing
Existing
10'-2"
Overframing of floor to match adjacent elevation
1
Existing
4 6'-4"
A04
Existing
7'-5"
9'-7"
2'-5"
2
11'-1"
4
Provide new dryer vent. Must vent directly to the outside per section M1502 of the KRC
Remodel Second Floor Plan Scale: 1/4" = 1'-0"
Second Floor Plan PLAN NOTES 1
57
Provide new Smoke Detectors and CO detectors in compliance with R324 and 315 and per the following requirements: Per R314 a. Install a dual sensing (photoelectric and ionization) smoke detector outside of the bedrooms, and a min. of one on every level. b. Install an ionization or dual sensing smoke detector in each bedroom. c. Smoke detectors shall be hardwired and interconnected per RCO 314.5
Evan Warder Per R315
WOOD FRAMING NOTES WOOD · ALL WOOD IN CONTACT WITH CONCRETE TO BE PRESSURE TREATED. · WOOD TRUSS MANUFACTURER TO PROVIDE ENGINEERED DRAWINGS WITH SPACING, TYPE, AND SIZE OF TJI’S AND LVL’S. · FIREBLOCKING SHALL BE PROVIDED TO CUT OFF ALL CONCEALED DRAFT OPENINGS. · FIRE CAULKING PER LOCAL AND STATE CODE REQUIREMENTS. · ALL WINDOWS AND DOORS ON NON LOAD BEARING WALLS TO
WALL LEGEND HEADER CHART · 2X4 WALLS = STANDARD HEADER UP TO 6’ (2) 2X10s WITH 7/16” OSB IN BETWEEN. · 2X6 WALLS = STANDARD HEADER UP TO 6’ (3) 2X10s WITH 7/16” OSB IN BETWEEN. · OPENINGS GREATER THAN 6’ AS NOTED ON PLAN.
EXISTING
NEW
John D Registrat Expires
DATE
8/10/ PROJECT
SHEET NA
PERMIT REV. #1 - 9/17/18
4" gutter & downspouts, connect to existing lines 5/8" GWB
REVISIONS:
2x6 Studs @ 16" o.c. 2x6 Pressure Treated Sill Plate
PERMIT REV. #1 - 9/17/18
1 2" dia. Anchor bolts @ 4'-0" oc
1x Trim
1 21" Furring @ 24" o.c. horiz. or 16" o.c. vertical
Frieze Board
5/8" GWB
ISSUED FOR: DATE: Nichiha 5 mm spacer 8"
2x6 Pressure Treated Garage Sill Plate
dia. Anchor bolts @ 4'-0" oc
1x Trim
1 2"
GWB
R-38 Closed cell foam insul.
8/10/18
1 21" Furring @ 24" o.c. horiz. or 16" o.c. vertical
18"-24" Verify on site
Verify elevation on site to match alley elevation
Garage
ISSUED FOR: Carriage House
DATE:
Preliminary Bidding
8/10/18
4" Concrete Slab
9'-10"
Min. 6" compacted gravel base
6-mil Vapor Barrier
Preliminary Bidding
1 2"
6-mil Vapor Barrier
Weather Resistant Barrier Nichiha Clip Located on Stud
Min. 6" compacted gravel base
R-19 Band Board Insul. 2x10 Rim Joist
8"x24" Conc. footing w/ (3) #4 bars cont.
2'-0"
Nichiha Siding Horizontal Rainscreen
8"x24" Conc. footing w/ (3) #4 bars cont.
4 A07
Interior Garage/CH Foundation Detail
8"
Garage Foundation Detail 1
Scale: 1" = 1'-0"
2'-0" Nichiha Clip Located on Stud
Min. R-15 batt insul. w/vapor barrier
Interior Garage/CH Foundation Detail
4 A07
5/8" GWB
Scale: 1" = 1'-0"
Min. R-15 batt insul. w/vapor barrier
Weather Resistant Barrier Nichiha Siding Horizontal Rainscreen 2
1 2"
Nichiha Furring @ 24"Clip o.c. horiz. Located on Stud or 16" o.c. vertical
Nichiha Starter Track Fastener Located on Stud
1 2"
dia. Anchor bolts Min. @ R-15 batt 4'-0" ocinsul. w/vapor barrier 1 21" Furring @ 24" o.c. horiz. or 16" o.c. vertical
2x4 Studs @ 16" o.c.
5/8" GWB
Weather Resistant Barrier Nichiha Siding Sheathing Horizontal Rainscreen 1 2" dia. Anchor bolts @ 4'-0" oc
2 21" Furring @ 24" o.c. horiz. or 16" o.c. vertical
Nichiha Starter Track Fastener Located on Stud
1 21" Furring @ 24" o.c. horiz. or 16" o.c. vertical
Nichiha Starter Track Fastener Located on Stud
Sheathing Grade Line
Carriage House
4" Concrete Slab 6-mil Vapor Barrier
Min. 6" compacted gravel base
Grade Line
ADDITION and REMODEL ADDITION and REMODEL BECKERarchitecture
8"
8"
8" Poured Conc. foundation w/ #4 bars horizontal @ top & bottom
Carriage House
4" Concrete Slab 6-mil Vapor Barrier
8" Poured Conc. foundation w/ #4 bars horizontal @ top & bottom
Min. 6" compacted gravel base
Grade Line
Floor System -2x10 joists @ 16" o.c -34" T&G plywood
8"x24" Conc. footing w/ (3) #4 bars cont.
5 A07
Exterior CH Foundation Detail Scale: 1" = 1'-0"
GWB
1 2"
GWB
Floor System -2x10 joists @ 16" o.c -34" T&G plywood 1 2" dia. Anchor bolts @ 4'-0" oc
R-30 batt insulation in between joists 2" rigid insulation Fasten to joists @ 16" o.c.
Crawl space vents per RCO 408. Locate vents within 3' of each corner
8" Poured Conc. Wall Min. 30" below Grade
Vapor barrier extended up walls & tape joints
Min. 2'-6"
8"x24" Conc. footing w/ (3) #4 bars cont. 8" Poured Conc. foundation w/ #4 bars horizontal @ top & bottom
1 2"
John D. Becker Registration #: 3510 Expires: 12/31/19
4" Compacted gravel base
DATE
1' x 2' poured conc. ftg. w (3) #4 bars cont. @ bottom
8/10/2018
5 A07
Exterior CH Foundation Detail Scale: 1" = 1'-0"
Field Verify Align new floor w/ existing
6-mil Vapor Barrier
Min. 2'-0"
4" Concrete Slab
John Becker, RA
Carriage House
8" Poured Conc. foundation w/ #4 bars horizontal @ top & bottom
Sheathing
Cincinnati, OH 45208 Ph: 513.325.9475 COVINGTON, KENTUCKY, 41011 John Becker,Ph: RA 513.325.9475 COVINGTON, KENTUCKY, 41011
Min. 6" compacted gravel base
BECKERarchitecture 1222 Herschel Avenue 320 RIVERSIDE DRIVE Herschel Avenue 45208 320 RIVERSIDE DRIVECincinnati, OH1222
18"-24" Verify on site
Min. 6" compacted gravel base
11'-4"
6-mil Vapor Barrier
4" Concrete Slab
Nichiha Finish Clip
Verify elevation on site to match alley elevation 2x6 Studs @ 16" o.c.
4" Concrete Slab
8"
cted
Slope Structure 1 4" per 1'0" min.
REVISIONS:
8"
ompacted ase
Roof Construction -2x6 joists @ 16" o.c. -1/2" plywood sheathing -EPDM Roof Membrane
John D. Becker Registration #: 3510 Expires: 12/31/19 PROJECT NO.
4" drain tile w/ filter fabric. Connect to existing downspout lines
DATE SHEET NAME 8/10/2018
Garage Foundation Detail 2
GarageNO. PROJECT
Addition Wall Detail
Foundation Plan
DRAWING SHEET NAMENO.
Garage Foundation Plan
A.07
320 Riverside
58
ewarder@tulane.edu