portfolio VL2
exparanzar munguti 2019 - 2020
PERSONAL PROFILE D.O.B: 07-1995 Languages: English - fluent Swahili - fluent Kamba - intermediate Nationality: Kenyan EDUCATION HISTORY K.C.P.E. (2001 - 2008) Machakos Primary School
SKILLS Profesional -
Self-motivated Excellent communication skills Team player Time- management Punctual and Detail-oriented Problem Solver Adaptability
K.C.S.E. (2009 - 2010) St. Teresa D’lima (2011 - 2012) Wellspring Girls Secondary School
Certificate of Interior Design (2014 - 2015) Buruburu Institute of Fine Arts
ABOUT ME I am an architectural student from Nairobi Institute of Technology. My goal is to create art, provide a moment when one stops and looks at a fine building and they clearly see why Architecture matters: it is our own human spirit, willed into stone and space. ambitious, hardworking and challenge oriented individual. I am eager to learn and grow to be a qualified architect and design. I will do my best to achieve this goal. - Exparanzar Mbithe
Diploma in Architecture (2015 - 2018) Nairobi Institute of Technology
REFERENCES
DANIEL LOMOLE Architect mail: dlomole@googlemail.com No: +254 722 926016
WILLIS LUVAI Architect mail: willsmudimbwa@gmail.com No: +254 727 466 418
KAMAU KAARA Architect mail: kamaukaara@gmail.com No: +254 702 796039
Software Skills -
ARCHICAD LUMION ARTLANTIS ADOBE INDESIGN ADOBE PHOTOSHOP ADOBE ILLUSTRATOR MICROSOFT OFFICE SKETCH UP REVIT KRITA
hobbies -
reading drawing walks/ hiking watching movies
WORK HISTORY (2015 - 2016) Ambient Group Duties & responsibilities - Handle incoming and outgoing correspondence - Organize persional and proffessional calender and supplied reminders for meetings and events - Develope skills in CADD software’s - Creative input in existing project budgets
(2017) Mwembe & Mwembe Associates Duties & responsibilities - Sharpen skills in CADD software’s - Creative input in existing project budgets
(2019) Habit-Art & Partners LTD Duties & responsibilities - Sharpen C.A.D.D skills - Project management
CONTENT O1. PERSONAL ARCHITECTURAL WORKS 02. ATTACHMENT ARCHITECTURAL WORKS
(2020) PRIVATE RESIDENCE Duties & responsibilities - Project management - MATERIAL PROCUREMENT
(2018) OTHER HISTORY - Fine art artist and participated in various art shows - Managed various start-us including; Mbithe’s homemade bakery
03. FURNITURE DESIGN WORKS
G
RE
01.1 BRIEF THE MODERN STYLE HOME IS LOCATED IN KAJIADO REGION. A PLACE THAT PROMOTES THE SEAMLESS FLOW OF SURROUNDING NATURE TO INTERTWINE WITH THEIR EVERYDAY LIFE. TO FULFILL THIS REQUEST, THE DESIGN MAKES US OF NATURAL STONE AND TEMPERED GLASS.
DESIGN INTENT A TWO STOREY HOME. THE MAIN HOUSE IS RAISED BY 300MM TO CREATE DIFFERENCE IN THE SPATIAL PERCEPTION IN THE INTERIOR LEVELS LIGHT AND ELEGANT MATERIALS SUCH AS NATURAL STONE, WOODEN FLOORS ARE USED TO CREATE THE WARM AND SPACIOUS FEEL. LARGE OPENINGS USED TO WELCOME NATURE WITHIN
GLOBAL VILLAGE
ESIDENTIAL PROJECT (PROJECT IN PROGRESS)
SOFTWARES USED - TWINMOTION - ARCHICARD
NOTES
GENERAL
19,150 400
400 200
172 = 18 x
2
pv
Shower
16
A-01
17 1
-0
Lounge
pv
BIC
610
610
pv
pv
600 450 200
200 450 1,500
1,200 200 50 200
2,100 450
100
100 2,000
450 1,200 250 200
4,000
4,600
200 550 1,000 200
1,200
4,000
450 2,300
250 200 1,000 200 50 200
3,200
450 4,600
02
1,500 200 450 2,400
3,600
pv
15° Roof
W/S
Children's BDR
Cer.tile f.f
Cer.tile f.f
200mm W/S wall with Project Name: mazerus stone cladding to client's approval
Lounge Cer.tile f.f
GLOBAL VILLAGE 118
450
4,000
Cer.tile f.f
pv
4.
550 450
250
Kitchen
Cer.tile f.f
3.
470
pv
pv
pv
610
Cer.tile f.f
Cer.tile f.f
pv
Dining
approval
2.
990
Cover Porch pv
pv
470
wc
pv
REVISION
Cer.tile f.f + 300
pv
1.
525
Cer.tile f.f
7,070
+
5,520
1,000
Children's bedroom
1,000
Bench
BIC
pv
1,125
18
2,000
450
470
200 470
14
3,100
Walk-in closet
3
pv
pv
1,670
2,600 200 470
12
13
9
11
8
10
6
5
750 1,000
750
-0
450
650
pv
wc
1,000
3,640
Cer.tile f.f
1,500
pv
IE-01
2,650
Master Bedroom
4,050
15
Shower
Cer.tile f.f +
470
610 410 200 200 450
1,500
4
2,250
200 470
200 470 1,500
470 5,520
7,070
700
pv
pv
470
900
pv
Bench
2,400 400
1,850
7
400 250 900
2,400
3,000
200 450
1,500
9,100
450 150
04
200 200
2,650
2,400
A-01
2,600
126 274
1,170
450 150
pv
450
12,300
1,500
2,400
410 200 200 450
450 150
900
03
900
1. All dimensions are shown in m unless otherwise specified. 2. DrawingsFlat are not to be scaled. Only firoof laid to fall gured dimensions to be used. 3. The contractor must check and verify all dimensions on site before commencement of anywork. * 300mm 4. Conflicts200mm must be clarified before work begins. 5. All worksreinforced to be strictly inconcrete accordancering to the standard, specifications, notes and Local beam authority regulations. 6. PV denotes permanent vents over the windows and doors. 7. Unless otherwise indicated, all doors are M/S casement window offset from adjacent corners by atleast 100mm. 8. Depth of foundation to be determined on site. to schedule 9. Drain pipes passing under tarmac, driveways and buildin to be encased in 150mm thick concrete surround. 10. All reinforced concrete works to structural engineer's drawings. 11. All sanitary works adhere to MOH requirements. 200mm wall painted to
2,600
Client:
19,150
G.L
STELLA SHASHI Location:
01
Strip foundation on ccompacted hardcore to
Plot no:118 Kitengela/Kajiado S.E's detail 33138
PLINTH AREA: 135.4 m2
A-01 SECTION SCALE 1:100
Developer: NOTES
GENERAL
03
12,750
4,500
3,250
500
300 1,200
1,100
1,500
1,000
pv
200
12
13
9
11
4
10
8
6
pv
7
5
50 280
pv
172 =
16
pv
18 x
2
1,950
3,100
15
3
1,670
280
1,500
200
1,200
14
4,450
A-01
200
17
A-01
1
F
2,320
2,520
Kitchen Cer.tile f.f
Balcony
02
4,150 6,600
REVISION
4,450 50
pv
400 100 1,200 400
1,450
4,400
100 400 1,200 400
4,050 400
50
4,050
Hanger
2. 3. 4.
p
d
3,400 50
Skirting
3,400 400
4,450
100 50 950 100 50 950 100 50 950
pv
D40 mm 1750
1.
Cer.tile f.f
300 200
300
pv
1,350
pv
Roof
2,000
Cer.tile f.f
Roof
200
50 230
Dining
pv
1,350
1,500
Cer.tile f.f
04
6,600
3,750
Balcony
1,350
3,500
18
270
4,400 GSPublisherVersion 0.1.100.100
EM 18
3,600 150
2,000
4,700 200
50
Project Name:
3,400
12,750
GLOBAL VILLAGE 118
G.L
100
4,450 50
Drawing Title: 1. All dimensions are shown in m unless otherwise specified. GROUND FLOOR 2. Drawings are not to be scaled. Only figured dimensions to be used. 3. The contractor must check and verify all dimensions on site before commencement of Drawnanywork. by: Scale: 1:100 Munguti. E must be 4. Conflicts clarified before work begins. 5. All works to be strictly in accordance to the Checked by: Date: standard, specifications, notes and Local 06/05/2020 authority regulations. 6. PV denotes permanent vents over the windows and doors. Laminated MDF shelve 7. Unless otherwise indicated, all doors are offset from adjacent corners by atleast 100mm. 8. Depth of foundation to be determined on site. 9. Drain pipes passing under tarmac, driveways and buildin to be encased in 150mm thick concrete surround. 10. All reinforced concrete works to structural engineer's drawings. Laminated MDF cabinet door with 11. All sanitary works adhere to MOH 10mm beading at 50mmdorr edge requirements.
Client:
01
STELLA SHASHI
FRONT
Location:
Plot no:118 Kitengela/Kajiado 33138
PLINTH AREA: 84.2 m2
Developer:
GSPublisherVersion 0.1.100.100
Drawing Title:
IE-01 SECTION SCALE 1:50
300 200
NOTES
pv
6,600
Cer.tile f.f
pv
1,500
pv
W/S
Master BDR
Cer.tile f.f
100
1,400
Cer.tile f.f
G.L
REVISION 1. 2.
N
3. 4.
Project Name:
GLOBAL VILLAGE 118 Client: 30
STELLA SHASHI
15
530
270
m Chrome tube at 0 mm from ground
15
505
20 mm laminated partico board shelf
Location:
Plot no:118 Kitengela/Kajiado 33138
505
Developer:
355
20
Laminated MDF drawer with h /duty extending runners
N
1. All dimensions are shown in m unless otherwise specified. 2. Drawings are not to be scaled. Only figured dimensions to be used. 3. The contractor must check and verify all dimensions on site before commencement of anywork. 4. Conflicts must be clarified before work begins. 5. All works to be strictly in accordance to the standard, specifications, notes and Local authority regulations. 6. PV denotes permanent vents over the windows and doors. 7. Unless otherwise indicated, all doors are offset from adjacent corners by atleast 100mm. 8. Depth of foundation to be determined on site. 9. Drain pipes passing under tarmac, driveways and buildin to be encased in 150mm thick concrete surround. 10. All reinforced concrete works to structural engineer's drawings. 11. All sanitary works adhere to MOH requirements.
2,600
Balcony
pv
GENERAL
25
Skirting
Drawing Title:
SECTION A-01 & IE-01 SHELF ARRANGEMENT
Drawn by:
Munguti. E Checked by:
Scale: 1:100
Date: 06/05/2020
EM 18
W
01.2 BRIEF A CONTAINER WORKSHOP WITH AFRICAN HERITAGE PRINTS
DESIGN INTENT RENOVATE THE CONTAINERS IN WHICH 2 CAN HOUSE MACHINERY AND ALSO COULD BE USED AS A CLASSROOM IF NEED BE. LARGE DOOR TO ACT AS INCLINED RAMP IF NEED TO MOVE MACHINERY PRESENTS ITSELF. OFFICE TO ACT AS SUPERVISION AREA WITH PROVISION OF A BALCONY LOOKING ONTO THE LARGE SLABBED WORKSPACE AREA
MACHINEANI
WORKSHOP PROJECT (PROJECT IN PROGRESS)
SOFTWARES USED - LUMION - ARCHICARD
clients specification.
Open 20mm thick particle board shelves
Project Name:
SECTION M-2 Scale: 1:100
Open 20mm thick particle board shelve outfitted with adjustable dividers
Flat roof laid to fall
Proposed MachineANI Workshop.
200mm * 300mm reinforced concrete ring Client: beam
pv
1,500
20mm thick laminated particle board shelves
40
40
Plot Boundary
12.180
600
Scale:
2,000 EM W/S Cer.tile f.f 17
1:100
40 NOTES
Date: 04/14/2020
200mm W/S wall with mazerus stone cladding to client's approval
6.000
5.000
GATE ROAD
1,410
1,500
12,030
02/27/2020
9.670
Terrace
MDF cabinet door with M-Laminated 1 10mm beading at 50mmdorr edge
Location:
Plot Boundary
100
G.L
5.000
5.000
Developer:
V-04
2.865
1.500
0.040 3.165
0.500 pv
Office
n
no-slip ceramic tile flooring pv pv
D40 mm 1750
no-slip ceramic tile flooring
Balcony
pv
pv
1.540 12.110
0.690
2.000 3.260
2.315 0.040
2.100 5.430
p
2.615 0.040
d
12.110
Skirting
Kibiko Farm - Ngong
50.000
1.500
5.430
pv
0.040
Gearbox Pan African Network
12.110
V-01
FRONT
Drawing Title:
GATE
0.040
1.500
3.310
Work Shop 2
Client:
ROAD
3.260
0.940
Proposed MachineANI Workshop.
A-01 SECTION SCALE 1:100 12.110
0.040
Laminated MDF shelve
4.
V-01
12.110
Hanger
SITE PLAN
2.000 12.180
900
2,740
2.430 0.040 0.900 2700.040 1.410 2,000
3.
Cer.tile f.f 2,740
1,945 40
V-03
2.430
02/18/2020
2,740
40 Lounge
Cer.tile f.f
GROUND FLOOR PLAN Plinth: 58.8m2 Scale: 1:100
3.200
2.
555
5,500 Children's BDR
G.L
Project Name:
9.670
pv
27,000
1.250
02/09/2020
1.910
1.
IE-01
ROAD
pv
1,500
V-02
V-03
40.000
M-1
30.000
PLOT B Lobby
30.000
40.000
V-01
PLOT A
Lobby
545
REVISION
GSPublisherVersion 0.1.100.100
1,055
IE-01
Hot rolled stainless steel checkers pv plate flooring pv
12,110
1. All dimensions are shown in m unless otherwise specified. 2. Drawings are not to be scaled. Only figured dimensions be used. Striptofoundation on 3. The contractor must check and verify all ccompacted hardcore to dimensions on site before commencement of S.E's detail anywork. 4. Conflicts must be clarified before work begins. 5. All works to be strictly in accordance to the standard, specifications, notes and Local authority regulations. 6. PV denotes permanent vents over the windows and doors. 7. Unless otherwise indicated, all doors are offset from adjacent corners by atleast 100mm. 8. Depth of foundation to be determined on site. 9. Drain pipes passing under tarmac, driveways and buildin to be encased in 150mm thick concrete surround. 10. All reinforced concrete works to structural engineer's drawings. 11. All sanitary works adhere to MOH requirements.
Work Shop 1
ROAD
900
1,500
465
Section M-1,pvM2 & IE -01 pv
Checked by:
2.000 9.670
Work Shop
M- 1
Munguti. E
IE -01 Scale: 1:30
2.000
12.150
2,740
Kitchen Cer.tile f.f
465
40 2,350
2,430
2,430
V-02
2,430
pv
Drawn by:
50.000
6.000
1,945
Cer.tile f.f
pv
GENERAL
2.000
900
Dining
40
2,740
15° Roof
V-02
5.000
9,265
Kibiko Farm - Ngong
pv
2,740
12,030
Location: M/S casement window to schedule
100mm high metal skirting to match floor.
GSPublisherVersion 0.0.100.100
GATE
27,000
pv
Developer:
900mm high laminated MDF drawers with h/duty extending runners & 250mm wide brass handles.
GATE
pv
12,110
Gearbox Pan African Network
200mm wall painted to approval Drawing Title:
12.150
pv
pv
40
1/4'' Plate steel worktop on timber countertop.
6.000
V-03
6.000 Drawn by:
Munguti. E
Scale: 1:100
Checked by:
Date: 04/14/2020 GSPublisherVersion 0.0.100.100
GSPublisherVersion 0.1.100.100
EM 17
IE-01 SECTION SCALE 1:50
NOTES NOTES
300 200
1,500 12,110
1,410
Balcony
2,000
600
M- 1
9,265
W/S
Master BDR
40 Cer.tile f.f
Cer.tile f.f 12,030
1,400
900
pv
1,500
pv
2,350
pv
pv
465
pv
40
pv
Hot rolled stainless steel checkers plate flooring pv
465
pv
Work Shop
1,500
pv
40
Cer.tile f.f
2,430 6,600 V-04
1,500
12,110
100
1,500
G.L
REVISION REVISION 1. 2.
N
3.
0.040
3.260
Laminated MDF drawer with h /duty extending runners
02/27/2020
4.
Project Name:
Proposed MachineANI GLOBAL VILLAGE 118 Workshop.
1.250
Client:
V-04
Client:
9.670
1.910
30 530
02/18/2020
3.
STELLA SHASHI Gearbox Pan African Network Location:
505 15
0.040
Plot no:118 Kitengela/Kajiado Kibiko Farm - Ngong 33138 Developer:
Developer:
355
20
3.260
0.390
2.
505
2.000
02/09/2020
Location:
1.500
20 mm laminated partico board shelf
M- 1
3.310
pv
Terrace
15
0.040 0.900
0 mm from ground
2.430
Office
2.430
0.040 1.410
pv
1.
Project Name:
0.640
270
1.500
3.200
4.
no-slip ceramic tile flooring m Chrome tube at
N
1. All dimensions are shown in m unless 1. All dimensions are shown in m unless otherwise specified. otherwise specified. 2. Drawings are not to be scaled. Only fi2. Drawings are not totobe gured dimensions bescaled. used. Only figured dimensions to be used. 3. The contractor must check and verify all 3. The contractor must check and verify all dimensions on site before commencement of dimensions on site before commencement of anywork. anywork. 4. Conflicts must be clarified before work begins. 4. Conflicts must be clarified before work begins. 5. All works to be strictly in accordance to the 5. All works to be strictly in accordance to the standard, specifications, notes and Local standard, specifications, notes and Local authority regulations. authority regulations. 6. PV denotes permanent vents over the windows 6. PV denotes permanent vents over the windows and doors. and doors. 7. Unless otherwise indicated, all doors are 7. Unless otherwise indicated, all doors are offset from adjacent corners by atleast 100mm. offset from adjacent corners by atleast 100mm. 8. Depth of foundation to be determined on site. 8. Depth of foundation to be determined on site. 9. Drain pipes passing under tarmac, driveways 9. Drain pipes passing under tarmac, driveways and buildin to be encased in 150mm thick and buildin to be encased in 150mm thick concrete surround. concrete surround. 10. All reinforced concrete works to structural 10. All reinforced concrete works to structural engineer's drawings. engineer's drawings. 11. All sanitary works adhere to MOH 11. All sanitary works adhere to MOH requirements. requirements.
2,600
5,000
40
2,430
12,030 545
GENERAL GENERAL
25
Skirting
SHELF ARRANGEMENT
FIRST FLOOR PLAN Plinth: 29.4m2 Scale: 1:100
Drawing Title:
Drawing Title:
Ground and First floor SECTIONPlan A-01 & IE-01
Drawn by: Drawn by:
Scale: Scale: 1:100 1:100
Checked by: Checked by:
Date: Date: 04/14/2020 06/05/2020
Munguti. Munguti. E E
EM EM 1817
TH
INTERI
01.3 BRIEF A FLOOR STOREY HOME IN KILIMANI. WITH VARIETY OF DIFFERENT STYLES, THE INTERIOR DESIGN WORKS WERE DETERMINED AND PERSONALLY PICKED OUT BY CLIENT. THE FINISHES INCLUDE WOODEN FINISHES AND NATURAL STONE.
ROLES
HAMBIRI HOUSE
IOR DESIGN PROJECT (PROJECT IN PROGRESS)
1. PLAN AND DESIGNATE PROJECT RESOURCES TO MEET CLIENTS BUDGET 2. PREPARE BUDGET 3. MONITOR PROGRESS AND MAKE ADJUSTMENTS AS NEEDED 4. PROCURE MATERIALS FOR PROJECT 5. DEVELOP AND MANAGE WORK PLAN AS WELL AS WORKERS 6. ENSURE INSTRUCTIONS PROVIDED BY CLIENT ARE FOLLOWED
ELEMENTS DISPLAYED 1. WALLS PAINTED 2. FLOOR FINISH I.E - WOODEN FLOORS FOR THE BEDROOMS AND LIVING ROOM AREA - CERAMIC TILE FLOORS FOR THE BATHROOMS AND KITCHEN AREAS, AS WELL AS GUEST BEDROOM. 3.CABINETRY INSTALLATION I.E FOR THE KITCHEN AND BEDROOM CLOSETS. 4. CEILING FINISH I.E GYPSUM CLADDING. 5. DOOR INSTALLATIONS 6. ELECTRICAL WORKS I.E LIGHTS, SWITCHES AND SOCKETS INSTALLATION 7. EXTERNAL WALLS CLADDING I.E MAZERUS STONES PLACED.
SIL
INTERI
01.4
BRIEF A SHOP REFURBISHMENT PROJECT, LOCATED IN NAIROBI CBD
DESIGN INTENT A MINIMALIST DESIGN WITH AN OPEN CONCEPT.
SOFTWARE USED -ARCHICARD
LVERLINE SHOP
IOR DESIGN PROJECT (PROJECT IN PROGRESS)
5,270
3,470
1,800
1,800
TV Display
Staff work
S-04Cashdesk Counter
S-03
Area 150 Communications 250
4,820 FLOOR PLAN
Slatwall Accessories Display
S-04
Staff work desk
150 50 Slatwall Accessories Display
S-03
Communications Area
Project Title: Proposed Shop Client : Silverline Mashariki LTD Display box Contractor : 11
EM GSPublisherEngine 0.13.100.100
4,820 FLOOR PLAN
150 50
Brand Feature wall
Slatwall accessories Display Laminated partico
SILVERLINE STORE
Communications Area board shelf Cash counter
Brand Feature wall Existing ground beam
Communications Area Laminated partico board shelf
SECTION 1
12mm gypsum bulkhead painted to finish with acoustic ceiling board infill and LED downlighters to approval
Cash counter
Dispaly Box with clear glass panels
4,000
Cash Counter
2,200 400 700 600
700 600 1,500 1,500 4,000
TV Display
Display box
SILVERLINE STORE
Dispaly Box with clear glass panel doors.
Slatwall accessories Display
Slatwall accessories Display
Existing ground beam
Frameless aluminium glass door
12mm gypsum bulkhead painted to finish with acoustic ceiling board Lamininated wooden infill and LED floor finish downlighters to approval
SECTION 1
2,720
3,470
380 20 20 20 20 500 500 500 150 2,500 2,900
5,270
12mm gypsum bulkhead painted to finish with acoustic ceiling board infill and LED downlighters to Dispaly Box with clear approval glass panel doors.
12mm gypsum bulkhead painted to finish with acoustic ceiling board infill and LED downlighters to approval
400 2,200
0
Proposed Silverline Mashariki Design
Existing ground beam
Dispaly Box with clear glass panels
5,270 SECTION 2 Drwg. title: Floor plan, Section 1 & 2
Slatwall accessories Display
Date: 12/15/2019 Frameless aluminium
Drawn glass doorby: Munguti E.
Checked by:
Scale : 1: .....
Existing ground beam
Lamininated wooden floor finish
5,270 SECTION 2
2,720
380 20 20 20 20 500 500 500 150 2,500 2,900
DENIS PRITT
CLAYWORKS
02.1 duties 1. SALON STATUS: COMPLETED - PROVIDE 3D RENDERS - WORK ON WORKING DRAWINGS. 2. RIRONI STATUS: IN PROGRESS - PROVIDE RENDERS 3. CLAYWORKS STATUS: IN PROGRESS - PROVIDE 3D RENDERS - WORK ON WORKING DRAWINGS 4. DENIS PRITT HOME STATUS: COMPLETE - PROVIDE 3D RENDERS - WORK ON WORKING DRAWING
SALON
rironi
SOFTWARE USED - ARCHICAD -ARTLANTIS
3/4'' Reclaimed wood painted to approval.
1
Laminated MDF drawer with h/duty extending runners
2
3
Laminated MDF board door with angle hydralic hinges
4
5
G.L
0.8'' laminated particle board base.
GSPublisherVersion 0.5.100.100
03.1
1
2
0.695
3
4
5
standard sized office desk
0.780
0.010 0.010 0.010 0.065 0.150 0.150 0.150 0.150
brief
3/4'' Reclaimed wood painted to approval.
0.750
0.780
0.8'' laminated particle side panel
Software used G.L
0.8'' laminated particle board base. GSPublisherVersion 0.5.100.100
0.700
-archicad -lumion
wooden panel hidden under polyester- linen blend upholstery, lifts on stainless steel sturdy hinges
18mm wooden frame hidden under polyesterlinen blend upholstery
G.L
Tapered wooden legs painted black
GSPublisherVersion 0.12.100.100
wooden panel hidde under polyester- line blend upholstery, lift stainless steel sturd hinges
18mm wooden fram hidden under polyes linen blend upholste
G.L
Tapered wooden leg painted black
03.2
brief
0.400
0.100
0.300
standard sized bed side bench
1.450
en en ts on dy
gs
0.100
0.300
me sterery
0.400
Software used -archicad -lumion
portfolio VL2 name: exparanzar munguti email: esparanarmbithe@gmail.com phone: +254729715171