Capital Works Flyer - May 2019

Page 1

FAIRFIELD CITY CENTRE

Capital Works 2019 EPOCH PLAZA • Epoch Plaza is located at 4 Station Street, Fairfield and provides a gateway to the Fairfield City Centre. Upon completion, the ambience and visual features within the Epoch Plaza will be noticeably enhanced. The proposed improvements provide for ‘up lighting’ of the Epoch ‘heritage silhouettes’, installation of stormwater heel-proof grates, interpretive signage and new and general improvements to the existing surrounding landscape beds. These works are due for completion by approximately June 2019. • Total allocation for improvement works is $75,000.

THOMAS WARE PLAZA • Thomas Ware Plaza is located between 30 Nelson Street and 4 Station Street, Fairfield and is the main access point for pedestrian movements from Ware Street and the Fairfield Forum shopping precinct. The proposed improvement works will continue the visual enhancement theme and provide a welcoming public space. Some of these works will include rejuvenation of the soft fall at the playground facility, placement of “bud lighting” at palm trees, general cleaning of pavement and the addition of a new water station. These works are due for completion by approximately June 2019. • Total allocation for improvement works is $75,000.

THE CRESCENT • This project is located in the section from Hamilton Road to Court Road. The Crescent is the primary connection between the Fairfield City Centre and the rail and public transport network. Over recent years there have been capital works which have included footpath upgrade treatments and the construction of the new ‘The Crescent Plaza’. The continuation of these improvement works include footpath paving treatments, upgrading of landscaping, refurbishment of memorial features, including interpretive signage within The Crescent open space area adjacent to the railway lines. The addition of engraved ‘street name’ footpath pavers at key locations will be a first for our City Centre. There will also be renewal of sections of kerb and guttering. These works are due for completion by approximately December 2019. • Total allocation for this improvement works project is $250,000.


FAIRFIELD CITY CENTRE

Capital Works 2019 HAMILTON ROAD • The Hamilton Road project is located between The Crescent and Barbara Street. Hamilton Road is an arterial road and gateway link to the Fairfield City Centre. The proposed improvements at this location include kerb and gutter realignment/reconstruction, road pavement restoration, footpath paver upgrade treatments, stormwater drainage, landscaping and tree planting. Once these works are completed they will enhance the streetscape and are due for completion by approximately December 2019. • Total allocation for the upgrade works is $500,000.

SPENCER STREET • The Spencer Street project is located between Smart Street and Ware Street. This new infrastructure is part of a pilot program in the Fairfield Local Government Area. The project is to provide for ‘Smart City’ infrastructure through the replacement of existing street lighting. These works include the installation of smart poles which include CCTV, ‘smart’ controlled LED roadway lighting, Wi-Fi, environmental sensors, public event audio with power outlets and electric car charging. This new infrastructure will give a glimpse of future streetscape environments going into the 21st century. These works are due for completion by approximately December 2019. • Total allocation for this project is $150,000.

For any further information in regards to these projects, please call Tony Walker on 0409 121 187 or 9725 0299


Turn static files into dynamic content formats.

Create a flipbook
Issuu converts static files into: digital portfolios, online yearbooks, online catalogs, digital photo albums and more. Sign up and create your flipbook.