Fan Wu 吴凡凡吴凡
Work Sample 2013-2018
Green Street Offices
Green Street Offices
Inner Lot
Green Street Offices
FAR (10.7)
FAR (6.11)
28
16
3,0
5,5
52 S
Q.F T
on
lt Car
11 10 9 8 7 6 5 4 3 2 1
Way
58
SQ .FT
7 6 5 4 3 2 1
2.4
9%
St A
ndre
ws
Pl
od
wo
lly Ho
d Blv
Green Street Offices Whole Year Sunpath Shadow Study 0-6 Level
G r eFlow e nOverlay S tOnr Pedestrian e e t OCirculation f f i c Around e s Site Traffic
Green Street Offices Create Viewing Terraces to Hollywood Sign Page 2 of 21
Page 3 of 21
June 21st 16:00PM
Page 4 of 21
T
S WE
DEC 21st 9:00 AM
+77 .00
Pedestrian
+0 .00
General Parking Valet Parking
ST
EA
Green Street Offices
Form Development Based on Sunpath Shadow Study
Page 8 of 21
Page 15 of 21
Green Street Offices
Green Street Offices
Page 5 of 21
Horizontal Separation of Mass
Vertical Separation of Mass
Vertical Courtyard
Private Terrace Public Terrace
Green Street Offices Form Development Based on Noise Study
Green Street Offices Public Space
Green Street Offices Egress
Page 6 of 21
Page 10 of 21
Page 7 of 21
Lobby Fitness
Staircase
Terrace
Elevator
Swimming Pool
Page 11 of 21
Page 13 of 21 Page 12 of 21