FA R A H M A H M O U D I N T E R I O R
D E S I G N
P O R T F O L I O
FA R A H N A D E R M A H M O U D MOBILE NO. +971567151564
PO BOX 42259 DUBAI, UAE
EMAIL Farahnmahmoud@gmail.com
DATE OF BIRTH March 15, 1994
E D U C AT I O N 2012- Present | American University of Sharjah | Currently third year Interior Design student
SKILLS DIGITAL ANALOGUE
Rhinoceros Model Making Autocad Sketching Adobe Photoshop Freehand Drawing Adobe Illustrator Woodshop Work Adobe InDesign Pottery - Wheel Throwing
LANGUAGES Arabic English
C U R R I C U L U M V I TA E
C U R R IC U L U M
V I TA E
2| 3
THE WALL
7
B AT H I N G R I T U A L
11
O B J E C T A N A LY S I S
15
S H I B U YA O N E B E D R O O M A PA R T M E N T
17
S H I B U YA T W O B E D R O O M S A PA R T M E N T
23
S H I B U YA A PA R T M E N T S K I O S K
29
POTTERY WORK
35
L I G H T PA I N T I N G
37
TA B L E O F C O N T E N T S
C ON TEN TS
4| 5
THE WALL S E C O N D
Y E A R -
S P R I N G
2 0 1 5
In this project we were asked to use bricks to create a tectonic wall. We used various transformation techniques to understand how to make a wall become a focal point in a space. Approach: Using diferent radius for each row an organic curviture was created to embody the curves of the human body. Also, these curves were made to provide interaction between the human body and the wall.
TH E
WAL L
6| 7
THE WALL l FARAH MAHMOUD
IDE202 l PROJECT 01 1
THE WALL l FARAH MAHMOUD
2m
27 40
1
21
2.55 m 1
2m
27 40
1
21
2
22
3
23
4 24 2
5
3
6 1
5
Row 5 pull brick 19-25 starting with (60 mm) with an increment of 10.
25 23
26
4
7
Row 26 Start pulling from brick 4-6 60 mm Brick 7-11 pull with an increment of 10.
22
24
27 25
8
1
28
26
6
9 7
29 27
30
10 Row 5 pull brick 19-25 starting with (60 mm) with an increment of 10.
Row 26 Start pulling from brick 4-6 60 mm Brick 7-11 pull with an increment of 10.
8
11 9
28
31 29
32
12 30
10 11
12
13
14
34
32
15
33
14
16
34
15
17
16
18
17
19
13
33
31
35 36 37
35
38
36
39
37 38 18
40 2039
19
The initial curve was generated by a circle with 2m radius and another that is 1.8m radius. 40
Section AA’
Section BB’
Section CC’
Section DD’
20-
Moving upwards along the wall, the radius- increase by 1% to generate new less linear curves.
The initial curve was generated by a circle with 2m radius and another that is 1.8m radius. Section AA’
Section BB’
ELEVATION + SECTIONS
Section CC’
Section DD’
Moving upwards along the wall, the radius- increase by 1% to generate new less linear curves.
PLANS TH E
WAL L
8| 9
B AT H I N G R I T U A L S E C O N D
Y E A R -
S P R I N G
2 0 1 5
In this project we were asked to design a bathing space using the previous tectonic wall. Creating a space for napping and meditating using the curves of the wall. Moreover, adding a skylight to provide daylight was added to the ceiling.
DARK
COLD 15 C
LIGHT
WARM 28 C
HOT 40 C
B AT H I N G
R ITUAL
1 0 | 11
B AT H I N G
R ITUAL
1 2 | 13
PROJECT I | CASE STUDY SMOKING PIPE FARAH MAHMOUD 44363
Geometric Analysis
Process
PLAN | SCALE 1.5:1
A’
A
SECTION AA’ | SCALE 1.5:1
mATERIALS
DETAILED SECTION
BACK ELEVATION
FRONT ELEVATION
SIDE ELEVATION 1
O B J E C T A N A LY S I S T H I R D
Y E A R -
FA L L
2 0 1 5
In this project we were asked to choose a product to analyse it in relationship to human scale to introduce us to ergonomics. Approach: For this project a pipe was chosen and the analysis drawings were done on autocad and rendered using photoshop.
OBJ E C T
A N A LY S I S
1 4 | 15
S H I B U YA O N E B E D R O O M A PA R T M E N T T H I R D
Y E A R -
S P R I N G
2 0 1 6
The Shibuya Crossing Tower is a new mixed used high-rise development salted to break ground in 2018. It is located in the heart of the Shibuya Ward in Tokyo, Japan. The client puts sustainability as a high priority. Approach: The approach to this project was to save space by having all the zones hidden within a wall that wraps around the appartment, to access each zone a cabinet can be opened when needed.
S H I B U YA
ON E
B E D ROOM
1 6 | 17
4000 mm B.O. Ceiling
3000 mm B.O. Drop Ceiling
1000 mm T.O. Kitchen Cabinet
ELEVATION A1
SECTION AA’
4000 mm B.O. Ceiling 3500 mm B.O. Ceiling Bed
ELEVATION A2
SECTION BB’
A’
B’ A2
RCP
A1
RECESSED LIGHT SWITCH
A
B
S PLAN
S H I B U YA
ON E
B E D ROOM
1 8 | 19
21
S H I B U YA T W O B E D R O O M S A PA R T M E N T T H I R D
Y E A R -
S P R I N G
2 0 1 6
The Shibuya Crossing Tower is a new mixed used high-rise development salted to break ground in 2018. It is located in the heart of the Shibuya Ward in Tokyo, Japan. The client puts sustainability as a high priority. Approach: The approach to this project was to have an open interactive public space. The pop of color used in the space was chosen according to the psychology of color, since yellow is an energizing color.
S H I B U YA
TWO
B E D ROOM
2 2 | 23
3800 mm B.O. Dropped Ceiling
1000 mm B.O. Overhead Cabinets
1000 mm T.O. Kitchen Cabinets
ELEVATION A1
SECTION AA’
4000 mm T.O.Ceiling
3200 mm B.O.Dropped Ceiling
ELEVATION A2
SECTION BB’
RCP
PENDANT
RECESSED LIGHT
S
SWITCH
SD
DIMMABLE SWITCH
PLAN S H I B U YA
TWO
B E D ROOM
2 4 | 25
S H I B U YA
TWO
B E D ROOM
2 6 | 27
S H I B U YA A PA R T M E N T S K I O S K T H I R D
Y E A R -
S P R I N G
2 0 1 6
The Shibuya Apartments approached us to design a kiosk to advertise for the previously designed apartments. Approach: Three linear elements were put together in a way that highlights each project. The materials used for each zone was chosen from the project showed in that space.
S H I B U YA
K IOS K
2 8 | 29
ELEVATION A1
ELEVATION A3
ELEVATION A2
ELEVATION A4
PLAN
SECTION AA’ S H I B U YA
K IOS K
3 0 | 31
S H I B U YA
K IOS K
3 2 | 33
TABOURET SOLVAY
FARAH MAHMOUD- 44363
PROUVE
JEAN
SANDING (ROUNDING EDGES)
LIGHT OAK WOOD FINISH
M I N I AT U R E F U R N I T U R E TA B O U R E T S O LVAY ( J E A N P R O U V E ) T H I R D
Y E A R -
S P R I N G
2 0 1 6
In this project we were asked to choose a famous furniture piece that we like and make a model of it at 1/6th scale of the original in diverse materials to emulate the original.
M I N I AT U R E
FU R N ITU R E
3 4 | 35
POTTERY WORK S E C O N D
Y E A R -
F A L L
2 0 1 4
POTTERY
3 6 | 37
SERIES OF WHEEL THROWN POTS.
L I G H T PA I N T I N G S E C O N D
Y E A R -
F A L L
S H I B U YA
K IOS K
2 0 1 1 4
3 8 | 39
FA R A H M A H M O U D FA R A H N M A H M O U D @ G M A I L . C O M ( + 9 7 1 ) - 5 6 7 1 5 1 5 6 4 D U B A I , U A E