POSTGraduate Works

Page 1

port folio

FARAH ROZHAN


WOR K

EX

N E CE I R E P

MINX ARCHITECTURE education

moull murray architects multi-residential

sash design residential


SD-DD-CD-CA

3D MODELLING

FURNITURE DESIGN

MINX ARCHITECTURE EDUCATION

MASTER PLAN


SD-DDCD-CA

St. Dominics Primary School STEAM Centre

PLAYING FIELD

ADJACENT RESIDENTIAL PROPERTY

CLASSROOM WING

EXISTING PLAYGROUND

PLAY EQUIPMENT

CLASSROOM WING

JUNIOR PLAYGROUND

PLANTER POT PLANTER POT

CONC NAIL TBM 121.57

PLANTER POT

PLANTER POTS

PLANTER POTS

ADMINISTRATION

SHED GAS METER

6 A03

CARPARK

2

CONC NAIL TBM 120.75

VEHICLE EXIT

A02 RWT

STATUE

CLASSROOM WING

KIT. GARDEN

SENIOR PLAY EQUIP.

ST.DOMINICS COMMUNITY CENTRE CARPARK

COVERD WAY

OUTDOOR LEARNING

STEAM CENTRE

CONC NAIL TBM 121.39

BASKETBALL COURT

GARAGE

VEHICLE ENTRY

CLASSRM

1 A02

SPORTS STORE

PARISH RESOURCE CENTRE

PARISH TENNIS COURTS

ST.DOMINICS PRESPYTERY

ST.DOMINICS PARISH CHURCH

30.48m 180d01'30"

36.58m 270d02'30"

GYMNASIUM

TIMBER FENCE

VEHICLE ACCESS

1

PROPOSED SITE PLAN SCALE 1:500

JENSEN ROAD

JOSEPH STREET

NETBALL POST

BOYS & GIRLS TOILETS

MEET RM

EXISTING JUNIOR PLAYGROUND

CONC. SPOON DRAIN

CLASSROOM WING

PLAYING FIELD

VEHICLE ACCESS

CAMP ROAD

ADJACENT COMMERCIAL PROPERTY


F:\ajobs\0000-JOB NUMBER\Legends

LEGEND ACU AFL AP# BA# CH COL DB DP FE FFL FHR FR FW GR GU# HD HWU LC# PA PB# PC# PL# PN# PTD RU S# SD SK SHR SHC TMV TH TI# TP TR# VN# VB# WC# WT#

EXISTING BRICK PAVING EXISTING CONC. PAVING CONC STEPS AND LANDING

SERVICE DUCT

CONC STEPS AND LANDING

CONC STEPS AND LANDING

DP UP

UP

EX METAL BALUSTRADE & POSTS TO REMAIN

EXIST. PIT TO REMIAN

STAIRS

STAIRS

CONC STEPS AND LANDING DP

UP

EX METAL BALUSTRADE & POSTS TO REMAIN

STAIRS

EX METAL BALUSTRADE & POSTS TO REMAIN NEW PIT REFER CIVIL ENGINEERS DRGS

EX. PIT

EX. POST

EX. POST

EXISTING PLAYGROUND

EXISTING JUNIOR PLAYGROUND

EXISTING JUNIOR PLAYGROUND TO BE RETAINED

EX. METAL GATE

EXISTING TOILETS

EX. METAL FENCE

NEW CONC.BASE

EX. CONC PAVING

NEW ELEC. PIT REFER ELEC. ENGINEERS DRGS

EXISTING FENCING

EX. STEEL COL

EX. SHED RELOCATED TO NEW POSITION

EX. GAS METER & ENCLOSURE NEW CONC. BASE

EXSIT. SW PIT TO REMAIN REFER CIVIL ENGINEERS DRGS

NEW DP

EX. RAINWATER TANK RELOCATED TO NEW POSITION

CONCRETE PLANTER POT

RAMP UP

DP

NEW ELEC. PIT REFER ELEC. ENGINEERS DRGS

NEW CONCRETE PAVING WITH PLEXIPAVE & LINE MARKING REFER CIVIL ENGINEERS DRGS

PROPOSED BUILDERS 1800mm TEMPORARY FENCE ENCLOSURE

NEW TIMBER FRAMED BLADE COLUMN SHEETED WITH FIBRE CEMENT SHEET

LINE OF COVERED WAY OVER EX. STEEL COL

DP

EXTENT OF NEW BUILDING WORKS

RAMP UP

EX. PIT

EX. STEEL COL

EX. POST

EX. POST

EX. GATE VALVE COVER

EX SHADE STRUCTURE

EX. POST

NEW CONCRETE PAVING WITH PLEXIPAVE & LINE MARKING REFER CIVIL ENGINEERS DRGS

EX. STEEL COL EXIST. CONCRETE

EX. STEEL COL

PLANTER BOX

LINE OF COVERED WAY OVER SHOWN DOTTED EXIST. CONCRETE

NEW 1800mm HIGH POWDERCOATED METAL FENCE & GATE NEW SW PIT REFER CIVIL ENGINEERS DRGS

SERVICE DUCT OVER

COVERED WAY

PLANTER BOX

KITCHEN GARDEN

EXIST. GARDEN BED & LANDSCAPING TO REMAIN

METAL SERVICE DUCT MOUNTED TO UNDERSIDE OF COVERED WAY

EX. STEEL COL

EX. GARDEN STATUE

NEW CONCRETE SPOON DRAIN REFER CIVIL ENGINEERS DRGS

CONCRETE PLANTER POT

NEW PIT REFER CIVIL ENGINEERS DRGS

EXIST. PIT TO REMAIN REFER CIVIL ENGINEERS DRGS

EX SHADE STRUCTURE

EXISTING GENERAL LEARNING SPACE

SERVICE DUCT OVER

PLANTER BOX PLANTER BOX

PROPOSED BUILDERS 1800mm TEMPORARY FENCE ENCLOSURE

EX. POST

DP

EX. POST

EXISTING SAND PIT

EX. STEEL COL

EXISTING TIMBER SLEEPER RETAINING WALL TO REMAIN

NEW I/O REFER CIVIL ENGINEERS DRGS

COVERED OUTDOOR LEARNING

NEW TIMBER EDGING TO MATCH EXISTING

NEW CONCRETE

PROPOSED BUILDERS 1800mm TEMPORARY FENCE ENCLOSURE

PROPOSED BUILDERS 1800mm TEMPORARY FENCE ENCLOSURE

NEW I/O REFER CIVIL ENGINEERS DRGS

NEW I/O REFER CIVIL ENGINEERS DRGS

CONCRETE PLANTER POT

RAMP UP

DP

NEW STEEL COL

EXSIT. SW PIT TO REMAIN REFER CIVIL ENGINEERS DRGS

NEW DP EXIST. COL

EXIST. BASKETBALL LINE MARKING NEW STEEL COL LINE OF EAVES OVER

EXIST. NETBALL/ BASKETBALL RING & POST

CONCRETE PAVING & CHAINWIRE MESH ENCLOSURE WITH GATES

NEW COVERED WAY NEW CONCRETE NEW STEEL COL PROPOSED BUILDERS 1800mm TEMPORARY FENCE ENCLOSURE

EX METAL BALUSTRADE & POSTS TO REMAIN

AIR CONDITION UNIT ABOVE FLOOR LEVEL QUIETSPACE ACOUSTIC PANELS BASIN COAT HOOKS COLUMN DISTRIBUTION BOARD DOWN PIPE FIRE EXTINGUISHER FINISHED FLOOR LEVEL FIRE HOSE REEL FRIDGE FLOOR WASTE GRAB RAIL GUTTER HAND DRYER HOT WATER UNIT LAMINATE FINISH PUBLIC ADDRESS SPEAKER PLASTERBOARD PAINT COLOUR PLYWOOD PANELING PINBOARD PAPER TOWEL DISPENSER RACK UNIT CABINET SINK SOAP DISPENSER TIMBER SKIRTING SHOWER SHOWER CURTAIN THERMOSTATIC MIXING VALVE TOILET ROLL HOLDER TACTILE INDICATOR TOILET PARTITION TROUGH VINYL VILLABOARD WATER CLOSET WALL TILE EXTENT OF NEW CONCRETE PAVING

LINE OF COVERED WAY OVER EX. STEEL COL EX. PIT

EX. STEEL COL

PROPOSED BUILDERS 1800mm TEMPORARY FENCE ENCLOSURE

DP

DRINKING TROUGH

DP BENCH

RAMP UP

EX. GATE VALVE COVER

CONCRETE PLANTER POT

CONCRETE PLANTER POT

DRINKING TROUGH BENCH

DRINKING TROUGH

DP BENCH

CONTRACTORS MUST VERIFY ALL DIMENSIONS ON SITE PRIOR TO COMMENCING WORKS ON SITE. ALL SHOP DRAWINGS MUST BE SUBMITTED FOR APPROVAL BY THE ARCHITECT BEFORE MANUFACTURE PROCEEDS.

A

CONSULTANTS ISSUE

B

CONSULTANTS ISSUE

FR

21.02.17

C

CONSULTANTS ISSUE

FM

10.03.17

D

CONTRACT DOCUMENTATION ISSUE

FM

24.03.17

E

TENDER ISSUE

FM

20.04.17

F

CONSTRUCTION ISSUE

FM

06.06.17

JB

02.08.17

FM

22.01.18

G

02 -

CIVIL & STORMWATER REVISIONS

17.02.17

PITS DELETED H

EX. STEEL COL

FR

AS BUILT

PROPOSED SITE PLAN - PLAYGROUND

1:100

MINX ARCHITECTURE PTY LTD 7A / 91 MORELAND STREET, FOOTSCRAY, VIC. 3011 PHONE: (03) 9646 7000 E-MAIL: info@minxarchitecture.com.au WEB: www.minxarchitecture.com.au

NEW I/O REFER CIVIL ENGINEERS DRGS NEW I/O REFER CIVIL ENGINEERS DRGS

NEW 1800mm HIGH POWDER COATED METAL FENCE

-

EXISTING SPORTS STORE EXISTING TO REMAIN

EXISTING ROLLER DOOR TO REMAIN

PROPOSED STEAM CENTRE

NEW ELEC. PIT REFER ELEC. ENGINEERS DRGS

01

NEW STEEL COL

PROPOSED SITE PLAN - STEAM CENTRE

1:100

EX. STEEL COL EXISTING COVERED WAY OVER TO REMAIN

EX. GARDEN BED TO REMAIN. NEW SLEEPER RETAINING WALL TO BE CONSTRUCTED TO SUIT NEW LEVELS

St Dominics Primary School S.T.E.A.M Building 408 Camp Road Broadmeadows VIC 3047 PROPOSED SITE PLAN

FM

1:100

1611-A02

JAN 18

H 22.01.18


EXIST. BUILDING 10

A06

LEGEND

EXIST. BUILDING

EXIST. BUILDING

ACU AFL BK# CT# DB DP FB FE FFL FHR FR FW HWU LC# PA PB# PC# PL# PN# RU S# SD SK TR# TM# VN# VB#

D

A05

EXIST. COL

EXIST. COL

NEW DP EXIST. COL

EXIST. COL

EXISTING COVERED WAY OVER

EXIST. COL 200

10090 CL COL

FLOOR PLAN

STEAM BUILDING 1:100

LED STRIP LIGHT FITTING. REFER ELECTRICAL DRAWINGS

LIGHT

CEILING MOUNTED LIGHT FITTING. REFER ELECTRICAL DRAWINGS

RF1

NEW BEAM

CLASSROOM

AC-1 SLOPING 10 DEG. SLOPE

EQ

EQ

EQ

DEMOLISH EXIST. UPPER COVERED WALKWAY ROOF OVERHANG

NEW

BC1

LIGHT

NEW ZINCALUME METAL ROOF SHEETING TO MATCH EXIST. PROFILE LINE OF STEAM BUILDING EAVES OVER

CONTRACTORS MUST VERIFY ALL DIMENSIONS ON SITE PRIOR TO COMMENCING WORKS ON SITE. ALL SHOP DRAWINGS MUST BE SUBMITTED FOR APPROVAL BY THE ARCHITECT BEFORE MANUFACTURE PROCEEDS. 100 x 75mm DP

100 x 75mm DP &SPREADER

BC1 2 DEG. SLOPE

AF1

EXIST. SPORTS STORE

GU1

EXIST. SPORTS STORE

PL-1

BC1

STEAM BUILDING

SLOPING UNDERSIDE NEW METAL ROOF SHEETING & PURLINS TO WALKWAY ROOF

A05

2

REFLECTED CEILING PLAN

STEAM BUILDING 1:100

WALL MOUNTED LIGHT FITTING. REFER ELECTRICAL DRAWINGS

BC1

DP & SPREADER

NEW BEAM

CEILING MOUNTED LIGHT FITTING. REFER ELECTRICAL DRAWINGS

CEILING MOUNTED FAN. REFER ELECTRICAL DRAWINGS

NEW

AF1

EQ

10 DEG. SLOPE

A05

LINE OF BUILDING SHOWN DOTTED BELOW

DP

LIGHT

AF1

2575

1810

LIGHT

A

GU1

NEW STEEL BEAM REFER ENGRINEERS DRGS

DP & SPREADER

OVERALL

E

COVERED WAY

D

A05

NEW CLASSROOM EQ

EXIST. COL

EXIST. SPORTS STORE 1810

CEILING MOUNTED LIGHT FITTING. REFER ELECTRICAL DRAWINGS

1:500 FALL

RF1

LIGHT

D

10 DEG FALL

NEW METAL COLORBOND BARGE CAPPING

100 X 75MM DP

CL ROOM DP

COLORBOND BACK FLASHING

10 DEG FALL

950

06

A08

1:20 GRADE UP

W

EXIST. ROOF

BC1

LINE OF NEW COVERED WALKWAY ROOF BELOW

EXHAUST FAN. REFER MECHANICAL DRAWINGS

760

1:500 FALL NEW STEEL BEAM REFER ENGRINEERS DRGS

EQ

EQ

EQ

EXF FAN

NEW COVERED WAY OVER

10 DEG. SLOPE EQ

COLORBOND BACK FLASHING

EXF FAN

GU1

RANGEHOOD RISER DUCT & FLUE

EQ

COL

A06

06

EXIST. COVERED WALKWAY ROOF

100 x 75mm DP &SPREADER

GU1

GU1

CL ROOM EQ EQ

CL ROOM

GU1

1810 590

4800

EXIST. BEAM

NEW METAL ROOF PURLINS REFER ENGRINEERS DRGS

12mm PLYWOOD SHEET TO EXTERNAL SOFFIT & EAVES FIXED TO TIMBER BATTENS. REFER TO SPECIFICATION

LED MAINTAINED CEILING OR WALL MOUNTED EMERGENCY EXIT LUMINAIRE. REFER ELECTRICAL DRAWING

EX

EXIST. BUILDING NEW STEEL FIXING ANGLE REFER ENGRINEERS DRGS

10mm THICK FLUSH-JOINTED PLASTERBOARD FIXED TO TIMBER CEILING JOISTS

LED RECESSED EMERGENCY LUMINAIRE. REFER ELECTRICAL DRAWING

EQ

1810 1810 590

SLOPING

COLORBOND HALF ROUND COLORBOND GUTTER COLOR: COTTAGE GREEN 13mm THICK ACOUSTIC PERFORATED PLASTERBOARD FIXED TO METAL FURRING CHANNELS ON DIRECT FIXING CLIPS

DENOTES RECESSED PASSIVE INFRARED MOVEMENT SENSOR. REFER ELECTRICAL DRAWINGS

PIR

STEAM CENTRE

10 DEG. SLOPE

1430 4800

09

A06

09a

FB

1310

EXIST. BEAM

DP

05

WHITEBOARD/PINBOARD 250

EQ

2060 U/S EXPOSED TIMBER TRUSS

10 DEG. SLOPE

590

AUTO LOUVRE CONTROL BOX

HW

W

B

LIGHT

08a A06

1

EQ

2890

A06

CARPET TILES

950

EQ

2060 U/S EXPOSED TIMBER TRUSS

1:8 THRESHOLD RAMP

02

HEIGHT

COLORBOND CUSTOM ORB ROOFING COLOR: PALE EUCALYPT

LEGEND - ELECTRICAL & MECHANICAL EF

DP & SPREADER

EQ

BRICKWORK

CLASSROOM

02

D

FB

08

PL-1

LINE OF EXIST. COVERED WALKWAY ROOF BELOW

PL-1 LIGHT

04

HEIGHT

A05

A08

D 03

2 x LAYERS 13mm FIRE RATED PLASTERBOARD FIRE RATED WALL

ROOMS

W 04

ERU 1 & NDB1 UNDER

90

A08

PB-1

A05

NEW UPVC DOWNPIPE & OVERFLOW -PAINT FINISH

BC1

COVERED OUTDOOR LEARNING

EX

2890

02 HW

STEAM CENTRE AC-1

COL

04 BRICKWORK

EQ

RANGEHOOD RISER DUCT

07

DP

HEIGHT

C

EXIST. BEAM

100 X 75MM DP

SLOPING

17150

A08

HALF GLAZED TIMBER BI-FOLDING DOOR

07

HIGHLIGHT WINDOW 6285

3635 1869

LINE OF EAVES OVER

CL COL

8685

5530

90

5140

1500

12

A08

A/C

CONCRETE PAVING & CHAINWIRE MESH ENCLOSURE WITH GATES

7175

S FB

A06

A06

OVERALL

W 03

RANGEHOOD OVER

04 FR

COL

A08

GRID OFFSET

2890 COL CL CL COL

4800

20690 CL COL

11

A08

HOT PLATE & UNDERBENCH OVEN

HWS

02 S

A/C

CL COL

A06

BC1

EXIST. BEAM

EX

DP

10 DEG. SLOPE

W

S

09 S

AC-1

EXPOSED TIMBER ROOF TRUSS

TRUSS AT HIGH LEVEL

HOT PLATE & UNDERBENCH OVEN

A05

200

05

A08

RANGEHOOD OVER

A

4800

55 HIGHLIGHT WINDOW

2006 4800

5730

W

01

S

10

DP

W

A08

FB

A06

08

RAINWATER TANK SHOWN DOTTED BELOW

UNDERSIDE EXIST. METAL ROOF SHEETING & PURLINS

10 DEG. SLOPE

2015

03

VINYL

TALL CUPBAORD

SLOPING

COL

HALF GLAZED TIMBER BI-FOLDING DOOR

STEAM CENTRE

03

EXIST. UPPER METAL COVERED WALKWAY ROOF

RAINWATER TANK SHOWN DOTTED BELOW

NEW GUTTER & FALL

10 DEG. SLOPE 175

01

1810

A08

05

HW

HW

UNDERSIDE EXIST. METAL ROOF SHEETING & PURLINS TO UPPER COVERED WALKWAY ROOF

NEW UPVC DOWNPIPE & OVERFLOW -PAINT FINISH

DEMOLISH PART OF EXIST. COVERED WALKWAY ROOF

PL-1

470

D 01

04

06

COVERED OUTDOOR LEARNING

A06

590

CONCRETE

230

DP

250

EXIST. COL

COVERED OUTDOOR LEARNING 03

A06

A05

GU1

LINE OF ROOF OVER

02

B

3540

ISLAND PREP. BENCH

LINE OF EAVES OVER

2630

TR

3715

880

01

A06

A05

CL COL

1500

LINE OF EXIST. COVERED WALKWAY ROOF BELOW

CONCRETE

600

1:8 THRESHOLD RAMP

250

RF1

EXIST. ROOF

CL COL

230

C

LEGEND - ceiling materials & finishes

EXIST. BUILDING

EXIST. EXIST. BUILDING BUILDING

2015

COL CL

10490

350

BRICKWORK

GRIDS

200

NEW COVERED WAY OVER

OVERALL

EXIST. BUILDING

AIR CONDITION UNIT ABOVE FLOOR LEVEL BRICK CERAMIC TILE DISTRIBUTION BOARD DOWN PIPE FLOOR BOX FIRE EXTINGUISHER FINISHED FLOOR LEVEL FIRE HOSE REEL FRIDGE FLOOR WASTE HOT WATER UNIT LAMINATE FINISH PUBLIC ADDRESS SPEAKER PLASTERBOARD PAINT COLOUR PLYWOOD PANELING PINBOARD RACK UNIT CABINET SINK SOAP DISPENSER TIMBER SKIRTING TROUGH TIMBER FINISH VINYL VILLABOARD

A

CONSULTANTS ISSUE

FR

17.02.17

B

COST PLAN D _QS ISSUE

FM

10.03.17

C

CONTRACT DOCUMENTATION ISSUE

FM

24.03.17

D

TENDER ISSUE

FM

20.04.17

E

CONSTRUCTION ISSUE

FM

06.06.17 02.08.17

F

CIVIL REVISIONS

JB

G

AMEND DIMENSION

FM

29.08.17

H

REPLACE PROPOSED WINDOW W07 WITH DOOR D04

FR

11.10.17

I

AS BUILT

FM

22.01.18

2 DEG FALL RF1

NEW BEAM

REMOVE & MODIFY EXIST. GUTTER COMPLETE WITH STOP END

4

ROOF PLAN

STEAM BUILDING 1:100 MINX ARCHITECTURE PTY LTD 7A / 91 MORELAND STREET, FOOTSCRAY, VIC. 3011 PHONE: (03) 9646 7000 E-MAIL: info@minxarchitecture.com.au WEB: www.minxarchitecture.com.au

FINISHES SCHEDULE LIGHT

BLANK-OFF EXIST. FLOOR GRILLE REFER MECHANICAL DRGS

UNDERSIDE EXIST. METAL ROOF SHEETING & PURLINS TO UPPER COVERED WALKWAY ROOF

MEETING ROOM NEW WALL MOUNTED A/C UNIT. REFER MECHANICAL DRGS

NEW BEAM

DP

EXIST. BEAM

FLOOR PLAN

ADMINISTRATION MEETING ROOM 1:100

3

CUSTOM-ORB PROFILED STEEL SHEET. COLORBOND FINISH SHADOWCLAD NATURAL TEXTURE PLYWOOD CLADDING. PAINT FINISH

TM1

TEXTURED TIMBER CLADDING

DP & SPREADER

100 x 75mm DP

FALL ARREST ANCHOR POINT STATIC LINE SYSTEM

LADDER SUPPORT BRACKET

REFLECTED CEILING PLAN

COVERED WALKWAY 1:100

FACE BRICKWORK - AUSTRAL BRICK GREY

PL1

ANCHOR POINT STROP

EXIST. SPORTS STORE EXIST. MODIFIED GUTTER

6

BK1 MS1

NEW

BC1

EXIST. SPORTS STORE ROOF

NO ACCESS AREA

BC1

EXIST. GUTTER CUT TO NEW LENGTH WITH NEW STOP END & RE-INSTALLED

5

ROOF PLAN

EXIST. UPPER METAL COVERED WALKWAY ROOF

St Dominics Primary School S.T.E.A.M Building 408 Camp Road Broadmeadows VIC 3047 PROPOSED PLANS

COVERED WALKWAY 1:100 FM

1:100

1611-A03

JAN 18

I 22.01.18


FINISHES SCHEDULE BK1

FACE BRICKWORK - AUSTRAL BRICK GREY

MS1

CUSTOM-ORB PROFILED STEEL SHEET. COLORBOND FINISH

PL1 TM1

SHADOWCLAD NATURAL TEXTURE PLYWOOD CLADDING. PAINT FINISH TEXTURED TIMBER CLADDING FALL ARREST ANCHOR POINT STATIC LINE SYSTEM

LINE OF EXISTING GYMNASIUM BUILDING SHOWN DOTTED

ANCHOR POINT STROP LADDER SUPPORT BRACKET NO ACCESS AREA

NEW STEEL COVERED WAY BEYOND NEW STEEL COVERED WAY EXIST. BRICK VENEER BUILDING

ALUMINIUM FIXED HIGHLIGHT WINDOW

COLORBOND METAL BARGE CAPPING

EXPOSED TIMBER TRUSS TOP CHORD REFER ENGINEERS DRGS

240 x 30mm H3 TREATED PINE BARGE BOARD

LINE OF EXISTING SPORTS STORE BUILDING SHOWN DOTTED

240 x 30mm H3 TREATED PINE BARGE BOARD

NEW COLORBOND APRON FLASHING INFILL TO EXPOSED BUILDING END

COLORBOND METAL BARGE CAPPING

HALF ROUND COLORBOND GUTTER

EXIST. STEEL COVERED WAY SHOWN HATCHED

HALF ROUND COLORBOND GUTTER

HW

01 SELECTED FACE BRICKWORK

EXIST. STEEL COVERED WAY

/ / / /

BK1

04

/

/

/

01

/

/

SLAB LEVEL RL 122.020

/

/

/

/

/

/

/

/

/

/

/

/

SLAB LEVEL RL 122.020

D

NEW GALV. STEEL POST

EXIST. METAL BOUNDARY FENCE

2100

/ /

/

/

/

4190

/ /

/

3045

/ /

/

BK1

/

BK1

NEW COVERED WALKWAY

D

/

/

DIRECTION OF BI-FOLDIING DOORS

/

/

EXIST. CONCRETE PAVING

TIMBER GLAZED BI-FOLDING DOORS SELECTED FACE BRICKWORK

NEW CONCRETE PAVING

3

NORTH ELEVATION

1

SCALE 1:100

NAT. ANODISED ALUMINIUM WINDOW FRAME & AUTO LOUVRE SYSTEM

NAT. ANODISED ALUMINIUM WINDOW FRAME & AUTO LOUVRE SYSTEM

COLORBOND CUSTOM ORB ROOF SHEETING

HALF ROUND COLORBOND GUTTER

HALF ROUND COLORBOND GUTTER

NEW STEEL COVERED WAY

DP & SPREADER

2420

W 06 EXIST. GALV. STEEL POST

EXPANSION JOINT

EXIST. SINGLE STOREY BRICK VENEER BUILDING IN FOREGROUND

EXIST. BRICK VENEER BUILDING

LIGHT

BK1

02

EXISTING ROLLER SHUTTER

2

LIGHT

D

EXISTING SPORTS STORE BUILDING

SLAB LEVEL RL 122.020

SCALE 1:100

DP & SPREADER

LIGHT

EXISTING GYMNASIUM BUILDING

SOUTH ELEVATION

BK1

W

EXPANSION JOINT

W

05

04

NEW GALV. STEEL POST & DP

W

W

03

02

SELECTED FACE BRICKWORK

NEW GALV. STEE POST

EXPANSION JOINT

CLAY TROUGH WITH SUPPORT LEGS. REFER TO SPEC

EXIST. GALV. STEEL POST

NEW GALV. STEEL POST & DP

EXIST. GALV. STEEL POST

EXIST. GALV. STEEL POST

EXIST. GALV. STEEL POSTS

EXIST. GALV. STEEL POST

EAST ELEVATION SCALE 1:100

EXIST. RELOCATED POLY RAINWATER TANK NEW PVC DOWNPIPE & OVERFLOW -PAINT FINISH

NEW ZINCALUME GUTTER

COLORBOND CUSTOM ORB ROOF SHEETING

NEW ZINCALUME METAL ROOF SHEETING TO MATCH EXIST. PROFILE

EXIST. BRICK VENEER BUILDING

HALF ROUND COLORBOND GUTTER

INSTANTANEOUS HWU

HW

EXIST. GALV. STEEL POST

NEW TIMBER FRAMED BLADE COLUMN SHEETED WITH FIBRE CEMENT SHEET

NEW CONCRETE BASE

EXIST. GALV. STEEL POST

EXIST. GALV. STEEL POST

HW 02

BK1 1200

DP

EXIST. GALV. STEEL POST

WEST ELEVATION

03 2400

BK1

EXIST. GALV. STEEL POSTS

SLAB LEVEL RL 122.020

NEW ZINCALUME APRON / BARGE CAPPING

A

ISSUED FOR TOWN PLANNING

FR

01.09.16

B

AMENDED DRAWINGS FOR TOWN PLANNING PERMIT

JB

06.12.16

C

CONSULTANTS ISSUE

FR

17.02.17

D

COST PLAN D _QS ISSUE

FM

10.03.17

E

CONTRACT DOCUMENTATION ISSUE

FM

24.03.17

F

TENDER ISSUE

FM

20.04.17

G

CONSTRUCTION ISSUE

FM

06.06.17

H

DOWNPIPE REVISIONS

JB

J

02.08.17

AMEND HW02 & 03 SILL DIM

FM

29.08.17

K

REPLACE PROPOSED WINDOW W07 WITH DOOR D04

FR

11.10.17

L

AS BUILT

FM

22.01.18

MINX ARCHITECTURE PTY LTD 7A / 91 MORELAND STREET, FOOTSCRAY, VIC. 3011 PHONE: (03) 9646 7000 E-MAIL: info@minxarchitecture.com.au WEB: www.minxarchitecture.com.au

EXIST. STEEL COVERED WAY

EXIST. BRICK VENEER BUILDING

CONTRACTORS MUST VERIFY ALL DIMENSIONS ON SITE PRIOR TO COMMENCING WORKS ON SITE. ALL SHOP DRAWINGS MUST BE SUBMITTED FOR APPROVAL BY THE ARCHITECT BEFORE MANUFACTURE PROCEEDS.

01

NEW GALV. STEEL POST

BRICK ON EDGE WINDOW SILL

EXIST. SINGLE STOREY BRICK VENEER BUILDING BEYOND

4

EXIST. BRICK VENEER BUILDING

EXIST. STEEL COVERED WAY

W

GAS ISOLATION VALVE CABINET

EXPANSION JOINT

W 08

EXPANSION JOINT NEW 3000 x 450 x 1800h CHAINWIRE MESH ENCLOSURE & GATES.

DP

EXISTING SPORTS STORE BUILDING AIRCONDITIONING CONDENSORS

EXPANSION JOINT SELECTED FACE BRICKWORK BRICK ON EDGE WINDOW SILL NAT. ANODISED ALUMINIUM WINDOW FRAME & AUTO LOUVRE SYSTEM

NEW CONCRETE BASE

EXISTING GYMNASIUM BUILDING

St Dominics Primary School S.T.E.A.M Building 408 Camp Road Broadmeadows VIC 3047

SCALE 1:100

PROPOSED ELEVATIONS

FM

1:100

1611- A04

JAN 18

L 22.01.18


COLORBOND RIDGE CAPPING

COLORBOND RIDGE CAPPING

03

A07 10 DEGREE

270

10 DEGREE

L ROOF FAL

A07

ROOF FAL

270

L

COLORBOND CUSTOM ORB ROOF SHEETING ON METAL PURLINS & SAFETY MESH

HALF ROUND COLORBOND GUTTER

HALF ROUND COLORBOND GUTTER

W

W

08

/ /

/

03

/

/

/

/

/

/

/

/

/

/

/

/

/

/

/

/

/

/

/

/

/

/

/

/

/

/

/

NAT. ANODISED ALUMINIUM WINDOW FRAME & AUTO LOUVRE SYSTEM

NEW COVERED WAY

/

/

NAT. ANODISED ALUMINIUM WINDOW FRAME & AUTO LOUVRE SYSTEM

/

/

/

/

/

/

/

/

/

/

/

/

/

/

/

EXIST. METAL BOUNDARY FENCE

SELECTED FACE BRICKWORK

/

/

/

/

2400

C200 METAL FASCIA PURLIN STEEL LINTEL REFER ENGINEERS DRGS

TEXTURED TIMBER CLADDING

STATIC LINE SYSTEM ANCHOR POINT STROP LADDER SUPPORT BRACKET

SPRINING HEIGHT - COVERED WAY BEAM

HW

/

/

/

/

/

2 DEGREE ROOF FALL

2400

/ / / / /

/

/

EXPOSED TIMBER TRUSS TOP CHORD REFER ENGINEERS DRGS

SHADOWCLAD NATURAL TEXTURE PLYWOOD CLADDING. PAINT FINISH

FALL ARREST ANCHOR POINT

NO ACCESS AREA

NEW COVERED WAY

EXIST. COVERED WAY

/

/

3085

SPRINING HEIGHT - TRUSS TOP CHORD 2060

UNDERSIDE TRUSS BOTTOM CHORD

/

/

/

/

CUSTOM-ORB PROFILED STEEL SHEET. COLORBOND FINISH

EXIST ROOF FALL

03 /

FACE BRICKWORK - AUSTRAL BRICK GREY

TM1

SPRINING HEIGHT - COVERED WAY BEAM

190 x 30mm H3 TREATED PINE FASCIA BOARD

BK1 MS1 PL1

2120

190mm HIGH TIMBER ROOF PURLINS REFER ENGINEERS DRGS

FINISHES SCHEDULE

2

UNDERSIDE EXIST.COVERED WAY FASCIA HEIGHT - APPROX.

COLORBOND CUSTOM ORB ROOF SHEETING ON SAKING, ROOF BLANKET & SAFETY MESH

/

/

/

/

CONCRETE SLAB ON MOISTURE BARRIER & SAND BED REFER ENGINEERS DRGS

SECTION A

1

CONCRETE SLAB ON MOISTURE BARRIER & SAND BED REFER ENGINEERS DRGS

CONCRETE PAD REFER ENGINEERS DRGS

04

3

A07

SCALE 1:50

SECTION C SCALE 1:50

COLORBOND RIDGE CAPPING

1

2

A07

A07

10 DEGREE

10 DEGREE

L

ROOF FAL

ROOF FAL

300

L

HW

2400

SPRINING HEIGHT - COVERED WAY BEAM

01

DIRECTION OF BI-FOLDIING DOORS

NEW COVERED WAY

D

EXIST. COVERED WAY

01

CONCRETE SLAB ON MOISTURE BARRIER & SAND BED REFER ENGINEERS DRGS

2

CONCRETE PAD REFER ENGINEERS DRGS

SECTION B SCALE 1:50

9

CONTRACTORS MUST VERIFY ALL DIMENSIONS ON SITE PRIOR TO COMMENCING WORKS ON SITE. ALL SHOP DRAWINGS MUST BE SUBMITTED FOR APPROVAL BY THE ARCHITECT BEFORE MANUFACTURE PROCEEDS.

A07

HW

02 08

6

8

A07

EXIST. SPORTS STORE

A07

BK1 EXIST. COVERED WAY

7

A07

EXIST. GALV. STEEL POST

SECTION D

01.09.16

JB

06.12.16 17.02.17

C

CONSULTANTS ISSUE

FR

D

CONSULTANTS ISSUE

FM

22.02.17

E

COST PLAN D _QS ISSUE

FM

10.03.17

F

CONTRACT DOCUMENTATION ISSUE

FM

24.03.17

G

TENDER ISSUE

FM

20.04.17

H

CONSTRUCTION ISSUE

FM

06.06.17

I

AS BUILT

FM

22.01.18

A07

SCALE 1:50

NAT. ANODISED ALUMINIUM WINDOW FRAME & AUTO LOUVRE SYSTEM

10

A07

MINX ARCHITECTURE PTY LTD NEW STEEL COVERED WAY

HALF ROUND COLORBOND GUTTER

11

A07 DP & SPREADER

DP & SPREADER

LIGHT

LIGHT

D 02

EXIST. COVERED WAY

FR

AMENDED DRAWINGS FOR TOWN PLANNING PERMIT

5

COLORBOND CUSTOM ORB ROOF SHEETING

EXIST. GYMNASIUM

ISSUED FOR TOWN PLANNING

03 W

4

A B HW

EXISTING ROLLER SHUTTER

W

W

06

05 EXPANSION JOINT

7A / 91 MORELAND STREET, FOOTSCRAY, VIC. 3011 PHONE: (03) 9646 7000 E-MAIL: info@minxarchitecture.com.au WEB: www.minxarchitecture.com.au

St Dominics Primary School S.T.E.A.M Building 408 Camp Road Broadmeadows VIC 3047

LIGHT

BK1

BK1

NEW COVERED WAY

W 04 EXPANSION JOINT

W

W

03

02

W

PROPOSED SECTIONS

01 EXPANSION JOINT

SELECTED FACE BRICKWORK

5

SECTION E SCALE 1:50

BRICK ON EDGE WINDOW SILL

FR

1:50

1611-A05

JAN 18

I 22.01.18


06

07

A09

352

CL RANGE HOOD & HOTPLATE

CL BOWL

WT1

CL HOTPLATE

2100

3000 926

600

702

PB WALL LINING PAINT FINISH PC1

900

1500

CL SINK

100

C L SINK

EQ

COVED VN1

LC3

LC3

PB PC1

GPO 2044

EQ

300

BOWLCL 283

CL BOWL CL BOWL

CL RANGE HOOD & HOTPLATE

SS LAB BOWL & TAPWARE REFER TO SPEC

W 01

32

PB PC1

E AC SP EE KN COVED VN1

590

LC2

1810

EQ 2044

SS LAB BOWL & TAPWARE REFER TO SPEC

W 02

590

EQ

400

℄ 863

1200

400

SS LAB BOWL & TAPWARE REFER TO SPEC

W

E AC SP EE KN COVED VN1

LC3

1810

NEW DIST BOARD

W

D

W

W

04

02

05

06

PB WALL LINING PAINT FINISH PC1

LC3

GPO

PB WALL LINING PAINT FINISH PC1 COVED VN1

TIMBER SKIRTING PC2

GPO DATA GPO

590 EQ

400

1200

RU CABINET 600 x 600

LOCATION OF BIFOLD DOORS WHEN STACKED

03

ACU AFL DB DP DW FB FE FFL FHR FR FW HWU LC PA PB PC PL PN# RU S SD SK TR VN VB WL WT

PB WALL LINING PAINT FINISH PC1

LINE OF TRUSS OVER DOOR

WT1

942

2544

450

--

ACU LINE OF TRUSS OVER

WT1

RANGE HOOD & HOTPLATE CL CL BOWL

01

ACU

WL

PB WALL LINING PAINT FINISH PC1

320

300

282 CL SINK

880

4324

LEGEND

A09

EQ

1200

863

32

AIR CONDITION UNIT ABOVE FLOOR LEVEL DISTRIBUTION BOARD DOWN PIPE DISHWASHER FLOOR BOX FIRE EXTINGUISHER FINISHED FLOOR LEVEL FIRE HOSE REEL FRIDGE FLOOR WASTE HOT WATER UNIT LAMINATE FINISH PUBLIC ADDRESS SPEAKER PLASTERBOARD PAINT COLOUR PLYWOOD PANELING PINBOARD RACK UNIT CABINET SINK SOAP DISPENSER TIMBER SKIRTING TROUGH VINYL VILLABOARD WIRELESS LAN - REFER TO ELEC WALL TILE

3064

FOOD TECH BENCH

STEAM CENTRE/CLASSROOM

02

PLAN

EAST ELEVATION

--

16

15

04

A09

A09

05

A09

01

A09

02

A09

1800 EQ

16

A09

A09

2400

EQ

EQ

EQ

EQ

845

EQ

EQ

845 250 250

ACU

SS RANGEHOOD AND DUCT REFER TO SPEC.

HW

LC3

LC4

WT1

GAS EMERGENCY STOP BUTTON

600 LC2

W 08

LC2

LC2

LC2

300

LC4

GPO

01

600

800

FR REFER TO SPEC

LOUVRE CONTROL PANEL INSTALLED TO CPD. REFER DWG E3

2100

3000

2060

3000

3880

PA

GPO

GPOGPO

PASS DOOR

DIRECTION OF BI-FOLDIING DOORS

CLOCK

300

PB PC1 2100H CUPBOARDS

GPO

GPO

BENCHTOP LC1

300

02

GPO

3000

PB WALL LINING PAINT FINISH PC1

ACU

HW

01

2100

PB WALL LINING PAINT FINISH PC1

HW

D TIMBER SKIRTING PC2

PN2

PN1

PN2

PN1

500 18

1000

500 1000

PN2

PN1

500

NORTH ELEVATION

--

PN1

500

500 1000

PN2

PN1

500

PN2

LC3

LC2

LC2

LC2

600

700

450

955

600

760

2165

900 LC2

LC2

LC2

COVED VN1

500 1000

5700

STEAM CENTRE

03

PN2

500 1000

GPO

OVEN AND COOKTOP

LC2

LC2

LC2 LC2

LC3

LC2

LC2

LC3

100

100

01

LC3

COVED VN1 760

760

600

450

795

600

600

2765

600

1800

STEAM CENTRE/CLASSROOM

04

CONTRACTORS MUST VERIFY ALL DIMENSIONS ON SITE PRIOR TO COMMENCING WORKS ON SITE. ALL SHOP DRAWINGS MUST BE SUBMITTED FOR APPROVAL BY THE ARCHITECT BEFORE MANUFACTURE PROCEEDS.

WEST ELEVATION

--

TIMBER TRUSS WITH PAINT FINISH AS SPECIFIED ALL EXPOSED STEEL PLATE CONNECTIONS AND BOLTS TO HAVE PAINT FINISH AS SPECIFIED

140

SEE SECTION A-A

BK1

04

2060

2999

3880

DIRECTION OF BI-FOLDIING DOORS

03

TIMBER BIFOLDIING DOOR WITH PINBOARD FINISH TO LOWER SECTION (REFER SPEC)

900 100

2000

D

PASS DOOR

D 04

PNB3

GLAZING TO DOORS (REFER SPEC)

ISSUED FOR TOWN PLANNING

FR

AMENDED DRAWINGS FOR TOWN PLANNING PERMIT

JB

06.12.16

C

COST PLAN D _QS ISSUE

FM

10.03.17

D

CONTRACT DOCUMENTATION ISSUE

JB

24.03.17

E

TENDER ISSUE

JB

20.04.17

F

CONSTRUCTION ISSUE

FM

06.06.17

G

RAISE HEIGHT OF WINDOW HW01 & 02 FM

29.08.17

H

REPLACE PROPOSED WINDOW W07 WITH DOOR D04

FR

11.10.17

I

AS BUILT

FM

22.01.18

2400

900

700

GPO

300

PA

1200

2100

3000

3880 2100

CLOCK

DIRECTION OF BI-FOLDIING DOORS

3795

--

WLAN

WHITEBOARD 2400 X 1200

PNB3

SS CLAY TROUGH ON SS SUPPORTS - REFER TO SPEC.

05

500 HW

300

GPO DATA GPO

PNB3

GPO DATA GPO

PNB3

PNB3

PN4

PNB3

PNB3

PN3

PNB3

PNB3

PNB3

PNB3

01.09.16

TIMBER SKIRTING PC2

314

COVERED OUTDOOR LEARNING

06

WEST ELEVATION

--

CLASSROOM

07

SOUTH ELEVATION

--

STEAM CENTRE/CLASSROOM NORTH ELEVATION

MINX ARCHITECTURE PTY LTD

GPO

4324 460

920

900

880

600

460 32

1500

920

BENCHTOP LC1 LC1 VERTICAL RETURN TO SIDES OF ISLAND BENCH

600

1500

880

FM

4324

08 --

STEAM CENTRE PLAN - LAB BENCH

09 --

PROPOSED INTERNAL ELEVATIONS

OVEN REFER TO SPEC

295 32

SIDE RETURNS LC1

800

600 GPO

St Dominics Primary School S.T.E.A.M Building 408 Camp Road Broadmeadows VIC 3047

900

900 100

LC2

BENCHTOP LC1 LC2

900

600

2400

100

2398

SS RANGEHOOD REFER TO SPEC.

LC1 VERTICAL RETURN TO SIDES OF ISLAND BENCH

900

268

600

COVED VN1

297

GPO LC2

LC2

SS RANGEHOOD REFER TO SPEC.

BENCHTOP LC1

DW GPO

SS EXTENSION DUCT INSTALLED TO MANUFACTURERS INSTRUCTIONS

100

HOTPLATES WITH RANGEHOOD OVER REFER TO SPEC.

BENCHTOP LC1 AND RETURNS

SS EXTENSION DUCT INSTALLED TO MANUFACTURERS INSTRUCTIONS

800

800

A09

600

SS SINK & TAPWARE REFER TO SPEC

A09

600

A09

7A / 91 MORELAND STREET, FOOTSCRAY, VIC. 3011 PHONE: (03) 9646 7000 E-MAIL: info@minxarchitecture.com.au WEB: www.minxarchitecture.com.au

14

900

A09

13

800

A09

12

900

11

100

10

600

3000

500

2HR FIRE RATED PB WALL LINING PAINT FINISH PC1

A B

FOOD TECH DEMO BENCH EAST ELEVATION

10 --

FOOD TECH DEMO BENCH SOUTH ELEVATION

11 --

FOOD TECH DEMO BENCH WEST ELEVATION

12 --

FOOD TECH DEMO BENCH NORTH ELEVATION

1:50

1611-A08

JAN 18

I 22.01.18


350

SS SHELF PINS IN PRE-DRILLED HOLES AS SPECIFIED

50

VARIES

AS PER INT ELEVATOIN

30

20

900

770

100

100

SCALE 1:20

615

900

18MM WRMDF CARCASS, DOORS TO UNDERBENCH CUPBOARD. EXPOSED SURFACES TO HAVE SELECTED LAMINATE FINISH. MELAMINE FINISH TO INTERNAL CABINET AREAS. 2MM HEAVY DUTY PVC EDGE STRIP TO ALL VISIBLE EDGES COLOUR TO MATCH LAMINATE.

ADJ.

ADJ.

1 NO 18MM ADJUSTABLE SHELF TO EACH CUPBOARD. SELECTED FINISH.

TOE RECESS WITH SPECIFIED LAMINATE OR COVED VINYL.

50

GPO REFER TO ELECTRICAL DWGS

TOE RECESS WITH SPECIFIED LAMINATE OR COVED VINYL.

100

100

20

30 20

18MM WRMDF CARCASS, DOORS TO UNDERBENCH CUPBOARD. EXPOSED SURFACES TO HAVE SELECTED LAMINATE FINISH. MELAMINE FINISH TO INTERNAL CABINET AREAS. 2MM HEAVY DUTY PVC EDGE STRIP TO ALL VISIBLE EDGES COLOUR TO MATCH LAMINATE. 1 NO 18MM ADJUSTABLE SHELF TO EACH CUPBOARD. SELECTED FINISH.

100

CABLE MANAGEMENT OUTLET. HAFELE 631.364.001 50MM STAINLESS STEEL

30

C L SINK

50

900

SS SINK AS SPECIFIED

32MM BENCHTOP WRMDF CONSTRUCTION. REF SPECIFICATION FOR FINISH.

750

30 DIS

750

AS

HE

R

GPO REFER TO ELECTRICAL DWGS

HW

DISHWASHER AS SPECIFIED.

880

300

32MM BENCHTOP WRMDF CONSTRUCTION. REF SPECIFICATION FOR FINISH.

20

30 770

--

615 CABLE MANAGEMENT OUTLET. HAFELE 631.364.001 50MM STAINLESS STEEL

CUPBOARDS BEYOND SELECTED LAMINATE FINISH.

600

BENCH WITH CUPBOARDS UNDER

880

615

32MM BENCHTOP WRMDF CONSTRUCTION. REF SPECIFICATION FOR FINISH.

06

SCALE 1:20

880

20

770

OV E

--

SCALE 1:20

BENCH WITH UNDERBENCH OVEN, COOKTOP & RANGEHOOD, DUCT TO ROOF

750

--

600

05

SINK IN BENCH WITH UBC & OBS (RECESSED LIGHTING)

32MM BENCHTOP WRMDF CONSTRUCTION. REF SPECIFICATION FOR FINISH.

FFL

50

100

04

BENCH WITH 4 DRAWERS UNDER & OBC (RECESSED LIGHTING)

FINISH TO WALLS AS PER INT. ELEVATIONS AND SPEC.

SPACE FOR EQUIPMENT, ELECTRICAL GOODS OR OPEN KNEE SPACE

TOE RECESS. SELECTED LAMINATE OR COVED VINYL

600 600

SCALE 1:20

18MM WRMDF CARCASS. EXPOSED SURFACES TO HAVE SELECTED LAMINATE FINISH. 2MM HEAVY DUTY ABS EDGE STRIP TO ALL VISIBLE EDGES COLOUR TO MATCH LAMINATE.

800 30

2100 30

CUPBOARDS END PANLEL BEYOND SELECTED LAMINATE FINISH.

900

--

SCALE 1:20

CL SINK

18MM WRMDF CARCASS. EXPOSED SURFACES TO HAVE SELECTED LAMINATE FINISH. MELAMINE FINISH TO INTERNAL CABINET AREAS.

50

600

02

270 SS SINK AS SPECIFIED 32MM BENCHTOP WRMDF CONSTRUCTION. REF SPECIFICATION FOR FINISH.

BUILT IN ELECTRIC OVEN AS SPECIFIED

375 50

BENCH WITH UBC & OBC (RECESSED LIGHTING)

32MM BENCHTOP WRMDF CONSTRUCTION. REF SPECIFICATION FOR FINISH.

EQ CL COOKTOP

100

TOE RECESS. SELECTED LAMINATE OR COVED VINYL

100

TOE RECESS. SELECTED LAMINATE OR COVED VINYL

FINISH TO WALLS AS PER INT. ELEVATIONS AND SPEC.

EQ GAS COOKTOP AS SPECIFIED

395

18MM WRMDF CARCASS. EXPOSED SURFACES TO HAVE SELECTED LAMINATE FINISH. 2MM HEAVY DUTY ABS EDGE STRIP TO ALL VISIBLE EDGES COLOUR TO MATCH LAMINATE.

20

2100 20

CL SINK

600

EQ

32MM BENCHTOP WRMDF CONSTRUCTION. REF SPECIFICATION FOR FINISH.

30

2100 770

18MM WRMDF CARCASS. EXPOSED SURFACES TO HAVE SELECTED LAMINATE FINISH. MELAMINE FINISH TO INTERNAL CABINET AND DRAWER AREAS.

100

EQ

SS SINK AS SPECIFIED

600

--

600

FINISH TO WALLS AS PER INT. ELEVATIONS AND SPEC.

32MM BENCHTOP WRMDF CONSTRUCTION. REF SPECIFICATION FOR FINISH.

50

01

FINISH TO WALLS AS PER INTERNAL ELEVATIONS AND SPEC.

RECESSED LIGHTING TRACK. REF SPEC

30

20

TOE RECESS. SELECTED LAMINATE OR COVED VINYL

ADJ.

N

FINISH TO WALLS AS PER INT. ELEVATIONS AND SPEC.

1 NO 18MM ADJUSTABLE SHELF TO EACH CUPBOARD. SELECTED FINISH.

18MM WRMDF CARCASS TO O/H SHELVING. EXPOSED SURFACES TO HAVE SELECTED LAMINATE FINISH.

20

RECESSED LIGHTING TRACK. REF SPEC

FINISH TO WALLS AS PER INT. ELEVATIONS AND SPEC.

600

RECESSED LIGHTING TRACK. REF SPEC

ADJ.

DUCT TO RUN UP FROM RANGEHOOD TO 2100 AFFL, EXHAUST DUCT TO RUN HORIZONTAL THROUGH EXTERNAL WALL STAINLESS STEEL FLUE TO EXTEND TO CEILING LEVEL ( 3045mm APPROX. )

RANGEHOOD AS SPECIFIED.

SS DOOR PULL HANDLES AS SPECIFIED

18MM WRMDF CARCASS. EXPOSED SURFACES TO HAVE SELECTED LAMINATE FINISH. MELAMINE FINISH TO INTERNAL CABINET AREAS.

50

SS SHELF PINS IN PRE-DRILLED HOLES AS SPECIFIED

SS DOOR PULL HANDLES AS SPECIFIED

32MM BENCHTOP WRMDF CONSTRUCTION. REF SPECIFICATION FOR FINISH.

FFL

ADJ.

18MM WRMDF CARCASS TO O/H CUPBOARDS. EXPOSED SURFACES TO HAVE SELECTED LAMINATE FINISH.

600

ADJ.

18MM WRMDF CARCASS TO O/H CUPBOARDS. EXPOSED SURFACES TO HAVE SELECTED LAMINATE FINISH.

300

770

SS SHELF PINS IN PRE-DRILLED HOLES AS SPECIFIED

350

600

350

50

07

BENCH WITH OPENING UNDER

10

FOOD TECH DEMO BENCH

11

FOOD TECH DEMO BENCH

--

SCALE 1:20

--

SCALE 1:20

--

SCALE 1:20

12 --

FOOD TECH DEMO BENCH SCALE 1:20 CONTRACTORS MUST VERIFY ALL DIMENSIONS ON SITE PRIOR TO COMMENCING WORKS ON SITE. ALL SHOP DRAWINGS MUST BE SUBMITTED FOR APPROVAL BY THE ARCHITECT BEFORE MANUFACTURE PROCEEDS.

320 C L RANGEHOOD ADJ.

880

880 18MM WRMDF CARCASS. EXPOSED SURFACES TO HAVE SELECTED LAMINATE FINISH.

32MM BENCHTOP WRMDF CONSTRUCTION. REF SPECIFICATION FOR FINISH.

TENDER ISSUE

FM

20.04.17

E

CONSTRUCTION ISSUE

FM

06.06.17

F

AS BUILT

FM

22.01.18

2100

2100 ADJ.

ADJ. PINBOARD FIXED TO FACE OF DOOR. REFER INT. ELEVATIONS & SPECIFICATION FOR TYPE

975

PINBOARD FIXED TO FACE OF DOOR. REFER INT. ELEVATIONS & SPECIFICATION FOR TYPE

900

24.03.17

D

SS D HANDLES AS SPECIFIED.

ADJ.

750

750

ELECTRIC OVEN AS SPECIFIED

900

OV

EN

18MM WRMDF CARCASS, DOORS TO UNDERBENCH CUPBOARD. EXPOSED SURFACES TO HAVE SELECTED LAMINATE FINISH. MELAMINE FINISH TO INTERNAL CABINET AREAS. 2MM HEAVY DUTY PVC EDGE STRIP TO ALL VISIBLE EDGES COLOUR TO MATCH LAMINATE.

10.03.17

FM

FIX

SS D HANDLES AS SPECIFIED.

20

20

30

32MM BENCHTOP WRMDF CONSTRUCTION. REF SPECIFICATION FOR FINISH.

17.02.17

FM

CONTRACT DOCUMENTATION ISSUE

18MM WRMDF CARCASS. EXPOSED SURFACES TO HAVE SELECTED LAMINATE FINISH. FIX

30

C L COOKTOP

FR

COST PLAN D _QS ISSUE

ADJ.

975

320

ADJ.

615

800

615

GAS COOKTOP AS SPECIFIED

ADJ.

4 NO. 18MM WRMDF ADJUSTABLE SHELVES. FINISH AS SPECIFIED.

975

4 NO. 18MM WRMDF ADJUSTABLE SHELVES. FINISH AS SPECIFIED.

CONSULTANTS ISSUE

B

975

RANGEHOOD AS SPECIFIED

A C

ADJ.

SS SHELF PINS IN PRE-DRILLED HOLES AS SPECIFIED

SS SHELF PINS IN PRE-DRILLED HOLES AS SPECIFIED

TOE RECESS. SELECTED LAMINATE OR COVED VINYL

TOE RECESS. SELECTED LAMINATE OR COVED VINYL

50

50

50

50 600

13 --

14

FOOD TECH DEMO BENCH WITH UNDERBENCH OVEN, COOKTOP & RANGEHOOD, DUCT TO ROOF

--

SCALE 1:20

15

FOOD TECH DEMO BENCH WITH 4 DRAWERS UNDER

--

SCALE 1:20

7A / 91 MORELAND STREET, FOOTSCRAY, VIC. 3011 PHONE: (03) 9646 7000 E-MAIL: info@minxarchitecture.com.au WEB: www.minxarchitecture.com.au

100

100

TOE RECESS WITH SPECIFIED LAMINATE OR COVED VINYL.

100

TOE RECESS WITH SPECIFIED LAMINATE OR COVED VINYL.

100

MINX ARCHITECTURE PTY LTD

FULL HEIGHT CUPBOARD WITH PINBOARD FACING ON DOOR SCALE 1:20

600

16 --

FULL HEIGHT CUPBOARD WITH LAMINATE FACING ON DOOR SCALE 1:20

VARIES

50

50

30

20MM SHADOW LINE. SELECT LAMINATE FINISH

30

20

TOE RECESS. SELECTED COVED VINYL

10MM THICK PINBOARD AS SPECIFIED. FIXED TO 18MM MDF DOORS, AS PER MANUFACTURES STANDARDS

100

TOE RECESS. SELECTED LAMINATE

18MM WRMDF CARCASS. EXPOSED SURFACES TO HAVE SELECTED LAMINATE FINISH.

32MM WRMDF CARCASS. EXPOSED SURFACES TO HAVE SELECTED LAMINATE FINISH.

18MM WRMDF CARCASS. EXPOSED SURFACES TO HAVE SELECTED LAMINATE FINISH. 20

18MM WRMDF CARCASS. EXPOSED SURFACES TO HAVE SELECTED LAMINATE FINISH.

100

FFL

SELECTED PINBOARD. REFER INT. ELEVATIONS & SPECIFICATION

MOISTURE PROTECTION TAPE. REFER DISHWASHER MANUFACTURER INSTALLATION INSTRUCTIONS

20MM SHADOW LINE. SELECT LAMINATE FINISH SELECTED DISHWASHER FACE PANEL. REFER SPECIFICATION

50

100 40

32MM WRMDF CARCASS. EXPOSED SURFACES TO HAVE SELECTED LAMINATE FINISH.

.

VARIES

100 50

50

SELECTED LAMINATE. REFER INT. ELEVATIONS & SPECIFICATION

.

40

SELECTED PINBOARD. REFER INT. ELEVATIONS & SPECIFICATION

50

St Dominics Primary School S.T.E.A.M Building 408 Camp Road Broadmeadows VIC 3047 PROPOSED JOINERY DETAILS

20 20

-

TYPICAL TOE RECESS - LAMINATE

-

TYPICAL TOE RECESS - LAMINATE

-

--

SCALE 1:5

--

SCALE 1:5

--

TYPICAL BENCH TOP EDGE LAMINATE SCALE 1:5

-

CUPBOARD DOORS WITH PINBOARD

aa

DRAWER DISHWASHER BENCHTOP DETAIL

--

SCALE 1:5

--

SCALE 1:5

SELECTED HANDLES. REFER SPECIFICATION

24

--.--

CUPBOARD DOOR MOUNTED PINBOARD LAYOUT SCALE 1:5

FM

1:100

1611-A09

JAN 18

F 22.01.18


50

2060

.

314

SL

SL

SL

SL

SL

04

06

W

02

03

EQ .

AL AWN CP DE DH FFL FG CFC - PC# IS LPDT SL SSK

EQ

DIRECTION OF BI-FOLDIING DOORS

NATURAL ANODISED ALUMINIUM

FG

FG

FG

FG

FG

FG

FG

FG

FG

ALL DIMENSIONS TO BE CONFIRMED ON SITE. NOTIFY THE SUPERINTENDENT OF ANY DISCREPANCIES.

FG

EXTERNAL WINDOWS & DOOR ARE DEPICTED AS SEEN FROM OUTSIDE. DOOR SWINGS SHOWN TO BE READ IN CONJUNCTION WITH PLANS.

RECESSED TIMBER SILL & NAT. ANODISED ALUMINIUM FLOOR GUIDE

W

D

08

01

NATURAL ANODISED ALUMINIUM

W 07

CENTOR ALUM. BI-FOLD DOOR & TRACK SYSTEM TASMANIAN OAK EXTERNAL TIMBER DOORS WITH 2No. SCHLEGEL AQ21 FOAM SEALS REBATED TO DOOR EDGES & SINGLE SCHLEGEL AQ21 FOAM SEAL REBATED TO DOOR STOP 2No. RAVEN RP52F ACOUSTIC BRUSH SEAL REBATED TO UNDERSIDE OF DOORS

DOOR GRILLES AS NOTED IN THE SPECIFICATION AND INDICATED ON THE DRAWNGS. ALSO REFER MECHANICAL DRAWINGS. ALL DOOR HANDLES TO BE MOUNTED AT 1000MM AFFL UNLESS OTHERWISE NOTED. INSTALL WINDOW DECALS TO FULL HEIGHT GLAZED DOORS AND WINDOWS AT 1000MM AFFL UNLESS OTHERWISE NOTED.

GLAZING: VIRIDIAN COMFORTPLUS CLEAR 82

DELETED

REFER TO PLANS, ELEVATIONS, SECTIONS, INTERNAL ELEVATIONS FOR ANY ADDITIONAL ALUMINIUM COVER PLATES

EXTERNAL WINDOWS

01 -

AUTOMATED LOUVRES AWNING WINDOWS ALUMINUM COVER PLATE - POWDERCOATED FINISH DECALS DOUBLE HUNG FINISHED FLOOR LEVEL FIXED GLAZING COMPRESSED FIBRE CEMENT SHEET - PAINT COLOUR INSECT SCREEN LOW PROFILE DOOR THRESHOLD - POWDERCOATED FINISH SLIDING 200mm HIGH STAINLESS STEEL KICK PLATE - TO BOTH SIDES OF DOOR

DOOR AND WINDOW SCHEDULE TO BE READ IN CONJUNCTION WITH THE DOOR AND WINDOW SECTIONS OF THE SPECIFICATION.

1000 22

01

NATURAL ANODISED ALUMINIUM

W

EQ

FOR COLOUR FINISHES REFER SPECIFICATION

FG

W

EQ

DECALS

FFL

W

EQ

HINGED PASS THRU DOOR

SL

1220

920

920

EQ

SUB SILL

SUB SILL

W

EQ

NATURAL ANODISED ALUMINIUM TOP HUNG BI-FOLD DOOR TRACK

EQ

FG

FG

SUB SILL

EQ

5530

. 1140

FG

EQ

.

501

501

. 1140

FG

FG

EQ

LEGEND - DOOR & WINDOW SCHEDULE

CONCEALED PIVOT HINGES

AL

EQ

HALF SET OFFSET HINGE

AL

EQ

CARRIER HINGES

AL

EQ

.

HALF SET OFFSET HINGE

EQ .

CARRIER HINGES

EQ

9790

HALF SET OFFSET HINGE

EQ

.

CARRIER HINGES

EQ .

HALF SET OFFSET HINGE

1810

EQ

CARRIER HINGES

EQ

.

HALF SET OFFSET HINGE

CARRIER HINGES

1810

STEAM BUILDING

HW

01g MIRROR

HW

01j HW

01m

449

449

FG

AL

FG

AL

FG

FG

FG

01b

01j

HW FG

HW

01c

FG

HW

HW

01e

01h

HW

FG

01m

HW

01k

FG

FG

FG

HW

HW

01a

01n

2200

2200

2400

FG

FG

240

237 FG 1303

1211

9790 OVERALL 2400

FG FG 1335

FG

FG

FG SUB SILL

SUB SILL

01g

01f

FG

1575

HW

01d

HW

1281

.

CP

1044

871

.

1011

.

224

851

843

986

843

.

1361

1345

1273

HW

762

.

FG

725

903

725

903

1575 OVERALL

903

.

FG

HW

1306

01b

32 x 32mm KDHW PLANT ON TIMBER BEADS BOTH SIDES

MIRROR

32 x 32mm KDHW PLANT ON TIMBER BEADS BOTH SIDES 2890

01f 32 x 32mm KDHW PLANT ON TIMBER BEADS BOTH SIDES

01d

HW

2890

HW

MIRROR

HW

1331

HW

HW

HW

01a

01c

01e

HW

HW

HW

01n MIRROR 32 x 32mm KDHW PLANT ON TIMBER BEADS BOTH SIDES

01k MIRROR 32 x 32mm KDHW PLANT ON TIMBER BEADS BOTH SIDES

01h MIRROR 32 x 32mm KDHW PLANT ON TIMBER BEADS BOTH SIDES

FFL

HW

HW

02

03

NATURAL ANODISED ALUMINIUM

HW

HW

01

04

32 x 32mm KDHW PLANT ON TIMBER BEADS BOTH SIDES

NATURAL ANODISED ALUMINIUM

EXTERNAL HIGHLIGHT WINDOWS

02 -

STEAM BUILDING

CONTRACTORS MUST VERIFY ALL DIMENSIONS ON SITE PRIOR TO COMMENCING WORKS ON SITE. ALL SHOP DRAWINGS MUST BE SUBMITTED FOR APPROVAL BY THE ARCHITECT BEFORE MANUFACTURE PROCEEDS.

EQ

EQ

EQ

EQ

EQ

.

1810 EQ .

.

EQ

FG

FG

50

2060

FG

DOUBLE ALUM. FRAME FG

HINGED PASS THRU DOOR

DIRECTION OF BI-FOLDIING DOORS FG

CONSULTANTS ISSUE

FR

17.02.17

B

COST PLAN D _QS ISSUE

FM

10.03.17

CONTRACT DOCUMENTATION ISSUE

FM

24.03.17

D

TENDER ISSUE

FM

20.04.17

E

CONSTRUCTION ISSUE

FM

F

FG

FG

FG

FG

FG

FG

FG

FG

FG

FG

FG

FIXED PANEL PN3 FINISH

FIXED PANEL PN3 FINISH

FIXED PANEL PN3 FINISH

FIXED PANEL PN3 FINISH

FIXED PANEL PN3 FINISH

FIXED PANEL PN3 FINISH

FIXED PANEL PN3 FINISH

FIXED PANEL PN3 FINISH

FIXED PANEL PN3 FINISH

FIXED PANEL PN3 FINISH

FIXED PANEL PN3 FINISH

FG

FG

06.06.17

AMEND HW02 & 03 SILL HEIGHT DIMS

FM

29.08.17

G

REPLACE PROPOSED WINDOW W07 WITH DOOR D04

FR

11.10.17

H

AS BUILT

FM

22.01.18

DIRECTION OF BI-FOLDIING DOORS 2060

1140

501

2040

.

EQ

CONCEALED PIVOT HINGES

EQ

HALF SET OFFSET HINGE

EQ

CARRIER HINGES

EQ

HALF SET OFFSET HINGE

EQ

CARRIER HINGES

EQ

.

9990

HALF SET OFFSET HINGE

.

CARRIER HINGES

910

CARRIER HINGES

EQ . .

HALF SET OFFSET HINGE

EQ

CARRIER HINGES

970

HALF SET OFFSET HINGE

EQ

.

CONCEALED PIVOT HINGES

1810

A C

LPDT

W

D

05

02

04 -

WEATHERPROOF EXTERNAL TIMBER DOOR & TIMBER DOOR FRAME WITH RAVEN RP137 NAT. ANODISED ALUMINIUM THRESHOLD

DOORS STEAM BUILDING

VIEW FROM STEAM CENTRE

RECESSED NAT. ANODISED ALUMINIUM FLOOR GUIDE

965

DOUBLE ALUM.FRAME WITH NAT. ANODISED ALUMINIUM COVER PLATE

22

965

920

SUB SILL

LPDT

D

D

03

04

CENTOR ALUM. BI-FOLD DOOR & TRACK SYSTEM TASMANIAN OAK EXTERNAL TIMBER DOORS WITH 2No. SCHLEGEL AQ21 FOAM SEALS REBATED TO DOOR EDGES & SINGLE SCHLEGEL AQ21 FOAM SEAL REBATED TO DOOR STOP RAVEN RP52F ACOUSTIC BRUSH SEAL REBATED TO UNDERSIDE OF DOORS

WEATHERPROOF EXTERNAL TIMBER DOUBLE DOOR & TIMBER DOOR FRAME WITH RAVEN RP137 NAT. ANODISED ALUMINIUM THRESHOLD

MINX ARCHITECTURE PTY LTD 7A / 91 MORELAND STREET, FOOTSCRAY, VIC. 3011 PHONE: (03) 9646 7000 E-MAIL: info@minxarchitecture.com.au WEB: www.minxarchitecture.com.au

St Dominics Primary School S.T.E.A.M Building 408 Camp Road Broadmeadows VIC 3047 PROPOSED WINDOW & DOOR SCHEDULE

FM

1:100

1611-A10

JAN 18

H 22.01.18







furniture design

Hazel Glen College, Doreen

admin desk design 08 07

--

03

--

-1000 200

COUTERTOP LC3 PINBOARD PN6

COUTERTOP LC3 PINBOARD PN6

432

00

LC3

LC3

PINBOARD PN6

PINBOARD PN6

432

00

R5

GPO

R3

200

18MM MDF COUTERTOP. LAMINATE FINISH LC3

18

600

18

200

DATA

GPO BENCHTOP LC1

350

04

--

STUD WALL BELOW SHOWN DASHED

18MM MDF COUTERTOP. LAMINATE FINISH LC3

2650

32

GPO

DATA

GPO

01

ADMINISTRATION DESK

02

ADMINISTRATION DESK

--

NORTH ELEVATION SCALE 1:20

--

EAST ELEVATION SCALE 1:20

06 -900

2450

05

CURVED PANEL LC3

LC3

LC3

CURVED PANEL LC3

450

10°

32MM MDF CONSTRUCTION BENCHTOP. SQUARE EDGE WITH 2MM HEAVY DUTY EDGE STRIP. LAMINATE FINISH LC1

HAFELE HEBGO BRACKET 287.44.461

FFL

HAFELE HEBGO BRACKET UNDER 287.44.461

HAFELE CABLE MANAGEMENT 429.94.458

1200

--

1250

--

LC3

CURVED PANEL LC3 LC3

718

HAFELE CABLE MANAGEMENT 429.94.458

02

CURVED PANEL LC3

750

--

1200

STUD WALL BELOW SHOWN DASHED

01

LC3

90

BENCHTOP WATERFALL LC1

32

PLAN DETAIL SCALE 1:20

750

ADMINISTRATION DESK

--

LC6

100

200

A

450

1200

758

1200

636

FFL

03 --

TIMBER SKIRTING PC4

ADMINISTRATION DESK

04

ADMINISTRATION DESK

SOUTH ELEVATION SCALE 1:20

--

WEST ELEVATION SCALE 1:20

200 36

200

200

MITRE JOIN

32MM MDF CONSTRUCTION BENCHTOP & WATERFALL. SQUARE EDGE WITH 2MM HEAVY DUTY EDGE STRIP. LAMINATE FINISH.

PINBOARD FIXED TO MDF LINING

COUNTERTOP DETAIL SCALE 1:20

750

05 --

90 74

90MM WIDE TIMBER STUD WALL 18MM MDF LINING TO STUD. LAMINATE FINISH.

18

750

200 100

CONTINUATION OF TIMBER SKIRTING. PAINT FINISH.

636

ADMINISTRATION DESK

90MM WIDE TIMBER STUD WALL 18MM MDF LINING TO STUD. LAMINATE FINISH.

FFL

-

450

90MM WIDE TIMBER STUD WALL

90MM WIDE TIMBER STUD WALL 18MM WRMDF LINING TO STUD. LAMINATE FINISH.

--

HAFELE HEBGO BRACKET 287.44.461

1200

2 LAYERS 18MM MDF LINING TO STUD. LAMINATE FINISH.

32 1200

HAFELE HEBGO BRACKET 287.44.461

32MM MDF CONSTRUCTION BENCHTOP. SQUARE EDGE WITH 2MM HEAVY DUTY EDGE STRIP. LAMINATE FINISH.

32MM MDF CONSTRUCTION BENCHTOP. SQUARE EDGE WITH 2MM HEAVY DUTY EDGE STRIP. LAMINATE FINISH.

18MM MDF LINING. LAMINATE FINISH.

MITRE JOIN

794

32MM MDF CONSTRUCTION BENCHTOP. SQUARE EDGE WITH 2MM HEAVY DUTY EDGE STRIP. LAMINATE FINISH.

10

18MM MDF PANEL BEYOND. LAMINATE FINISH.

PINBOARD FIXED TO WRMDF LINING

MITRE JOIN 18MM MDF LINING. LAMINATE FINISH.

350

18MM MDF LINING. LAMINATE FINISH.

PINBOARD FIXED TO MDF LINING

200

MITRE JOIN

18MM MDF COUTERTOP. LAMINATE FINISH.

18

2MM ABS EDGE STRIP. FINISH TO MATCH LAMINATE COLOUR

10

18MM MDF COUNTERTOP. LAMINATE FINISH.

MITRE JOIN

636

90

50

90

74

90 74

ADMINISTRATION DESK

06

ADMINISTRATION DESK

07

ADMINISTRATION DESK

08

ADMINISTRATION DESK

SECTION SCALE 1:20

--

SECTION SCALE 1:20

--

SECTION SCALE 1:20

--

SECTION SCALE 1:20



3d modelling

St Martin de Porres Altona

outdoor learning space design


learning space

admin desk

wet area




3d modelling

Mt St Joseph Girls Shool, Sunshine

admin entry sd options



master plan

Westall Hub redeveloment

AFTERNOON SUN

MORNING SUN

GPCS

TO WESTALL TRAIN STATION

ADMINISTRATION & STAFF AMENITIES VISUAL & PERFORMING ARTS PE

?

LIBRARY & RESOURCE CENTRE

?

?

TRAVEL SCIENCE

?

TECHNOLOGY WELC VEHICLE ENTRANCE PEDESTRIAN ENTRANCE SEC EASEMENT

EVENING SUN

?



SCREENING DETAIL

TOWN PLANNING

MOULL MURRAY ARCHITECTS MULTIRESIDENTIAL


3d modelling 1

Orloff Residence

Sections

North Elevation & Typical Details

FIXED (OUTSIDE)

SLIDING (INSIDE)

security screen detail

1,200

SLIDING (INSIDE)

AXONOMETRIC VIEW

1:200

600

FIXED (OUTSIDE)

WASHER ROTATING CATCH

200

ELEVATION FROM INSIDE

OUTSIDE FIXED PANEL

CATCH DETAIL (section)

SECTION

1:10

SLOT IN FIXED PANEL

FINGER PULL

1:2

1:10

1,200

FIXED (OUTSIDE)

NOTE: CONTRACTOR TO MEASURE ALL OPENINGS ON SITE AND ADJUST HORIZONTAL DIMENSIONS TO SUIT

3 1

#LayID #DrgID

OUTSIDE (FIXED)

SOUTH ELEVATION PANELS TO BE SINGLE FIXED PANELS ONLY

INSIDE (SLIDING)

SLIDING (INSIDE) 3 2

ROTATING CATCH

PLAN VIEW

CATCH DETAIL (plan)

1:10

PRELIMINARY

1:5

CLIENT

Peter Orloff

PROJECT

Proposed Orloff Penthouse Terrace Privacy Screens

DRAWING

Sections North Elevation & Typical Details

S.T.C.A.

PRINT DATE

SCALE

29/10/15

DRAWN

FR

ARCHITECT

AM

1:10, 1:200, 1:2, 1:5 @ A3

CHECKED

PROJECT NUMBER

10266

DRAWING NUMBER [REVISION]

/Volumes/Studio/projects/ORLOFF Penthouse.pln

1

Moull Murray Architects ABN 16 407 051 599

Melbourne Level 1, 312 New Street Brighton. VIC. 3186 T.+61 3 9530 8905 F.+61 3 9530 8906

info@moullmurrayarchitects.com.au moullmurrayarchitects.com.au


2 Plans

Details 1,160 1,110

25

25

600

1200 CL

FIXING ANGLE 600 HIGH

SS RIVET

AL ANGLE FIXED SS SCREW TO ALUMINIUM UNIVERSAL COLUMN

25X25 ALUMINIUM SHS SUB FRAME

PERFORATED SHEET

WELDED JOINTS ON 4 CORNERS

25X25 AL HOLLOW SECTION FIXED PANEL SS POP RIVETS

60

PANEL FIXED TO AL ANGLE PACKING 25X25 AL HOLLOW SECTION SLIDING PANEL

480

PERFORATED SHEET

30X30 'L's

60

DOUBLE ANGLES TO FORM CHANNEL 1200 HIGH FOR INSIDE PANEL TO SLIDE IN WITH STOP END AT TOP AND BOTTOM

600

NYLON BRUSH STUCK TO INSIDE FACE OF 'L's

EXTENT OF PERFORATION

60

1,040

INDICATIVE PERFORATION ONLY

PERFORATED ALUMINIUM SHEET LOCKER SLOTTED HOLES L25443 HOLE SIZE 25.4X6.35 SLOT DIRECTION "E" ALL POWDER COATED "BLACK"

FULL SIZE DETAIL

1:1

60

1,160

PRELIMINARY

ELEVATION OF PERFORATED SHEET

S.T.C.A.

1:10

CLIENT

Peter Orloff

PROJECT

Proposed Orloff Penthouse Terrace Privacy Screens

DRAWING

Plans Details

PRINT DATE

SCALE

29/10/15

DRAWN

FR

ARCHITECT

AM

1:1, 1:10 @ A3 CHECKED

PROJECT NUMBER

10266

DRAWING NUMBER [REVISION]

/Volumes/Studio/projects/ORLOFF Penthouse.pln

2

Moull Murray Architects ABN 16 407 051 599

Melbourne Level 1, 312 New Street Brighton. VIC. 3186 T.+61 3 9530 8905 F.+61 3 9530 8906

info@moullmurrayarchitects.com.au moullmurrayarchitects.com.au


town planning

Harrow Street, Box Hill

TP.03.1 Design and Context Response

Surrounding Amenity

proposed apartment

Key

9

6

10 8

1

4

Maroond

ah Highw

7

ay

2

Box Hil

l to Rin

5 S

gwood

3 Rail Tr

ail

S

Subject Site

1

Box Hill Train Station 700m

2

Centro Box Hill 550m

3

Box Hill High School 1.2km

4

Box Hill Town Hall and Library 300m

5

Centrelink 450m

6

St Francis Xavier's Primary 1.7km

7

Library 400m

8

Box Hill Institute Whitehorse 500m

9

Box Hill Police Station 500m

10

Box Hill Central 700m

PRELIMINARY


TP.03.2 Design and Context Response

Surrounding Street

5. Glenmore St

1. Harrow St

6. Ellingworth Parade

2. Harrow St

7. William St

3. Corner of Harrow St and Glenmore St

8. Corner of William St and Harrow St

4. Henry St

10. Corner of William St and Ellingworth Parade

9. William St

10

6

S

1

2

3 8

4

5

William Street

9 11

11. Harrow St

7

PRELIMINARY S.T.C.A.

CLIENT

Yifan Pan

PROJECT

Proposed Apartment Building 39 Harrow Street, Box Hill, Melbourne

DRAWING

Design and Context Response Surrounding Street

PRINT DATE

SCALE

3/12/15

DRAWN

FR

1:1 @ A3 ARCHITECT

AM

CHECKED

PROJECT NUMBER

10264

DRAWING NUMBER [REVISION]

TP.03.2

/Volumes/Studio/projects/10264 39 Harrow St Box Hill/02models/39 Harrow St Box Hill.pln

Moull Murray Architects ABN 16 407 051 599

Melbourne Level 1, 312 New Street Brighton. VIC. 3186 T.+61 3 9530 8905 F.+61 3 9530 8906

info@moullmurrayarchitects.com.au moullmurrayarchitects.com.au


TP.03.3 Design and Context Response

Wind + Sun Analysis Key ELLINGWORTH

PARADE

Winter sun path Summer sun path Prevailing Winds

DOUBLE STOREY BRICK BUILDING

DOUBLE STOREY BRICK BUILDING

94.95TW2 92.91FL2 DOOR

95.19TW2 93.94BW2 H/W

95.19TW2 93.94BW2 H/W

FLAT ROOF

NO FIRST FLOOR WINDOWS

FLAT ROOF

S

DOUBLE STOREY BRICK BUILDING

Subject Site

FLAT ROOF

CARPORT

W 05 inte r : PM 08

CARPARK

2

#DrgID #LayID1

RIGHT

OF

TP.06.1 1

WAY

3

ter Win 36 07: AM

4

2m

TIMBER

PALINGS

FLAT ROOF H/W

LAWN POS

CONC X-ING

E.POLE

NOT

FENCED

FOOTPATH

TIMBER

PALINGS

SINGLE STOREY W/BOARD HOUSE ALUM ROOF

SINGLE STOREY W/BOARD HOUSE TILE ROOF

CONCRETE

HARROW

STREET

TIMBER

FOOTPATH

PALINGS

HYD E.PIT

VER BALCONY

STREET

VERANDAH

2.15m

PALINGS

1.4m BRICK + METAL FENCE

TIMBER

89.34FL

PALINGS

VER

TIMBER

CONC X-ING

E.POLE

CONCRETE DRIVEWAY

1.85m

SEWER

2.15m

FENCED

90.34FL1

93.60FL2

NOTES:

RF - ROOF HEIGHT (GUTTER) RDG - RIDGE HEIGHT FL - FLOOR LEVEL TW - TOP OF WINDOW LEVEL BW - BOTTOM OF WINDOW LEVEL TK - TOP OF KERB LEVEL DK - DECK LEVEL H/W - HABITABLE WINDOW FR - FROSTED/OPAQUE WINDOW SEP - SIDE ENTRY PIT CH - CHIMNEY G - GAS METER

LEGEND:

GLENMORE

PICKET

DRIVEWAY

TIMBER

CONC X-ING

TIMBER

PALINGS TIMBER

CONCRETE

STREET

DRIVEWAY

1.2m

SEP SEWER

PALINGS

CONC X-ING

CONC X-ING

HENRY

NOT

CONCRETE

HARROW STREET

STREET

CONCRETE

HARROW

TOP FLOOR OBSCURED

BRICK GARAGE 2m TIMB PALS 2 TP.06.2

Su m 05 mer :5 AM 5

CONCRETE DRIVEWAY 10.00 %

FOOTPATH

EXISTING 3 STOREYS MULTI-RESIDENTIAL APARTMENT

20.00 %

CONCRETE

FLAT ROOF

20.00 %

PLANTER

47

H/W 10.00 %

er mm Su 8:42 0 M P

CONC X-ING

41-45

EXISTING 3 STOREY MULTI-RESIDENTIAL APARTMENT

WILLIAM

37

PROPOSED 4 STOREY MIXED USE DEVELOPMENT

AS APPROVED BY CITY OF WHITEHORSE

DOOR

H/W

STREET

TP.07.1 2

ROAD

S

TOP FLOOR OBSCURED

2m

POS

ALL WINDOWS VERANDAHVERANDAH ALL WINDOWS BALCONY BALCONY ESTIMATED ESTIMATED

LAWN

BAMBOO TIMB PALS

TP.07.1

1

DOUBLE STOREY BRICK UNITS TILE ROOF

LEVEL DATUM: AHD via PM7 (RL 95.65) CONTOUR INTERVAL: 0.2m LENGTHS ARE IN METRES DATE OF SURVEY: 17.06.2015

PRELIMINARY S.T.C.A. CLIENT

Yifan Pan

PROJECT

Proposed Apartment Building 39 Harrow Street, Box Hill, Melbourne

DRAWING

Design and Context Response Wind + Sun Analysis

PRINT DATE

SCALE

3/12/15

DRAWN

FR

ARCHITECT

AM

1:500, 1:200, 1:250 @ A3 CHECKED

PROJECT NUMBER

10264

DRAWING NUMBER [REVISION]

TP.03.3

/Volumes/Studio/projects/10264 39 Harrow St Box Hill/02models/39 Harrow St Box Hill.pln

Moull Murray Architects ABN 16 407 051 599

Melbourne Level 1, 312 New Street Brighton. VIC. 3186 T.+61 3 9530 8905 F.+61 3 9530 8906

info@moullmurrayarchitects.com.au moullmurrayarchitects.com.au


TP.05.1

36.52

2 1

8

VERANDAH BALCONY

LAWN

2 #LayID #DrgID TP.06.1POS

1.9m DE

EP PIT

4 3

PALINGS TIMBER 1.6m 3 1 89.1

7 8.5

E.POLE 2

(17.98) .52 2

K 4T

8

9.1

89

TP.06.2

HARROW

TBM TEL RL 89.73 3

TK

.63

89

STREET

91.32FL1 94.27FL2

100.06RF

96.99RF

CONCRETE DRIVEWAY .93

89

4

NOT

10.00 %

TK

89째40'

FLAT ROOF

20.00 %

FOOTPATH

2.74

PLANTER

Total 28

41-45

97.76RF

E

0 0.0

Car Stackers 9

KLAUS Stacker Parker Multibase 2072

96.31TW2 93.36TW1 H/W

20.00 %

KLAUS Stacker Parker Multibase 2072

G82 DB LP=500

1,977

CONCRETE

Store

NGL+89,280AHD 89.28

92.23RF

179째52'

Car Stackers

G82 DB LP=500

Car Space

D

.01

96.31TW2 94.27FL2 93.36TW1 91.32FL1 DOOR

4

96.31TW2 EXISTING 3 STOREY 94.27BW2 MULTI-RESIDENTIAL APARTMENT 93.36TW1 H/W 96.31TW2 94.27BW2 H/W

C

90

96.31TW2 94.27FL2 93.36TW1 91.32FL1 DOOR

7

FLAT ROOF

96.31TW2 93.36TW1 H/W

10.00 %

Car Space

.49 8925

TK

.98

Car Stackers

KLAUS Stacker Parker Multibase 2072

Lift

B

TP.07.1 2

G82 DB LP=500

Store

2,140

.78

1,629 1,870

89

24

A

ALL WINDOWS ESTIMATED

1.9m DE EP

Car Stackers

KLAUS Stacker92.64RF Parker Multibase 2072

D

2

.9 89

Car Stackers

KLAUS Stacker Parker Multibase 2072

Stairs

88

6m3

23

C

E

97.07RF

PALS

6m3 22

No. of stackers No. of bays/stacker

TOP FLOOR OBSCURED

25,000L Water Tank underground

6m3 21

Levels Basement

PALINGS

99.89RF

6m3 20

PIT

1.6m .37

89

3

12

359째52'

AS APPROVED BY CITY OF WHITEHORSE

.66m

89

TIMBER

TOP FLOOR OBSCURED

8m3 19

Driveway

6m3 11

ALL WINDOWS ESTIMATED

18

2.743

6m3 10

6m3

17

TP.06.2 1

PROPOSED 4 STOREY MIXED USE DEVELOPMENT

6m3

9

VERANDAH BALCONY

6m3

.68

89

6m3 8

LAWN

7

Storage

6m3 16

6m3

6

2m

BRICK GARAGE

PALINGS TIMBER

6m3 15

6m3

5

Building Summary - Car park

.34

89 .26

89

G82 DB LP=500

PALINGS

6m3 14

.53

G82 DB LP=500

37

TIMBER

6m3

4

4

GRATE

89

6m3

3

13

WAY

11.00 %

AS APPROVED BY CITY OF WHITEHORSE

6m3

2

3

(17.98)

22.01 %

PROPOSED 4 STOREY MIXED USE DEVELOPMENT

22.01 %

89

B

31-35

6m3

1

Bins

.39

A

6m3

O.06.1 F TP 1

Basement

.17

89

96.51RF

POS

89

89째52'

7 HT R .I8G

88

11.00 %

.28

89.00

89

2m TIMB PALS

PALINGS

.03

FENCE

36.46

TIMBER

2

#DrgID

SEWER 69#LayID NGL+88,690AHD 88. 1.5m ALUM FENCE TP.07.1 1

1.8m

WIRE

BAMBOO

1

2.2m

TIMB

88

2m

.73

96.68RF

Proposed Floor Plans

CONCRETE CONC X-ING

FENCED FOOTPATH

TK

.04

90

PRELIMINARY S.T.C.A.

Basement 1:200

CLIENT

Yifan Pan

PROJECT

Proposed Apartment Building 39 Harrow Street, Box Hill, Melbourne

DRAWING

Proposed Floor Plans Basement

PRINT DATE

SCALE

3/12/15

DRAWN

FR

1:200 @ A3 ARCHITECT

AM

CHECKED

PROJECT NUMBER

10264

DRAWING NUMBER [REVISION]

TP.05.1

/Volumes/Studio/projects/10264 39 Harrow St Box Hill/02models/39 Harrow St Box Hill.pln

Moull Murray Architects ABN 16 407 051 599

Melbourne Level 1, 312 New Street Brighton. VIC. 3186 T.+61 3 9530 8905 F.+61 3 9530 8906

info@moullmurrayarchitects.com.au moullmurrayarchitects.com.au


TP.05.2

97.07RF

A: 23 m2

W

.37

F

Courtyard

Terrace 92.64RF

1 Bedroom Unit

A: 18 m2

A: 47 m2

W

36.52

89

1,629 1,870

F

.98

A: 47 m2

Lift

D

A: 17 m2

179째52'

W

Terrace

1 Bedroom Unit

LAWN

96.31TW2 93.36TW1 H/W

D

F

.01

90

FLAT ROOF

W

W

2,140

96.31TW2 94.27FL2 93.36TW1 91.32FL1 DOOR

Total

F

91.32FL1 94.27FL2

F

PALINGS

2 Bedroom Unit

A: 65 m2

A: 60 m2

2m TIMB PALS

1.6m

CONCRETE

FOOTPATH

Services

8

2,780

Services

1,977

8 8.7

.49

NGL+89,280AHD

TK

89.28

TK

3

.57

88

89

1 89.1

97.76RF

E

0 0.0

Terrace

Terrace

89째40' E.POLE 2

A: 8 m2

A: 8 m2

PLANTER

(17.98) .52 2

K 4T

89

.1

89

HARROW

TP.06.2

TBM TEL RL 89.73 3

STREET

2.74

983

K 3T

.6

89

11

2 Bed. 3 3 3 5

14

Total 6 8 8 6

25

100.06RF

96.99RF

9

7.14 %

7.14 %

7.14 %

TIMBER

E

2 Bedroom Unit

1 Bed, 3 4 4 0

96.31TW2 94.27BW2 93.36TW1 H/W 96.31TW2 94.27BW2 H/W

C

36.46

Stairs

2 #LayID #DrgID TP.06.1POS

C

92.23RF

359째52'

89

96.31TW2 94.27FL2 93.36TW1 91.32FL1 DOOR

B

TP.07.1 2

FLAT ROOF

96.31TW2 93.36TW1 H/W

A

Levels Ground Floor 1st Floor 2nd Floor 3rd Floor

PALINGS

TOP FLOOR OBSCURED

1.6m

A: 59

m2

TIMBER

99.89RF

2m

PALINGS TIMBER

Terrace

2

.9 89

2m

TOP FLOOR OBSCURED

F

LAWN

A: 14 m2

2 Bedroom Unit

TP.06.2 1

PALINGS

AS APPROVED BY CITY OF WHITEHORSE

TIMBER

4 STOREY MIXED USE DEVELOPMENT

AS APPROVED BY CITY OF WHITEHORSE

.6

89

Terrace

POS

W

m2

ALL WINDOWS ESTIMATED

A: 48

2.743

.68

89

.39

B

37

.53

89

Building Summary - Number of Units

.34 89 6 .2 89NGL+89,260AHD

4

GRATE

89

A

PROPOSED 4 STOREY MIXED USE DEVELOPMENT

3

1 Bedroom Unit

Driveway

31-35

WAY

(17.98)

VERANDAH BALCONY

TP.06.1 1

VERANDAH BALCONY

OF

89째52'

7 8.8 82,000

Ground Floor

.17

89

96.51RF

ALL WINDOWS ESTIMATED

89

RIGHT

89

BRICK GARAGE

.28

89.00

.03

FENCE

2,500

PALINGS

TP.07.1 1

TIMBER

2

#DrgID

SEWER 69#LayID NGL+88,690AHD 88. 1.5m ALUM FENCE Line of Slab Above

1.8m

WIRE

PALS

1

2.2m

BAMBOO

88

TIMB

.73

96.68RF

Proposed Floor Plans

CONCRETE DRIVEWAY NOT

.93 89 NGL+89,760AHD

4

CONCRETE

CONC X-ING

FENCED FOOTPATH

TK

.04

90

NEW TREE

PRELIMINARY S.T.C.A.

Ground Floor 1:200

CLIENT

Yifan Pan

PROJECT

Proposed Apartment Building 39 Harrow Street, Box Hill, Melbourne

DRAWING

Proposed Floor Plans Ground Floor

PRINT DATE

SCALE

3/12/15

DRAWN

FR

1:200 @ A3 ARCHITECT

AM

CHECKED

PROJECT NUMBER

10264

DRAWING NUMBER [REVISION]

TP.05.2

/Volumes/Studio/projects/10264 39 Harrow St Box Hill/02models/39 Harrow St Box Hill.pln

Moull Murray Architects ABN 16 407 051 599

Melbourne Level 1, 312 New Street Brighton. VIC. 3186 T.+61 3 9530 8905 F.+61 3 9530 8906

info@moullmurrayarchitects.com.au moullmurrayarchitects.com.au


TP.05.3

1.6m

A: 7 m2

1,629 1,870

F

.37

89

F

1 Bedroom Unit

TP.07.1

Balcony

92.64RF A: 7 m2

W

36.52

A: 47 m2

.98

W

1 Bedroom Unit

Balcony

A: 47 m2

Lift

D

LAWN

36.46

Stairs

A: 7 m2

F

.01

90

96.31TW2 93.36TW1 H/W

FLAT ROOF

A: 60

W F

1 Bedroom Unit

m2

A: 45

2 Bedroom Unit

m2

A: 61

m2

A: 9 m2

CONCRETE

FOOTPATH

K 7T

K

T .13

1 89

Balcony

E.POLE 2

Balcony

A: 8 m2

PLANTER

89째40'

89.28

.5

88

Balcony

.49

89

A: 7 m2

(17.98) .52 2

K

T .14

89

89

HARROW

TP.06.2

TBM TEL RL 89.73 3

STREET

2m TIMB PALS

88

97.76RF

0

100.06RF

.0 90

1.6m 1,977

.78

91.32FL1 94.27FL2

F

W F

2 Bedroom Unit

TIMBER

E

PALINGS

W

2,140

96.31TW2 94.27FL2 93.36TW1 91.32FL1 DOOR

96.31TW2 94.27BW2 93.36TW1 H/W 96.31TW2 94.27BW2 H/W

POS

C

92.23RF

359째52'

89

FLAT ROOF

96.31TW2 93.36TW1 H/W 96.31TW2 94.27FL2 93.36TW1 91.32FL1 DOOR

PALINGS

TOP FLOOR OBSCURED

TIMBER

Balcony

A: 60 m2

W

2

.9 89

TIMBER

99.89RF

A: 9 m2

2m

PALINGS

97.07RF

PALS

BAMBOO

Balcony

F

9

TP.06.2 1

PALINGS

AS APPROVED BY CITY OF WHITEHORSE

TIMBER

AS APPROVED BY CITY OF WHITEHORSE

37

PROPOSED 4 STOREY MIXED USE DEVELOPMENT

8

89

2 Bedroom Unit

B

31-35

9.6

BEAM .3 BELOW

89

A

2m

89

2.743

.68

A: 67 m2

W

4 STOREY MIXED USE DEVELOPMENT

.53

89

2 Bedroom Unit

.34

89 .26

GRATE

LAWN

89

3

POS

.28

89.00

(17.98)

ALL WINDOWS ESTIMATED

TP.06.1 1

VERANDAH BALCONY

LANEWAY

89째52'

7

.8 88

1st Floor

.17

89

96.51RF

TOP FLOOR OBSCURED

89

TIMB

PALINGS

.03

FENCE

179째52'

TIMBER

2

#DrgID

SEWER #LayID .69 88 1.5m ALUM FENCE TP.07.1 1

1.8m

WIRE

VERANDAH BALCONY

1

2.2m

ALL WINDOWS ESTIMATED

88

BRICK GARAGE

.73

96.68RF

Proposed Floor Plans

2.74

983

TK

.63

89

96.99RF

CONCRETE DRIVEWAY NOT

.93

89

CONCRETE CONC X-ING

FENCED FOOTPATH

TK

.04

90

PRELIMINARY S.T.C.A.

First Floor

1:200

CLIENT

Yifan Pan

PROJECT

Proposed Apartment Building 39 Harrow Street, Box Hill, Melbourne

DRAWING

Proposed Floor Plans 1st Floor

PRINT DATE

SCALE

3/12/15

DRAWN

FR

1:200 @ A3 ARCHITECT

AM

CHECKED

PROJECT NUMBER

10264

DRAWING NUMBER [REVISION]

TP.05.3

/Volumes/Studio/projects/10264 39 Harrow St Box Hill/02models/39 Harrow St Box Hill.pln

Moull Murray Architects ABN 16 407 051 599

Melbourne Level 1, 312 New Street Brighton. VIC. 3186 T.+61 3 9530 8905 F.+61 3 9530 8906

info@moullmurrayarchitects.com.au moullmurrayarchitects.com.au


TP.05.4

2m

PALINGS TIMBER 1.6m

A: 7 m2

1,629 1,870

F

.37

89

F

1 Bedroom Unit

92.64RF A: 7 m2

A: 6 m2

PALINGS

2 Bedroom Unit

A: 45 m2

A: 61 m2

91.32FL1 94.27FL2

97.76RF

E

0 0.0

1 89.1

Balcony

89째40' E.POLE 2

Balcony

A: 9 m2

PLANTER

A: 7 m2

(17.98) .52 2

K

T .14

89

89

HARROW

TP.06.2

TBM TEL RL 89.73 3

STREET

2m TIMB PALS

A: 9 m2

K 3T

.5

88

Balcony

89.28

FOOTPATH

FLAT ROOF

100.06RF

96.99RF

9

.49

CONCRETE

96.31TW2 93.36TW1 H/W

W

W F

1 Bedroom Unit

A: 60 m2

89

K 7T

96.31TW2 94.27FL2 93.36TW1 91.32FL1 DOOR

F

W F

2 Bedroom Unit

TIMBER

8

96.31TW2 94.27FL2 93.36TW1 91.32FL1 DOOR

D

.01

90

1.6m 1,977

8 8.7

LAWN

2 #LayID #DrgID TP.06.1POS

Balcony

A: 47 m2

F

FLAT ROOF

96.31TW2 93.36TW1 H/W

96.31TW2 94.27BW2 93.36TW1 H/W 96.31TW2 94.27BW2 H/W

C

36.46 W

1 Bedroom Unit

Lift

2,140

E

.98

92.23RF

359째52'

Stairs

B

TP.07.1 2

Balcony

W

36.52

A: 47

m2

89

D

A

Balcony

A: 60 m2

C

.92

89

PALINGS

TOP FLOOR OBSCURED

A: 9 m2

TIMBER

99.89RF

PALS

BAMBOO

Balcony

2 Bedroom Unit

TP.06.2 1

PALINGS

AS APPROVED BY CITY OF WHITEHORSE

TIMBER

AS APPROVED BY CITY OF WHITEHORSE

37

PROPOSED 4 STOREY MIXED USE DEVELOPMENT

89

F

W

2m

.6

.68

89

.39

B

.34

89 .26

89

2.743

89

A

31-35

.53

A: 67 m2

4

GRATE

89

2 Bedroom Unit

W

PROPOSED 4 STOREY MIXED USE DEVELOPMENT

3

97.07RF

89

WAY

ALL WINDOWS ESTIMATED

.28

89.00

(17.98)

VERANDAH BALCONY

OF

TP.06.1 1

ALL WINDOWS ESTIMATED

.87

VERANDAH BALCONY

89째52'

RIGHT

88

2nd Floor

.17

89

96.51RF

TOP FLOOR OBSCURED

89

TIMB

PALINGS

.03

FENCE

179째52'

TIMBER

2

#DrgID

SEWER #LayID .69 88 1.5m ALUM FENCE TP.07.1 1

1.8m

WIRE

BRICK GARAGE

1

2.2m

LAWN

88

POS

.73

96.68RF

Proposed Floor Plans

2.74

983

K 3T

.6

89

CONCRETE DRIVEWAY NOT

.93

89

4

CONCRETE CONC X-ING

FENCED FOOTPATH

TK

.04

90

PRELIMINARY S.T.C.A.

Second Floor

1:200

CLIENT

Yifan Pan

PROJECT

Proposed Apartment Building 39 Harrow Street, Box Hill, Melbourne

DRAWING

Proposed Floor Plans 2nd Floor

PRINT DATE

SCALE

3/12/15

DRAWN

FR

1:200 @ A3 ARCHITECT

AM

CHECKED

PROJECT NUMBER

10264

DRAWING NUMBER [REVISION]

TP.05.4

/Volumes/Studio/projects/10264 39 Harrow St Box Hill/02models/39 Harrow St Box Hill.pln

Moull Murray Architects ABN 16 407 051 599

Melbourne Level 1, 312 New Street Brighton. VIC. 3186 T.+61 3 9530 8905 F.+61 3 9530 8906

info@moullmurrayarchitects.com.au moullmurrayarchitects.com.au


TP.05.5

A: 7 m2

LAWN

.01

90

F

F

PALINGS

A: 65

FLAT ROOF

W

2 Bedroom Unit

2 Bedroom Unit

m2

A: 68

m2

97.76RF

E

0

91.32FL1 94.27FL2

100.06RF

1,977

8

89째40'

89.28 1,000

K

T .13

1 89

A: 12 m2

2.74

PLANTER

E.POLE 2

(17.98) .52 2

K

T .14

89

89

HARROW

TP.06.2

TBM TEL RL 89.73 3

STREET

1,983

TK

.63

89

1,600

Balcony

96.99RF

CONCRETE DRIVEWAY NOT

.93

89

4

1,841

Balcony

2m TIMB PALS

1.6m

TIMBER

.0 90

9 9.4

.5

88

D

F

W

96.31TW2 93.36TW1 H/W

TOP FLOOR OBSCURED

179째52'

Balcony

A: 12 m2

FOOTPATH

92.23RF

A: 72

m2

96.31TW2 94.27FL2 93.36TW1 91.32FL1 DOOR

96.31TW2 94.27BW2 93.36TW1 H/W 96.31TW2 94.27BW2 H/W

C

2 #LayID #DrgID TP.06.1POS

2 Bedroom Unit

Stairs

BRICK GARAGE

36.52

.98

89

Lift

K 7T

TP.07.1 2

92.64RF

2,400

B

ALL WINDOWS ESTIMATED

F

2,140

CONCRETE

97.07RF

2m

.37

89

D

.78

1,629 1,870

W

FLAT ROOF

96.31TW2 93.36TW1 H/W 96.31TW2 94.27FL2 93.36TW1 91.32FL1 DOOR

PALINGS

99.89RF

PALINGS TIMBER 1.6m

A: 12 m2

W

88

A

Balcony

A: 72 m2

C

E

2

.9 89

TIMBER

TOP FLOOR OBSCURED

F

2 Bedroom Unit

359째52'

AS APPROVED BY CITY OF WHITEHORSE

8

A: 9 m2

5,450

TP.06.2 1

PALINGS

37

PROPOSED 4 STOREY MIXED USE DEVELOPMENT

TIMBER

Balcony

2m

9.6

8

B

AS APPROVED BY CITY OF WHITEHORSE

89

.34

89 .26

89

3,623 2.74 3

.68

9 9.3

A

31-35

.53

A: 65 m2

4

GRATE

89

2 Bedroom Unit

W

PROPOSED 4 STOREY MIXED USE DEVELOPMENT

WAY

LAWN

89

3

(17.98)

POS

2,450 8

OF

TP.06.1 1

ALL WINDOWS ESTIMATED

7

.8 88

3rd Floor

.17

89

96.51RF

VERANDAH BALCONY

89째52'

RIGHT

.2

89.00

89

BAMBOO

PALINGS

.03

FENCE

36.46

TIMBER

2

#DrgID

SEWER #LayID .69 88 1.5m ALUM FENCE TP.07.1 1

1.8m

WIRE

TIMB

1

2.2m

VERANDAH BALCONY

88

PALS

.73

96.68RF

Proposed Floor Plans

CONCRETE CONC X-ING

FENCED FOOTPATH

TK

.04

90

PRELIMINARY S.T.C.A.

Third Floor

1:200

CLIENT

Yifan Pan

PROJECT

Proposed Apartment Building 39 Harrow Street, Box Hill, Melbourne

DRAWING

Proposed Floor Plans 3rd Floor

PRINT DATE

SCALE

3/12/15

DRAWN

FR

1:200 @ A3 ARCHITECT

AM

CHECKED

PROJECT NUMBER

10264

DRAWING NUMBER [REVISION]

TP.05.5

/Volumes/Studio/projects/10264 39 Harrow St Box Hill/02models/39 Harrow St Box Hill.pln

Moull Murray Architects ABN 16 407 051 599

Melbourne Level 1, 312 New Street Brighton. VIC. 3186 T.+61 3 9530 8905 F.+61 3 9530 8906

info@moullmurrayarchitects.com.au moullmurrayarchitects.com.au


TP.05.6

WAY

(17.98)

3

89

2m

9.6

8

89

2

A

.9 89

BAMBOO

TIMB

1,629 1,870

B

PALINGS

2m TIMB PALS

TIMBER .49

89

CONCRETE

FOOTPATH

1 89

2.74

PLANTER

89째40' K

T .13

.5

88

ALL WINDOWS ESTIMATED

96.31TW2 93.36TW1 H/W

FLAT ROOF

91.32FL1 94.27FL2

97.76RF

E

0

89.28

K 7T

96.31TW2 94.27FL2 93.36TW1 91.32FL1 DOOR

100.06RF

.0 90

1.6m 1,977

.78

88

96.31TW2 94.27FL2 93.36TW1 91.32FL1 DOOR

PALINGS

FLAT ROOF

96.31TW2 93.36TW1 H/W

D

.01

90

2,140

E

LAWN

2 #LayID #DrgID TP.06.1POS

92.23RF

179째52' D

TIMBER

96.31TW2 94.27BW2 93.36TW1 H/W 96.31TW2 94.27BW2 H/W

C

36.46

C

BRICK GARAGE

36.52

.98

89

359째52'

AS APPROVED BY CITY OF WHITEHORSE

B

TP.07.1 2

92.64RF

TP.06.2 1

PALINGS

AS APPROVED BY CITY OF WHITEHORSE

37

PROPOSED 4 STOREY MIXED USE DEVELOPMENT

TIMBER

31-35

PROPOSED 4 STOREY MIXED USE DEVELOPMENT

.37

89

VERANDAH BALCONY

1.6m

TIMBER

2m

.39

A

.34

89 .26

89

2.743

.68

PALS

89

.53

89

.28

89.00

4

GRATE

TOP FLOOR OBSCURED

TP.06.1 1

99.89RF

OF

89째52'

7

.8 88

Roof

.17

89

96.51RF

97.07RF

RIGHT

89

TOP FLOOR OBSCURED

.03

FENCE

LAWN

PALINGS

TP.07.1 1

TIMBER

2

SEWER #LayID .69 88 1.5m ALUM FENCE

PALINGS

1.8m

#DrgID

WIRE

POS

1

2.2m

ALL WINDOWS ESTIMATED

88

VERANDAH BALCONY

.73

96.68RF

Proposed Floor Plans

E.POLE 2

(17.98) .52 2

K

T .14

89

89

HARROW

TP.06.2

TBM TEL RL 89.73 3

STREET

TK

.63

89

96.99RF

CONCRETE DRIVEWAY NOT

.93

89

4

CONCRETE CONC X-ING

FENCED FOOTPATH

TK

.04

90

PRELIMINARY S.T.C.A.

Roof

1:200

CLIENT

Yifan Pan

PROJECT

Proposed Apartment Building 39 Harrow Street, Box Hill, Melbourne

DRAWING

Proposed Floor Plans Roof

PRINT DATE

SCALE

3/12/15

DRAWN

FR

1:200 @ A3 ARCHITECT

AM

CHECKED

PROJECT NUMBER

10264

DRAWING NUMBER [REVISION]

TP.05.6

/Volumes/Studio/projects/10264 39 Harrow St Box Hill/02models/39 Harrow St Box Hill.pln

Moull Murray Architects ABN 16 407 051 599

Melbourne Level 1, 312 New Street Brighton. VIC. 3186 T.+61 3 9530 8905 F.+61 3 9530 8906

info@moullmurrayarchitects.com.au moullmurrayarchitects.com.au


TP.06.1 Proposed Elevations

5,318

2

7,730

4,935

North + East Elevations

1

13,206

+102,470.0 4 Roof

3

+98,970.0 3 Third Floor

2,600 400

37 HARROW ST

PROPOSED 4 STOREY DEVELOPMENT

+92,970.0 1 First Floor

+89,970.0 0 Ground Floor

706

3,000

2,600 400

EXISTING 3 STOREY APARTMENT

+95,970.0 2 Second Floor

3,000

41-45 HARROW ST

12,500

3,000

2,600 400

2,600

3,500

900

4

DRIVEWAY

RIGHT OF WAY

+86,320.0 -1 Basement

NORTH ELEVATION

1:200

5,750

D

5,750

C

B

5,750

5,750

A

+12,500.0 4 Roof

+9,000.0 3 Third Floor

+6,000.0 2 Second Floor

+3,000.0 1 First Floor

3,000

2,800 200

3,000

2,800 200

12,500

3,000

2,800 200

2,600

3,500

900

E

±0.0 0 Ground Floor

90,075 (Datum)

89,526 (Datum) NGL

HARROW ST

RIGHT OF WAY

-3,650.0 -1 Basement

EAST ELEVATION

PRELIMINARY

1:200

CLIENT

Yifan Pan

S.T.C.A. PROJECT

Proposed Apartment Building 39 Harrow Street, Box Hill, Melbourne

DRAWING

Proposed Elevations North + East Elevations

PRINT DATE

SCALE

3/12/15

DRAWN

FR

1:200 @ A3 ARCHITECT

AM

CHECKED

PROJECT NUMBER

10264

DRAWING NUMBER [REVISION]

TP.06.1

/Volumes/Studio/projects/10264 39 Harrow St Box Hill/02models/39 Harrow St Box Hill.pln

Moull Murray Architects ABN 16 407 051 599

Melbourne Level 1, 312 New Street Brighton. VIC. 3186 T.+61 3 9530 8905 F.+61 3 9530 8906

info@moullmurrayarchitects.com.au moullmurrayarchitects.com.au


TP.07.1

88,811 (NGL)

C

5,750

D

5,750

3,480 2,378

13,723

BEDROOM

+95,970.0 2 Second Floor +92,970.0 1 First Floor

RIGHT OF WAY

Sections

980

+98,970.0 3 Third Floor

+89,970.0 0 Ground Floor

Proposed Sections

E

5,750

BOUNDARY

BOUNDARY

B

5,750

COURTYARD

BATH.

APARTMENT

ENS.

BEDROOM

ENS.

BATH.

BEDROOM

ENS.

BATH.

BEDROOM

APARTMENT BEDROOM

APARTMENT BEDROOM

BALCONY

BALCONY

ENTRY RAMP

STAIRS RAMP

BALCONY

ENTRY

1,223

3,500 3,000

2,600 400

3,000

2,600 400

3,000

12,500

2,600 400

3,000

500

+102,470.0 4 Roof

A

BASEMENT CAR PARK

HARROW STREET

89,150 (NGL)

BASEMENT CAR PARK

+86,320.0 -1 Basement

SECTION A

1:200

2,600 400

3,500 3,000

2,600 400

3,000

2,600 400

BOUNDARY

+9,000.0 3 Third Floor +6,000.0 2 Second Floor

12,500

3,000

3,000

500

+12,500.0 4 Roof

41-45 HARROW ST

EXISTING 3 STOREY APARTMENT

+3,000.0 1 First Floor

90,067 (NGL)

±0.0 0 Ground Floor

3,623

5,171

3

164

2

7,566

164

4,771

5,100

2,823

BALCONY

BALCONY

APARTMENT

BEDROOM

WIR

APARTMENT

LIVING

BALCONY

APARTMENT

LIVING

TERRACE

APARTMENT

LIVING

ENS.

BATH.

BATH.

BATH.

1

164

BOUNDARY

4

147

PASSAGE

PASSAGE 37 HARROW ST

PROPOSED 4 STOREY DEVELOPMENT

PASSAGE

PASSAGE

COURTYARD 89,279 (NGL)

BASEMENT CAR PARK

-3,650.0 -1 Basement

RAMP

2072-DB 195/350

PRELIMINARY S.T.C.A.

SECTION B

1:200 CLIENT

Yifan Pan

PROJECT

Proposed Apartment Building 39 Harrow Street, Box Hill, Melbourne

DRAWING

Proposed Sections Sections

PRINT DATE

SCALE

3/12/15

DRAWN

FR

1:200 @ A3 ARCHITECT

AM

CHECKED

PROJECT NUMBER

10264

DRAWING NUMBER [REVISION]

TP.07.1

/Volumes/Studio/projects/10264 39 Harrow St Box Hill/02models/39 Harrow St Box Hill.pln

Moull Murray Architects ABN 16 407 051 599

Melbourne Level 1, 312 New Street Brighton. VIC. 3186 T.+61 3 9530 8905 F.+61 3 9530 8906

info@moullmurrayarchitects.com.au moullmurrayarchitects.com.au


TP.08.1

TP.08.2

Proposed Shadow Diagrams

Proposed Shadow Diagrams

11AM SHADOW

12 PM SHADOW 11m HIGH MASSING OVER FULL SITE

11m HIGH MASSING OVER FULL SITE

PROPOSED SHADOW LINE

PROPOSED SHADOW LINE

PRELIMINARY

PRELIMINARY

12PM

1:433.21

1:433.21

PROJECT

Proposed Apartment Building 39 Harrow Street, Box Hill, Melbourne

DRAWING

CLIENT

Yifan Pan Proposed Shadow Diagrams 11AM SHADOW

PROJECT

PRINT DATE

3/12/15

DRAWN

FR

ARCHITECT

AM

SCALE

1:200 @ A3

S.T.C.A.

S.T.C.A.

1PM

PROJECT NUMBER

Proposed Apartment Building 10264 39 Harrow Street, Box Hill, Melbourne CHECKED

CLIENT DRAWINGDRAWING NUMBER [REVISION]

PROJECT PRINT DATE Melbourne

SCALE

DRAWING PROJECT NUMBER

DRAWING NUMBER [REVISION]

Brighton. VIC. 3186 Apartment Building Proposed Yifan Shadow Pan Diagrams Proposed 10264 Proposed Shadow Diagrams TP.08.2 TP.08.1 T.+61 3 9530 8905 12 PM SHADOW Harrow Street, Box Hill, Melbourne 1PM SHADOW ARCHITECT CHECKED Moull Murray Architects DRAWNF.+6139 3 9530 8906

/Volumes/Studio/projects/10264 39 Harrow St Box Hill/02models/39 Harrow St Box Hill.pln

Level 1, 312 New Street 3/12/15

ABN 16 407 051 599

FR

AM

info@moullmurrayarchitects.com.au moullmurrayarchitects.com.au

1:200 @ A3

/Volumes/Studio/projects/10264 39 Harrow St Box Hill/02models/39 Harrow St Box Hill.pln

PRINT DATE

3/12/15

SCALE Melbourne Level 1, 312 New Street 1:200 @ Brighton. VIC. 3186 T.+61 3 9530 8905 ARCHITECTF.+61 3 9530 8906CHECKED

Moull Murray DRAWN Architects ABN 16 407 FR 051 599

AM

info@moullmurrayarchitects.com.au moullmurrayarchitects.com.au

A3

PROJECT NUMBER

10264

/Volumes/Studio/projects/10264 39 Ha


TP.08.4 Proposed Shadow Diagrams

2PM SHADOW 11m HIGH MASSING OVER FULL SITE

PROPOSED SHADOW LINE

41-45 HARROW STREET EXISTING 3 STOREY MULTI-RESIDENTIAL NEIGHBOURING APARTMENT 39 HARROW STREET PROPOSED APARTMENT

PROPOSED APARTMENT SHADOW PROJECTION AT 2PM

PRELIMINARY

2PM

S.T.C.A.

2PM shadow projection CLIENT

Yifan Pan

PROJECT

Proposed Apartment Building 39 Harrow Street, Box Hill, Melbourne

DRAWING

Proposed Shadow Diagrams 2PM SHADOW

PRINT DATE

SCALE

3/12/15

DRAWN

FR

1:200 @ A3 ARCHITECT

AM

CHECKED

PROJECT NUMBER

10264

DRAWING NUMBER [REVISION]

TP.08.4

/Volumes/Studio/projects/10264 39 Harrow St Box Hill/02models/39 Harrow St Box Hill.pln

Moull Murray Architects ABN 16 407 051 599

Melbourne Level 1, 312 New Street Brighton. VIC. 3186 T.+61 3 9530 8905 F.+61 3 9530 8906

info@moullmurrayarchitects.com.au moullmurrayarchitects.com.au


TP.09.3 Imagery PRELIMINARY Perspectives S.T.C.A.

CLIENT

Yifan Pan

PROJECT

Proposed Apartment Building 39 Harrow Street, Box Hill, Melbourne

DRAWING

PRINT DATE

SCALE

3/12/15

Imagery Perspectives

1:1 @ A3

DRAWN

ARCHITECT

FR

AM

CHECKED

PROJECT NUMBER

10264

DRAWING NUMBER [REVISION]

TP.09.1

/Volumes/Studio/projects/10264 39 Harrow St Box Hill/02models/39 Harrow St Box Hill.pln

Moull Murray Architects ABN 16 407 051 599

Melbourne Level 1, 312 New Street Brighton. VIC. 3186 T.+61 3 9530 8905 F.+61 3 9530 8906

info@moullmurrayarchitects.com.au

moullmurrayarchitects.com.au CLIENT

Yifan Pan

PRELIMINARY S.T.C.A. CLIENT

Yifan Pan

PROJECT

Proposed Apartment Building 39 Harrow Street, Box Hill, Melbourne

DRAWING

Imagery Perspectives

PRINT DATE

SCALE

3/12/15

DRAWN

FR

1:1 @ A3 ARCHITECT

AM

CHECKED

PROJECT NUMBER

10264

DRAWING NUMBER [REVISION]

TP.09.3

/Volumes/Studio/projects/10264 39 Harrow St Box Hill/02models/39 Harrow St Box Hill.pln

Moull Murray Architects ABN 16 407 051 599

Melbourne Level 1, 312 New Street Brighton. VIC. 3186 T.+61 3 9530 8905 F.+61 3 9530 8906

info@moullmurrayarchitects.com.au moullmurrayarchitects.com.au

PROJECT

Proposed Apartment Building 39 Harrow Street, Box Hill, Melbourne

DRAWING

Imagery Perspectives

PRINT DATE

SCALE

3/12/15

DRAWN

FR

1:1 @ A3 ARCHITECT

AM

CHECKED

PROJECT NUMBER

10264

DRAWING NUMBER [REVISION]

TP.09.2

/Volumes/Studio/projects/10264 39 Harrow St Box Hill/02models/39 Harrow St Box Hill.pln

Moull M

ABN 16 407


SKETCH DESIGN 2

SASH DESIGN RESIDENTIAL


sketch design

Park Avenue residential redeveloment

option 1: ground floor


option 1: first floor


option 1: perspective


option 2: ground floor


option 2: first floor


option 2: perspective


option 3: ground floor


option 3: first floor


option 3: perspective


Turn static files into dynamic content formats.

Create a flipbook
Issuu converts static files into: digital portfolios, online yearbooks, online catalogs, digital photo albums and more. Sign up and create your flipbook.