port folio
FARAH ROZHAN
WOR K
EX
N E CE I R E P
MINX ARCHITECTURE education
moull murray architects multi-residential
sash design residential
SD-DD-CD-CA
3D MODELLING
FURNITURE DESIGN
MINX ARCHITECTURE EDUCATION
MASTER PLAN
SD-DDCD-CA
St. Dominics Primary School STEAM Centre
PLAYING FIELD
ADJACENT RESIDENTIAL PROPERTY
CLASSROOM WING
EXISTING PLAYGROUND
PLAY EQUIPMENT
CLASSROOM WING
JUNIOR PLAYGROUND
PLANTER POT PLANTER POT
CONC NAIL TBM 121.57
PLANTER POT
PLANTER POTS
PLANTER POTS
ADMINISTRATION
SHED GAS METER
6 A03
CARPARK
2
CONC NAIL TBM 120.75
VEHICLE EXIT
A02 RWT
STATUE
CLASSROOM WING
KIT. GARDEN
SENIOR PLAY EQUIP.
ST.DOMINICS COMMUNITY CENTRE CARPARK
COVERD WAY
OUTDOOR LEARNING
STEAM CENTRE
CONC NAIL TBM 121.39
BASKETBALL COURT
GARAGE
VEHICLE ENTRY
CLASSRM
1 A02
SPORTS STORE
PARISH RESOURCE CENTRE
PARISH TENNIS COURTS
ST.DOMINICS PRESPYTERY
ST.DOMINICS PARISH CHURCH
30.48m 180d01'30"
36.58m 270d02'30"
GYMNASIUM
TIMBER FENCE
VEHICLE ACCESS
1
PROPOSED SITE PLAN SCALE 1:500
JENSEN ROAD
JOSEPH STREET
NETBALL POST
BOYS & GIRLS TOILETS
MEET RM
EXISTING JUNIOR PLAYGROUND
CONC. SPOON DRAIN
CLASSROOM WING
PLAYING FIELD
VEHICLE ACCESS
CAMP ROAD
ADJACENT COMMERCIAL PROPERTY
F:\ajobs\0000-JOB NUMBER\Legends
LEGEND ACU AFL AP# BA# CH COL DB DP FE FFL FHR FR FW GR GU# HD HWU LC# PA PB# PC# PL# PN# PTD RU S# SD SK SHR SHC TMV TH TI# TP TR# VN# VB# WC# WT#
EXISTING BRICK PAVING EXISTING CONC. PAVING CONC STEPS AND LANDING
SERVICE DUCT
CONC STEPS AND LANDING
CONC STEPS AND LANDING
DP UP
UP
EX METAL BALUSTRADE & POSTS TO REMAIN
EXIST. PIT TO REMIAN
STAIRS
STAIRS
CONC STEPS AND LANDING DP
UP
EX METAL BALUSTRADE & POSTS TO REMAIN
STAIRS
EX METAL BALUSTRADE & POSTS TO REMAIN NEW PIT REFER CIVIL ENGINEERS DRGS
EX. PIT
EX. POST
EX. POST
EXISTING PLAYGROUND
EXISTING JUNIOR PLAYGROUND
EXISTING JUNIOR PLAYGROUND TO BE RETAINED
EX. METAL GATE
EXISTING TOILETS
EX. METAL FENCE
NEW CONC.BASE
EX. CONC PAVING
NEW ELEC. PIT REFER ELEC. ENGINEERS DRGS
EXISTING FENCING
EX. STEEL COL
EX. SHED RELOCATED TO NEW POSITION
EX. GAS METER & ENCLOSURE NEW CONC. BASE
EXSIT. SW PIT TO REMAIN REFER CIVIL ENGINEERS DRGS
NEW DP
EX. RAINWATER TANK RELOCATED TO NEW POSITION
CONCRETE PLANTER POT
RAMP UP
DP
NEW ELEC. PIT REFER ELEC. ENGINEERS DRGS
NEW CONCRETE PAVING WITH PLEXIPAVE & LINE MARKING REFER CIVIL ENGINEERS DRGS
PROPOSED BUILDERS 1800mm TEMPORARY FENCE ENCLOSURE
NEW TIMBER FRAMED BLADE COLUMN SHEETED WITH FIBRE CEMENT SHEET
LINE OF COVERED WAY OVER EX. STEEL COL
DP
EXTENT OF NEW BUILDING WORKS
RAMP UP
EX. PIT
EX. STEEL COL
EX. POST
EX. POST
EX. GATE VALVE COVER
EX SHADE STRUCTURE
EX. POST
NEW CONCRETE PAVING WITH PLEXIPAVE & LINE MARKING REFER CIVIL ENGINEERS DRGS
EX. STEEL COL EXIST. CONCRETE
EX. STEEL COL
PLANTER BOX
LINE OF COVERED WAY OVER SHOWN DOTTED EXIST. CONCRETE
NEW 1800mm HIGH POWDERCOATED METAL FENCE & GATE NEW SW PIT REFER CIVIL ENGINEERS DRGS
SERVICE DUCT OVER
COVERED WAY
PLANTER BOX
KITCHEN GARDEN
EXIST. GARDEN BED & LANDSCAPING TO REMAIN
METAL SERVICE DUCT MOUNTED TO UNDERSIDE OF COVERED WAY
EX. STEEL COL
EX. GARDEN STATUE
NEW CONCRETE SPOON DRAIN REFER CIVIL ENGINEERS DRGS
CONCRETE PLANTER POT
NEW PIT REFER CIVIL ENGINEERS DRGS
EXIST. PIT TO REMAIN REFER CIVIL ENGINEERS DRGS
EX SHADE STRUCTURE
EXISTING GENERAL LEARNING SPACE
SERVICE DUCT OVER
PLANTER BOX PLANTER BOX
PROPOSED BUILDERS 1800mm TEMPORARY FENCE ENCLOSURE
EX. POST
DP
EX. POST
EXISTING SAND PIT
EX. STEEL COL
EXISTING TIMBER SLEEPER RETAINING WALL TO REMAIN
NEW I/O REFER CIVIL ENGINEERS DRGS
COVERED OUTDOOR LEARNING
NEW TIMBER EDGING TO MATCH EXISTING
NEW CONCRETE
PROPOSED BUILDERS 1800mm TEMPORARY FENCE ENCLOSURE
PROPOSED BUILDERS 1800mm TEMPORARY FENCE ENCLOSURE
NEW I/O REFER CIVIL ENGINEERS DRGS
NEW I/O REFER CIVIL ENGINEERS DRGS
CONCRETE PLANTER POT
RAMP UP
DP
NEW STEEL COL
EXSIT. SW PIT TO REMAIN REFER CIVIL ENGINEERS DRGS
NEW DP EXIST. COL
EXIST. BASKETBALL LINE MARKING NEW STEEL COL LINE OF EAVES OVER
EXIST. NETBALL/ BASKETBALL RING & POST
CONCRETE PAVING & CHAINWIRE MESH ENCLOSURE WITH GATES
NEW COVERED WAY NEW CONCRETE NEW STEEL COL PROPOSED BUILDERS 1800mm TEMPORARY FENCE ENCLOSURE
EX METAL BALUSTRADE & POSTS TO REMAIN
AIR CONDITION UNIT ABOVE FLOOR LEVEL QUIETSPACE ACOUSTIC PANELS BASIN COAT HOOKS COLUMN DISTRIBUTION BOARD DOWN PIPE FIRE EXTINGUISHER FINISHED FLOOR LEVEL FIRE HOSE REEL FRIDGE FLOOR WASTE GRAB RAIL GUTTER HAND DRYER HOT WATER UNIT LAMINATE FINISH PUBLIC ADDRESS SPEAKER PLASTERBOARD PAINT COLOUR PLYWOOD PANELING PINBOARD PAPER TOWEL DISPENSER RACK UNIT CABINET SINK SOAP DISPENSER TIMBER SKIRTING SHOWER SHOWER CURTAIN THERMOSTATIC MIXING VALVE TOILET ROLL HOLDER TACTILE INDICATOR TOILET PARTITION TROUGH VINYL VILLABOARD WATER CLOSET WALL TILE EXTENT OF NEW CONCRETE PAVING
LINE OF COVERED WAY OVER EX. STEEL COL EX. PIT
EX. STEEL COL
PROPOSED BUILDERS 1800mm TEMPORARY FENCE ENCLOSURE
DP
DRINKING TROUGH
DP BENCH
RAMP UP
EX. GATE VALVE COVER
CONCRETE PLANTER POT
CONCRETE PLANTER POT
DRINKING TROUGH BENCH
DRINKING TROUGH
DP BENCH
CONTRACTORS MUST VERIFY ALL DIMENSIONS ON SITE PRIOR TO COMMENCING WORKS ON SITE. ALL SHOP DRAWINGS MUST BE SUBMITTED FOR APPROVAL BY THE ARCHITECT BEFORE MANUFACTURE PROCEEDS.
A
CONSULTANTS ISSUE
B
CONSULTANTS ISSUE
FR
21.02.17
C
CONSULTANTS ISSUE
FM
10.03.17
D
CONTRACT DOCUMENTATION ISSUE
FM
24.03.17
E
TENDER ISSUE
FM
20.04.17
F
CONSTRUCTION ISSUE
FM
06.06.17
JB
02.08.17
FM
22.01.18
G
02 -
CIVIL & STORMWATER REVISIONS
17.02.17
PITS DELETED H
EX. STEEL COL
FR
AS BUILT
PROPOSED SITE PLAN - PLAYGROUND
1:100
MINX ARCHITECTURE PTY LTD 7A / 91 MORELAND STREET, FOOTSCRAY, VIC. 3011 PHONE: (03) 9646 7000 E-MAIL: info@minxarchitecture.com.au WEB: www.minxarchitecture.com.au
NEW I/O REFER CIVIL ENGINEERS DRGS NEW I/O REFER CIVIL ENGINEERS DRGS
NEW 1800mm HIGH POWDER COATED METAL FENCE
-
EXISTING SPORTS STORE EXISTING TO REMAIN
EXISTING ROLLER DOOR TO REMAIN
PROPOSED STEAM CENTRE
NEW ELEC. PIT REFER ELEC. ENGINEERS DRGS
01
NEW STEEL COL
PROPOSED SITE PLAN - STEAM CENTRE
1:100
EX. STEEL COL EXISTING COVERED WAY OVER TO REMAIN
EX. GARDEN BED TO REMAIN. NEW SLEEPER RETAINING WALL TO BE CONSTRUCTED TO SUIT NEW LEVELS
St Dominics Primary School S.T.E.A.M Building 408 Camp Road Broadmeadows VIC 3047 PROPOSED SITE PLAN
FM
1:100
1611-A02
JAN 18
H 22.01.18
EXIST. BUILDING 10
A06
LEGEND
EXIST. BUILDING
EXIST. BUILDING
ACU AFL BK# CT# DB DP FB FE FFL FHR FR FW HWU LC# PA PB# PC# PL# PN# RU S# SD SK TR# TM# VN# VB#
D
A05
EXIST. COL
EXIST. COL
NEW DP EXIST. COL
EXIST. COL
EXISTING COVERED WAY OVER
EXIST. COL 200
10090 CL COL
FLOOR PLAN
STEAM BUILDING 1:100
LED STRIP LIGHT FITTING. REFER ELECTRICAL DRAWINGS
LIGHT
CEILING MOUNTED LIGHT FITTING. REFER ELECTRICAL DRAWINGS
RF1
NEW BEAM
CLASSROOM
AC-1 SLOPING 10 DEG. SLOPE
EQ
EQ
EQ
DEMOLISH EXIST. UPPER COVERED WALKWAY ROOF OVERHANG
NEW
BC1
LIGHT
NEW ZINCALUME METAL ROOF SHEETING TO MATCH EXIST. PROFILE LINE OF STEAM BUILDING EAVES OVER
CONTRACTORS MUST VERIFY ALL DIMENSIONS ON SITE PRIOR TO COMMENCING WORKS ON SITE. ALL SHOP DRAWINGS MUST BE SUBMITTED FOR APPROVAL BY THE ARCHITECT BEFORE MANUFACTURE PROCEEDS. 100 x 75mm DP
100 x 75mm DP &SPREADER
BC1 2 DEG. SLOPE
AF1
EXIST. SPORTS STORE
GU1
EXIST. SPORTS STORE
PL-1
BC1
STEAM BUILDING
SLOPING UNDERSIDE NEW METAL ROOF SHEETING & PURLINS TO WALKWAY ROOF
A05
2
REFLECTED CEILING PLAN
STEAM BUILDING 1:100
WALL MOUNTED LIGHT FITTING. REFER ELECTRICAL DRAWINGS
BC1
DP & SPREADER
NEW BEAM
CEILING MOUNTED LIGHT FITTING. REFER ELECTRICAL DRAWINGS
CEILING MOUNTED FAN. REFER ELECTRICAL DRAWINGS
NEW
AF1
EQ
10 DEG. SLOPE
A05
LINE OF BUILDING SHOWN DOTTED BELOW
DP
LIGHT
AF1
2575
1810
LIGHT
A
GU1
NEW STEEL BEAM REFER ENGRINEERS DRGS
DP & SPREADER
OVERALL
E
COVERED WAY
D
A05
NEW CLASSROOM EQ
EXIST. COL
EXIST. SPORTS STORE 1810
CEILING MOUNTED LIGHT FITTING. REFER ELECTRICAL DRAWINGS
1:500 FALL
RF1
LIGHT
D
10 DEG FALL
NEW METAL COLORBOND BARGE CAPPING
100 X 75MM DP
CL ROOM DP
COLORBOND BACK FLASHING
10 DEG FALL
950
06
A08
1:20 GRADE UP
W
EXIST. ROOF
BC1
LINE OF NEW COVERED WALKWAY ROOF BELOW
EXHAUST FAN. REFER MECHANICAL DRAWINGS
760
1:500 FALL NEW STEEL BEAM REFER ENGRINEERS DRGS
EQ
EQ
EQ
EXF FAN
NEW COVERED WAY OVER
10 DEG. SLOPE EQ
COLORBOND BACK FLASHING
EXF FAN
GU1
RANGEHOOD RISER DUCT & FLUE
EQ
COL
A06
06
EXIST. COVERED WALKWAY ROOF
100 x 75mm DP &SPREADER
GU1
GU1
CL ROOM EQ EQ
CL ROOM
GU1
1810 590
4800
EXIST. BEAM
NEW METAL ROOF PURLINS REFER ENGRINEERS DRGS
12mm PLYWOOD SHEET TO EXTERNAL SOFFIT & EAVES FIXED TO TIMBER BATTENS. REFER TO SPECIFICATION
LED MAINTAINED CEILING OR WALL MOUNTED EMERGENCY EXIT LUMINAIRE. REFER ELECTRICAL DRAWING
EX
EXIST. BUILDING NEW STEEL FIXING ANGLE REFER ENGRINEERS DRGS
10mm THICK FLUSH-JOINTED PLASTERBOARD FIXED TO TIMBER CEILING JOISTS
LED RECESSED EMERGENCY LUMINAIRE. REFER ELECTRICAL DRAWING
EQ
1810 1810 590
SLOPING
COLORBOND HALF ROUND COLORBOND GUTTER COLOR: COTTAGE GREEN 13mm THICK ACOUSTIC PERFORATED PLASTERBOARD FIXED TO METAL FURRING CHANNELS ON DIRECT FIXING CLIPS
DENOTES RECESSED PASSIVE INFRARED MOVEMENT SENSOR. REFER ELECTRICAL DRAWINGS
PIR
STEAM CENTRE
10 DEG. SLOPE
1430 4800
09
A06
09a
FB
1310
EXIST. BEAM
DP
05
WHITEBOARD/PINBOARD 250
EQ
2060 U/S EXPOSED TIMBER TRUSS
10 DEG. SLOPE
590
AUTO LOUVRE CONTROL BOX
HW
W
B
LIGHT
08a A06
1
EQ
2890
A06
CARPET TILES
950
EQ
2060 U/S EXPOSED TIMBER TRUSS
1:8 THRESHOLD RAMP
02
HEIGHT
COLORBOND CUSTOM ORB ROOFING COLOR: PALE EUCALYPT
LEGEND - ELECTRICAL & MECHANICAL EF
DP & SPREADER
EQ
BRICKWORK
CLASSROOM
02
D
FB
08
PL-1
LINE OF EXIST. COVERED WALKWAY ROOF BELOW
PL-1 LIGHT
04
HEIGHT
A05
A08
D 03
2 x LAYERS 13mm FIRE RATED PLASTERBOARD FIRE RATED WALL
ROOMS
W 04
ERU 1 & NDB1 UNDER
90
A08
PB-1
A05
NEW UPVC DOWNPIPE & OVERFLOW -PAINT FINISH
BC1
COVERED OUTDOOR LEARNING
EX
2890
02 HW
STEAM CENTRE AC-1
COL
04 BRICKWORK
EQ
RANGEHOOD RISER DUCT
07
DP
HEIGHT
C
EXIST. BEAM
100 X 75MM DP
SLOPING
17150
A08
HALF GLAZED TIMBER BI-FOLDING DOOR
07
HIGHLIGHT WINDOW 6285
3635 1869
LINE OF EAVES OVER
CL COL
8685
5530
90
5140
1500
12
A08
A/C
CONCRETE PAVING & CHAINWIRE MESH ENCLOSURE WITH GATES
7175
S FB
A06
A06
OVERALL
W 03
RANGEHOOD OVER
04 FR
COL
A08
GRID OFFSET
2890 COL CL CL COL
4800
20690 CL COL
11
A08
HOT PLATE & UNDERBENCH OVEN
HWS
02 S
A/C
CL COL
A06
BC1
EXIST. BEAM
EX
DP
10 DEG. SLOPE
W
S
09 S
AC-1
EXPOSED TIMBER ROOF TRUSS
TRUSS AT HIGH LEVEL
HOT PLATE & UNDERBENCH OVEN
A05
200
05
A08
RANGEHOOD OVER
A
4800
55 HIGHLIGHT WINDOW
2006 4800
5730
W
01
S
10
DP
W
A08
FB
A06
08
RAINWATER TANK SHOWN DOTTED BELOW
UNDERSIDE EXIST. METAL ROOF SHEETING & PURLINS
10 DEG. SLOPE
2015
03
VINYL
TALL CUPBAORD
SLOPING
COL
HALF GLAZED TIMBER BI-FOLDING DOOR
STEAM CENTRE
03
EXIST. UPPER METAL COVERED WALKWAY ROOF
RAINWATER TANK SHOWN DOTTED BELOW
NEW GUTTER & FALL
10 DEG. SLOPE 175
01
1810
A08
05
HW
HW
UNDERSIDE EXIST. METAL ROOF SHEETING & PURLINS TO UPPER COVERED WALKWAY ROOF
NEW UPVC DOWNPIPE & OVERFLOW -PAINT FINISH
DEMOLISH PART OF EXIST. COVERED WALKWAY ROOF
PL-1
470
D 01
04
06
COVERED OUTDOOR LEARNING
A06
590
CONCRETE
230
DP
250
EXIST. COL
COVERED OUTDOOR LEARNING 03
A06
A05
GU1
LINE OF ROOF OVER
02
B
3540
ISLAND PREP. BENCH
LINE OF EAVES OVER
2630
TR
3715
880
01
A06
A05
CL COL
1500
LINE OF EXIST. COVERED WALKWAY ROOF BELOW
CONCRETE
600
1:8 THRESHOLD RAMP
250
RF1
EXIST. ROOF
CL COL
230
C
LEGEND - ceiling materials & finishes
EXIST. BUILDING
EXIST. EXIST. BUILDING BUILDING
2015
COL CL
10490
350
BRICKWORK
GRIDS
200
NEW COVERED WAY OVER
OVERALL
EXIST. BUILDING
AIR CONDITION UNIT ABOVE FLOOR LEVEL BRICK CERAMIC TILE DISTRIBUTION BOARD DOWN PIPE FLOOR BOX FIRE EXTINGUISHER FINISHED FLOOR LEVEL FIRE HOSE REEL FRIDGE FLOOR WASTE HOT WATER UNIT LAMINATE FINISH PUBLIC ADDRESS SPEAKER PLASTERBOARD PAINT COLOUR PLYWOOD PANELING PINBOARD RACK UNIT CABINET SINK SOAP DISPENSER TIMBER SKIRTING TROUGH TIMBER FINISH VINYL VILLABOARD
A
CONSULTANTS ISSUE
FR
17.02.17
B
COST PLAN D _QS ISSUE
FM
10.03.17
C
CONTRACT DOCUMENTATION ISSUE
FM
24.03.17
D
TENDER ISSUE
FM
20.04.17
E
CONSTRUCTION ISSUE
FM
06.06.17 02.08.17
F
CIVIL REVISIONS
JB
G
AMEND DIMENSION
FM
29.08.17
H
REPLACE PROPOSED WINDOW W07 WITH DOOR D04
FR
11.10.17
I
AS BUILT
FM
22.01.18
2 DEG FALL RF1
NEW BEAM
REMOVE & MODIFY EXIST. GUTTER COMPLETE WITH STOP END
4
ROOF PLAN
STEAM BUILDING 1:100 MINX ARCHITECTURE PTY LTD 7A / 91 MORELAND STREET, FOOTSCRAY, VIC. 3011 PHONE: (03) 9646 7000 E-MAIL: info@minxarchitecture.com.au WEB: www.minxarchitecture.com.au
FINISHES SCHEDULE LIGHT
BLANK-OFF EXIST. FLOOR GRILLE REFER MECHANICAL DRGS
UNDERSIDE EXIST. METAL ROOF SHEETING & PURLINS TO UPPER COVERED WALKWAY ROOF
MEETING ROOM NEW WALL MOUNTED A/C UNIT. REFER MECHANICAL DRGS
NEW BEAM
DP
EXIST. BEAM
FLOOR PLAN
ADMINISTRATION MEETING ROOM 1:100
3
CUSTOM-ORB PROFILED STEEL SHEET. COLORBOND FINISH SHADOWCLAD NATURAL TEXTURE PLYWOOD CLADDING. PAINT FINISH
TM1
TEXTURED TIMBER CLADDING
DP & SPREADER
100 x 75mm DP
FALL ARREST ANCHOR POINT STATIC LINE SYSTEM
LADDER SUPPORT BRACKET
REFLECTED CEILING PLAN
COVERED WALKWAY 1:100
FACE BRICKWORK - AUSTRAL BRICK GREY
PL1
ANCHOR POINT STROP
EXIST. SPORTS STORE EXIST. MODIFIED GUTTER
6
BK1 MS1
NEW
BC1
EXIST. SPORTS STORE ROOF
NO ACCESS AREA
BC1
EXIST. GUTTER CUT TO NEW LENGTH WITH NEW STOP END & RE-INSTALLED
5
ROOF PLAN
EXIST. UPPER METAL COVERED WALKWAY ROOF
St Dominics Primary School S.T.E.A.M Building 408 Camp Road Broadmeadows VIC 3047 PROPOSED PLANS
COVERED WALKWAY 1:100 FM
1:100
1611-A03
JAN 18
I 22.01.18
FINISHES SCHEDULE BK1
FACE BRICKWORK - AUSTRAL BRICK GREY
MS1
CUSTOM-ORB PROFILED STEEL SHEET. COLORBOND FINISH
PL1 TM1
SHADOWCLAD NATURAL TEXTURE PLYWOOD CLADDING. PAINT FINISH TEXTURED TIMBER CLADDING FALL ARREST ANCHOR POINT STATIC LINE SYSTEM
LINE OF EXISTING GYMNASIUM BUILDING SHOWN DOTTED
ANCHOR POINT STROP LADDER SUPPORT BRACKET NO ACCESS AREA
NEW STEEL COVERED WAY BEYOND NEW STEEL COVERED WAY EXIST. BRICK VENEER BUILDING
ALUMINIUM FIXED HIGHLIGHT WINDOW
COLORBOND METAL BARGE CAPPING
EXPOSED TIMBER TRUSS TOP CHORD REFER ENGINEERS DRGS
240 x 30mm H3 TREATED PINE BARGE BOARD
LINE OF EXISTING SPORTS STORE BUILDING SHOWN DOTTED
240 x 30mm H3 TREATED PINE BARGE BOARD
NEW COLORBOND APRON FLASHING INFILL TO EXPOSED BUILDING END
COLORBOND METAL BARGE CAPPING
HALF ROUND COLORBOND GUTTER
EXIST. STEEL COVERED WAY SHOWN HATCHED
HALF ROUND COLORBOND GUTTER
HW
01 SELECTED FACE BRICKWORK
EXIST. STEEL COVERED WAY
/ / / /
BK1
04
/
/
/
01
/
/
SLAB LEVEL RL 122.020
/
/
/
/
/
/
/
/
/
/
/
/
SLAB LEVEL RL 122.020
D
NEW GALV. STEEL POST
EXIST. METAL BOUNDARY FENCE
2100
/ /
/
/
/
4190
/ /
/
3045
/ /
/
BK1
/
BK1
NEW COVERED WALKWAY
D
/
/
DIRECTION OF BI-FOLDIING DOORS
/
/
EXIST. CONCRETE PAVING
TIMBER GLAZED BI-FOLDING DOORS SELECTED FACE BRICKWORK
NEW CONCRETE PAVING
3
NORTH ELEVATION
1
SCALE 1:100
NAT. ANODISED ALUMINIUM WINDOW FRAME & AUTO LOUVRE SYSTEM
NAT. ANODISED ALUMINIUM WINDOW FRAME & AUTO LOUVRE SYSTEM
COLORBOND CUSTOM ORB ROOF SHEETING
HALF ROUND COLORBOND GUTTER
HALF ROUND COLORBOND GUTTER
NEW STEEL COVERED WAY
DP & SPREADER
2420
W 06 EXIST. GALV. STEEL POST
EXPANSION JOINT
EXIST. SINGLE STOREY BRICK VENEER BUILDING IN FOREGROUND
EXIST. BRICK VENEER BUILDING
LIGHT
BK1
02
EXISTING ROLLER SHUTTER
2
LIGHT
D
EXISTING SPORTS STORE BUILDING
SLAB LEVEL RL 122.020
SCALE 1:100
DP & SPREADER
LIGHT
EXISTING GYMNASIUM BUILDING
SOUTH ELEVATION
BK1
W
EXPANSION JOINT
W
05
04
NEW GALV. STEEL POST & DP
W
W
03
02
SELECTED FACE BRICKWORK
NEW GALV. STEE POST
EXPANSION JOINT
CLAY TROUGH WITH SUPPORT LEGS. REFER TO SPEC
EXIST. GALV. STEEL POST
NEW GALV. STEEL POST & DP
EXIST. GALV. STEEL POST
EXIST. GALV. STEEL POST
EXIST. GALV. STEEL POSTS
EXIST. GALV. STEEL POST
EAST ELEVATION SCALE 1:100
EXIST. RELOCATED POLY RAINWATER TANK NEW PVC DOWNPIPE & OVERFLOW -PAINT FINISH
NEW ZINCALUME GUTTER
COLORBOND CUSTOM ORB ROOF SHEETING
NEW ZINCALUME METAL ROOF SHEETING TO MATCH EXIST. PROFILE
EXIST. BRICK VENEER BUILDING
HALF ROUND COLORBOND GUTTER
INSTANTANEOUS HWU
HW
EXIST. GALV. STEEL POST
NEW TIMBER FRAMED BLADE COLUMN SHEETED WITH FIBRE CEMENT SHEET
NEW CONCRETE BASE
EXIST. GALV. STEEL POST
EXIST. GALV. STEEL POST
HW 02
BK1 1200
DP
EXIST. GALV. STEEL POST
WEST ELEVATION
03 2400
BK1
EXIST. GALV. STEEL POSTS
SLAB LEVEL RL 122.020
NEW ZINCALUME APRON / BARGE CAPPING
A
ISSUED FOR TOWN PLANNING
FR
01.09.16
B
AMENDED DRAWINGS FOR TOWN PLANNING PERMIT
JB
06.12.16
C
CONSULTANTS ISSUE
FR
17.02.17
D
COST PLAN D _QS ISSUE
FM
10.03.17
E
CONTRACT DOCUMENTATION ISSUE
FM
24.03.17
F
TENDER ISSUE
FM
20.04.17
G
CONSTRUCTION ISSUE
FM
06.06.17
H
DOWNPIPE REVISIONS
JB
J
02.08.17
AMEND HW02 & 03 SILL DIM
FM
29.08.17
K
REPLACE PROPOSED WINDOW W07 WITH DOOR D04
FR
11.10.17
L
AS BUILT
FM
22.01.18
MINX ARCHITECTURE PTY LTD 7A / 91 MORELAND STREET, FOOTSCRAY, VIC. 3011 PHONE: (03) 9646 7000 E-MAIL: info@minxarchitecture.com.au WEB: www.minxarchitecture.com.au
EXIST. STEEL COVERED WAY
EXIST. BRICK VENEER BUILDING
CONTRACTORS MUST VERIFY ALL DIMENSIONS ON SITE PRIOR TO COMMENCING WORKS ON SITE. ALL SHOP DRAWINGS MUST BE SUBMITTED FOR APPROVAL BY THE ARCHITECT BEFORE MANUFACTURE PROCEEDS.
01
NEW GALV. STEEL POST
BRICK ON EDGE WINDOW SILL
EXIST. SINGLE STOREY BRICK VENEER BUILDING BEYOND
4
EXIST. BRICK VENEER BUILDING
EXIST. STEEL COVERED WAY
W
GAS ISOLATION VALVE CABINET
EXPANSION JOINT
W 08
EXPANSION JOINT NEW 3000 x 450 x 1800h CHAINWIRE MESH ENCLOSURE & GATES.
DP
EXISTING SPORTS STORE BUILDING AIRCONDITIONING CONDENSORS
EXPANSION JOINT SELECTED FACE BRICKWORK BRICK ON EDGE WINDOW SILL NAT. ANODISED ALUMINIUM WINDOW FRAME & AUTO LOUVRE SYSTEM
NEW CONCRETE BASE
EXISTING GYMNASIUM BUILDING
St Dominics Primary School S.T.E.A.M Building 408 Camp Road Broadmeadows VIC 3047
SCALE 1:100
PROPOSED ELEVATIONS
FM
1:100
1611- A04
JAN 18
L 22.01.18
COLORBOND RIDGE CAPPING
COLORBOND RIDGE CAPPING
03
A07 10 DEGREE
270
10 DEGREE
L ROOF FAL
A07
ROOF FAL
270
L
COLORBOND CUSTOM ORB ROOF SHEETING ON METAL PURLINS & SAFETY MESH
HALF ROUND COLORBOND GUTTER
HALF ROUND COLORBOND GUTTER
W
W
08
/ /
/
03
/
/
/
/
/
/
/
/
/
/
/
/
/
/
/
/
/
/
/
/
/
/
/
/
/
/
/
NAT. ANODISED ALUMINIUM WINDOW FRAME & AUTO LOUVRE SYSTEM
NEW COVERED WAY
/
/
NAT. ANODISED ALUMINIUM WINDOW FRAME & AUTO LOUVRE SYSTEM
/
/
/
/
/
/
/
/
/
/
/
/
/
/
/
EXIST. METAL BOUNDARY FENCE
SELECTED FACE BRICKWORK
/
/
/
/
2400
C200 METAL FASCIA PURLIN STEEL LINTEL REFER ENGINEERS DRGS
TEXTURED TIMBER CLADDING
STATIC LINE SYSTEM ANCHOR POINT STROP LADDER SUPPORT BRACKET
SPRINING HEIGHT - COVERED WAY BEAM
HW
/
/
/
/
/
2 DEGREE ROOF FALL
2400
/ / / / /
/
/
EXPOSED TIMBER TRUSS TOP CHORD REFER ENGINEERS DRGS
SHADOWCLAD NATURAL TEXTURE PLYWOOD CLADDING. PAINT FINISH
FALL ARREST ANCHOR POINT
NO ACCESS AREA
NEW COVERED WAY
EXIST. COVERED WAY
/
/
3085
SPRINING HEIGHT - TRUSS TOP CHORD 2060
UNDERSIDE TRUSS BOTTOM CHORD
/
/
/
/
CUSTOM-ORB PROFILED STEEL SHEET. COLORBOND FINISH
EXIST ROOF FALL
03 /
FACE BRICKWORK - AUSTRAL BRICK GREY
TM1
SPRINING HEIGHT - COVERED WAY BEAM
190 x 30mm H3 TREATED PINE FASCIA BOARD
BK1 MS1 PL1
2120
190mm HIGH TIMBER ROOF PURLINS REFER ENGINEERS DRGS
FINISHES SCHEDULE
2
UNDERSIDE EXIST.COVERED WAY FASCIA HEIGHT - APPROX.
COLORBOND CUSTOM ORB ROOF SHEETING ON SAKING, ROOF BLANKET & SAFETY MESH
/
/
/
/
CONCRETE SLAB ON MOISTURE BARRIER & SAND BED REFER ENGINEERS DRGS
SECTION A
1
CONCRETE SLAB ON MOISTURE BARRIER & SAND BED REFER ENGINEERS DRGS
CONCRETE PAD REFER ENGINEERS DRGS
04
3
A07
SCALE 1:50
SECTION C SCALE 1:50
COLORBOND RIDGE CAPPING
1
2
A07
A07
10 DEGREE
10 DEGREE
L
ROOF FAL
ROOF FAL
300
L
HW
2400
SPRINING HEIGHT - COVERED WAY BEAM
01
DIRECTION OF BI-FOLDIING DOORS
NEW COVERED WAY
D
EXIST. COVERED WAY
01
CONCRETE SLAB ON MOISTURE BARRIER & SAND BED REFER ENGINEERS DRGS
2
CONCRETE PAD REFER ENGINEERS DRGS
SECTION B SCALE 1:50
9
CONTRACTORS MUST VERIFY ALL DIMENSIONS ON SITE PRIOR TO COMMENCING WORKS ON SITE. ALL SHOP DRAWINGS MUST BE SUBMITTED FOR APPROVAL BY THE ARCHITECT BEFORE MANUFACTURE PROCEEDS.
A07
HW
02 08
6
8
A07
EXIST. SPORTS STORE
A07
BK1 EXIST. COVERED WAY
7
A07
EXIST. GALV. STEEL POST
SECTION D
01.09.16
JB
06.12.16 17.02.17
C
CONSULTANTS ISSUE
FR
D
CONSULTANTS ISSUE
FM
22.02.17
E
COST PLAN D _QS ISSUE
FM
10.03.17
F
CONTRACT DOCUMENTATION ISSUE
FM
24.03.17
G
TENDER ISSUE
FM
20.04.17
H
CONSTRUCTION ISSUE
FM
06.06.17
I
AS BUILT
FM
22.01.18
A07
SCALE 1:50
NAT. ANODISED ALUMINIUM WINDOW FRAME & AUTO LOUVRE SYSTEM
10
A07
MINX ARCHITECTURE PTY LTD NEW STEEL COVERED WAY
HALF ROUND COLORBOND GUTTER
11
A07 DP & SPREADER
DP & SPREADER
LIGHT
LIGHT
D 02
EXIST. COVERED WAY
FR
AMENDED DRAWINGS FOR TOWN PLANNING PERMIT
5
COLORBOND CUSTOM ORB ROOF SHEETING
EXIST. GYMNASIUM
ISSUED FOR TOWN PLANNING
03 W
4
A B HW
EXISTING ROLLER SHUTTER
W
W
06
05 EXPANSION JOINT
7A / 91 MORELAND STREET, FOOTSCRAY, VIC. 3011 PHONE: (03) 9646 7000 E-MAIL: info@minxarchitecture.com.au WEB: www.minxarchitecture.com.au
St Dominics Primary School S.T.E.A.M Building 408 Camp Road Broadmeadows VIC 3047
LIGHT
BK1
BK1
NEW COVERED WAY
W 04 EXPANSION JOINT
W
W
03
02
W
PROPOSED SECTIONS
01 EXPANSION JOINT
SELECTED FACE BRICKWORK
5
SECTION E SCALE 1:50
BRICK ON EDGE WINDOW SILL
FR
1:50
1611-A05
JAN 18
I 22.01.18
06
07
A09
352
CL RANGE HOOD & HOTPLATE
CL BOWL
WT1
CL HOTPLATE
2100
3000 926
600
702
PB WALL LINING PAINT FINISH PC1
900
1500
CL SINK
100
C L SINK
EQ
COVED VN1
LC3
LC3
PB PC1
GPO 2044
EQ
300
BOWLCL 283
CL BOWL CL BOWL
CL RANGE HOOD & HOTPLATE
SS LAB BOWL & TAPWARE REFER TO SPEC
W 01
32
PB PC1
E AC SP EE KN COVED VN1
590
LC2
1810
EQ 2044
SS LAB BOWL & TAPWARE REFER TO SPEC
W 02
590
EQ
400
℄ 863
1200
400
℄
SS LAB BOWL & TAPWARE REFER TO SPEC
W
E AC SP EE KN COVED VN1
LC3
1810
NEW DIST BOARD
W
D
W
W
04
02
05
06
PB WALL LINING PAINT FINISH PC1
LC3
GPO
PB WALL LINING PAINT FINISH PC1 COVED VN1
TIMBER SKIRTING PC2
GPO DATA GPO
590 EQ
400
1200
RU CABINET 600 x 600
LOCATION OF BIFOLD DOORS WHEN STACKED
03
ACU AFL DB DP DW FB FE FFL FHR FR FW HWU LC PA PB PC PL PN# RU S SD SK TR VN VB WL WT
PB WALL LINING PAINT FINISH PC1
LINE OF TRUSS OVER DOOR
WT1
942
2544
450
--
ACU LINE OF TRUSS OVER
WT1
RANGE HOOD & HOTPLATE CL CL BOWL
01
ACU
WL
PB WALL LINING PAINT FINISH PC1
320
300
282 CL SINK
880
4324
LEGEND
A09
EQ
1200
℄
863
32
AIR CONDITION UNIT ABOVE FLOOR LEVEL DISTRIBUTION BOARD DOWN PIPE DISHWASHER FLOOR BOX FIRE EXTINGUISHER FINISHED FLOOR LEVEL FIRE HOSE REEL FRIDGE FLOOR WASTE HOT WATER UNIT LAMINATE FINISH PUBLIC ADDRESS SPEAKER PLASTERBOARD PAINT COLOUR PLYWOOD PANELING PINBOARD RACK UNIT CABINET SINK SOAP DISPENSER TIMBER SKIRTING TROUGH VINYL VILLABOARD WIRELESS LAN - REFER TO ELEC WALL TILE
3064
FOOD TECH BENCH
STEAM CENTRE/CLASSROOM
02
PLAN
EAST ELEVATION
--
16
15
04
A09
A09
05
A09
01
A09
02
A09
1800 EQ
16
A09
A09
2400
EQ
EQ
EQ
EQ
845
EQ
EQ
845 250 250
ACU
SS RANGEHOOD AND DUCT REFER TO SPEC.
HW
LC3
LC4
WT1
GAS EMERGENCY STOP BUTTON
600 LC2
W 08
LC2
LC2
LC2
300
LC4
GPO
01
℄
600
℄
800
FR REFER TO SPEC
LOUVRE CONTROL PANEL INSTALLED TO CPD. REFER DWG E3
2100
3000
2060
3000
3880
PA
℄
GPO
GPOGPO
PASS DOOR
DIRECTION OF BI-FOLDIING DOORS
CLOCK
300
PB PC1 2100H CUPBOARDS
GPO
GPO
BENCHTOP LC1
300
02
GPO
3000
PB WALL LINING PAINT FINISH PC1
ACU
HW
01
2100
PB WALL LINING PAINT FINISH PC1
HW
D TIMBER SKIRTING PC2
PN2
PN1
PN2
PN1
500 18
1000
500 1000
PN2
PN1
500
NORTH ELEVATION
--
PN1
500
500 1000
PN2
PN1
500
PN2
LC3
LC2
LC2
LC2
600
700
450
955
600
760
2165
900 LC2
LC2
LC2
COVED VN1
500 1000
5700
STEAM CENTRE
03
PN2
500 1000
GPO
OVEN AND COOKTOP
LC2
LC2
LC2 LC2
LC3
LC2
LC2
LC3
100
100
01
LC3
COVED VN1 760
760
600
450
795
600
600
2765
600
1800
STEAM CENTRE/CLASSROOM
04
CONTRACTORS MUST VERIFY ALL DIMENSIONS ON SITE PRIOR TO COMMENCING WORKS ON SITE. ALL SHOP DRAWINGS MUST BE SUBMITTED FOR APPROVAL BY THE ARCHITECT BEFORE MANUFACTURE PROCEEDS.
WEST ELEVATION
--
TIMBER TRUSS WITH PAINT FINISH AS SPECIFIED ALL EXPOSED STEEL PLATE CONNECTIONS AND BOLTS TO HAVE PAINT FINISH AS SPECIFIED
140
SEE SECTION A-A
BK1
℄
℄
℄
04
2060
2999
3880
DIRECTION OF BI-FOLDIING DOORS
03
TIMBER BIFOLDIING DOOR WITH PINBOARD FINISH TO LOWER SECTION (REFER SPEC)
900 100
2000
D
PASS DOOR
D 04
PNB3
GLAZING TO DOORS (REFER SPEC)
ISSUED FOR TOWN PLANNING
FR
AMENDED DRAWINGS FOR TOWN PLANNING PERMIT
JB
06.12.16
C
COST PLAN D _QS ISSUE
FM
10.03.17
D
CONTRACT DOCUMENTATION ISSUE
JB
24.03.17
E
TENDER ISSUE
JB
20.04.17
F
CONSTRUCTION ISSUE
FM
06.06.17
G
RAISE HEIGHT OF WINDOW HW01 & 02 FM
29.08.17
H
REPLACE PROPOSED WINDOW W07 WITH DOOR D04
FR
11.10.17
I
AS BUILT
FM
22.01.18
2400
900
700
GPO
300
PA
1200
2100
3000
3880 2100
CLOCK
DIRECTION OF BI-FOLDIING DOORS
3795
--
WLAN
WHITEBOARD 2400 X 1200
PNB3
SS CLAY TROUGH ON SS SUPPORTS - REFER TO SPEC.
05
500 HW
℄
300
GPO DATA GPO
PNB3
GPO DATA GPO
PNB3
PNB3
PN4
PNB3
PNB3
PN3
PNB3
PNB3
PNB3
PNB3
01.09.16
TIMBER SKIRTING PC2
314
COVERED OUTDOOR LEARNING
06
WEST ELEVATION
--
CLASSROOM
07
SOUTH ELEVATION
--
STEAM CENTRE/CLASSROOM NORTH ELEVATION
MINX ARCHITECTURE PTY LTD
GPO
4324 460
920
900
880
600
460 32
1500
920
BENCHTOP LC1 LC1 VERTICAL RETURN TO SIDES OF ISLAND BENCH
600
1500
880
FM
4324
08 --
STEAM CENTRE PLAN - LAB BENCH
09 --
PROPOSED INTERNAL ELEVATIONS
OVEN REFER TO SPEC
295 32
SIDE RETURNS LC1
800
600 GPO
St Dominics Primary School S.T.E.A.M Building 408 Camp Road Broadmeadows VIC 3047
900
900 100
LC2
BENCHTOP LC1 LC2
900
℄
600
2400
100
2398
SS RANGEHOOD REFER TO SPEC.
LC1 VERTICAL RETURN TO SIDES OF ISLAND BENCH
900
268
600
COVED VN1
297
GPO LC2
LC2
SS RANGEHOOD REFER TO SPEC.
BENCHTOP LC1
DW GPO
SS EXTENSION DUCT INSTALLED TO MANUFACTURERS INSTRUCTIONS
100
HOTPLATES WITH RANGEHOOD OVER REFER TO SPEC.
BENCHTOP LC1 AND RETURNS
SS EXTENSION DUCT INSTALLED TO MANUFACTURERS INSTRUCTIONS
800
800
A09
600
SS SINK & TAPWARE REFER TO SPEC
A09
600
A09
7A / 91 MORELAND STREET, FOOTSCRAY, VIC. 3011 PHONE: (03) 9646 7000 E-MAIL: info@minxarchitecture.com.au WEB: www.minxarchitecture.com.au
14
900
A09
13
800
A09
12
900
11
100
10
600
3000
500
2HR FIRE RATED PB WALL LINING PAINT FINISH PC1
A B
FOOD TECH DEMO BENCH EAST ELEVATION
10 --
FOOD TECH DEMO BENCH SOUTH ELEVATION
11 --
FOOD TECH DEMO BENCH WEST ELEVATION
12 --
FOOD TECH DEMO BENCH NORTH ELEVATION
1:50
1611-A08
JAN 18
I 22.01.18
350
SS SHELF PINS IN PRE-DRILLED HOLES AS SPECIFIED
50
VARIES
AS PER INT ELEVATOIN
30
20
900
770
100
100
SCALE 1:20
615
900
18MM WRMDF CARCASS, DOORS TO UNDERBENCH CUPBOARD. EXPOSED SURFACES TO HAVE SELECTED LAMINATE FINISH. MELAMINE FINISH TO INTERNAL CABINET AREAS. 2MM HEAVY DUTY PVC EDGE STRIP TO ALL VISIBLE EDGES COLOUR TO MATCH LAMINATE.
ADJ.
ADJ.
1 NO 18MM ADJUSTABLE SHELF TO EACH CUPBOARD. SELECTED FINISH.
TOE RECESS WITH SPECIFIED LAMINATE OR COVED VINYL.
50
GPO REFER TO ELECTRICAL DWGS
TOE RECESS WITH SPECIFIED LAMINATE OR COVED VINYL.
100
100
20
30 20
18MM WRMDF CARCASS, DOORS TO UNDERBENCH CUPBOARD. EXPOSED SURFACES TO HAVE SELECTED LAMINATE FINISH. MELAMINE FINISH TO INTERNAL CABINET AREAS. 2MM HEAVY DUTY PVC EDGE STRIP TO ALL VISIBLE EDGES COLOUR TO MATCH LAMINATE. 1 NO 18MM ADJUSTABLE SHELF TO EACH CUPBOARD. SELECTED FINISH.
100
CABLE MANAGEMENT OUTLET. HAFELE 631.364.001 50MM STAINLESS STEEL
30
C L SINK
50
900
SS SINK AS SPECIFIED
32MM BENCHTOP WRMDF CONSTRUCTION. REF SPECIFICATION FOR FINISH.
750
30 DIS
750
AS
HE
R
GPO REFER TO ELECTRICAL DWGS
HW
DISHWASHER AS SPECIFIED.
880
300
32MM BENCHTOP WRMDF CONSTRUCTION. REF SPECIFICATION FOR FINISH.
20
30 770
--
615 CABLE MANAGEMENT OUTLET. HAFELE 631.364.001 50MM STAINLESS STEEL
CUPBOARDS BEYOND SELECTED LAMINATE FINISH.
600
BENCH WITH CUPBOARDS UNDER
880
615
32MM BENCHTOP WRMDF CONSTRUCTION. REF SPECIFICATION FOR FINISH.
06
SCALE 1:20
880
20
770
OV E
--
SCALE 1:20
BENCH WITH UNDERBENCH OVEN, COOKTOP & RANGEHOOD, DUCT TO ROOF
750
--
600
05
SINK IN BENCH WITH UBC & OBS (RECESSED LIGHTING)
32MM BENCHTOP WRMDF CONSTRUCTION. REF SPECIFICATION FOR FINISH.
FFL
50
100
04
BENCH WITH 4 DRAWERS UNDER & OBC (RECESSED LIGHTING)
FINISH TO WALLS AS PER INT. ELEVATIONS AND SPEC.
SPACE FOR EQUIPMENT, ELECTRICAL GOODS OR OPEN KNEE SPACE
TOE RECESS. SELECTED LAMINATE OR COVED VINYL
600 600
SCALE 1:20
18MM WRMDF CARCASS. EXPOSED SURFACES TO HAVE SELECTED LAMINATE FINISH. 2MM HEAVY DUTY ABS EDGE STRIP TO ALL VISIBLE EDGES COLOUR TO MATCH LAMINATE.
800 30
2100 30
CUPBOARDS END PANLEL BEYOND SELECTED LAMINATE FINISH.
900
--
SCALE 1:20
CL SINK
18MM WRMDF CARCASS. EXPOSED SURFACES TO HAVE SELECTED LAMINATE FINISH. MELAMINE FINISH TO INTERNAL CABINET AREAS.
50
600
02
270 SS SINK AS SPECIFIED 32MM BENCHTOP WRMDF CONSTRUCTION. REF SPECIFICATION FOR FINISH.
BUILT IN ELECTRIC OVEN AS SPECIFIED
375 50
BENCH WITH UBC & OBC (RECESSED LIGHTING)
32MM BENCHTOP WRMDF CONSTRUCTION. REF SPECIFICATION FOR FINISH.
EQ CL COOKTOP
100
TOE RECESS. SELECTED LAMINATE OR COVED VINYL
100
TOE RECESS. SELECTED LAMINATE OR COVED VINYL
FINISH TO WALLS AS PER INT. ELEVATIONS AND SPEC.
EQ GAS COOKTOP AS SPECIFIED
395
18MM WRMDF CARCASS. EXPOSED SURFACES TO HAVE SELECTED LAMINATE FINISH. 2MM HEAVY DUTY ABS EDGE STRIP TO ALL VISIBLE EDGES COLOUR TO MATCH LAMINATE.
20
2100 20
CL SINK
600
EQ
32MM BENCHTOP WRMDF CONSTRUCTION. REF SPECIFICATION FOR FINISH.
30
2100 770
18MM WRMDF CARCASS. EXPOSED SURFACES TO HAVE SELECTED LAMINATE FINISH. MELAMINE FINISH TO INTERNAL CABINET AND DRAWER AREAS.
100
EQ
SS SINK AS SPECIFIED
600
--
600
FINISH TO WALLS AS PER INT. ELEVATIONS AND SPEC.
32MM BENCHTOP WRMDF CONSTRUCTION. REF SPECIFICATION FOR FINISH.
50
01
FINISH TO WALLS AS PER INTERNAL ELEVATIONS AND SPEC.
RECESSED LIGHTING TRACK. REF SPEC
30
20
TOE RECESS. SELECTED LAMINATE OR COVED VINYL
ADJ.
N
FINISH TO WALLS AS PER INT. ELEVATIONS AND SPEC.
1 NO 18MM ADJUSTABLE SHELF TO EACH CUPBOARD. SELECTED FINISH.
18MM WRMDF CARCASS TO O/H SHELVING. EXPOSED SURFACES TO HAVE SELECTED LAMINATE FINISH.
20
RECESSED LIGHTING TRACK. REF SPEC
FINISH TO WALLS AS PER INT. ELEVATIONS AND SPEC.
600
RECESSED LIGHTING TRACK. REF SPEC
ADJ.
DUCT TO RUN UP FROM RANGEHOOD TO 2100 AFFL, EXHAUST DUCT TO RUN HORIZONTAL THROUGH EXTERNAL WALL STAINLESS STEEL FLUE TO EXTEND TO CEILING LEVEL ( 3045mm APPROX. )
RANGEHOOD AS SPECIFIED.
SS DOOR PULL HANDLES AS SPECIFIED
18MM WRMDF CARCASS. EXPOSED SURFACES TO HAVE SELECTED LAMINATE FINISH. MELAMINE FINISH TO INTERNAL CABINET AREAS.
50
SS SHELF PINS IN PRE-DRILLED HOLES AS SPECIFIED
SS DOOR PULL HANDLES AS SPECIFIED
32MM BENCHTOP WRMDF CONSTRUCTION. REF SPECIFICATION FOR FINISH.
FFL
ADJ.
18MM WRMDF CARCASS TO O/H CUPBOARDS. EXPOSED SURFACES TO HAVE SELECTED LAMINATE FINISH.
600
ADJ.
18MM WRMDF CARCASS TO O/H CUPBOARDS. EXPOSED SURFACES TO HAVE SELECTED LAMINATE FINISH.
300
770
SS SHELF PINS IN PRE-DRILLED HOLES AS SPECIFIED
350
600
350
50
07
BENCH WITH OPENING UNDER
10
FOOD TECH DEMO BENCH
11
FOOD TECH DEMO BENCH
--
SCALE 1:20
--
SCALE 1:20
--
SCALE 1:20
12 --
FOOD TECH DEMO BENCH SCALE 1:20 CONTRACTORS MUST VERIFY ALL DIMENSIONS ON SITE PRIOR TO COMMENCING WORKS ON SITE. ALL SHOP DRAWINGS MUST BE SUBMITTED FOR APPROVAL BY THE ARCHITECT BEFORE MANUFACTURE PROCEEDS.
320 C L RANGEHOOD ADJ.
880
880 18MM WRMDF CARCASS. EXPOSED SURFACES TO HAVE SELECTED LAMINATE FINISH.
32MM BENCHTOP WRMDF CONSTRUCTION. REF SPECIFICATION FOR FINISH.
TENDER ISSUE
FM
20.04.17
E
CONSTRUCTION ISSUE
FM
06.06.17
F
AS BUILT
FM
22.01.18
2100
2100 ADJ.
ADJ. PINBOARD FIXED TO FACE OF DOOR. REFER INT. ELEVATIONS & SPECIFICATION FOR TYPE
975
PINBOARD FIXED TO FACE OF DOOR. REFER INT. ELEVATIONS & SPECIFICATION FOR TYPE
900
24.03.17
D
SS D HANDLES AS SPECIFIED.
ADJ.
750
750
ELECTRIC OVEN AS SPECIFIED
900
OV
EN
18MM WRMDF CARCASS, DOORS TO UNDERBENCH CUPBOARD. EXPOSED SURFACES TO HAVE SELECTED LAMINATE FINISH. MELAMINE FINISH TO INTERNAL CABINET AREAS. 2MM HEAVY DUTY PVC EDGE STRIP TO ALL VISIBLE EDGES COLOUR TO MATCH LAMINATE.
10.03.17
FM
FIX
SS D HANDLES AS SPECIFIED.
20
20
30
32MM BENCHTOP WRMDF CONSTRUCTION. REF SPECIFICATION FOR FINISH.
17.02.17
FM
CONTRACT DOCUMENTATION ISSUE
18MM WRMDF CARCASS. EXPOSED SURFACES TO HAVE SELECTED LAMINATE FINISH. FIX
30
C L COOKTOP
FR
COST PLAN D _QS ISSUE
ADJ.
975
320
ADJ.
615
800
615
GAS COOKTOP AS SPECIFIED
ADJ.
4 NO. 18MM WRMDF ADJUSTABLE SHELVES. FINISH AS SPECIFIED.
975
4 NO. 18MM WRMDF ADJUSTABLE SHELVES. FINISH AS SPECIFIED.
CONSULTANTS ISSUE
B
975
RANGEHOOD AS SPECIFIED
A C
ADJ.
SS SHELF PINS IN PRE-DRILLED HOLES AS SPECIFIED
SS SHELF PINS IN PRE-DRILLED HOLES AS SPECIFIED
TOE RECESS. SELECTED LAMINATE OR COVED VINYL
TOE RECESS. SELECTED LAMINATE OR COVED VINYL
50
50
50
50 600
13 --
14
FOOD TECH DEMO BENCH WITH UNDERBENCH OVEN, COOKTOP & RANGEHOOD, DUCT TO ROOF
--
SCALE 1:20
15
FOOD TECH DEMO BENCH WITH 4 DRAWERS UNDER
--
SCALE 1:20
7A / 91 MORELAND STREET, FOOTSCRAY, VIC. 3011 PHONE: (03) 9646 7000 E-MAIL: info@minxarchitecture.com.au WEB: www.minxarchitecture.com.au
100
100
TOE RECESS WITH SPECIFIED LAMINATE OR COVED VINYL.
100
TOE RECESS WITH SPECIFIED LAMINATE OR COVED VINYL.
100
MINX ARCHITECTURE PTY LTD
FULL HEIGHT CUPBOARD WITH PINBOARD FACING ON DOOR SCALE 1:20
600
16 --
FULL HEIGHT CUPBOARD WITH LAMINATE FACING ON DOOR SCALE 1:20
VARIES
50
50
30
20MM SHADOW LINE. SELECT LAMINATE FINISH
30
20
TOE RECESS. SELECTED COVED VINYL
10MM THICK PINBOARD AS SPECIFIED. FIXED TO 18MM MDF DOORS, AS PER MANUFACTURES STANDARDS
100
TOE RECESS. SELECTED LAMINATE
18MM WRMDF CARCASS. EXPOSED SURFACES TO HAVE SELECTED LAMINATE FINISH.
32MM WRMDF CARCASS. EXPOSED SURFACES TO HAVE SELECTED LAMINATE FINISH.
18MM WRMDF CARCASS. EXPOSED SURFACES TO HAVE SELECTED LAMINATE FINISH. 20
18MM WRMDF CARCASS. EXPOSED SURFACES TO HAVE SELECTED LAMINATE FINISH.
100
FFL
SELECTED PINBOARD. REFER INT. ELEVATIONS & SPECIFICATION
MOISTURE PROTECTION TAPE. REFER DISHWASHER MANUFACTURER INSTALLATION INSTRUCTIONS
20MM SHADOW LINE. SELECT LAMINATE FINISH SELECTED DISHWASHER FACE PANEL. REFER SPECIFICATION
50
100 40
32MM WRMDF CARCASS. EXPOSED SURFACES TO HAVE SELECTED LAMINATE FINISH.
.
VARIES
100 50
50
SELECTED LAMINATE. REFER INT. ELEVATIONS & SPECIFICATION
.
40
SELECTED PINBOARD. REFER INT. ELEVATIONS & SPECIFICATION
50
St Dominics Primary School S.T.E.A.M Building 408 Camp Road Broadmeadows VIC 3047 PROPOSED JOINERY DETAILS
20 20
-
TYPICAL TOE RECESS - LAMINATE
-
TYPICAL TOE RECESS - LAMINATE
-
--
SCALE 1:5
--
SCALE 1:5
--
TYPICAL BENCH TOP EDGE LAMINATE SCALE 1:5
-
CUPBOARD DOORS WITH PINBOARD
aa
DRAWER DISHWASHER BENCHTOP DETAIL
--
SCALE 1:5
--
SCALE 1:5
SELECTED HANDLES. REFER SPECIFICATION
24
--.--
CUPBOARD DOOR MOUNTED PINBOARD LAYOUT SCALE 1:5
FM
1:100
1611-A09
JAN 18
F 22.01.18
50
2060
.
314
SL
SL
SL
SL
SL
04
06
W
02
03
EQ .
AL AWN CP DE DH FFL FG CFC - PC# IS LPDT SL SSK
EQ
DIRECTION OF BI-FOLDIING DOORS
NATURAL ANODISED ALUMINIUM
FG
FG
FG
FG
FG
FG
FG
FG
FG
ALL DIMENSIONS TO BE CONFIRMED ON SITE. NOTIFY THE SUPERINTENDENT OF ANY DISCREPANCIES.
FG
EXTERNAL WINDOWS & DOOR ARE DEPICTED AS SEEN FROM OUTSIDE. DOOR SWINGS SHOWN TO BE READ IN CONJUNCTION WITH PLANS.
RECESSED TIMBER SILL & NAT. ANODISED ALUMINIUM FLOOR GUIDE
W
D
08
01
NATURAL ANODISED ALUMINIUM
W 07
CENTOR ALUM. BI-FOLD DOOR & TRACK SYSTEM TASMANIAN OAK EXTERNAL TIMBER DOORS WITH 2No. SCHLEGEL AQ21 FOAM SEALS REBATED TO DOOR EDGES & SINGLE SCHLEGEL AQ21 FOAM SEAL REBATED TO DOOR STOP 2No. RAVEN RP52F ACOUSTIC BRUSH SEAL REBATED TO UNDERSIDE OF DOORS
DOOR GRILLES AS NOTED IN THE SPECIFICATION AND INDICATED ON THE DRAWNGS. ALSO REFER MECHANICAL DRAWINGS. ALL DOOR HANDLES TO BE MOUNTED AT 1000MM AFFL UNLESS OTHERWISE NOTED. INSTALL WINDOW DECALS TO FULL HEIGHT GLAZED DOORS AND WINDOWS AT 1000MM AFFL UNLESS OTHERWISE NOTED.
GLAZING: VIRIDIAN COMFORTPLUS CLEAR 82
DELETED
REFER TO PLANS, ELEVATIONS, SECTIONS, INTERNAL ELEVATIONS FOR ANY ADDITIONAL ALUMINIUM COVER PLATES
EXTERNAL WINDOWS
01 -
AUTOMATED LOUVRES AWNING WINDOWS ALUMINUM COVER PLATE - POWDERCOATED FINISH DECALS DOUBLE HUNG FINISHED FLOOR LEVEL FIXED GLAZING COMPRESSED FIBRE CEMENT SHEET - PAINT COLOUR INSECT SCREEN LOW PROFILE DOOR THRESHOLD - POWDERCOATED FINISH SLIDING 200mm HIGH STAINLESS STEEL KICK PLATE - TO BOTH SIDES OF DOOR
DOOR AND WINDOW SCHEDULE TO BE READ IN CONJUNCTION WITH THE DOOR AND WINDOW SECTIONS OF THE SPECIFICATION.
1000 22
01
NATURAL ANODISED ALUMINIUM
W
EQ
FOR COLOUR FINISHES REFER SPECIFICATION
FG
W
EQ
DECALS
FFL
W
EQ
HINGED PASS THRU DOOR
SL
1220
920
920
EQ
SUB SILL
SUB SILL
W
EQ
NATURAL ANODISED ALUMINIUM TOP HUNG BI-FOLD DOOR TRACK
EQ
FG
FG
SUB SILL
EQ
5530
. 1140
FG
EQ
.
501
501
. 1140
FG
FG
EQ
LEGEND - DOOR & WINDOW SCHEDULE
CONCEALED PIVOT HINGES
AL
EQ
HALF SET OFFSET HINGE
AL
EQ
CARRIER HINGES
AL
EQ
.
HALF SET OFFSET HINGE
EQ .
CARRIER HINGES
EQ
9790
HALF SET OFFSET HINGE
EQ
.
CARRIER HINGES
EQ .
HALF SET OFFSET HINGE
1810
EQ
CARRIER HINGES
EQ
.
HALF SET OFFSET HINGE
CARRIER HINGES
1810
STEAM BUILDING
HW
01g MIRROR
HW
01j HW
01m
449
449
FG
AL
FG
AL
FG
FG
FG
01b
01j
HW FG
HW
01c
FG
HW
HW
01e
01h
HW
FG
01m
HW
01k
FG
FG
FG
HW
HW
01a
01n
2200
2200
2400
FG
FG
240
237 FG 1303
1211
9790 OVERALL 2400
FG FG 1335
FG
FG
FG SUB SILL
SUB SILL
01g
01f
FG
1575
HW
01d
HW
1281
.
CP
1044
871
.
1011
.
224
851
843
986
843
.
1361
1345
1273
HW
762
.
FG
725
903
725
903
1575 OVERALL
903
.
FG
HW
1306
01b
32 x 32mm KDHW PLANT ON TIMBER BEADS BOTH SIDES
MIRROR
32 x 32mm KDHW PLANT ON TIMBER BEADS BOTH SIDES 2890
01f 32 x 32mm KDHW PLANT ON TIMBER BEADS BOTH SIDES
01d
HW
2890
HW
MIRROR
HW
1331
HW
HW
HW
01a
01c
01e
HW
HW
HW
01n MIRROR 32 x 32mm KDHW PLANT ON TIMBER BEADS BOTH SIDES
01k MIRROR 32 x 32mm KDHW PLANT ON TIMBER BEADS BOTH SIDES
01h MIRROR 32 x 32mm KDHW PLANT ON TIMBER BEADS BOTH SIDES
FFL
HW
HW
02
03
NATURAL ANODISED ALUMINIUM
HW
HW
01
04
32 x 32mm KDHW PLANT ON TIMBER BEADS BOTH SIDES
NATURAL ANODISED ALUMINIUM
EXTERNAL HIGHLIGHT WINDOWS
02 -
STEAM BUILDING
CONTRACTORS MUST VERIFY ALL DIMENSIONS ON SITE PRIOR TO COMMENCING WORKS ON SITE. ALL SHOP DRAWINGS MUST BE SUBMITTED FOR APPROVAL BY THE ARCHITECT BEFORE MANUFACTURE PROCEEDS.
EQ
EQ
EQ
EQ
EQ
.
1810 EQ .
.
EQ
FG
FG
50
2060
FG
DOUBLE ALUM. FRAME FG
HINGED PASS THRU DOOR
DIRECTION OF BI-FOLDIING DOORS FG
CONSULTANTS ISSUE
FR
17.02.17
B
COST PLAN D _QS ISSUE
FM
10.03.17
CONTRACT DOCUMENTATION ISSUE
FM
24.03.17
D
TENDER ISSUE
FM
20.04.17
E
CONSTRUCTION ISSUE
FM
F
FG
FG
FG
FG
FG
FG
FG
FG
FG
FG
FG
FIXED PANEL PN3 FINISH
FIXED PANEL PN3 FINISH
FIXED PANEL PN3 FINISH
FIXED PANEL PN3 FINISH
FIXED PANEL PN3 FINISH
FIXED PANEL PN3 FINISH
FIXED PANEL PN3 FINISH
FIXED PANEL PN3 FINISH
FIXED PANEL PN3 FINISH
FIXED PANEL PN3 FINISH
FIXED PANEL PN3 FINISH
FG
FG
06.06.17
AMEND HW02 & 03 SILL HEIGHT DIMS
FM
29.08.17
G
REPLACE PROPOSED WINDOW W07 WITH DOOR D04
FR
11.10.17
H
AS BUILT
FM
22.01.18
DIRECTION OF BI-FOLDIING DOORS 2060
1140
501
2040
.
EQ
CONCEALED PIVOT HINGES
EQ
HALF SET OFFSET HINGE
EQ
CARRIER HINGES
EQ
HALF SET OFFSET HINGE
EQ
CARRIER HINGES
EQ
.
9990
HALF SET OFFSET HINGE
.
CARRIER HINGES
910
CARRIER HINGES
EQ . .
HALF SET OFFSET HINGE
EQ
CARRIER HINGES
970
HALF SET OFFSET HINGE
EQ
.
CONCEALED PIVOT HINGES
1810
A C
LPDT
W
D
05
02
04 -
WEATHERPROOF EXTERNAL TIMBER DOOR & TIMBER DOOR FRAME WITH RAVEN RP137 NAT. ANODISED ALUMINIUM THRESHOLD
DOORS STEAM BUILDING
VIEW FROM STEAM CENTRE
RECESSED NAT. ANODISED ALUMINIUM FLOOR GUIDE
965
DOUBLE ALUM.FRAME WITH NAT. ANODISED ALUMINIUM COVER PLATE
22
965
920
SUB SILL
LPDT
D
D
03
04
CENTOR ALUM. BI-FOLD DOOR & TRACK SYSTEM TASMANIAN OAK EXTERNAL TIMBER DOORS WITH 2No. SCHLEGEL AQ21 FOAM SEALS REBATED TO DOOR EDGES & SINGLE SCHLEGEL AQ21 FOAM SEAL REBATED TO DOOR STOP RAVEN RP52F ACOUSTIC BRUSH SEAL REBATED TO UNDERSIDE OF DOORS
WEATHERPROOF EXTERNAL TIMBER DOUBLE DOOR & TIMBER DOOR FRAME WITH RAVEN RP137 NAT. ANODISED ALUMINIUM THRESHOLD
MINX ARCHITECTURE PTY LTD 7A / 91 MORELAND STREET, FOOTSCRAY, VIC. 3011 PHONE: (03) 9646 7000 E-MAIL: info@minxarchitecture.com.au WEB: www.minxarchitecture.com.au
St Dominics Primary School S.T.E.A.M Building 408 Camp Road Broadmeadows VIC 3047 PROPOSED WINDOW & DOOR SCHEDULE
FM
1:100
1611-A10
JAN 18
H 22.01.18
furniture design
Hazel Glen College, Doreen
admin desk design 08 07
--
03
--
-1000 200
COUTERTOP LC3 PINBOARD PN6
COUTERTOP LC3 PINBOARD PN6
432
00
LC3
LC3
PINBOARD PN6
PINBOARD PN6
432
00
R5
GPO
R3
200
18MM MDF COUTERTOP. LAMINATE FINISH LC3
18
600
18
200
DATA
GPO BENCHTOP LC1
350
04
--
STUD WALL BELOW SHOWN DASHED
18MM MDF COUTERTOP. LAMINATE FINISH LC3
2650
32
GPO
DATA
GPO
01
ADMINISTRATION DESK
02
ADMINISTRATION DESK
--
NORTH ELEVATION SCALE 1:20
--
EAST ELEVATION SCALE 1:20
06 -900
2450
05
CURVED PANEL LC3
LC3
LC3
CURVED PANEL LC3
450
10°
32MM MDF CONSTRUCTION BENCHTOP. SQUARE EDGE WITH 2MM HEAVY DUTY EDGE STRIP. LAMINATE FINISH LC1
HAFELE HEBGO BRACKET 287.44.461
FFL
HAFELE HEBGO BRACKET UNDER 287.44.461
HAFELE CABLE MANAGEMENT 429.94.458
1200
--
1250
--
LC3
CURVED PANEL LC3 LC3
718
HAFELE CABLE MANAGEMENT 429.94.458
02
CURVED PANEL LC3
750
--
1200
STUD WALL BELOW SHOWN DASHED
01
LC3
90
BENCHTOP WATERFALL LC1
32
PLAN DETAIL SCALE 1:20
750
ADMINISTRATION DESK
--
LC6
100
200
A
450
1200
758
1200
636
FFL
03 --
TIMBER SKIRTING PC4
ADMINISTRATION DESK
04
ADMINISTRATION DESK
SOUTH ELEVATION SCALE 1:20
--
WEST ELEVATION SCALE 1:20
200 36
200
200
MITRE JOIN
32MM MDF CONSTRUCTION BENCHTOP & WATERFALL. SQUARE EDGE WITH 2MM HEAVY DUTY EDGE STRIP. LAMINATE FINISH.
PINBOARD FIXED TO MDF LINING
COUNTERTOP DETAIL SCALE 1:20
750
05 --
90 74
90MM WIDE TIMBER STUD WALL 18MM MDF LINING TO STUD. LAMINATE FINISH.
18
750
200 100
CONTINUATION OF TIMBER SKIRTING. PAINT FINISH.
636
ADMINISTRATION DESK
90MM WIDE TIMBER STUD WALL 18MM MDF LINING TO STUD. LAMINATE FINISH.
FFL
-
450
90MM WIDE TIMBER STUD WALL
90MM WIDE TIMBER STUD WALL 18MM WRMDF LINING TO STUD. LAMINATE FINISH.
--
HAFELE HEBGO BRACKET 287.44.461
1200
2 LAYERS 18MM MDF LINING TO STUD. LAMINATE FINISH.
32 1200
HAFELE HEBGO BRACKET 287.44.461
32MM MDF CONSTRUCTION BENCHTOP. SQUARE EDGE WITH 2MM HEAVY DUTY EDGE STRIP. LAMINATE FINISH.
32MM MDF CONSTRUCTION BENCHTOP. SQUARE EDGE WITH 2MM HEAVY DUTY EDGE STRIP. LAMINATE FINISH.
18MM MDF LINING. LAMINATE FINISH.
MITRE JOIN
794
32MM MDF CONSTRUCTION BENCHTOP. SQUARE EDGE WITH 2MM HEAVY DUTY EDGE STRIP. LAMINATE FINISH.
10
18MM MDF PANEL BEYOND. LAMINATE FINISH.
PINBOARD FIXED TO WRMDF LINING
MITRE JOIN 18MM MDF LINING. LAMINATE FINISH.
350
18MM MDF LINING. LAMINATE FINISH.
PINBOARD FIXED TO MDF LINING
200
MITRE JOIN
18MM MDF COUTERTOP. LAMINATE FINISH.
18
2MM ABS EDGE STRIP. FINISH TO MATCH LAMINATE COLOUR
10
18MM MDF COUNTERTOP. LAMINATE FINISH.
MITRE JOIN
636
90
50
90
74
90 74
ADMINISTRATION DESK
06
ADMINISTRATION DESK
07
ADMINISTRATION DESK
08
ADMINISTRATION DESK
SECTION SCALE 1:20
--
SECTION SCALE 1:20
--
SECTION SCALE 1:20
--
SECTION SCALE 1:20
3d modelling
St Martin de Porres Altona
outdoor learning space design
learning space
admin desk
wet area
3d modelling
Mt St Joseph Girls Shool, Sunshine
admin entry sd options
master plan
Westall Hub redeveloment
AFTERNOON SUN
MORNING SUN
GPCS
TO WESTALL TRAIN STATION
ADMINISTRATION & STAFF AMENITIES VISUAL & PERFORMING ARTS PE
?
LIBRARY & RESOURCE CENTRE
?
?
TRAVEL SCIENCE
?
TECHNOLOGY WELC VEHICLE ENTRANCE PEDESTRIAN ENTRANCE SEC EASEMENT
EVENING SUN
?
SCREENING DETAIL
TOWN PLANNING
MOULL MURRAY ARCHITECTS MULTIRESIDENTIAL
3d modelling 1
Orloff Residence
Sections
North Elevation & Typical Details
FIXED (OUTSIDE)
SLIDING (INSIDE)
security screen detail
1,200
SLIDING (INSIDE)
AXONOMETRIC VIEW
1:200
600
FIXED (OUTSIDE)
WASHER ROTATING CATCH
200
ELEVATION FROM INSIDE
OUTSIDE FIXED PANEL
CATCH DETAIL (section)
SECTION
1:10
SLOT IN FIXED PANEL
FINGER PULL
1:2
1:10
1,200
FIXED (OUTSIDE)
NOTE: CONTRACTOR TO MEASURE ALL OPENINGS ON SITE AND ADJUST HORIZONTAL DIMENSIONS TO SUIT
3 1
#LayID #DrgID
OUTSIDE (FIXED)
SOUTH ELEVATION PANELS TO BE SINGLE FIXED PANELS ONLY
INSIDE (SLIDING)
SLIDING (INSIDE) 3 2
ROTATING CATCH
PLAN VIEW
CATCH DETAIL (plan)
1:10
PRELIMINARY
1:5
CLIENT
Peter Orloff
PROJECT
Proposed Orloff Penthouse Terrace Privacy Screens
DRAWING
Sections North Elevation & Typical Details
S.T.C.A.
PRINT DATE
SCALE
29/10/15
DRAWN
FR
ARCHITECT
AM
1:10, 1:200, 1:2, 1:5 @ A3
CHECKED
PROJECT NUMBER
10266
DRAWING NUMBER [REVISION]
/Volumes/Studio/projects/ORLOFF Penthouse.pln
1
Moull Murray Architects ABN 16 407 051 599
Melbourne Level 1, 312 New Street Brighton. VIC. 3186 T.+61 3 9530 8905 F.+61 3 9530 8906
info@moullmurrayarchitects.com.au moullmurrayarchitects.com.au
2 Plans
Details 1,160 1,110
25
25
600
1200 CL
FIXING ANGLE 600 HIGH
SS RIVET
AL ANGLE FIXED SS SCREW TO ALUMINIUM UNIVERSAL COLUMN
25X25 ALUMINIUM SHS SUB FRAME
PERFORATED SHEET
WELDED JOINTS ON 4 CORNERS
25X25 AL HOLLOW SECTION FIXED PANEL SS POP RIVETS
60
PANEL FIXED TO AL ANGLE PACKING 25X25 AL HOLLOW SECTION SLIDING PANEL
480
PERFORATED SHEET
30X30 'L's
60
DOUBLE ANGLES TO FORM CHANNEL 1200 HIGH FOR INSIDE PANEL TO SLIDE IN WITH STOP END AT TOP AND BOTTOM
600
NYLON BRUSH STUCK TO INSIDE FACE OF 'L's
EXTENT OF PERFORATION
60
1,040
INDICATIVE PERFORATION ONLY
PERFORATED ALUMINIUM SHEET LOCKER SLOTTED HOLES L25443 HOLE SIZE 25.4X6.35 SLOT DIRECTION "E" ALL POWDER COATED "BLACK"
FULL SIZE DETAIL
1:1
60
1,160
PRELIMINARY
ELEVATION OF PERFORATED SHEET
S.T.C.A.
1:10
CLIENT
Peter Orloff
PROJECT
Proposed Orloff Penthouse Terrace Privacy Screens
DRAWING
Plans Details
PRINT DATE
SCALE
29/10/15
DRAWN
FR
ARCHITECT
AM
1:1, 1:10 @ A3 CHECKED
PROJECT NUMBER
10266
DRAWING NUMBER [REVISION]
/Volumes/Studio/projects/ORLOFF Penthouse.pln
2
Moull Murray Architects ABN 16 407 051 599
Melbourne Level 1, 312 New Street Brighton. VIC. 3186 T.+61 3 9530 8905 F.+61 3 9530 8906
info@moullmurrayarchitects.com.au moullmurrayarchitects.com.au
town planning
Harrow Street, Box Hill
TP.03.1 Design and Context Response
Surrounding Amenity
proposed apartment
Key
9
6
10 8
1
4
Maroond
ah Highw
7
ay
2
Box Hil
l to Rin
5 S
gwood
3 Rail Tr
ail
S
Subject Site
1
Box Hill Train Station 700m
2
Centro Box Hill 550m
3
Box Hill High School 1.2km
4
Box Hill Town Hall and Library 300m
5
Centrelink 450m
6
St Francis Xavier's Primary 1.7km
7
Library 400m
8
Box Hill Institute Whitehorse 500m
9
Box Hill Police Station 500m
10
Box Hill Central 700m
PRELIMINARY
TP.03.2 Design and Context Response
Surrounding Street
5. Glenmore St
1. Harrow St
6. Ellingworth Parade
2. Harrow St
7. William St
3. Corner of Harrow St and Glenmore St
8. Corner of William St and Harrow St
4. Henry St
10. Corner of William St and Ellingworth Parade
9. William St
10
6
S
1
2
3 8
4
5
William Street
9 11
11. Harrow St
7
PRELIMINARY S.T.C.A.
CLIENT
Yifan Pan
PROJECT
Proposed Apartment Building 39 Harrow Street, Box Hill, Melbourne
DRAWING
Design and Context Response Surrounding Street
PRINT DATE
SCALE
3/12/15
DRAWN
FR
1:1 @ A3 ARCHITECT
AM
CHECKED
PROJECT NUMBER
10264
DRAWING NUMBER [REVISION]
TP.03.2
/Volumes/Studio/projects/10264 39 Harrow St Box Hill/02models/39 Harrow St Box Hill.pln
Moull Murray Architects ABN 16 407 051 599
Melbourne Level 1, 312 New Street Brighton. VIC. 3186 T.+61 3 9530 8905 F.+61 3 9530 8906
info@moullmurrayarchitects.com.au moullmurrayarchitects.com.au
TP.03.3 Design and Context Response
Wind + Sun Analysis Key ELLINGWORTH
PARADE
Winter sun path Summer sun path Prevailing Winds
DOUBLE STOREY BRICK BUILDING
DOUBLE STOREY BRICK BUILDING
94.95TW2 92.91FL2 DOOR
95.19TW2 93.94BW2 H/W
95.19TW2 93.94BW2 H/W
FLAT ROOF
NO FIRST FLOOR WINDOWS
FLAT ROOF
S
DOUBLE STOREY BRICK BUILDING
Subject Site
FLAT ROOF
CARPORT
W 05 inte r : PM 08
CARPARK
2
#DrgID #LayID1
RIGHT
OF
TP.06.1 1
WAY
3
ter Win 36 07: AM
4
2m
TIMBER
PALINGS
FLAT ROOF H/W
LAWN POS
CONC X-ING
E.POLE
NOT
FENCED
FOOTPATH
TIMBER
PALINGS
SINGLE STOREY W/BOARD HOUSE ALUM ROOF
SINGLE STOREY W/BOARD HOUSE TILE ROOF
CONCRETE
HARROW
STREET
TIMBER
FOOTPATH
PALINGS
HYD E.PIT
VER BALCONY
STREET
VERANDAH
2.15m
PALINGS
1.4m BRICK + METAL FENCE
TIMBER
89.34FL
PALINGS
VER
TIMBER
CONC X-ING
E.POLE
CONCRETE DRIVEWAY
1.85m
SEWER
2.15m
FENCED
90.34FL1
93.60FL2
NOTES:
RF - ROOF HEIGHT (GUTTER) RDG - RIDGE HEIGHT FL - FLOOR LEVEL TW - TOP OF WINDOW LEVEL BW - BOTTOM OF WINDOW LEVEL TK - TOP OF KERB LEVEL DK - DECK LEVEL H/W - HABITABLE WINDOW FR - FROSTED/OPAQUE WINDOW SEP - SIDE ENTRY PIT CH - CHIMNEY G - GAS METER
LEGEND:
GLENMORE
PICKET
DRIVEWAY
TIMBER
CONC X-ING
TIMBER
PALINGS TIMBER
CONCRETE
STREET
DRIVEWAY
1.2m
SEP SEWER
PALINGS
CONC X-ING
CONC X-ING
HENRY
NOT
CONCRETE
HARROW STREET
STREET
CONCRETE
HARROW
TOP FLOOR OBSCURED
BRICK GARAGE 2m TIMB PALS 2 TP.06.2
Su m 05 mer :5 AM 5
CONCRETE DRIVEWAY 10.00 %
FOOTPATH
EXISTING 3 STOREYS MULTI-RESIDENTIAL APARTMENT
20.00 %
CONCRETE
FLAT ROOF
20.00 %
PLANTER
47
H/W 10.00 %
er mm Su 8:42 0 M P
CONC X-ING
41-45
EXISTING 3 STOREY MULTI-RESIDENTIAL APARTMENT
WILLIAM
37
PROPOSED 4 STOREY MIXED USE DEVELOPMENT
AS APPROVED BY CITY OF WHITEHORSE
DOOR
H/W
STREET
TP.07.1 2
ROAD
S
TOP FLOOR OBSCURED
2m
POS
ALL WINDOWS VERANDAHVERANDAH ALL WINDOWS BALCONY BALCONY ESTIMATED ESTIMATED
LAWN
BAMBOO TIMB PALS
TP.07.1
1
DOUBLE STOREY BRICK UNITS TILE ROOF
LEVEL DATUM: AHD via PM7 (RL 95.65) CONTOUR INTERVAL: 0.2m LENGTHS ARE IN METRES DATE OF SURVEY: 17.06.2015
PRELIMINARY S.T.C.A. CLIENT
Yifan Pan
PROJECT
Proposed Apartment Building 39 Harrow Street, Box Hill, Melbourne
DRAWING
Design and Context Response Wind + Sun Analysis
PRINT DATE
SCALE
3/12/15
DRAWN
FR
ARCHITECT
AM
1:500, 1:200, 1:250 @ A3 CHECKED
PROJECT NUMBER
10264
DRAWING NUMBER [REVISION]
TP.03.3
/Volumes/Studio/projects/10264 39 Harrow St Box Hill/02models/39 Harrow St Box Hill.pln
Moull Murray Architects ABN 16 407 051 599
Melbourne Level 1, 312 New Street Brighton. VIC. 3186 T.+61 3 9530 8905 F.+61 3 9530 8906
info@moullmurrayarchitects.com.au moullmurrayarchitects.com.au
TP.05.1
36.52
2 1
8
VERANDAH BALCONY
LAWN
2 #LayID #DrgID TP.06.1POS
1.9m DE
EP PIT
4 3
PALINGS TIMBER 1.6m 3 1 89.1
7 8.5
E.POLE 2
(17.98) .52 2
K 4T
8
9.1
89
TP.06.2
HARROW
TBM TEL RL 89.73 3
TK
.63
89
STREET
91.32FL1 94.27FL2
100.06RF
96.99RF
CONCRETE DRIVEWAY .93
89
4
NOT
10.00 %
TK
89째40'
FLAT ROOF
20.00 %
FOOTPATH
2.74
PLANTER
Total 28
41-45
97.76RF
E
0 0.0
Car Stackers 9
KLAUS Stacker Parker Multibase 2072
96.31TW2 93.36TW1 H/W
20.00 %
KLAUS Stacker Parker Multibase 2072
G82 DB LP=500
1,977
CONCRETE
Store
NGL+89,280AHD 89.28
92.23RF
179째52'
Car Stackers
G82 DB LP=500
Car Space
D
.01
96.31TW2 94.27FL2 93.36TW1 91.32FL1 DOOR
4
96.31TW2 EXISTING 3 STOREY 94.27BW2 MULTI-RESIDENTIAL APARTMENT 93.36TW1 H/W 96.31TW2 94.27BW2 H/W
C
90
96.31TW2 94.27FL2 93.36TW1 91.32FL1 DOOR
7
FLAT ROOF
96.31TW2 93.36TW1 H/W
10.00 %
Car Space
.49 8925
TK
.98
Car Stackers
KLAUS Stacker Parker Multibase 2072
Lift
B
TP.07.1 2
G82 DB LP=500
Store
2,140
.78
1,629 1,870
89
24
A
ALL WINDOWS ESTIMATED
1.9m DE EP
Car Stackers
KLAUS Stacker92.64RF Parker Multibase 2072
D
2
.9 89
Car Stackers
KLAUS Stacker Parker Multibase 2072
Stairs
88
6m3
23
C
E
97.07RF
PALS
6m3 22
No. of stackers No. of bays/stacker
TOP FLOOR OBSCURED
25,000L Water Tank underground
6m3 21
Levels Basement
PALINGS
99.89RF
6m3 20
PIT
1.6m .37
89
3
12
359째52'
AS APPROVED BY CITY OF WHITEHORSE
.66m
89
TIMBER
TOP FLOOR OBSCURED
8m3 19
Driveway
6m3 11
ALL WINDOWS ESTIMATED
18
2.743
6m3 10
6m3
17
TP.06.2 1
PROPOSED 4 STOREY MIXED USE DEVELOPMENT
6m3
9
VERANDAH BALCONY
6m3
.68
89
6m3 8
LAWN
7
Storage
6m3 16
6m3
6
2m
BRICK GARAGE
PALINGS TIMBER
6m3 15
6m3
5
Building Summary - Car park
.34
89 .26
89
G82 DB LP=500
PALINGS
6m3 14
.53
G82 DB LP=500
37
TIMBER
6m3
4
4
GRATE
89
6m3
3
13
WAY
11.00 %
AS APPROVED BY CITY OF WHITEHORSE
6m3
2
3
(17.98)
22.01 %
PROPOSED 4 STOREY MIXED USE DEVELOPMENT
22.01 %
89
B
31-35
6m3
1
Bins
.39
A
6m3
O.06.1 F TP 1
Basement
.17
89
96.51RF
POS
89
89째52'
7 HT R .I8G
88
11.00 %
.28
89.00
89
2m TIMB PALS
PALINGS
.03
FENCE
36.46
TIMBER
2
#DrgID
SEWER 69#LayID NGL+88,690AHD 88. 1.5m ALUM FENCE TP.07.1 1
1.8m
WIRE
BAMBOO
1
2.2m
TIMB
88
2m
.73
96.68RF
Proposed Floor Plans
CONCRETE CONC X-ING
FENCED FOOTPATH
TK
.04
90
PRELIMINARY S.T.C.A.
Basement 1:200
CLIENT
Yifan Pan
PROJECT
Proposed Apartment Building 39 Harrow Street, Box Hill, Melbourne
DRAWING
Proposed Floor Plans Basement
PRINT DATE
SCALE
3/12/15
DRAWN
FR
1:200 @ A3 ARCHITECT
AM
CHECKED
PROJECT NUMBER
10264
DRAWING NUMBER [REVISION]
TP.05.1
/Volumes/Studio/projects/10264 39 Harrow St Box Hill/02models/39 Harrow St Box Hill.pln
Moull Murray Architects ABN 16 407 051 599
Melbourne Level 1, 312 New Street Brighton. VIC. 3186 T.+61 3 9530 8905 F.+61 3 9530 8906
info@moullmurrayarchitects.com.au moullmurrayarchitects.com.au
TP.05.2
97.07RF
A: 23 m2
W
.37
F
Courtyard
Terrace 92.64RF
1 Bedroom Unit
A: 18 m2
A: 47 m2
W
36.52
89
1,629 1,870
F
.98
A: 47 m2
Lift
D
A: 17 m2
179째52'
W
Terrace
1 Bedroom Unit
LAWN
96.31TW2 93.36TW1 H/W
D
F
.01
90
FLAT ROOF
W
W
2,140
96.31TW2 94.27FL2 93.36TW1 91.32FL1 DOOR
Total
F
91.32FL1 94.27FL2
F
PALINGS
2 Bedroom Unit
A: 65 m2
A: 60 m2
2m TIMB PALS
1.6m
CONCRETE
FOOTPATH
Services
8
2,780
Services
1,977
8 8.7
.49
NGL+89,280AHD
TK
89.28
TK
3
.57
88
89
1 89.1
97.76RF
E
0 0.0
Terrace
Terrace
89째40' E.POLE 2
A: 8 m2
A: 8 m2
PLANTER
(17.98) .52 2
K 4T
89
.1
89
HARROW
TP.06.2
TBM TEL RL 89.73 3
STREET
2.74
983
K 3T
.6
89
11
2 Bed. 3 3 3 5
14
Total 6 8 8 6
25
100.06RF
96.99RF
9
7.14 %
7.14 %
7.14 %
TIMBER
E
2 Bedroom Unit
1 Bed, 3 4 4 0
96.31TW2 94.27BW2 93.36TW1 H/W 96.31TW2 94.27BW2 H/W
C
36.46
Stairs
2 #LayID #DrgID TP.06.1POS
C
92.23RF
359째52'
89
96.31TW2 94.27FL2 93.36TW1 91.32FL1 DOOR
B
TP.07.1 2
FLAT ROOF
96.31TW2 93.36TW1 H/W
A
Levels Ground Floor 1st Floor 2nd Floor 3rd Floor
PALINGS
TOP FLOOR OBSCURED
1.6m
A: 59
m2
TIMBER
99.89RF
2m
PALINGS TIMBER
Terrace
2
.9 89
2m
TOP FLOOR OBSCURED
F
LAWN
A: 14 m2
2 Bedroom Unit
TP.06.2 1
PALINGS
AS APPROVED BY CITY OF WHITEHORSE
TIMBER
4 STOREY MIXED USE DEVELOPMENT
AS APPROVED BY CITY OF WHITEHORSE
.6
89
Terrace
POS
W
m2
ALL WINDOWS ESTIMATED
A: 48
2.743
.68
89
.39
B
37
.53
89
Building Summary - Number of Units
.34 89 6 .2 89NGL+89,260AHD
4
GRATE
89
A
PROPOSED 4 STOREY MIXED USE DEVELOPMENT
3
1 Bedroom Unit
Driveway
31-35
WAY
(17.98)
VERANDAH BALCONY
TP.06.1 1
VERANDAH BALCONY
OF
89째52'
7 8.8 82,000
Ground Floor
.17
89
96.51RF
ALL WINDOWS ESTIMATED
89
RIGHT
89
BRICK GARAGE
.28
89.00
.03
FENCE
2,500
PALINGS
TP.07.1 1
TIMBER
2
#DrgID
SEWER 69#LayID NGL+88,690AHD 88. 1.5m ALUM FENCE Line of Slab Above
1.8m
WIRE
PALS
1
2.2m
BAMBOO
88
TIMB
.73
96.68RF
Proposed Floor Plans
CONCRETE DRIVEWAY NOT
.93 89 NGL+89,760AHD
4
CONCRETE
CONC X-ING
FENCED FOOTPATH
TK
.04
90
NEW TREE
PRELIMINARY S.T.C.A.
Ground Floor 1:200
CLIENT
Yifan Pan
PROJECT
Proposed Apartment Building 39 Harrow Street, Box Hill, Melbourne
DRAWING
Proposed Floor Plans Ground Floor
PRINT DATE
SCALE
3/12/15
DRAWN
FR
1:200 @ A3 ARCHITECT
AM
CHECKED
PROJECT NUMBER
10264
DRAWING NUMBER [REVISION]
TP.05.2
/Volumes/Studio/projects/10264 39 Harrow St Box Hill/02models/39 Harrow St Box Hill.pln
Moull Murray Architects ABN 16 407 051 599
Melbourne Level 1, 312 New Street Brighton. VIC. 3186 T.+61 3 9530 8905 F.+61 3 9530 8906
info@moullmurrayarchitects.com.au moullmurrayarchitects.com.au
TP.05.3
1.6m
A: 7 m2
1,629 1,870
F
.37
89
F
1 Bedroom Unit
TP.07.1
Balcony
92.64RF A: 7 m2
W
36.52
A: 47 m2
.98
W
1 Bedroom Unit
Balcony
A: 47 m2
Lift
D
LAWN
36.46
Stairs
A: 7 m2
F
.01
90
96.31TW2 93.36TW1 H/W
FLAT ROOF
A: 60
W F
1 Bedroom Unit
m2
A: 45
2 Bedroom Unit
m2
A: 61
m2
A: 9 m2
CONCRETE
FOOTPATH
K 7T
K
T .13
1 89
Balcony
E.POLE 2
Balcony
A: 8 m2
PLANTER
89째40'
89.28
.5
88
Balcony
.49
89
A: 7 m2
(17.98) .52 2
K
T .14
89
89
HARROW
TP.06.2
TBM TEL RL 89.73 3
STREET
2m TIMB PALS
88
97.76RF
0
100.06RF
.0 90
1.6m 1,977
.78
91.32FL1 94.27FL2
F
W F
2 Bedroom Unit
TIMBER
E
PALINGS
W
2,140
96.31TW2 94.27FL2 93.36TW1 91.32FL1 DOOR
96.31TW2 94.27BW2 93.36TW1 H/W 96.31TW2 94.27BW2 H/W
POS
C
92.23RF
359째52'
89
FLAT ROOF
96.31TW2 93.36TW1 H/W 96.31TW2 94.27FL2 93.36TW1 91.32FL1 DOOR
PALINGS
TOP FLOOR OBSCURED
TIMBER
Balcony
A: 60 m2
W
2
.9 89
TIMBER
99.89RF
A: 9 m2
2m
PALINGS
97.07RF
PALS
BAMBOO
Balcony
F
9
TP.06.2 1
PALINGS
AS APPROVED BY CITY OF WHITEHORSE
TIMBER
AS APPROVED BY CITY OF WHITEHORSE
37
PROPOSED 4 STOREY MIXED USE DEVELOPMENT
8
89
2 Bedroom Unit
B
31-35
9.6
BEAM .3 BELOW
89
A
2m
89
2.743
.68
A: 67 m2
W
4 STOREY MIXED USE DEVELOPMENT
.53
89
2 Bedroom Unit
.34
89 .26
GRATE
LAWN
89
3
POS
.28
89.00
(17.98)
ALL WINDOWS ESTIMATED
TP.06.1 1
VERANDAH BALCONY
LANEWAY
89째52'
7
.8 88
1st Floor
.17
89
96.51RF
TOP FLOOR OBSCURED
89
TIMB
PALINGS
.03
FENCE
179째52'
TIMBER
2
#DrgID
SEWER #LayID .69 88 1.5m ALUM FENCE TP.07.1 1
1.8m
WIRE
VERANDAH BALCONY
1
2.2m
ALL WINDOWS ESTIMATED
88
BRICK GARAGE
.73
96.68RF
Proposed Floor Plans
2.74
983
TK
.63
89
96.99RF
CONCRETE DRIVEWAY NOT
.93
89
CONCRETE CONC X-ING
FENCED FOOTPATH
TK
.04
90
PRELIMINARY S.T.C.A.
First Floor
1:200
CLIENT
Yifan Pan
PROJECT
Proposed Apartment Building 39 Harrow Street, Box Hill, Melbourne
DRAWING
Proposed Floor Plans 1st Floor
PRINT DATE
SCALE
3/12/15
DRAWN
FR
1:200 @ A3 ARCHITECT
AM
CHECKED
PROJECT NUMBER
10264
DRAWING NUMBER [REVISION]
TP.05.3
/Volumes/Studio/projects/10264 39 Harrow St Box Hill/02models/39 Harrow St Box Hill.pln
Moull Murray Architects ABN 16 407 051 599
Melbourne Level 1, 312 New Street Brighton. VIC. 3186 T.+61 3 9530 8905 F.+61 3 9530 8906
info@moullmurrayarchitects.com.au moullmurrayarchitects.com.au
TP.05.4
2m
PALINGS TIMBER 1.6m
A: 7 m2
1,629 1,870
F
.37
89
F
1 Bedroom Unit
92.64RF A: 7 m2
A: 6 m2
PALINGS
2 Bedroom Unit
A: 45 m2
A: 61 m2
91.32FL1 94.27FL2
97.76RF
E
0 0.0
1 89.1
Balcony
89째40' E.POLE 2
Balcony
A: 9 m2
PLANTER
A: 7 m2
(17.98) .52 2
K
T .14
89
89
HARROW
TP.06.2
TBM TEL RL 89.73 3
STREET
2m TIMB PALS
A: 9 m2
K 3T
.5
88
Balcony
89.28
FOOTPATH
FLAT ROOF
100.06RF
96.99RF
9
.49
CONCRETE
96.31TW2 93.36TW1 H/W
W
W F
1 Bedroom Unit
A: 60 m2
89
K 7T
96.31TW2 94.27FL2 93.36TW1 91.32FL1 DOOR
F
W F
2 Bedroom Unit
TIMBER
8
96.31TW2 94.27FL2 93.36TW1 91.32FL1 DOOR
D
.01
90
1.6m 1,977
8 8.7
LAWN
2 #LayID #DrgID TP.06.1POS
Balcony
A: 47 m2
F
FLAT ROOF
96.31TW2 93.36TW1 H/W
96.31TW2 94.27BW2 93.36TW1 H/W 96.31TW2 94.27BW2 H/W
C
36.46 W
1 Bedroom Unit
Lift
2,140
E
.98
92.23RF
359째52'
Stairs
B
TP.07.1 2
Balcony
W
36.52
A: 47
m2
89
D
A
Balcony
A: 60 m2
C
.92
89
PALINGS
TOP FLOOR OBSCURED
A: 9 m2
TIMBER
99.89RF
PALS
BAMBOO
Balcony
2 Bedroom Unit
TP.06.2 1
PALINGS
AS APPROVED BY CITY OF WHITEHORSE
TIMBER
AS APPROVED BY CITY OF WHITEHORSE
37
PROPOSED 4 STOREY MIXED USE DEVELOPMENT
89
F
W
2m
.6
.68
89
.39
B
.34
89 .26
89
2.743
89
A
31-35
.53
A: 67 m2
4
GRATE
89
2 Bedroom Unit
W
PROPOSED 4 STOREY MIXED USE DEVELOPMENT
3
97.07RF
89
WAY
ALL WINDOWS ESTIMATED
.28
89.00
(17.98)
VERANDAH BALCONY
OF
TP.06.1 1
ALL WINDOWS ESTIMATED
.87
VERANDAH BALCONY
89째52'
RIGHT
88
2nd Floor
.17
89
96.51RF
TOP FLOOR OBSCURED
89
TIMB
PALINGS
.03
FENCE
179째52'
TIMBER
2
#DrgID
SEWER #LayID .69 88 1.5m ALUM FENCE TP.07.1 1
1.8m
WIRE
BRICK GARAGE
1
2.2m
LAWN
88
POS
.73
96.68RF
Proposed Floor Plans
2.74
983
K 3T
.6
89
CONCRETE DRIVEWAY NOT
.93
89
4
CONCRETE CONC X-ING
FENCED FOOTPATH
TK
.04
90
PRELIMINARY S.T.C.A.
Second Floor
1:200
CLIENT
Yifan Pan
PROJECT
Proposed Apartment Building 39 Harrow Street, Box Hill, Melbourne
DRAWING
Proposed Floor Plans 2nd Floor
PRINT DATE
SCALE
3/12/15
DRAWN
FR
1:200 @ A3 ARCHITECT
AM
CHECKED
PROJECT NUMBER
10264
DRAWING NUMBER [REVISION]
TP.05.4
/Volumes/Studio/projects/10264 39 Harrow St Box Hill/02models/39 Harrow St Box Hill.pln
Moull Murray Architects ABN 16 407 051 599
Melbourne Level 1, 312 New Street Brighton. VIC. 3186 T.+61 3 9530 8905 F.+61 3 9530 8906
info@moullmurrayarchitects.com.au moullmurrayarchitects.com.au
TP.05.5
A: 7 m2
LAWN
.01
90
F
F
PALINGS
A: 65
FLAT ROOF
W
2 Bedroom Unit
2 Bedroom Unit
m2
A: 68
m2
97.76RF
E
0
91.32FL1 94.27FL2
100.06RF
1,977
8
89째40'
89.28 1,000
K
T .13
1 89
A: 12 m2
2.74
PLANTER
E.POLE 2
(17.98) .52 2
K
T .14
89
89
HARROW
TP.06.2
TBM TEL RL 89.73 3
STREET
1,983
TK
.63
89
1,600
Balcony
96.99RF
CONCRETE DRIVEWAY NOT
.93
89
4
1,841
Balcony
2m TIMB PALS
1.6m
TIMBER
.0 90
9 9.4
.5
88
D
F
W
96.31TW2 93.36TW1 H/W
TOP FLOOR OBSCURED
179째52'
Balcony
A: 12 m2
FOOTPATH
92.23RF
A: 72
m2
96.31TW2 94.27FL2 93.36TW1 91.32FL1 DOOR
96.31TW2 94.27BW2 93.36TW1 H/W 96.31TW2 94.27BW2 H/W
C
2 #LayID #DrgID TP.06.1POS
2 Bedroom Unit
Stairs
BRICK GARAGE
36.52
.98
89
Lift
K 7T
TP.07.1 2
92.64RF
2,400
B
ALL WINDOWS ESTIMATED
F
2,140
CONCRETE
97.07RF
2m
.37
89
D
.78
1,629 1,870
W
FLAT ROOF
96.31TW2 93.36TW1 H/W 96.31TW2 94.27FL2 93.36TW1 91.32FL1 DOOR
PALINGS
99.89RF
PALINGS TIMBER 1.6m
A: 12 m2
W
88
A
Balcony
A: 72 m2
C
E
2
.9 89
TIMBER
TOP FLOOR OBSCURED
F
2 Bedroom Unit
359째52'
AS APPROVED BY CITY OF WHITEHORSE
8
A: 9 m2
5,450
TP.06.2 1
PALINGS
37
PROPOSED 4 STOREY MIXED USE DEVELOPMENT
TIMBER
Balcony
2m
9.6
8
B
AS APPROVED BY CITY OF WHITEHORSE
89
.34
89 .26
89
3,623 2.74 3
.68
9 9.3
A
31-35
.53
A: 65 m2
4
GRATE
89
2 Bedroom Unit
W
PROPOSED 4 STOREY MIXED USE DEVELOPMENT
WAY
LAWN
89
3
(17.98)
POS
2,450 8
OF
TP.06.1 1
ALL WINDOWS ESTIMATED
7
.8 88
3rd Floor
.17
89
96.51RF
VERANDAH BALCONY
89째52'
RIGHT
.2
89.00
89
BAMBOO
PALINGS
.03
FENCE
36.46
TIMBER
2
#DrgID
SEWER #LayID .69 88 1.5m ALUM FENCE TP.07.1 1
1.8m
WIRE
TIMB
1
2.2m
VERANDAH BALCONY
88
PALS
.73
96.68RF
Proposed Floor Plans
CONCRETE CONC X-ING
FENCED FOOTPATH
TK
.04
90
PRELIMINARY S.T.C.A.
Third Floor
1:200
CLIENT
Yifan Pan
PROJECT
Proposed Apartment Building 39 Harrow Street, Box Hill, Melbourne
DRAWING
Proposed Floor Plans 3rd Floor
PRINT DATE
SCALE
3/12/15
DRAWN
FR
1:200 @ A3 ARCHITECT
AM
CHECKED
PROJECT NUMBER
10264
DRAWING NUMBER [REVISION]
TP.05.5
/Volumes/Studio/projects/10264 39 Harrow St Box Hill/02models/39 Harrow St Box Hill.pln
Moull Murray Architects ABN 16 407 051 599
Melbourne Level 1, 312 New Street Brighton. VIC. 3186 T.+61 3 9530 8905 F.+61 3 9530 8906
info@moullmurrayarchitects.com.au moullmurrayarchitects.com.au
TP.05.6
WAY
(17.98)
3
89
2m
9.6
8
89
2
A
.9 89
BAMBOO
TIMB
1,629 1,870
B
PALINGS
2m TIMB PALS
TIMBER .49
89
CONCRETE
FOOTPATH
1 89
2.74
PLANTER
89째40' K
T .13
.5
88
ALL WINDOWS ESTIMATED
96.31TW2 93.36TW1 H/W
FLAT ROOF
91.32FL1 94.27FL2
97.76RF
E
0
89.28
K 7T
96.31TW2 94.27FL2 93.36TW1 91.32FL1 DOOR
100.06RF
.0 90
1.6m 1,977
.78
88
96.31TW2 94.27FL2 93.36TW1 91.32FL1 DOOR
PALINGS
FLAT ROOF
96.31TW2 93.36TW1 H/W
D
.01
90
2,140
E
LAWN
2 #LayID #DrgID TP.06.1POS
92.23RF
179째52' D
TIMBER
96.31TW2 94.27BW2 93.36TW1 H/W 96.31TW2 94.27BW2 H/W
C
36.46
C
BRICK GARAGE
36.52
.98
89
359째52'
AS APPROVED BY CITY OF WHITEHORSE
B
TP.07.1 2
92.64RF
TP.06.2 1
PALINGS
AS APPROVED BY CITY OF WHITEHORSE
37
PROPOSED 4 STOREY MIXED USE DEVELOPMENT
TIMBER
31-35
PROPOSED 4 STOREY MIXED USE DEVELOPMENT
.37
89
VERANDAH BALCONY
1.6m
TIMBER
2m
.39
A
.34
89 .26
89
2.743
.68
PALS
89
.53
89
.28
89.00
4
GRATE
TOP FLOOR OBSCURED
TP.06.1 1
99.89RF
OF
89째52'
7
.8 88
Roof
.17
89
96.51RF
97.07RF
RIGHT
89
TOP FLOOR OBSCURED
.03
FENCE
LAWN
PALINGS
TP.07.1 1
TIMBER
2
SEWER #LayID .69 88 1.5m ALUM FENCE
PALINGS
1.8m
#DrgID
WIRE
POS
1
2.2m
ALL WINDOWS ESTIMATED
88
VERANDAH BALCONY
.73
96.68RF
Proposed Floor Plans
E.POLE 2
(17.98) .52 2
K
T .14
89
89
HARROW
TP.06.2
TBM TEL RL 89.73 3
STREET
TK
.63
89
96.99RF
CONCRETE DRIVEWAY NOT
.93
89
4
CONCRETE CONC X-ING
FENCED FOOTPATH
TK
.04
90
PRELIMINARY S.T.C.A.
Roof
1:200
CLIENT
Yifan Pan
PROJECT
Proposed Apartment Building 39 Harrow Street, Box Hill, Melbourne
DRAWING
Proposed Floor Plans Roof
PRINT DATE
SCALE
3/12/15
DRAWN
FR
1:200 @ A3 ARCHITECT
AM
CHECKED
PROJECT NUMBER
10264
DRAWING NUMBER [REVISION]
TP.05.6
/Volumes/Studio/projects/10264 39 Harrow St Box Hill/02models/39 Harrow St Box Hill.pln
Moull Murray Architects ABN 16 407 051 599
Melbourne Level 1, 312 New Street Brighton. VIC. 3186 T.+61 3 9530 8905 F.+61 3 9530 8906
info@moullmurrayarchitects.com.au moullmurrayarchitects.com.au
TP.06.1 Proposed Elevations
5,318
2
7,730
4,935
North + East Elevations
1
13,206
+102,470.0 4 Roof
3
+98,970.0 3 Third Floor
2,600 400
37 HARROW ST
PROPOSED 4 STOREY DEVELOPMENT
+92,970.0 1 First Floor
+89,970.0 0 Ground Floor
706
3,000
2,600 400
EXISTING 3 STOREY APARTMENT
+95,970.0 2 Second Floor
3,000
41-45 HARROW ST
12,500
3,000
2,600 400
2,600
3,500
900
4
DRIVEWAY
RIGHT OF WAY
+86,320.0 -1 Basement
NORTH ELEVATION
1:200
5,750
D
5,750
C
B
5,750
5,750
A
+12,500.0 4 Roof
+9,000.0 3 Third Floor
+6,000.0 2 Second Floor
+3,000.0 1 First Floor
3,000
2,800 200
3,000
2,800 200
12,500
3,000
2,800 200
2,600
3,500
900
E
±0.0 0 Ground Floor
90,075 (Datum)
89,526 (Datum) NGL
HARROW ST
RIGHT OF WAY
-3,650.0 -1 Basement
EAST ELEVATION
PRELIMINARY
1:200
CLIENT
Yifan Pan
S.T.C.A. PROJECT
Proposed Apartment Building 39 Harrow Street, Box Hill, Melbourne
DRAWING
Proposed Elevations North + East Elevations
PRINT DATE
SCALE
3/12/15
DRAWN
FR
1:200 @ A3 ARCHITECT
AM
CHECKED
PROJECT NUMBER
10264
DRAWING NUMBER [REVISION]
TP.06.1
/Volumes/Studio/projects/10264 39 Harrow St Box Hill/02models/39 Harrow St Box Hill.pln
Moull Murray Architects ABN 16 407 051 599
Melbourne Level 1, 312 New Street Brighton. VIC. 3186 T.+61 3 9530 8905 F.+61 3 9530 8906
info@moullmurrayarchitects.com.au moullmurrayarchitects.com.au
TP.07.1
88,811 (NGL)
C
5,750
D
5,750
3,480 2,378
13,723
BEDROOM
+95,970.0 2 Second Floor +92,970.0 1 First Floor
RIGHT OF WAY
Sections
980
+98,970.0 3 Third Floor
+89,970.0 0 Ground Floor
Proposed Sections
E
5,750
BOUNDARY
BOUNDARY
B
5,750
COURTYARD
BATH.
APARTMENT
ENS.
BEDROOM
ENS.
BATH.
BEDROOM
ENS.
BATH.
BEDROOM
APARTMENT BEDROOM
APARTMENT BEDROOM
BALCONY
BALCONY
ENTRY RAMP
STAIRS RAMP
BALCONY
ENTRY
1,223
3,500 3,000
2,600 400
3,000
2,600 400
3,000
12,500
2,600 400
3,000
500
+102,470.0 4 Roof
A
BASEMENT CAR PARK
HARROW STREET
89,150 (NGL)
BASEMENT CAR PARK
+86,320.0 -1 Basement
SECTION A
1:200
2,600 400
3,500 3,000
2,600 400
3,000
2,600 400
BOUNDARY
+9,000.0 3 Third Floor +6,000.0 2 Second Floor
12,500
3,000
3,000
500
+12,500.0 4 Roof
41-45 HARROW ST
EXISTING 3 STOREY APARTMENT
+3,000.0 1 First Floor
90,067 (NGL)
±0.0 0 Ground Floor
3,623
5,171
3
164
2
7,566
164
4,771
5,100
2,823
BALCONY
BALCONY
APARTMENT
BEDROOM
WIR
APARTMENT
LIVING
BALCONY
APARTMENT
LIVING
TERRACE
APARTMENT
LIVING
ENS.
BATH.
BATH.
BATH.
1
164
BOUNDARY
4
147
PASSAGE
PASSAGE 37 HARROW ST
PROPOSED 4 STOREY DEVELOPMENT
PASSAGE
PASSAGE
COURTYARD 89,279 (NGL)
BASEMENT CAR PARK
-3,650.0 -1 Basement
RAMP
2072-DB 195/350
PRELIMINARY S.T.C.A.
SECTION B
1:200 CLIENT
Yifan Pan
PROJECT
Proposed Apartment Building 39 Harrow Street, Box Hill, Melbourne
DRAWING
Proposed Sections Sections
PRINT DATE
SCALE
3/12/15
DRAWN
FR
1:200 @ A3 ARCHITECT
AM
CHECKED
PROJECT NUMBER
10264
DRAWING NUMBER [REVISION]
TP.07.1
/Volumes/Studio/projects/10264 39 Harrow St Box Hill/02models/39 Harrow St Box Hill.pln
Moull Murray Architects ABN 16 407 051 599
Melbourne Level 1, 312 New Street Brighton. VIC. 3186 T.+61 3 9530 8905 F.+61 3 9530 8906
info@moullmurrayarchitects.com.au moullmurrayarchitects.com.au
TP.08.1
TP.08.2
Proposed Shadow Diagrams
Proposed Shadow Diagrams
11AM SHADOW
12 PM SHADOW 11m HIGH MASSING OVER FULL SITE
11m HIGH MASSING OVER FULL SITE
PROPOSED SHADOW LINE
PROPOSED SHADOW LINE
PRELIMINARY
PRELIMINARY
12PM
1:433.21
1:433.21
PROJECT
Proposed Apartment Building 39 Harrow Street, Box Hill, Melbourne
DRAWING
CLIENT
Yifan Pan Proposed Shadow Diagrams 11AM SHADOW
PROJECT
PRINT DATE
3/12/15
DRAWN
FR
ARCHITECT
AM
SCALE
1:200 @ A3
S.T.C.A.
S.T.C.A.
1PM
PROJECT NUMBER
Proposed Apartment Building 10264 39 Harrow Street, Box Hill, Melbourne CHECKED
CLIENT DRAWINGDRAWING NUMBER [REVISION]
PROJECT PRINT DATE Melbourne
SCALE
DRAWING PROJECT NUMBER
DRAWING NUMBER [REVISION]
Brighton. VIC. 3186 Apartment Building Proposed Yifan Shadow Pan Diagrams Proposed 10264 Proposed Shadow Diagrams TP.08.2 TP.08.1 T.+61 3 9530 8905 12 PM SHADOW Harrow Street, Box Hill, Melbourne 1PM SHADOW ARCHITECT CHECKED Moull Murray Architects DRAWNF.+6139 3 9530 8906
/Volumes/Studio/projects/10264 39 Harrow St Box Hill/02models/39 Harrow St Box Hill.pln
Level 1, 312 New Street 3/12/15
ABN 16 407 051 599
FR
AM
info@moullmurrayarchitects.com.au moullmurrayarchitects.com.au
1:200 @ A3
/Volumes/Studio/projects/10264 39 Harrow St Box Hill/02models/39 Harrow St Box Hill.pln
PRINT DATE
3/12/15
SCALE Melbourne Level 1, 312 New Street 1:200 @ Brighton. VIC. 3186 T.+61 3 9530 8905 ARCHITECTF.+61 3 9530 8906CHECKED
Moull Murray DRAWN Architects ABN 16 407 FR 051 599
AM
info@moullmurrayarchitects.com.au moullmurrayarchitects.com.au
A3
PROJECT NUMBER
10264
/Volumes/Studio/projects/10264 39 Ha
TP.08.4 Proposed Shadow Diagrams
2PM SHADOW 11m HIGH MASSING OVER FULL SITE
PROPOSED SHADOW LINE
41-45 HARROW STREET EXISTING 3 STOREY MULTI-RESIDENTIAL NEIGHBOURING APARTMENT 39 HARROW STREET PROPOSED APARTMENT
PROPOSED APARTMENT SHADOW PROJECTION AT 2PM
PRELIMINARY
2PM
S.T.C.A.
2PM shadow projection CLIENT
Yifan Pan
PROJECT
Proposed Apartment Building 39 Harrow Street, Box Hill, Melbourne
DRAWING
Proposed Shadow Diagrams 2PM SHADOW
PRINT DATE
SCALE
3/12/15
DRAWN
FR
1:200 @ A3 ARCHITECT
AM
CHECKED
PROJECT NUMBER
10264
DRAWING NUMBER [REVISION]
TP.08.4
/Volumes/Studio/projects/10264 39 Harrow St Box Hill/02models/39 Harrow St Box Hill.pln
Moull Murray Architects ABN 16 407 051 599
Melbourne Level 1, 312 New Street Brighton. VIC. 3186 T.+61 3 9530 8905 F.+61 3 9530 8906
info@moullmurrayarchitects.com.au moullmurrayarchitects.com.au
TP.09.3 Imagery PRELIMINARY Perspectives S.T.C.A.
CLIENT
Yifan Pan
PROJECT
Proposed Apartment Building 39 Harrow Street, Box Hill, Melbourne
DRAWING
PRINT DATE
SCALE
3/12/15
Imagery Perspectives
1:1 @ A3
DRAWN
ARCHITECT
FR
AM
CHECKED
PROJECT NUMBER
10264
DRAWING NUMBER [REVISION]
TP.09.1
/Volumes/Studio/projects/10264 39 Harrow St Box Hill/02models/39 Harrow St Box Hill.pln
Moull Murray Architects ABN 16 407 051 599
Melbourne Level 1, 312 New Street Brighton. VIC. 3186 T.+61 3 9530 8905 F.+61 3 9530 8906
info@moullmurrayarchitects.com.au
moullmurrayarchitects.com.au CLIENT
Yifan Pan
PRELIMINARY S.T.C.A. CLIENT
Yifan Pan
PROJECT
Proposed Apartment Building 39 Harrow Street, Box Hill, Melbourne
DRAWING
Imagery Perspectives
PRINT DATE
SCALE
3/12/15
DRAWN
FR
1:1 @ A3 ARCHITECT
AM
CHECKED
PROJECT NUMBER
10264
DRAWING NUMBER [REVISION]
TP.09.3
/Volumes/Studio/projects/10264 39 Harrow St Box Hill/02models/39 Harrow St Box Hill.pln
Moull Murray Architects ABN 16 407 051 599
Melbourne Level 1, 312 New Street Brighton. VIC. 3186 T.+61 3 9530 8905 F.+61 3 9530 8906
info@moullmurrayarchitects.com.au moullmurrayarchitects.com.au
PROJECT
Proposed Apartment Building 39 Harrow Street, Box Hill, Melbourne
DRAWING
Imagery Perspectives
PRINT DATE
SCALE
3/12/15
DRAWN
FR
1:1 @ A3 ARCHITECT
AM
CHECKED
PROJECT NUMBER
10264
DRAWING NUMBER [REVISION]
TP.09.2
/Volumes/Studio/projects/10264 39 Harrow St Box Hill/02models/39 Harrow St Box Hill.pln
Moull M
ABN 16 407
SKETCH DESIGN 2
SASH DESIGN RESIDENTIAL
sketch design
Park Avenue residential redeveloment
option 1: ground floor
option 1: first floor
option 1: perspective
option 2: ground floor
option 2: first floor
option 2: perspective
option 3: ground floor
option 3: first floor
option 3: perspective