BORA CONSTRUCTION

Page 1

www.boracons.com



www.boracons.com www.boracons.com


BORA CONSTRUCTİON; BALANCE SHEET AND FİNİSHED WORK NOM DU TRAVAILLE

COUT DE CONSTRUCTION

GROZNY CITY 1 (7 HIGHRISE BUILDINGS COMPLEX) ARGUN CITY 1 (5 HIGHRISE BUILDINGS COMPLEX) ARGUN CITY 1 (5 HIGHRISE BUILDINGS COMPLEX) GUDERMES MOSQUE HOTEL (30-STORY HOTEL BUILDING AND FINISHING WORKS) CONSTRUCTION OF RESIDENCE RIVER REHABILITION CENTRAL HEAT BUİLDİNG GELDİGEN MOSQUİE MEDRESE GROZNİY ALLAROY MOSQUE MİLİTARY BARRACKS BUİLDİNG RESİDENCE MOSQUE CONSTRUCTİON OF SUNJA RİVER REHABİLİTİON KADİROV STREET HİGHWAY BRİDGE MULTİPURPOSE HALL BUİLDİNG GLOBE RESTAURANT ARGUN MODERN MOSQUE ARGUN HİGHWAY UNDERPASS GROZNY WATERFALL STRUCTURES TV BUİLDİNG 16 STOREY BANK BUİLDİNG THE 2 CLOCKS WİCH HAVE 13.6 METERS İN DİAMETER. MEMBRANE COATİNG OVER THE STADİUM OF GROZNY SUNJA RİVER SİDE RECREATİON CONSTRUCTİONS ALUCOBOND COVER OF SOME BUİLDİNGS İN GUDERMES CİTY SHELTER BUİLDİNG REZİDANCE RİVER BRİDGE CONSTRUCTİONS GUDERMES MOSQUE LANDSCAPİNG WORKS WATER INTAKE STRUCTURE HOSPİTAL BUİLDİNG MAST BUSİNESS AND RESİDENTİAL CENTER KURÇALOY WASTEWATER TREATMENT PLANT SUPERMARKET SİDİNG WORKS NOVOROSSİYSK-KRASNO DAR-RUSSIA ROAD AND BRİDGS KALİMASH / ALBANİA 28 MAY SUBWAY STATİON BAKU / AZERBAİJAN

$ 278.365.454,00 $ 25.749.000,00 $ 28.635.000,00 $ 12.848.000,00 $ 29.250.000,00 $ 3.000.000,00 $ 11.859.365,00 $ 8.250.000,00 $ 450.000,00 $ 9.622.86,00 $ 2.629.800,00 $ 2.750.000,00 $ 32.828.631,00 $ 6.300.000,00 $ 34.000.000,00 $ 4.528.986,00 $ 9.910.000,00 $ 2.624.158,00 $ 6.331.48, 98 $ 3.231.000,00 $ 21.000.000,00 $ 1.550.000,00 $ 1.875.000,00 $ 3.517.902,00 $ 545.478,00 $ 227.600,00 $ 1.158.996,00 $ 2.000.000,00 $ 3.949.440,00 $ 7.417.640,00 $ 12.000.000,00 $ 2.000.000,00 $ 3.710.000,00 $ 360.000.000,00 $ 120.000.000,00 $ 5.300.000.000,00

TOTAL

$1.059.415.852


The Bora construc on was established in 1998, and 1998/1 of Bora Insaat Turizm ve Danishmanlik Sanayi Ticaret Ltd.S ., registered and announced at the Russian Federa on Republic and in Turkey Trade Registry. Circular Text : Arif AYDIN NASIP, Ibrahim Eker who are selected as company directors for ten years and authorized individually with one of their signets to represent the company in general in every aspect, domes cally and abroad with all official authori es, public state owned enterprises, administra ve, judicial, military authori es, Ministers, Tax offices, Social security ins tu ons, municipali es and all other ins tu ons and organiza ons, en

es and unites, head offices

and branches of privet and public banks, Central Bank, real and legal persons, companies in all fields and stages is in true way and in all broad means represen ng and binding the company, are authorized to sign every kind of documents that leave the company under the debt like surety ship, pledge, counter- guarantee, bill payable, check, policy, bond, other nego able notes, declara ons and such. Also they are authorized to give documents on behalf of company to banks for collec on and as collateral, to buy all securi es and real estates due to courts, to give and cancel mortgage on behalf and against company, to open and close le er of credit or use exis ng le ers, to give verbal and wri en securi es to banks, to open court for all issues regarding company opera ons, to make enforcement proceedings. Bora Holding


GROZNY CITY HOTEL OFFICE & RESIDENTIAL PROJECT

The hotel,office and residential project are placed in the capital Republic of Chechenya. Project Location: Grozny - Chechenya The Date Of Design And Implementation : 2008-2010 Area: 350.000 m² 6


GROZNY CITY HOTEL OFFICE & RESIDENTIAL PROJECT

7


GROZNY CITY HOTEL OFFICE & RESIDENTIAL PROJECT

8


GROZNY CITY HOTEL OFFICE & RESIDENTIAL PROJECT

9


GROZNY CITY HOTEL OFFICE & RESIDENTIAL PROJECT

10


GROZNY CITY HOTEL OFFICE & RESIDENTIAL PROJECT

11


GROZNY CITY HOTEL OFFICE & RESIDENTIAL PROJECT

12


GROZNY CITY HOTEL OFFICE & RESIDENTIAL PROJECT

13


GROZNY CITY HOTEL OFFICE & RESIDENTIAL PROJECT

14


GROZNY CITY HOTEL OFFICE & RESIDENTIAL PROJECT

15


GROZNY CITY HOTEL OFFICE & RESIDENTIAL PROJECT

16


ARGUN MOSQUE PROJECT

Argun modern mosque are placed in Argun city (under construction) Project Location : Argun-Chechenya The Date Of Design And Implementation: 2011 Area : 10.000 m² Area of building - 8.000 m² Parking - 6.200 m² Green space and the courtyard

17


ARGUN MOSQUE PROJECT

18


ARGUN MOSQUE PROJECT

19


ARGUN CITY 2 PROJECT

Аrgun City-2 Residential Project are placed in the Argun city.(under construction) Project Location : Argun-Chechenya The Date Of Design And Implementation: 2011 Area : 65.500 m²

20


ARGUN CITY 2 PROJECT

21


ARGUN CITY 2 PROJECT

22


KADIROV STREET BRIDGE

23


KADIROV STREET BRIDGE

24


MAST CENTER OFFICE & RESIDENTIAL PROJECT

Mast Center Office and Residential Project are placed in Grozny city. Project Location : Grozny - Chechenya The Date Of Design And Implementation: 2010 Area : 17.000 m² Area of building

25


MAST CENTER OFFICE & RESIDENTIAL PROJECT

26


MAST CENTER OFFICE & RESIDENTIAL PROJECT

27


GLOBE RESTAURANT

Project Location : Grozny - Chechenya The Date Of Design And Implementation: 2011 Area : 1.250 m²

28


GLOBE RESTAURANT

29


GLOBE RESTAURANT

30


THE STAGE OF “GROZNY CITY” PROJECT

31


THE STAGE OF “GROZNY CITY” PROJECT

32


THE STAGE OF “GROZNY CITY” PROJECT

33


HOUSING PROJECT in NOVOROSSIYSK RUSSIA ‘ZOLOTOY BEREG’

Prestige Housing Project of total 1300 commercial and residental units, located on seaside, new residential area. Project Location : Novorossiysk - Krasnodar - RUSSIA The Date Of Design And Implementation: 2013 Area : 170.000 m²

34


HOUSING PROJECT in NOVOROSSIYSK RUSSIA ‘ZOLOTOY BEREG’

35


HOUSING PROJECT in NOVOROSSIYSK RUSSIA ‘ZOLOTOY BEREG’

36


HOUSING PROJECT in NOVOROSSIYSK RUSSIA ‘ZOLOTOY BEREG’

37


GROZNY REHABILITATION CENTER

THE NAME OF THE JOB : GROZNY REHABILITATION CENTER PROJECT LOCATION : GROZNY CHECHNY PROJECT DESIGN AND IMPLEMENTATION : 2011 TOTAL CONSTRUCTION AREA : 14.000 m² EMPLOYER : BORA INSAAT

38


GROZNY REHABILITATION CENTER

39


GROZNY CITY 2 PROJECTS

THE NAME OF THE JOB : GROZNI CITY 2 PROJECTS PROJECT LOCATION : GROZNY CHECHNY PROJECT DESIGN AND IMPLEMENTATION : 2011 TOTAL CONSTRUCTION AREA : 450.000 m²

40


GROZNY CITY 2 PROJECTS

41


AIRPORT PROJECT

THE NAME OF THE JOB : GROZNY AIRPORT PROJECT LOCATION : GROZNY CHECHNY PROJECT DESIGN AND IMPLEMENTATION : 2011 TOTAL CONSTRUCTION AREA : 23.000 m² EMPLOYER : BORA INSAAT

42


AIRPORT PROJECT

43


V.I.P. RESIDENCE

The Date Of Design And Implementa on: 2012 Area : 9.500 ²

44


V.I.P. RESIDENCE

45


V.I.P. RESIDENCE

46


V.I.P. RESIDENCE

The Date Of Design And Implementation: 2011 Area : 14.300 m²

47


V.I.P. RESIDENCE

48


V.I.P. RESIDENCE

The Date Of Design And Implementation : 2012 Area : 9.500 m²

49


SAMSUN AUTOROUTE PROJET (0+000-12+340)

SAMSUN AUTOROUTE PROJET (0+000-12+340) Employer: General Directorate of Highways/ Ministry of Communications Location: Samsun / Turkiye The date of beginning construction: 16.03.2005 Construction Completion Date: 31.12.2009 Scope of work: Field Cleaning & Levelling: 140 hektar Excavation: 7.565.000 m続 Filling: 5.100.000 m続 Concrete work: 122.000 m続 Earthwork: 420.000 m続 Armature: 13.420 ton Sub Base: 450.000 m3 Plentmiks foundation: 250.000 ton Hot Mixing: 300.000 ton

50


SAMSUN AUTOROUTE PROJET (0+000-12+340)

51


SAMSUN AUTOROUTE PROJET (0+000-12+340)

52


BURSA AUTOROUTE PROJECT

Employer: General Directorate of Highways/ Ministry of Communications The date of beginning construction: 22.05.2000 Construction Completion Date: 15.12.2003 Scope of work: Earthwork: 15.000.000 m3 Superstructure Works: 1.200.000 ton Excavation: 30.000 mt Concrete work: 250.000 m³ Armature: 27.000 ton

53


BURSA AUTOROUTE PROJECT

54


BURSA AUTOROUTE PROJECT

55


BRIDGED CROSSROAD AND ACCESS ROADS PROJECT

Employer: TOKİ Loca tion: İstanbul / Turkiye The date of beginning construction: 16.08.2006 Construction Completion Date: 31.12.2008 Scope of work: Pile: 4900 mt Reinforced concrete wall: 1000 mt Hot Mixing: 16000 ton 70 mt Underpass

56


BRIDGED CROSSROAD AND ACCESS ROADS PROJECT

57


BRIDGED CROSSROAD AND ACCESS ROADS PROJECT

Employer: Bechtel – ENKA J.v Loca tion: Rreshen – Kalimash / Albania The date of beginning construction: 30.01.2008 Construction Completion Date: 01.06.2009 Scope of work: Field Cleaning & Levelling: 90 hektar Excavation: 2.900.000 m3 Filling: 2.600.000 m³ Concrete work: 4585 m3 Earthwork: 260.000 m³ Armature: 450 ton

58


BRIDGED CROSSROAD AND ACCESS ROADS PROJECT

59


CHECHNYA TV STUDIO ADDITIONAL BUILDING

THE NAME OF THE JOB: CHECHNY TV STUDIO ADDITIONAL BUILDING PROJECT LOCATION : CHECHNYA PROJECT DESIGN AND IMPLEMENTATION : 2011 TOTAL CONSTRUCTION AREA : 5.000 m² EMPLOYER : BORA INSAAT

60


CHECHNYA TV STUDIO ADDITIONAL BUILDING

61


28 MAY SUBWAY STATİON BAKU / AZERBAİJAN

THE NAME OF THE JOB: 28 MAY SUBWAY STATION BAKU PROJECT LOCATION : AZERBAIJAN PROJECT DESIGN AND IMPLEMENTATION : 2012 EMPLOYER : BORA INSAAT

62


28 MAY SUBWAY STATİON BAKU / AZERBAİJAN

63