www.boracons.com
www.boracons.com www.boracons.com
BORA CONSTRUCTİON; BALANCE SHEET AND FİNİSHED WORK NOM DU TRAVAILLE
COUT DE CONSTRUCTION
GROZNY CITY 1 (7 HIGHRISE BUILDINGS COMPLEX) ARGUN CITY 1 (5 HIGHRISE BUILDINGS COMPLEX) ARGUN CITY 1 (5 HIGHRISE BUILDINGS COMPLEX) GUDERMES MOSQUE HOTEL (30-STORY HOTEL BUILDING AND FINISHING WORKS) CONSTRUCTION OF RESIDENCE RIVER REHABILITION CENTRAL HEAT BUİLDİNG GELDİGEN MOSQUİE MEDRESE GROZNİY ALLAROY MOSQUE MİLİTARY BARRACKS BUİLDİNG RESİDENCE MOSQUE CONSTRUCTİON OF SUNJA RİVER REHABİLİTİON KADİROV STREET HİGHWAY BRİDGE MULTİPURPOSE HALL BUİLDİNG GLOBE RESTAURANT ARGUN MODERN MOSQUE ARGUN HİGHWAY UNDERPASS GROZNY WATERFALL STRUCTURES TV BUİLDİNG 16 STOREY BANK BUİLDİNG THE 2 CLOCKS WİCH HAVE 13.6 METERS İN DİAMETER. MEMBRANE COATİNG OVER THE STADİUM OF GROZNY SUNJA RİVER SİDE RECREATİON CONSTRUCTİONS ALUCOBOND COVER OF SOME BUİLDİNGS İN GUDERMES CİTY SHELTER BUİLDİNG REZİDANCE RİVER BRİDGE CONSTRUCTİONS GUDERMES MOSQUE LANDSCAPİNG WORKS WATER INTAKE STRUCTURE HOSPİTAL BUİLDİNG MAST BUSİNESS AND RESİDENTİAL CENTER KURÇALOY WASTEWATER TREATMENT PLANT SUPERMARKET SİDİNG WORKS NOVOROSSİYSK-KRASNO DAR-RUSSIA ROAD AND BRİDGS KALİMASH / ALBANİA 28 MAY SUBWAY STATİON BAKU / AZERBAİJAN
$ 278.365.454,00 $ 25.749.000,00 $ 28.635.000,00 $ 12.848.000,00 $ 29.250.000,00 $ 3.000.000,00 $ 11.859.365,00 $ 8.250.000,00 $ 450.000,00 $ 9.622.86,00 $ 2.629.800,00 $ 2.750.000,00 $ 32.828.631,00 $ 6.300.000,00 $ 34.000.000,00 $ 4.528.986,00 $ 9.910.000,00 $ 2.624.158,00 $ 6.331.48, 98 $ 3.231.000,00 $ 21.000.000,00 $ 1.550.000,00 $ 1.875.000,00 $ 3.517.902,00 $ 545.478,00 $ 227.600,00 $ 1.158.996,00 $ 2.000.000,00 $ 3.949.440,00 $ 7.417.640,00 $ 12.000.000,00 $ 2.000.000,00 $ 3.710.000,00 $ 360.000.000,00 $ 120.000.000,00 $ 5.300.000.000,00
TOTAL
$1.059.415.852
The Bora construc on was established in 1998, and 1998/1 of Bora Insaat Turizm ve Danishmanlik Sanayi Ticaret Ltd.S ., registered and announced at the Russian Federa on Republic and in Turkey Trade Registry. Circular Text : Arif AYDIN NASIP, Ibrahim Eker who are selected as company directors for ten years and authorized individually with one of their signets to represent the company in general in every aspect, domes cally and abroad with all official authori es, public state owned enterprises, administra ve, judicial, military authori es, Ministers, Tax offices, Social security ins tu ons, municipali es and all other ins tu ons and organiza ons, en
es and unites, head offices
and branches of privet and public banks, Central Bank, real and legal persons, companies in all fields and stages is in true way and in all broad means represen ng and binding the company, are authorized to sign every kind of documents that leave the company under the debt like surety ship, pledge, counter- guarantee, bill payable, check, policy, bond, other nego able notes, declara ons and such. Also they are authorized to give documents on behalf of company to banks for collec on and as collateral, to buy all securi es and real estates due to courts, to give and cancel mortgage on behalf and against company, to open and close le er of credit or use exis ng le ers, to give verbal and wri en securi es to banks, to open court for all issues regarding company opera ons, to make enforcement proceedings. Bora Holding
GROZNY CITY HOTEL OFFICE & RESIDENTIAL PROJECT
The hotel,office and residential project are placed in the capital Republic of Chechenya. Project Location: Grozny - Chechenya The Date Of Design And Implementation : 2008-2010 Area: 350.000 m² 6
GROZNY CITY HOTEL OFFICE & RESIDENTIAL PROJECT
7
GROZNY CITY HOTEL OFFICE & RESIDENTIAL PROJECT
8
GROZNY CITY HOTEL OFFICE & RESIDENTIAL PROJECT
9
GROZNY CITY HOTEL OFFICE & RESIDENTIAL PROJECT
10
GROZNY CITY HOTEL OFFICE & RESIDENTIAL PROJECT
11
GROZNY CITY HOTEL OFFICE & RESIDENTIAL PROJECT
12
GROZNY CITY HOTEL OFFICE & RESIDENTIAL PROJECT
13
GROZNY CITY HOTEL OFFICE & RESIDENTIAL PROJECT
14
GROZNY CITY HOTEL OFFICE & RESIDENTIAL PROJECT
15
GROZNY CITY HOTEL OFFICE & RESIDENTIAL PROJECT
16
ARGUN MOSQUE PROJECT
Argun modern mosque are placed in Argun city (under construction) Project Location : Argun-Chechenya The Date Of Design And Implementation: 2011 Area : 10.000 m² Area of building - 8.000 m² Parking - 6.200 m² Green space and the courtyard
17
ARGUN MOSQUE PROJECT
18
ARGUN MOSQUE PROJECT
19
ARGUN CITY 2 PROJECT
Аrgun City-2 Residential Project are placed in the Argun city.(under construction) Project Location : Argun-Chechenya The Date Of Design And Implementation: 2011 Area : 65.500 m²
20
ARGUN CITY 2 PROJECT
21
ARGUN CITY 2 PROJECT
22
KADIROV STREET BRIDGE
23
KADIROV STREET BRIDGE
24
MAST CENTER OFFICE & RESIDENTIAL PROJECT
Mast Center Office and Residential Project are placed in Grozny city. Project Location : Grozny - Chechenya The Date Of Design And Implementation: 2010 Area : 17.000 m² Area of building
25
MAST CENTER OFFICE & RESIDENTIAL PROJECT
26
MAST CENTER OFFICE & RESIDENTIAL PROJECT
27
GLOBE RESTAURANT
Project Location : Grozny - Chechenya The Date Of Design And Implementation: 2011 Area : 1.250 m²
28
GLOBE RESTAURANT
29
GLOBE RESTAURANT
30
THE STAGE OF “GROZNY CITY” PROJECT
31
THE STAGE OF “GROZNY CITY” PROJECT
32
THE STAGE OF “GROZNY CITY” PROJECT
33
HOUSING PROJECT in NOVOROSSIYSK RUSSIA ‘ZOLOTOY BEREG’
Prestige Housing Project of total 1300 commercial and residental units, located on seaside, new residential area. Project Location : Novorossiysk - Krasnodar - RUSSIA The Date Of Design And Implementation: 2013 Area : 170.000 m²
34
HOUSING PROJECT in NOVOROSSIYSK RUSSIA ‘ZOLOTOY BEREG’
35
HOUSING PROJECT in NOVOROSSIYSK RUSSIA ‘ZOLOTOY BEREG’
36
HOUSING PROJECT in NOVOROSSIYSK RUSSIA ‘ZOLOTOY BEREG’
37
GROZNY REHABILITATION CENTER
THE NAME OF THE JOB : GROZNY REHABILITATION CENTER PROJECT LOCATION : GROZNY CHECHNY PROJECT DESIGN AND IMPLEMENTATION : 2011 TOTAL CONSTRUCTION AREA : 14.000 m² EMPLOYER : BORA INSAAT
38
GROZNY REHABILITATION CENTER
39
GROZNY CITY 2 PROJECTS
THE NAME OF THE JOB : GROZNI CITY 2 PROJECTS PROJECT LOCATION : GROZNY CHECHNY PROJECT DESIGN AND IMPLEMENTATION : 2011 TOTAL CONSTRUCTION AREA : 450.000 m²
40
GROZNY CITY 2 PROJECTS
41
AIRPORT PROJECT
THE NAME OF THE JOB : GROZNY AIRPORT PROJECT LOCATION : GROZNY CHECHNY PROJECT DESIGN AND IMPLEMENTATION : 2011 TOTAL CONSTRUCTION AREA : 23.000 m² EMPLOYER : BORA INSAAT
42
AIRPORT PROJECT
43
V.I.P. RESIDENCE
The Date Of Design And Implementa on: 2012 Area : 9.500 ²
44
V.I.P. RESIDENCE
45
V.I.P. RESIDENCE
46
V.I.P. RESIDENCE
The Date Of Design And Implementation: 2011 Area : 14.300 m²
47
V.I.P. RESIDENCE
48
V.I.P. RESIDENCE
The Date Of Design And Implementation : 2012 Area : 9.500 m²
49
SAMSUN AUTOROUTE PROJET (0+000-12+340)
SAMSUN AUTOROUTE PROJET (0+000-12+340) Employer: General Directorate of Highways/ Ministry of Communications Location: Samsun / Turkiye The date of beginning construction: 16.03.2005 Construction Completion Date: 31.12.2009 Scope of work: Field Cleaning & Levelling: 140 hektar Excavation: 7.565.000 m続 Filling: 5.100.000 m続 Concrete work: 122.000 m続 Earthwork: 420.000 m続 Armature: 13.420 ton Sub Base: 450.000 m3 Plentmiks foundation: 250.000 ton Hot Mixing: 300.000 ton
50
SAMSUN AUTOROUTE PROJET (0+000-12+340)
51
SAMSUN AUTOROUTE PROJET (0+000-12+340)
52
BURSA AUTOROUTE PROJECT
Employer: General Directorate of Highways/ Ministry of Communications The date of beginning construction: 22.05.2000 Construction Completion Date: 15.12.2003 Scope of work: Earthwork: 15.000.000 m3 Superstructure Works: 1.200.000 ton Excavation: 30.000 mt Concrete work: 250.000 m³ Armature: 27.000 ton
53
BURSA AUTOROUTE PROJECT
54
BURSA AUTOROUTE PROJECT
55
BRIDGED CROSSROAD AND ACCESS ROADS PROJECT
Employer: TOKİ Loca tion: İstanbul / Turkiye The date of beginning construction: 16.08.2006 Construction Completion Date: 31.12.2008 Scope of work: Pile: 4900 mt Reinforced concrete wall: 1000 mt Hot Mixing: 16000 ton 70 mt Underpass
56
BRIDGED CROSSROAD AND ACCESS ROADS PROJECT
57
BRIDGED CROSSROAD AND ACCESS ROADS PROJECT
Employer: Bechtel – ENKA J.v Loca tion: Rreshen – Kalimash / Albania The date of beginning construction: 30.01.2008 Construction Completion Date: 01.06.2009 Scope of work: Field Cleaning & Levelling: 90 hektar Excavation: 2.900.000 m3 Filling: 2.600.000 m³ Concrete work: 4585 m3 Earthwork: 260.000 m³ Armature: 450 ton
58
BRIDGED CROSSROAD AND ACCESS ROADS PROJECT
59
CHECHNYA TV STUDIO ADDITIONAL BUILDING
THE NAME OF THE JOB: CHECHNY TV STUDIO ADDITIONAL BUILDING PROJECT LOCATION : CHECHNYA PROJECT DESIGN AND IMPLEMENTATION : 2011 TOTAL CONSTRUCTION AREA : 5.000 m² EMPLOYER : BORA INSAAT
60
CHECHNYA TV STUDIO ADDITIONAL BUILDING
61
28 MAY SUBWAY STATİON BAKU / AZERBAİJAN
THE NAME OF THE JOB: 28 MAY SUBWAY STATION BAKU PROJECT LOCATION : AZERBAIJAN PROJECT DESIGN AND IMPLEMENTATION : 2012 EMPLOYER : BORA INSAAT
62
28 MAY SUBWAY STATİON BAKU / AZERBAİJAN
63