1 minute read

CONTINUING DISCLOSURE SECTION

CITY OF FAYETTEVILLE, GEORGIA

WATER SUPPLY BY SOURCE LAST TEN CALENDAR YEARS (IN THOUSAND GALLONS)

Note:

CITY OF FAYETTEVILLE, GEORGIA

WASTEWATER TREATMENT PLANT AVERAGE FLOW (IN MILLION GALLONS PER DAY)

Last Ten Calendar Years

The City's sewerage system consists of a modern secondary wastewater treatment facility, 24 pumping stations and approximately 122 miles of collector and transmission lines. The Whitewater Creek wastewater treatment plant was expanded and upgraded in 1992 to 3.75 MGC and in 2008 to 5.0 MGC through 2003 Water and Sewer Bonds and a GEFA Loan.

Source:

City of Fayetteville, Georgia records.

Source: City of Fayetteville, Georgia records.

CITY OF FAYETTEVILLE, GEORGIA

WATER AND SEWER CUSTOMERS LAST TEN CALENDAR YEARS

This article is from: