7.FURNITURE
6.CONCEPT
4.SPACE
3.SPACE
2.CONCEPT
1.PRODUCT
5.TRANSPORT
PORTFOLIO
FELIPE CASTAÑEDA INDUSTRIAL DESIGN + PROJECT MANAGEMENT
CV
EDUCATION Instituto Tecnológico y de Estudios Superiores de Monterrey (ITESM) Bachelor in Industrial Design, graduated with honors End: May 2011 • Awarded Best Prospect Bachelor Student Scholarship regarding outstanding academic performance • Awarded Student Development Diploma upon student leadership activities
0
Copenhagen University College of Engineering (IHK) International Design Semester Programme. End: May 2009 • Joint project with SIEMMENS DK regarding electric car deployment and smart grid implementation for Copenhagen City Council
PROFILE Designer with advanced experience in concept development, and project management. A disruptive problem solver with strong learning appetite and excellent team-work skills. Organized project leader with a solid work ethic. Passionate about design thinking and constant innovation.
EXPERIENCE AGENT Strategic Intelligence Embassy Lead Designer Oct.2011 - CURRENT Designer Dec.2010 - Oct.2011 Internship March.2010 - Dec.2010 SIEMMENS Denmark Internship Jan.2009 - June.2009
AWARDS Short-listed Red Dot Design Award, 2011 Project: “IXION” Waste Truck Concept Winner MABE-IMINOX White Goods Award, 2010 Project: “MABE Bubbles” washing machine concept Winner A-Diseño Product concept Award, 2009 Project: “Vittus” center table prototype
FELIPE CASTAÑEDA / felipeecastaneda@gmail.com / INDUSTRIAL DESIGN + PROJECT MANAGEMENT
PROJECT TIMELINE
2013
2012
2011
2010
2009
CONCEPTUAL
EXECUTED
FELIPE CASTAÑEDA / felipeecastaneda@gmail.com / INDUSTRIAL DESIGN + PROJECT MANAGEMENT
ISLE OF I
SINK AND WATER SAVING SYSTEM PROJECT DESCRIPTION: CUSTOM SINK WITH INTEGRATED FILTERS CLIENT: R432 STATUS: PROTOTYPE PROJECT ROLE: DESIGNER RESPONSIBILITIES + ACHIEVEMENTS: • • • •
SKETCHING CAD MODELING RENDERING PRESENTATION
NOTES: DEVELOPED AT AGENT FOR R432 HIGH RISE BUILDING
Custom integrated sink for R432 High Rise.
FELIPE CASTAÑEDA / felipeecastaneda@gmail.com / INDUSTRIAL DESIGN + PROJECT MANAGEMENT
PROJECTS
CYCLE FLOW
1 FILTERING SYSTEM
TIME USED
USED WATER
PERCIEVED VOLUME
With CYCLE FLOW system it doesnʼt matter how long a user leaves the water running, he still uses the same water.
GRAY WATER
HANDWASHING 10 l
FLUSH, NO REGRETS!
FILTER / RESERVOIR
OTHER 20 l
FELIPE CASTAÑEDA / felipeecastaneda@gmail.com / INDUSTRIAL DESIGN + PROJECT MANAGEMENT
PROJECTS
CAD EXCERCISES
1
PROTOTYPING
FELIPE CASTAÑEDA / felipeecastaneda@gmail.com / INDUSTRIAL DESIGN + PROJECT MANAGEMENT
PROJECTS
1
FELIPE CASTAÑEDA / felipeecastaneda@gmail.com / INDUSTRIAL DESIGN + PROJECT MANAGEMENT
MOVE ON
REDEFINING THE SUITCASE
PROJECT DESCRIPTION: SUITCASE FAMILY INTENDED FOR “MODERN NOMADS”. FUN-THEORY INSPIRED PROJECT. CLIENT: PUSH PROJECT STATUS: CONCEPT PROJECT ROLE: DESIGNER RESPONSIBILITIES + ACHIEVEMENTS: • • • •
SKETCHING CAD MODELING RENDERING PRESENTATION
NOTES: DEVELOPED AT AGENT
“Redefining the modern traveller suitcase”
FELIPE CASTAÑEDA / felipeecastaneda@gmail.com / INDUSTRIAL DESIGN + PROJECT MANAGEMENT
PROJECTS
2 TRAVEL OFTEN IMPLIES LONG PERIODS OF WAITING
TIME WHILE CAR-
RYING CONSIDERABLE AMMOUNTS
OF WEIGHT.
RATHER THAN BEING A DEAD WEIGHT USERS FREQUENTLY
HACK THEIR OWN SUITCASES
AS SITTING OR PLAYING DEVICES.
FELIPE CASTAÑEDA / felipeecastaneda@gmail.com / INDUSTRIAL DESIGN + PROJECT MANAGEMENT
PROJECTS
CURVED PROFILE
FILLETED PROFILE
2
FELIPE CASTAÑEDA / felipeecastaneda@gmail.com / INDUSTRIAL DESIGN + PROJECT MANAGEMENT
PROJECTS
2
FELIPE CASTAÑEDA / felipeecastaneda@gmail.com / INDUSTRIAL DESIGN + PROJECT MANAGEMENT
FORO
CIEL
COLLABORATIVE THINK TANK PROJECT DESCRIPTION: HELIPAD REFURBISHMENT AS HEAD OFFICES FOR BUSINESS INCUBATION PROJECTS. CLIENT: THE COCA-COLA CO. PROJECT ROLE: PROJECT MANAGER + LEAD DESIGNER STATUS: EXECUTED (2012) BUILT AREA: 700+ SQM RESPONSIBILITIES + ACHIEVEMENTS: • DESIGN DIRECTION. • CLIENT - SUPPLIER LIASON . • NEGOTIATED A TWO FOLD BUDGET INCREASE. • SUPPERVISED CONSTRUCTION WORKS AND FINAL EXECUTION. NOTES: DEVELOPED AT AGENT IN COLLABORATION WITH ROJKIND ARQUITECTOS
“An abandoned helipad transformed into a think tank.” FELIPE CASTAÑEDA / felipeecastaneda@gmail.com / INDUSTRIAL DESIGN + PROJECT MANAGEMENT
PROJECTS
CONTEXT + EXISTING STRUCTURE
3
AIMED VALUES + FEATURES
WORK ON DISPLAY
LANDING V.S. FIXED
CHANGE, MOVEMENT, CREATION
CHALLENGING DISRUPTIVE YET SIMPLE
FELIPE CASTAÑEDA / felipeecastaneda@gmail.com / INDUSTRIAL DESIGN + PROJECT MANAGEMENT
PROJECTS
3
ExistingHELIPORT heliport structure EXISTING
COMMUNITY seeks to create a sense of companionship in the space by implementing a workspace that can be configured in different ways (co-working space). CREATIVITY t he flexible space promotes e ncourges the users to develop ideas in a dynamic and everchanging environment. GREEN S PACES t he g reen r oof and o rchard reinforce the positive transformation of unused space.
a
b-b
a-a-a
b
b-a-b
a-a-a-a
CUSTOM DESIGNED FURNITURE
OPEN PLAN LAYOUT
FELIPE CASTAĂ‘EDA / felipeecastaneda@gmail.com / INDUSTRIAL DESIGN + PROJECT MANAGEMENT
PROJECTS
3
FELIPE CASTAÑEDA / felipeecastaneda@gmail.com / INDUSTRIAL DESIGN + PROJECT MANAGEMENT
CINETECA NACIONAL NATIONAL MOVIE THEATRES
PROJECT DESCRIPTION: EXTENSION AND RENOVATION OF NATIONAL THEATRE COMPLEX CLIENT: CONACULTA STATUS: ONGOING (2011-2013) LOCATION: MEXICO CITY PROJECT ROLE: PROJECT MANAGER + LEAD DESIGNER RESPONSIBILITIES + ACHIEVEMENTS: • DEVELOPED CONCEPTS FOR INTERIORS, SEATS, LIGHTING POSTS, SIGNAGE, BENCHES, TRASHCANS, AND CAFETERIAS • SUPERVISED MANUFACTURE AND EXECUTION • CONTACTED AND MANAGED SUPPLIERS AND PRODUCTION COSTS NOTES: IN COLLABORATION WITH ROJKIND ARQUITECTOS
“Giving people back the national movie theatres.” FELIPE CASTAÑEDA / felipeecastaneda@gmail.com / INDUSTRIAL DESIGN + PROJECT MANAGEMENT
PROJECTS
4
FELIPE CASTAÑEDA / felipeecastaneda@gmail.com / INDUSTRIAL DESIGN + PROJECT MANAGEMENT
PARAMETRIC OPTIMIZATION PROJECTS
4 CAD STUDIES + EXECUTION
FELIPE CASTAÑEDA / felipeecastaneda@gmail.com / INDUSTRIAL DESIGN + PROJECT MANAGEMENT
PROJECTS
4
THEATRE’S DESIGN INCLUDED COLLABORATION WITH ACCOUSTIC ENGENEERING, LIGHTING ENGENEERING AND CONSTRUCTION TEAMS. FELIPE CASTAÑEDA / felipeecastaneda@gmail.com / INDUSTRIAL DESIGN + PROJECT MANAGEMENT
PROJECTS
4
FELIPE CASTAÑEDA / felipeecastaneda@gmail.com / INDUSTRIAL DESIGN + PROJECT MANAGEMENT
PROJECTS
4
“ROXY” ICE CREAM SHOP DESIGN, PROJECTION AND EXECUTION AT CINETECA NACIONAL. FELIPE CASTAÑEDA / felipeecastaneda@gmail.com / INDUSTRIAL DESIGN + PROJECT MANAGEMENT
IXION URBAN WASTE COLLECTING TRUCK
PROJECT DESCRIPTION: ELECTRIC WASTE TRUCK CONCEPT FOR MEXICO CITY CLIENT: DINA CAMIONES
“How can we collect urban waste in Mexico City?”
STATUS: CONCEPT (2010) LOCATION: MEXICO CITY PROJECT ROLE: TEAM LEADER RESPONSIBILITIES + ACHIEVEMENTS: • SKETCHING • IDEATION • RENDERING • PROTOTYPING AND PRESENTATION NOTES: IN COLLABORATION WITH HECTOR GALAZ AND STEPHEN ZAVALA
FELIPE CASTAÑEDA / felipeecastaneda@gmail.com / INDUSTRIAL DESIGN + PROJECT MANAGEMENT
PROJECTS
5
P.E.T. SORTING
ALUMINUM SORTING CARDBOARD SORTING
HANDS ON: PRODUCT EXPERIENCE
GARBAGE CYCLE IN MEXICO
EXPOSED WORKERS
MASSIVE SCALE
FELIPE CASTAÑEDA / felipeecastaneda@gmail.com / INDUSTRIAL DESIGN + PROJECT MANAGEMENT
PROJECTS
5
SECONDARY COCKPIT
MAIN COCKPIT
URBAN SCALE CONFIGURABLE STORAGE FELIPE CASTAÑEDA / felipeecastaneda@gmail.com / INDUSTRIAL DESIGN + PROJECT MANAGEMENT
PROJECTS
5
FELIPE CASTAÑEDA / felipeecastaneda@gmail.com / INDUSTRIAL DESIGN + PROJECT MANAGEMENT
SPHERA
ELECTRIC CAR CHARGING STATION
CLIENT: SIEMMENS DK STATUS: PROTOTYPE (2009) LOCATION: MEXICO CITY PROJECT DESCRIPTION: AUTOMATED CHARGING STATION FOR ELECTRIC VEHICLES IN DENMARK PROJECT ROLE: TEAM LEADER RESPONSIBILITIES + ACHIEVEMENTS: • COORDINATED PROJECT DOSSIER • DEVELOPED CAD MODELS • IDEATION • PRODUCT RESEARCH NOTES: IN COLLABORATION WITH SIEMMENS DK ZUZANA TRIZULJAKOVA AND RUTA VAYÇAITITE
“How do we store wind power electric surplus?” FELIPE CASTAÑEDA / felipeecastaneda@gmail.com / INDUSTRIAL DESIGN + PROJECT MANAGEMENT
ELECTRIC SURPLUS PIKES THROUGHOUT THE DAY IN CPH
PROBLEM: LOW VISIBILITY OF ELECTRIC STATION COMPARED TO THAT OF GASS STATIONS
PROJECTS
6 GOAL: STORE GRID SURPLUS IN PARKED VEHICLES
PROJECT OVERVIEW AND WORKPLAN
BASE CONCEPT
FELIPE CASTAÑEDA / felipeecastaneda@gmail.com / INDUSTRIAL DESIGN + PROJECT MANAGEMENT
PROJECTS
CONNECTION SYSTEM
6 ON BOARD INTERFACE
PRODUCT ASSEMBLY
URBAN SIGNAGE
FELIPE CASTAÑEDA / felipeecastaneda@gmail.com / INDUSTRIAL DESIGN + PROJECT MANAGEMENT
PROJECTS
6
FELIPE CASTAÑEDA / felipeecastaneda@gmail.com / INDUSTRIAL DESIGN + PROJECT MANAGEMENT
EDGE FURNITURE SERIES
PROJECT DESCRIPTION: ONGOING FURNITURE EXCERCISES CLIENT: PRIVATE
“We wish for uniqueness and personality”
PROJECT ROLE: SOLO PROJECT STATUS: EXECUTED (2013) MATERIALS: MAPLE + WALNUT HARDWOOD RESPONSIBILITIES + ACHIEVEMENTS: • DESIGN DIRECTION • PRODUCT MANUFACTURE • CURRENTLY DEVELOPING SALES CHANNELS
FELIPE CASTAÑEDA / felipeecastaneda@gmail.com / INDUSTRIAL DESIGN + PROJECT MANAGEMENT
PROJECTS
7
EXCECUTION
FELIPE CASTAÑEDA / felipeecastaneda@gmail.com / INDUSTRIAL DESIGN + PROJECT MANAGEMENT
PROJECTS
7
FELIPE CASTAÑEDA / felipeecastaneda@gmail.com / INDUSTRIAL DESIGN + PROJECT MANAGEMENT
PROJECTS
7
FELIPE CASTAÑEDA / felipeecastaneda@gmail.com / INDUSTRIAL DESIGN + PROJECT MANAGEMENT
NOTABLE CLIENTS
EXPERIENCE SUMMARY YEARS OF PROFESSIONAL EXPERIENCE: 3 MAIN EXPERIENCE / COLLABORATION PARTNERS: AGENT ROJKIND ARQUITECTOS EXPERIENCE GEOGRAPHY:
CANADA UNITED STATES MEXICO
FINLAND DENMARK
PANAMA
FELIPE CASTAÑEDA / felipeecastaneda@gmail.com / INDUSTRIAL DESIGN + PROJECT MANAGEMENT
THANK YOU
CONTACT:
FELIPE CASTAÑEDA felipeecastaneda@gmail.com
FELIPE CASTAÑEDA / felipeecastaneda@gmail.com / INDUSTRIAL DESIGN + PROJECT MANAGEMENT