1 minute read
Schedule of Changes & Amendments
S8. COROWA STP: $29M project to renew existing plant in poor condition and not meeting environmental requirements ($21M) + upgrade to cater for development ($8M). Financial plan assumes $14M grant.
S9. HOWLONG STP: $10M project to renew and upgrade plant. If $5M grant (assumed) is not secured, only the upgrade portion will be done (but renewal will be needed within 15 years).
S10. MULWALA STP: $13M augmentation to cater for growth. No grants anticipated.
S11. PLANT RENEWALS: switchboard program + other minor plant.
S12. PLANT UPGRADES: program to provide connections for backup generators all sites.
Version Date Changes / Amendments
1.0 9 Nov 2022 Draft for public exhibition for Council consideration
NOTE: This is a controlled document. If you are reading a printed copy please check that you have the latest version by checking it on Councils Electronic Document system. Printed or downloaded versions of this document
are uncontrolled.
Federation Council - Federation Council Strategic Asset Management Plan 2022-2032 15/11/2022 12:26 PM Reference: 22/43143 Version No: 1.0 Page 34