Federation Villages - Floodplain Risk Management Study and Plan

Page 84

Federation Villages Floodplain Risk Management Study and Plan

8. DRAFT FLOODPLAIN RISK MANAGEMENT PLAN

H IB IT IO

N

The Floodplain Risk Management Plan summarises the recommended measures that have been investigated as part of the Floodplain Risk Management Study. Measures have been assessed for effectiveness against a range of criteria. The assessment criteria included how the option affected property damages, community flood awareness, impact on the SES, and economic merits, and a range of other factors. Recommended options are prioritised based upon how readily the management measures can be implemented, their capital cost, what constraints exist and how effective the measures are. Measures with little cost that can readily be implemented, and which are effective in reducing damage or personal danger would have high priority.

EX

Table 30 lists the mitigation measures that have been recommended by the Floodplain Risk Management Study for implementation and describes the purpose of the measure, as well as its priority, cost, timeframe and the party responsible for its implementation. Detailed description of each recommendation is provided in Section 6 of the Study.

D

R

AF

T

FO

R

PU

BL

IC

The Floodplain Risk Management Plan has been prepared in accordance with the NSW Floodplain Development Manual.

118048: R211211_FederationVillagesFRMSP.docx: 11 December 2021

73


Turn static files into dynamic content formats.

Create a flipbook

Articles inside

10. REFERENCES

14min
pages 92-121

9. ACKNOWLEDGEMENTS

0
page 91

Table 30: Floodplain Risk Management Plan

17min
pages 85-90

Discussion of Results

1min
page 83

8. DRAFT FLOODPLAIN RISK MANAGEMENT PLAN

0
page 84

6.5.3. Improvements to Driver Safety

5min
pages 75-77

Table 28 Multicriteria Matrix Assessment – Scoring System

4min
page 81

6.5.2. Community Flood Awareness and Education

6min
pages 71-74

6.4.7. Section 10.7 Planning Certificates

4min
pages 68-69

6.4.6. Planning Controls to Managing Future Development

2min
page 67

Table 25: Summary of Freeboard Asessment

4min
pages 62-63

6.4.3. Voluntary House Raising

1min
page 65

6.4.2. Flood Planning Area

2min
page 64

Table 24: Likelihood of given design events occurring in a period of 70 years

6min
pages 59-61

Flood Modification Measures

2min
page 56

4.2.2. NSW Flood Prone Land Policy

1min
page 29

1.2.2. Floodplain Risk Management Draft Plan Objectives

1min
page 14

5.6.3. First Event Flooded

2min
pages 53-54

Assessment Methodology

1min
page 44

4.3.2. Development Control Plan

4min
pages 41-42

4.2.4. Section 10.7 Planning Certificates

4min
pages 33-34

4.2.3. Flood Prone Land Package

5min
pages 30-32

Engagement with Local Primary Schools

2min
page 25
Issuu converts static files into: digital portfolios, online yearbooks, online catalogs, digital photo albums and more. Sign up and create your flipbook.