FEDERICA CAVAGNA PORTFOLIO
THIS IS MY WORLD
14th July 1985 _DATE Via Carlo Cattaneo, 90_20099 Sesto S. Giovanni Milan Italy
A
OF BIRT _L I V I N G IN
+39 02 24 82 642 _ +39 (0) 333 19 80 352
P H O N E
D
I
esign
onme
E R
Envir
A
H C R
E T I
U T C
nt
Environmental Architecture Degree _ E D U C A T I O N at Politecnico di Milano_2008 Sustainability Architecture Master Degree at Politecnico di Milano_ 2012
bo
ing Draw ut
M
e
THIS IS MY WORLD
CV X
&
OFTWARES
PERIENCE
AG&P S.r.l. _ Via Savona, 50_20144 Milan
West 8 urban design & landscape architecture_ Schiehaven 13M_Rotterdam Town Hall_Piazza della Resistenza, 5_20099 Sesto San Giovanni (Milan) Corbellini Engineering office_Strada ottava, 6_20090 San Felice _Segrate (Milan) Alter Studio Architetti Associati_Via Cadolini Giovanni, 32_20137 Milan
THIS IS MY
LIFE .
DO WHAT I
Autocad Rhinoceros 3D Studio Max
Studio AGALMATA_Via Pomponazzi, 19_20134 Milan
Dell’Orto Arch. Franco_Via Ausonio, 9/A_20123 Milan
S
DETAILS
Sketchup Adobe Photoshop Adobe Illustrator Adobe Indesign Office utilities
LOVE Live my dream and wear my passion
II
WORK E
Great passion for MAT E R I A L S
04
THIS IS MY WORK
THIS IS MY WORK
INDEX PROJECTS
NATURE/ARTIFICE LOW OR HIGH? SILK LAND THE CEMETERY URBAN PUZZLE
WORK
URBAN EXECUTIVE PROJECT RENOVATIONS
COMPETITIONS
H2OUSE ABITARE A MILANO_2
05
RENDERING
06 THIS IS MY WORK
07
THIS IS MY WORK
08
THIS IS MY WORK
THIS IS MY WORK
1. NATURE / ARTIFICE
This script aims at facing the problems concerning outdoor paving. As for the paving structure I took into consideration the fact that paving is not only a matter of floor covering, but also a complex series of elements, all different for characteristics and performances. Therefore, the subject was analyzed also from a more operational point of view, where the correct design, according to the national and European regulations, as well as the exhaustive knowledge of materials did make the difference. However, the problem I encountered is that both the economic and environmental component tend to prevail on the quality and final design of these works. The consequent expenditure of money for more and more frequent maintenance interventions, due to weak design, and the exploitation of non-renewable resources are playing a fundamental role in the choice of paving systems, especially as regards outdoor spaces for public use. For this work I considered as resources what at the present time are deemed waste materials, trying to optimize the materials that, for different reasons, have been put aside.
WOOD, STONE, TERRACOTTA and SOIL.
09
In any case, the material is the real protagonist. It is vital to study, know and inquire it in order to utilize it at best and enhance it through a correct laying according to its characteristics . The challenge was that of using the above cited materials in a context of high ecological interest, such as PMVL. Its complex position, between the built-area of 4 cities in the province of Milan, gives the possibility to use those paving systems in connection with the surrounding landscape, which can be more or less naturalistic, in order to realize paving areas, roads, tracks and ways.
10
THIS IS MY WORK
THIS IS MY WORK CLIENT_Politecnico di Milano A.A. 2010/2011
TUTOR_Prof. Arch. Andrea Campioli SUBJECT_”IL BORGO SOSTENIBILE MILANO-FIGINO” HOUSING ESTATE REALIZED WITH THREE DIFFERENT TECHNOLOGIES
11
TECHNOLOGIES
THIS IS MY WORK
SISTEMA DI OSCURAMENTO
POMPA DI CALORE FRANGI SOLE
VASCA DI RACCOLTA ACQUEE METEORICHE
CENTRALE FOTOVOLTAICA POMPA DI CALORE
12
PLAN AND SOUTH ELEVATION - SCALE 1:500
THIS IS MY WORK
2. MEDIUM TECHNOLOGIES
It’s a project of social housing based in Figino, a residential quarter located north-west of Milan next to other 3 cities: Pero, Rho and Settimo Milanese. The project surface is situated in the southern part of the Figino built-up area and takes up part of a town agricultural area. The project envisages the realization of one private housing estate consisting in
16 apartments available in three principal typologies:
simplex two-roomed flat, duplex and four-roomed flat. It’s com-
posed of 4 floors above ground and the apartments are served by one central staircase with an elevator that connects all floors. Moreover, the entrance at the single unity is guaranteed by a landing which is structurally independent from the house and is located on the north side of the building. Lastly, on the roof there is a bioclimatic glasshouse that both allows the placement of a heat pump for the heating/cooling system of rooms and offers the possibility to have a space for social aggregation. The project theme can be described by the motto “Low or High? Medium Technologies”. Indeed, my goal was to make the building as sustainable as possible through the medium technologies, which I consider to be the best. The priority was to introduce technological solutions in three different materials -
WOOD, CONCRETE and STEEL - that
respect the environment, are innovative and always with an eye on sus-
tainability, dominant feature of all the materials involved.
13
The main characteristics of the project are the PREFABRICATION, an easier system of construction with the technologies in wood and steel , as well as the realization of a unique open space for SOCIAL AGGREGATION made available for the entire building. I decided to create this open space on the roof because the presence of the park on the ground floor is already an opportunity to meet people. That’s why a big CONSERVATORY was created which performs the above cited function, having also bioclimatic features: the air that warms up inside the conservatory in winter is used to heat the apartments, together with a heat pump. By means of the pipes that pass through the slots, the warm air is piped into the rooms of the building, where the ventilation grids are located in correspondence with services.
THIS IS MY WORK
MODULE 1
GLULAM BEAM UPRIGHTS CLADDING FORMED BY LARCH BATTENS sp. 2,7+2,7mm TIMBER LARCH JOISTS, sp.30mm WATERPROOF MEMBRANE, sp.1,6mm CELENIT AB PANEL, sp. 25mm GLULAM BEAM UPRIGHTS AND JOISTS SANDWICHING ROCKWOOL INSULATION, sp.100mm X-LAM PANELS WITH FUNCTION OF STIFFENER, sp.13\20\13mm GLULAM BEAM UPRIGHTS AND JOISTS SANDWICHING DOUBLE CELENIT AB INSULATION PANEL, sp.25+25mm FINISH INDOOR WITH WHITE PAINT
MODULE 2 - WINDOW
14
GLULAM BEAM UPRIGHTS CLADDING FORMED BY LARCH BATTENS sp. 2,7+2,7mm TIMBER LARCH JOISTS, sp.30mm WATERPROOF MEMBRANE, sp.1,6mm CELENIT AB PANEL, sp. 25mm GLULAM BEAM UPRIGHTS AND JOISTS SANDWICHING ROCKWOOL INSULATION, sp.100mm X-LAM PANELS WITH FUNCTION OF STIFFENER, sp.13\20\13mm WINDOW WITH TIMBER FRAMES AND DOUBLE GLAZING SANDWICHING LUMIRA AEROGEL GLULAM BEAM UPRIGHTS AND JOISTS SANDWICHING DOUBLE CELENIT AB INSULATION PANEL, sp.25+25mm FINISH INDOOR WITH WHITE PAINT
THIS IS MY WORK DETAIL OF ROOF
DECKING IN MAPLE TIMBER, sp.20mm, ON FRAME WORK OF GLULAM UPRIGHTS AND JOISTS, sp. 350mm WATERPROOF MEMBRANE, sp.1,6mm TIMBER PANEL, sp.18mm ON GLULAM UPRIGHTS AND JOISTS, sp. 100mm PVC MEMBRANE, sp.1,2mm TIMBER PANEL, sp.24mm ON GLULAM BEAM UPRIGHTS AND JOISTS SANDWICHING DOUBLE GLASS CELL FOAM INSULATION, sp.80+80mm ROOFING FELT, sp.2mm X-LAM PANELS, sp.19\22\19mm TERRACOTTA TILES, sp. 27mm STRUCTURE OF GLULAM BEAM (100X50mm) AND JOISTS (80X90mm)
DETAIL OF FLOOR
15
TERRACOTTA TILES, sp.25mm WATERPROOF MEMBRANE, sp.1,6mm DOUBLE TIMBER PANEL, sp.10+10mm ON GLULAM UPRIGHTS AND JOISTS SANDWICHING PSE INSULATION, sp.100mm,PVC MEMBRANE, sp.1,2mm TIMBER PANEL, sp.24mm ON GLULAM BEAM UPRIGHTS AND JOISTS SANDWICHING DOUBLE GLASS CELL FOAM INSULATION, sp.80+80mm LIGHTWEIGHT CONCRETE, sp.50mm CARDBOARD BITUMEN, sp.1mm X-LAM PANELS, sp.19\22\19mm TERRACOTTA TILES, sp. 27mm STRUCTURE OF GLULAM BEAM (100X50mm) AND JOISTS (80X90mm)
16
THIS IS MY WORK
17
ILK LAND THIS IS MY WORK
18
3. RIVERSIDE
THIS IS MY WORK
THIS IS MY WORK 19
SEZIONE VERTICALE 1- Tappeto di usura sp. 3 cm, strato toutvenant di base sp. 10cm, strato di collegamento (binder) sp. 7cm, strato di fondazione in granulare stabilizzato sp.30cm 2- Cordolo in “pietra del paese”, dim. 10x50xh.25cm 3- Pavimentazione in Porfido di Trento sp. 2,5cm, malta di allettamento sp. 3cm, soletta in calcestruzzo armato con rete elettrosapldata sp. 10cm 4- Lastre in Porfido di Trento sp. 2,5cm, piastra in acciaio inossidabile sp. 3cm, putrella calandrata in acciaio IPE140 saldata a montante tubolare in acciaio di ancoraggio al suolo diam. 5cm 5- IPE120 di irrigidimento della struttura, cavi d’acciaio come supporto alla rampicante (vite americana)
THIS IS MY WORK
“(...) un luogo architettonico dove la forma e la razionalità delle costruzioni, interpreti della pietà e del significato del cimitero, siano un’alternativa alla crescita brutta e disordinata della città moderna. Un luogo architettonico, il cimitero come gli altri edifici pubblici, capace di costruire la memoria e la volontà collettiva della città”.
20
Aldo Rossi
THIS IS MY WORK
THE CEMETERY:
MONUMENTALITY STORY ART
RSI NE
FUNER
LL’ARC
ARIA D
HITETT
URA
I CASA
LPUST E
RLENG
O
21
PERCO
THIS IS MY WORK 22
4. REGENERATION CEMETERY
23
THIS IS MY WORK
24
THIS IS MY WORK
25
THIS IS MY WORK
URBAN PUZZLE
26
THIS IS MY WORK
27
THIS IS MY WORK
5. URBAN PUZZLE
THIS IS MY WORK
6. WORK
7. COMPETITIONS
“H2Ouse - LIVING ON THE WATER”
“ABITARE A MILANO/2: nuovi spazi urbani per gli insediamenti di edilizia sociale”
28
Capogruppo: Arch. Paolo Giacomo Vasino
THIS IS MY WORK
“RIQUALIFICAZIONE URBANA Piazza Umberto I e del centro storico di Besana in Brianza” Capogruppo: Prof. Arch. Anna Laura Pezzetti
29
8. RENDERING
FEDERICA CAVAGNA PORTFOLIO