Urban planning + design portfolio

Page 1


TABLE OF CONTENTS 01

BIKE LA

1

Work Sample of Active Transporation Projects Internship at Los Angeles Department of Transportation (Jun. 2015- present)

02

GREAT STREET

8

Urban Design Strategy for Hollywood Blvd, Los Angeles Academic Studio in Urban Design (Oct.2014-Dec.2014)

03

NATURE 1.5

11

Landscape Architecture Design of Huadu Lake, Guangzhou City Green Award · International Landscape Planning Competition (Jun.2013-Aug.2013)

04

OTHER WORKS

15


01 BIKE LA WORK SAMPLE OF ACTIVE TRANSPORTATION PROJECTS Internship at Los Angeles Department of Transportation (Jun. 2015-present) Partner: Severin Martinez Supervisor: Michelle Mowery Role: Photo documentation and rendering for the Los Angeles Street Bike Lane Project, Diagrams of different bikeway facilities, Graphic illustration for the Guide to the City of Los Angeles Bicycle Parking Ordinance, Collision Mapping for Soto Corridor Project

1


LOS ANGELES STREET BIKE LANE PROJECT

BIKEWAY DIAGRAMS Bike Path

Protected Bike Lane

PROTECTED BIKE LANES

Bike Lane

Neighborhood Street I

Neighborhood Street II

Lo s

An g

ele ss

t

Buffered Bike Lane

BUS PLATFORM

Sharrowed Route

Bike Route

BIKE SIGNAL LIGHT

2


GUIDE TO THE CITY OF LOS ANGELES BICYCLE PARKING ORDINANCE Types of Bicycle Parking

Design Standards (Short-term Bicycle Parking)

SHORT-TERM BICYCLE PARKINGG Short-term bicycle parking consists of bicycle racks located outside buildings or on public sidewalks or public streets that are free to the user.

Racks

Bicycle Corrals

LONG-TERM BICYCLE PARKING

Clearance Requirements Diagram (Short-term Bicycle Parking)

Long-term bicycle parking facilities are needed to provide a high level of security and protection from theft and weather.

Lockers

Bike Room &Bike Cages

Bike Stations

Replacement of Automobile Parking

X 1 Automobile Parking space

4 bicycle Parking space May replace 10 % of the required automobile parking

Residential Building Residential Building within 1500 ft of Transit Facilities Residential Building With Density Bonus

4

M

+

May replace 15 % of the required automobile parking

May replace 30 % of the required automobile parking

3


STREET IMPROVEMENTS VISIONING FOR SOTO CORRIDOR, LOS ANGELES

Soto St

Sheridan st

Soto & Boulder & Sheridan Streets

Soto Street & Cesar Chavez Avenue

Soto St

Boulder st Addition of Bike Lane

Soto St

Soto St

Boulder st

Cesar Chavez Ave

Removal of AM/PM Parking Restrictions

FUTURE

EXISTING

Sheridan st

EXISTING

Cesar Chavez Ave

Soto St

Removal of AM/PM Parking Restrictions

FUTURE

4


TRAFFIC COLLISION MAPPING AND ANALYSIS FOR SOTO CORRIDOR, LOS ANGELES Data Source: SWITRS (2009 - 2013), LADOT (2014 – 2015). Task: Merging two sets of collision data in Excel, Displaying collision data in ArcMap, Aggregating collision data to intersections, Exporting the map to Adobe Illustrator to further enhance the graphic. Soto Corridor is part of the HIGH INJURY NETWORK IN CITY OF LOS ANGELES

5


GIS DATABASE UPDATE FOR BICYCLE FACILITIES Data Source: LADOT Bikeways, Excel Sheet descrbing the location of new bikeways. Task: Selecting street segments according to Excel sheet, Exporting data of different bikeways to different feasture classes.

6


GIS MAPPING FOR CIVIC CENTER/ LITTLE TOKYO REDEVELOPMENT PLAN (Course Project) Data Source: Los Angeles Open Data, Los Angeles County GIS Data Portal, Metro, LADOT. Task: Displaying current transit and bicycle infrastuctures in ArcMap, Exporting the map to Adobe Illustrator to further enhance the graphic.

7


02 Great Street

URBAN DESIGN STRATEGY FOR HOLLYWOOD BLVD, LOS ANGELES Academic Celebration Student Exhibition Award, Academic Studio in Urban Design (Oct.2014-Dec.2014) Street segment length: 1.5 miles Partner: Jasmine Williams, Yang Ge Role: Sketching, developing design strategies ,GIS Analysis, Traffic analysis, Field investigation


Council District 13 | Hollywood Blvd. Urban Design Proposal

Commercial Manufacturing

Height | Feet

0 -13

Buildings

General Commercial

2.1 % - 3.5%

26 - 44

3.6 % - 6.3%

45 - 108

6.4 % - 10.9%

109 - 300

11 % - 21.5%

High Residential

Zoning

Highway Oriented Commercial Limited Commercial

Other Land Use Type

1HLJKERUKRRG 2IÀFH &RPPHUFLDO

Commercial Manufacturing

Table of Contents Limited Manufacturing

Low I Residential

General Commercial

Open Space

Low II Residential

High Medium Residential

Public Facilities

Low Medium I Residential

High Residential

Introduction

Public/Quasi-Public Open Space

Council District 13 | Hollywood Blvd. Urban Design Proposal

Medium Residential

Limited Manufacturing

Low I Residential

Open Space

Low II Residential

|4

|6

Driving Concepts

Railway Station 0.5 Mile Buffer

Low Medium I Residential History | 3 Three Questions | 19 This proposal is for the implemen tati on of Mayor Eri c Public/Quasi-Public Open Space Low Medium Il Residential MappingRegional | 4-7 Green Space Network + Nodes | 20 Center Commercial Medium Residential Garcetti’s Great Streets Initiative. Our Implementation Demographics 8-9 Minimum Residential Tree Consistency Public Transportation Usage| 21 Very Low II | Residential Introduction thisis linked objective to California reimage Hollywood Boulevard’s Identity + Urbanism | 10 Case Studies | 22-23 Thisof document to a University ofis Southern Master of Planning Program, it documents an urban design project for the course “Shaping The Built Environment” led by Dr. Tridib Banerjee. Our group (Jasmine Williams, Site Typology | 11 s t r e e t s c a p e t o p r e s e r v e t| 7 hCouncil e u n i q u e f eFeiyang a t uZhang, r e sand |5 Yang Ge) has been elected to represent and envision a street design for District 13. The street selected for this district *Los Angeles County GIS Data Portal. Retrieved from http://egis3.lacounty.gov/dataportal/ *Los Angeles County GIS Data Portal. Retrieved from http://egis3.lacounty.gov/dataportal/ TraGmc Study | 12-13 Hollywood, reflect the and character ofThisthe area community, wasof Hollywood Boulevard between Gower Street La Brea Avenue. proposal is for and the implementation of Mayor Eric Median Age 2010 Median Household Income Garcetti’s Great Streets Initiative short term- temporal treatments, including parklets and plazas, and long-term permanent

*Los Angeles County GIS Data Portal. Retrieved from http://egis3.lacounty.gov/dataportal/ Public Facilities

Zoning

Hollywood Blvd.

21.6 % - 30.8%

Limited Commercial

Minimum Residential 1HLJKERUKRRG 2IÀFH &RPPHUFLDO

Site Analysis

Demographic Mapping

Buildings

Low Medium Il Residential Highway Oriented Commercial

Context | 1 Very Low II Residential

Regional Center Commercial

Building Footprint Hollywood Blvd.

Average 14.1%

14 - 25

High Medium Residential

BACKGROUND OF THE SITE

Public Transportation Usage

St.

Hollywood Blvd.

r Gowe

Building Building Footprint

Zoning

Other Land Use Type

La Brea Ave.

GIS ANALYSIS

Mapping

*Los Angeles County GIS Data Portal. Retrieved from http://egis3.lacounty.gov/dataportal/

*Los Angeles County GIS Data Portal. Retrieved from http://egis3.lacounty.gov/dataportal/

|5

*Los Angeles County GIS Data Portal. Retrieved from http://egis3.lacounty.gov/dataportal/

Urban Design Quality Average 34.5 Analysis $ 21,119 - 26,696Design Proposal

Median Age 2010 Median Household Income Phase Descriptions | 25 Average 34.5 21,119 - 26,696 $ 26,697 - 34,342 Phase 1 (Short-Term) $| 26-27 30.4 31.3 Phase 2 (Mid-Term) | 28-29 $ 26,697 - 34,342 $ 34,343 - 44,864 Phase 3 (Long-Term) | 30-31

Physical Features | 15 30.4 - 31.3 Urban Design Qualities | 16 31.4 - 33.5 Initial Impressions | 17 33.6 - 35.9

$ 44,865 - 59,415

36.0 - 37.8

31.4 - 33.5 33.6 - 35.9

Council District 13 | Hollywood Blvd. Urban Design Proposal

36.0 - 37.8

Mapping

37.9 - 39.1

37.9 - 39.1

Median Age

Building Height | Feet

*Los Angeles County GIS Data Portal. Retrieved from http://egis3.lacounty.gov/dataportal/

0 -13

*Los Angeles County GIS Data Portal. Retrieved from http://egis3.lacounty.gov/dataportal/

Zoning

Other Land Use Type Commercial Manufacturing

General Commercial

Building Footprint Hollywood Blvd. Buildings

High Medium Residential

Building Limited Footprint Commercial 1HLJKERUKRRG 2IÀFH &RPPHUFLDO Limited Manufacturing

Low I Residential

Open Space

Low II Residential

Public Facilities

Low Medium I Residential

Public/Quasi-Public Open Space

Low Medium Il Residential

Entertainment District of Hollywood Business Improvement District Hollywood Redevelopment Plan Ordinance No. 165652-165669 Hollywood Signage Supplemental Use District- Ordinance No. 176172 & Hollywood Redevelopment Plan- Ordinance No. 165652 to 165669

Public Transportation Usage Average 14.1%

|9

*Los Angeles County GIS Data Portal. Retrieved from http://egis3.lacounty.gov/dataportal/

14 - 25

2.1 % - 3.5%

26 - 44

3.6 % - 6.3%

45 - 108

6.4 % - 10.9%

109 - 300

11 % - 21.5%

|1 |3

|9

21.6 % - 30.8%

High Residential Highway Oriented Commercial

Context

$ 44,865 - 59,415

Median Household Income

*Los Angeles County GIS Data Portal. Retrieved from http://egis3.lacounty.gov/dataportal/

|8

$ 34,343 - 44,864

activate the public realm, enhance local culture, encourage equitability, support alternative transportation, address the business improvement district and produce green spaces for the local and visiting public.

changes to curbs, street lighting, street trees and street furniture. The mayor’s objective is to strengthen neighborhoods by improving gathering spaces, generating economic activity, and revitalizing key community corridors (Garcetti, Great Streets Initiative). Our Implementation of this objective is to reimage Hollywood Boulevard’s streetscape to preserve the unique features of Hollywood, renect the character of the area and community, activate the public realm, enhance local culture, encourage equitability, support alternative transportation, address the business improvement district and produce green spaces for the local and visiting public. We hope the ideas in the proposal could be an inspiration for the Great Streets Initiative. What follows is a description of our design proposal, and methodologies.

Building Height (Feet)

Railway Station 0.5 Mile Buffer

9


Council District 13 | Hollywood Blvd. Urban Design Proposal

URBAN DESIGN QUALITIES ANALYSIS

TRAFFIC VOLUME

Urban Design Qualities

Imageability - Signage - Neon Lights - Landmarks

Transparency - Greatest Transparency located at intersections - Limited perception of human activity beyond edges

(QFORVXUH

Legibility

Linkage

Human Scale

- Visually disorganized - Lack of Cohesive form - Few Visible reference points - Legibility varies East/West

- Visual axis is directed down Hollywood Blvd. - Limited view of Adjacent Streets & Buildings

- Average correspondence to human speed - Some buildings at human scale and others at superhuman scale

Complexity

Tidiness

Council District 13 | Hollywood Blvd. Urban Design Proposal

- High cross street linkage - Ornamentation + Signage 7UDIĂ€F 6WXG\ $UHD - Low Space to Space Linkage -Low street furniture + landscape 'DLO\ 7UDIĂ€F &RXQW - Medium-High Building connection - Diverse Architecture - Physical linkage; transit - High human activity

| 16

Sense of Safety Embezz:14 Burglary: 510 Burglary/Theft Veh: 1443 Robbery: 468 Other Theft: 1541 Weapon: 47 Vehicle Theft: 505 Murder: 8 Forg/Cntrft: 84 Rape: 60 Fraud: 571 Agg Assault: 388 Vand:950 Other Assault:1580 Other Viol: 529 Agnst Fam Child: 18 Dis Cond: 11 VAG: 124 Other Sex Offenses: 143 Pimp/Pan: 8 Theft From Person: 80

Sense of Comfort

Level of Interest

- Lack of Tree coverage (shading) - Lack of benches & resting areas - Limited Pedestrian Space at congested intersections

- High Levels of activity - Many attractions - Historic Buildings - Landmarks - Street Performers - Shopping - Tours -Museums - Restaurants - Bars/ Nigh clubs

7LPH 6HQVLWLYH 7UDIĂ€F 6WXG\ TIME-SENSITIVE TRAFFIC ANALYSIS Total: 9082 *

- Pollution - Littering - Decay

(71 crimes per 1000 Persons)

Above are subjective rankings of Urban Design Qualities

'UDIW (QYLURQPHQWDO ,PSDFW 5HSRUW +ROO\ZRRG &RPPXQLW\ 3ODQ $UHD $SSHQGLFHV 9ROXPH RI

Franklin Ave.

Franklin Ave.

12 PM

2 PM

4 PM

7 PM

10 PM

. ss Av e.

.

Ne

Va n

Go

we r

St

St

N

Vin e

10 am

N

N

Ca hu en ga Av e.

dA ve .

lan gh Hi N

N

La

Br

ea

Av e

.

Although Hollywood Blvd has a lot of good qualities to make a great street, Hollywood Blvd. Hollywood Blvd. there are problems like congestion, poor maintenance and giant parking lot taking up too much space. What we need to do for the physical environmentSunset is Blvd. Sunset Blvd. to preserve the qualities the street already have and try to bring or improve the qualities needed for Hollywood, like more walkability and better maintenance, Hollywood Fwy to become a great street.

| 12

Initial Impres

/$'27 7UDIĂ€F &RXQW 'DWD 'DLO\ $YHUDJH

*RRJOH 0DSV 7UDIĂ€F 'DWD

| 13

10


03 NATURE 1.5

LANDSCAPE ARCHITECTURE DESIGN OF HUADU LAKE, GUANG ZHOU CITY Silver Prize, Green award• International Landscape planning competition (Jun.2013-Aug.2013) Area: 35.51 acres Partner: Gan Yihui Role: Field investigation, Case study, Concept design, 3D digital Modeling, Diagram analysis, Final expression Advisor: Wangjin, Yuanyuan

11


SITE LOCATION AND BACKGROUNDS

DESIGN PROCESS Renewal Of The Cement Plant

Formulation of the Main Structure

The cement plant is the main existing structure on the site. It indicates the time of Industrilization.

The site is located in the rural-urban continuum of Guangzhou City, which has an advanced economy and well-protected environments. A s t h e u r ba n i z a t i o n d e ve l o p e d , t h e c i t y 's environment is threatened by pollutions. There was a cement plant which brought industrial wastes into the lake. To improve water quality and lakeside environment, the site is planned to be an open space . Thus, the design goal is to find a way to achieve symbiosis of the Nature 1 (things exist naturally) and Nature 2 (things created by human). We name this status as Nature 1.5.

DESIGN CONCEPT

1. Dismantling the unsafe structure.

STEP 1

2.Maintain some of the cylinders and the open space facing the lake.

3.Use platforms to connect the cylinders.

Nature 2

STEP 2 Nature 2 Nature 1.5

4.Deal with the rampways and increase the change of space.

Nature 1 Nature 1

Introduce Recover Revival

Grow Integrate

The reconstructed Eco-system Symbiosis

Organic Renewal

New constructions bring in new functions that are based on the original structures.

6. Use roof-greening and Chimney Effect to enhance the ecological value.

STEP 3

12


SITE PLAN 1.Entrance square 2.Fishing platform 3.Viewing deck 4.Hotel 5.Grass slope 6.Fountain plaza 7.Industrial museum 8.Office buliding 9.Creative exhibition hall 10.Park management office

11.Marina 12.Outdoor theater 13.Slope viewing deck 14.Green house 15.Terraced fields 16.Ecology Museum 17.Ecological farm 18.Waterfront footpath 19.Library

ACTIVITY ANALYSIS The Outdoor Activities in One Year Spring winter

The design highlights the integration of different functions and activities, in order to attract people of different ages and careers. At the same time, we analyzed different outdoor activities in one year and provide relevant spaces for them, to make the site popular all year around.

Autumn Summer

Walking Walking Bicycling Fishing Boating Music play Exercising Fruit picking Farming experience

Function and Activities

13


ECOLOGICAL DESIGN STRATEGY Rainwater collection system

Micro-climate of the Lake In the daytime, the sun warms earth’s surface and causes the rise of warm airs. The cold air over the water moves toward the mainland and fomulates cool breezes.

Utilize the slope to conduct the water and use the rainwater collection design , such as permeable pavement and ecological umbrella.

The cool breezes could be introduced into the gray spaces by the doublelayer structure.

The hydrophilic plant at the riverside would buffer and filter the rain water.

Roof Structure

Overall Wind Direction The double-layer structure prevents people from direct sunlight, on the other hand, the plants on the roof could absorb the solar radiation and keep the tempreture from being too hot.

Grass and shrub are planted on the roof and vertical surfaces which could effectively absorb the heat, cle an the air and reduce the noises.

Meanwhile, some holes bring the sunlight into the buildings which reduce the electricity cost in the day time.

Field Type

The Chimney Effect In summer, the tempreture of the internal space could be high, and holes on the roof cause Chimney Effect that pump the cool air into the inner spaces.

Grassland

Forest land

Farm land

Terrace

Pool

Wet land

Permeable pavement

14


04 OTHER WORK INTERSECTION SAFETY ANALYSIS Course Project of Traffic Engineering and Control Partner: Amauri Casarin Junior, Yao Deng Software: Synchro

SITE PLANNING Internship work at Yunnan Design Institute (2012) Individual work Software: AutoCAD, Photoshop

PARAMETRIC DESIGN Shanghai AA Visiting School (2013 ) Partner: Chen Xiao, Chen Xing Yue, Chen Yihong, Fan Wenjie, Han ziqing Software: Rhinoceros+Grasshopper

SKETCH

of CHINESE ANCIENT POGODA

LAND SUITABILITY ANALYSIS

Individual work (2011)

Academic Studio of the Urban Ecology (2012) Partner: Yu Haoliang Software: ArcGIS

15


16


Turn static files into dynamic content formats.

Create a flipbook
Issuu converts static files into: digital portfolios, online yearbooks, online catalogs, digital photo albums and more. Sign up and create your flipbook.