Felipe garcia portfolio & cv

Page 1

FELIPE GARCIA GARCIA architecture portfolio

2009-2013


CONTENT Curriculum Vitae.....................................................................04 00. Winery and hotel in banyalbufar..................06-10 A-Transport Projects....................................................11-13 01. Airport Air Traffic Control, Girona (Spain)..........11 02. Acoruna Airport, La Coruna (Spain)........................12 B- Sport Projects............................................................14-21 03. Football Stadium, Babil (Iraq)...................................14 04. Salahedin Football Stadium,Baghdad (Iraq)......16 05. Al Talaba F.C Complex,Baghdad (Iraq)...............20 C- Residential Projects.....................................22-39 06. 07. 08. 09. 10.

2

Residential Masterplan Sabyat,Bagdad (Iraq).....22 Forest House, Spain.........................................24 Areca Tower, Penang (Malaysia)........................26 Bayan Muntiara P3 (Malaysia)...........................32 Parkings,Baghdad (Iraq)..................................38

3


CV

FELIPE GARCIA Architect Designer

EDUCATION UNIVERSITY ALFONSO 10 EL SAVIO (MADRID, Title : Master of Architecture 2002-2010 ADITIONAL TRAINING

Madrid

- Course of Adobe Photoshop, Advance Level

(30 Hours) COAM

- Course of Architectural Photomontage

(40 Hours) COAM

- Course of Revit Architecture, Advance Level

(40 Hours) UPM

- Course of Adobe Indesign

(30 Hours) UPM

Unit 4/6/3, Tivoli villa condominium. Jalan Medang Tanduk, Bangsar, Kuala Lumpur, Malaysia 014 3389269 fgg.arquitectura@gmail.com

JOB EXPERIENCE AURIENS Arquitectura

21/09/1984 Jaen, (Spain)

02/2009-06/2009

-Architect Assistant. residential competitions. Antonio Parra (Madrid)

11/2010-02/2011

SKILLS

-Architect Designer. retails rehabilitations. FBArquitectura (Madrid)

02/2011-09/2011

-Architect Designer. Airports competitions. Triarena (Madrid)

10/2011-12/2012

-Architect Designer.design and construction drawings of Sports Buildings.

PERSONAL SKILLS Comunication Teamwork Creativity

GDParchitects ( Kuala Lumpur) 02/2013- actual -Architect Designer handling mix developments projects

Actual role and responsabilities in my work: -Liase with client representative to ensure that the project goals are met. -Menagement the project from inception through construction. -Provide leadership to the project and the project design team consisting of architects, engineers and external consultants. -Participating in preliminary studies and estimates of proposed building projects. -Prepare concept designs proposal in colaboration with others designers.

Leadership Menagement

PROFESONAL SKILLS Autocad Revit Vectoworks Adobe Photoshop Adobe Indesign Microsoft Office

5


00

Project title: Project type: Location: Project year: Client: Architects: Status

Winery in Banyalbufart Thesis Mallorca, Spain September 2010 Felipe Garcia Garcia

conceptual model

site plan situation

6

7


level 0

level -1

sections and elevation

level -2

level -3

8

9


01

10

Project title: Project type: Location: Project year: Client: Architects: Status

Airport Air Traffic Control, Girona Competition Girona Airport, Spain April 2010 Initec FBarquitectura In progress

11


02

12

Project title: Project type: Location: Project year: Client: Architects: Status

A Coruna Airport, A coruna Competition A Coruna, Spain April 2010 Initec FBarquitectura In progress

13


03

Project title: Project type: Location: Project year: Client: Architects: Status

Babil F.C Stadium, Babil Competition Babil, Irak September 2010 Initec Triarena Winners,Construction

The client, Ministry of youth and sports, wants a stadium belonging to FIFA standars with a capacity of 30.000 seats, qualified to host international competitions with television broadcast. To fulfill their wish, we tried to apply in our design three concepts: MODERNITY, FUNCTIONALITY AND TECHNOLOGY, by adopting the newest architectural tendencies, combining the use of new treated materials like light steel, thin precast concrete, ultra resistant textile and polymers, and tens of latest inventions helping to create easy adaptable spaces to the most exigent needs, using at the same time the material technology as an aesthetic and functional appeal.

section

14

general plan

15


04

Project title: Project type: Location: Project year: Client: Architects: Status

Salah el-Din F.C Stadium Competition Baghdad, Irak February 2011 Initec Triarena Winners, In progress

The design of the Salah el-Din Stadium reflects simplicity and modernity. A generic volume streamlined with a subtle gesture, as simple as the formation of a sand dune everyday by desert breeze. Modern as the latest shapes that architecture can offer today; a spatial design based on the concept of transparency and the integration of the surrounding exteriors inside the building. Facades are flirting with the opposite duality of materials such as allegory for clean sports competition, while VIP sector facade embraces same movement reinforcing this gestureby wearing noble material and a crown is created by roof folds allowing natural light topenetrate into the noble building to illuminate the interior space.

16

perspective

17


section

north elevation

east elevation

general plan west elevation

18

19


05

Project title: Project type: Location: Project year: Client: Architects: Status

Al Talaba F.C complex Competition Baghdad, Iraq June 2012 Baghdad Authorities Triarena In progres

The aim of the project is create a Multi-sports complex for Al Talaba Football Club, at the same site of the current one, in Baghdad. The topography of the site is mainly flat and the area of the plot is 71.150 m2 and has an approximate shape of a “scalene triangle� with the base in its longest side, at East-West axis.

20

21


AT

500

DATA

S A BYAT

12.500

DEWELLINGS

06

T y p e: U r b a n h a s e: C o m p e t i t i o n

Baghdad (IRAQ)

arena

Senior Architect

L DATA

Project title: Project type: Location: Project year: Client: Architects: Status

Sabyat Masterplan

PROJECT DATA B u i l d i n g T y p e: U r b a n P r o j e c t P h a s e: C o m p e t i t i o n

Competition Baghdad, Iraq September 2012

U R BA N P L A N N I N G P R O J E C T S

L o c a t i o n: B a g h d a d ( I R A Q ) Y e a r: 2 0 1 1

Baghdad Authorities Triarena In progres

DEWELLINGS

O f f i c e: Tr i a r e n a P o s i t i o n: S e n i o r A r c h i t e c t

S A BYAT

city is thought as a great residential, commercial and business. 850.367Sabyat m2

12.500

DEWELLINGS

Is situated in the north-west of Baghdad and is communicated directly to the highway nordetermined R O J E C T Dinfluence ATA th of Baghdad and the west that connects it to the airport. TheseP conections the design of the city to facilitate accessibility and traffic conditions. Between these two 45.000 people B u i l d i n g T y p e: U r b a n main circulations will be located the main green areas, the tertiary sector and single-faompetition P rservices o j e c t P so h a that s e: Cthe mily residential, forming the green lung of the city and centralizing adjoining residential areas are free of traffic and noise. The perimeter of the green area L o c a t i o n: B a g h d a d ( I R A Q ) is bordered by two strips of residential towers that will shape the skyline of the city, with Y e a r: 2 0 1 1 both rows a reference axis in the city.

TECHNICAL DATA P l o t A r e a: 850.367 m 2 B u d g e t: Undetermined C a p a c i t y: 45.000 people

O f f i c e: Tr i a r e n a P o s i t i o n: S e n i o r A r c h i t e c t

TECHNICAL DATA P l o t A r e a: 850.367 m 2 B u d g e t: Undetermined

tipical units and layout

C a p a c i t y: 45.000 people

MAIN MENU

MAIN MENU

Curriculum

Curriculum

Projects

Projects

Residential

Residential

Sports

Sports

Tra n s p o r t

Tra n s p o r t

Service

Service

Office

Office

Industrial

Industrial

ban Planning

Urban Planning

Others

NEXT

TFOLIO m i n o ARCHITECT

Others

MAIN MENU Curriculum Projects Residential Sports

BACK

NEXT

PORTFOLIO E n r i q u e C a m i n o ARCHITECT

Tra n s p o r t Service Office Industrial Urban Planning

22

Others

23


07

24

Project title: Project type: Location: Project year: Client: Architects: Status

Forest House Proposal Jaen,Spain may 2011 Felipe Garcia

25


08

Project title: Project type: Location: Project year: Client: Architects: Status

Areca Tower Soho residential Penang, Malaysia April 2013 Plenitude GDP Architects In progress

DESIGN CONCEPT

26

27


Main entrance & Atrium

28

29


A 750 sq.ft

C 750 sq.ft

U N I T S

B 750 sq.ft

D 750 sq.ft

E 1400 sq.ft

30

31


09

32

Project title: Project type: Location: Project year: Client: Architects: Status

Bayan Muntiara P3 Residential Penang (Malaysia) April 2013 Tropicana GDP Architects In Progress

33


450 sq.ft

550 sq.ft

650 sq.ft

UNITS TIPOLOGY ID

U N I T S 800 sq.ft

1200

34

900 sq.ft

1200 dual key

35


36

37


10

38

Project title: Project type: Location: Project year: Client: Architects: Status

Public Parking and Economy Bank Parking Competition Baghdad February 2011 Triarena In progress

39



Turn static files into dynamic content formats.

Create a flipbook
Issuu converts static files into: digital portfolios, online yearbooks, online catalogs, digital photo albums and more. Sign up and create your flipbook.