Diploma Portfolio @ RDI SG, Ferdy Cheng

Page 1





Hard Mix. Residential Project Lau’s HDB apartment

module : Design Studio 1 location : Blk 79D Toa Payoh Central total area : 230sqm

Design Brief Floor Plan Ceiling Plan Elevations and Sections 3D Perspectives Material Chart

06 07 08 09 10 12


keyplan

Hard Mix. Structuring Experimental Residence. 12th floor, #12-01/02

13th floor, #13-01

site plan

image objectives

Blk 422, Lorong Lew Lian, Serangoon, Singapore 550422

inspiration for the oblique, diagonal, and irregular composition.

client brief

adjacency diagram

Mr. Huang Lau, a professional CGI animator and designer has just purchased three HDB flats which is located in 12th and 13th floor of Blk 422 Lor Lew LIan, Serangoon, Singapore. He had requested to merge his two adjacent unit ( #12-01 and #12-02 ) together into a single apartment for his parents with disability.

first floor

inspiration of the ceiling feature and treatment

inspiration of advanced fabric application as design element.

second floor

Therefore, the scope of the project will include: merging two adjacent unit together, designing and renovating the lower level with accessibility and versatility concern including barrier free design, and adapting the concept into the contrasting demographic.

concept description Taking the demographic difference as the part of design problem, the solution of Lau’s apartment design is executed with adaptation of industrial style. It is as an icon to symbolise modernisations, while at the same time it is a tool to remember the past, to create balance between the new and the old. Inspired by everyday oblique object, the design language follows the diagonal line and shape, irregularity, and contrast between sizes of the design elements.

legend private space semi private / public space public space Important and Essential Important but not Essential Not Important and not Essential but Convenient

06|01

design brief


A

A

R08

R21 R09

R10

R05

R07

F04

R20

R06

F02 R04

R19

R03

R22

room legend

DN

R11 UP

R18 R12

R13 B

R02

F04

R17

R16

F05

R01

R15

UP UP

F03

first floor

A

Rendered Floor Plan of Lau’s HDB scale

1 : 75

First floor foyer First floor living room First floor dining area First floor dry kitchen First floor wet kitchen Maid bedroom Maid bathroom Service / Laundry area First floor master bedroom Barrier free master bathroom First floor walk-in closet Storage First floor guest bathroom Versatile room ( doubled up as guest bedroom, study, mahjong room, and yoga room ) Second floor entrance Second floor living room / entertainment area Capsule Library Second floor kitchenette and breakfast counter Second floor walk-in closet Second floor open concept master bathroom Private study / studio Second floor master bedroom

feature legend

F01

R14

F01

R01 R02 R03 R04 R05 R06 R07 R08 R09 R10 R11 R12 R13 R14 R15 R14 R14 R14 R14 R14 R14 R14

second floor

A

F01

architectural element with composition of diagonal line as feature wall connected from flooring to the ceiling, acting as lighting fixtures housing and other small mep system and promoting solid void design element.

F02

moveable partition panel that separates between wet kitchen and dry kitchen, mounted on a track at a lower elevation as flood control for the wet kitchen area

F03

fold-out bed system mounted on a cladding panel to cover unused entrance door.

F04

a capsule library on an elevated platform for client’s retreat to read and relax. With bespoke book shelving mounted on the riser’s cavity and oblique cabinet.

F05

be spoke pull-out tread system as housing for extra cushion and bed to accomodate large quantitiy of guest double up as a sleeping bed for sleep-in guests.

F06

open concept master bathroom on a lower elevation with water resilient flooring (poolside) with multiple cubicle composition. F01 architectural elements ends as vanity’s mirror and low wall as visual separation.

floor plan

01|07


WP

3 3

E

WP

S

E WP

S

SS WP

E

C03 WP

3

C03

3

SS 3

3

3

3 3

WP

3

3

S

C03

WP

E

WP

C03

3

E

S S

3

C04

WP

C03

C02 S

LEGEND

E

C03

WP

RECESSED DOWNLIGHT WP

E

WP

C03

C01

C03

WATERPROOF DOWNLIGHT HANGING PENDANT LIGHT

SSS

S SS S

DROP PENDANT LIGHT WALL WASHER

3

S S

C03

3

FLUORSCENT TUBE

33

E

E

3

SS S

COVE LED STRIP

S S

CEILING MOUNTED DOWNLIGHT

WP

WP

3

F01

3

EXPOSED DOWNLIGHT

E

LED LIGHTLINE

C01

SWITCH 3

C03

WP

LEGEND LEGEND

3

3

3

3

C01

WP

S S

3 WAY SWITCH

3

3

C04

C04

DISTRIBUTION BOARD

3 3

F01 3

3

3

3

S S SS

S

3

SSSS

RECESSED RECESSED DOWNLIGHT DOWNLIGHT WATERPROOF WATERPROOF DOWNLIGHT DOWNLIGHT

ceiling height legend WP

WP

C01 C02 C03 C04

C03

S SSSS S

HANGING HANGING PENDANT PENDANT LIGHT LIGHT

C03

3

3

C01

DROP DROP PENDANT PENDANT LIGHT LIGHT

3000 2850 2700 2400

C04

WALL WALL WASHER WASHER FLUORSCENT FLUORSCENT TUBE TUBE

F03

COVE COVE LEDLED STRIP STRIP CEILING CEILING MOUNTED MOUNTED DOWNLIGHT DOWNLIGHT

feature legend E

E

EXPOSED EXPOSED DOWNLIGHT DOWNLIGHT

C03

C02

LEDLED LIGHTLINE LIGHTLINE

F01

diagonal ceiling architectural element interconnected DISTRIBUTION DISTRIBUTION BOARD BOARD from flooring, feature wall, and ceiling. composed of SWITCH SWITCH gypsum panel on a lightweight aluminum framing

F02

recess ceiling above versatile room’s mahjong area along with hanging chandelier, vertical part of the recess is lit with cove led light

F03

second floor exposed general ceiling with industrial concept, along with suspended drop down ‘island’ false ceiling creating aisles along each elements.

F04

ceiling treatment above client’s second floor master bedroom composed of red-dyed 15mm dia. rope

F05

allocated small enclosed space for main distribution board for the first floor unit.

08|01

3

3

3

3 WAY 3 WAY SWITCH SWITCH

ceiling plan

33

3

S S S SS S

first floor

F02

Qualitative Reflective Ceiling Plan scale

1 : 75

F05

3

3

S S

second floor

3

3

3

3

S SSSSSS S


F02

F01

R16 | R17

R18

R19

F03

R20 | R22

F04

R21

room legend

R14

R12

R13

Sectional Elevation A-A

scale

F07

R03

Elevation B scale

1 : 75

R09

F05

First floor foyer First floor living room First floor dining area First floor dry kitchen First floor wet kitchen Maid bedroom Maid bathroom Service / Laundry area First floor master bedroom Barrier free master bathroom First floor master bedroom walk-in closet Storage First floor guest bathroom Versatile room ( doubled up as guest bedroom, study, mahjong room, and yoga room ) Second floor entrance Second floor living room / entertainment area Capsule Library Second floor kitchenette and breakfast counter Second floor master bedroom walk-in closet Second floor open concept master bathroom Private study / studio Second floor master bedroom

feature legend

1 : 75

F08

R11

R01 R02 R03 R04 R05 R06 R07 R08 R09 R10 R11 R12 R13 R14 R15 R16 R17 R18 R19 R20 R21 R22

R02

F01

private capuse library built on a higher elevation platform, cladded with concrete panel cladding and custom-cut glazing on the exterior.

F02

oblique kitchenette counter double-up as breakfast counter and liquor bar, composed of spray painted reclaimed piping

F03

diagonal architectural elements transitioned into flooring as master bath’s vanity mirror, fixed into concrete vanity counter.

F04

irregular diagonal orientation 15mm dia. red dyed rope harnessed towards ceiling and vanity counter as visual parition.

F05

triangular shaped cut high mirror for first floor master bedroom to create spatial illusion and to bring in more natural light

F06

pull-out step-up tread double up as extra seating space and bed or cushion for sleep-in guests.

F07

first floor living area tv console feature wall, different finish treatment (faux wood plank) on the main diagonal architecture element.

F08

concrete panel column cladding with metal structure framing, on an oblique vertical orientation

elevation and section

01|09


2nd Floor Living Area Perspective scale not defined

concept description Second floor flat is designed in a loft style open concept, maximising space and allowing resident to have large number of guests occasionally. The entertainment area is optimised for multimedia purposes, with bespoke pull-out tread where extra cushion bed is mounted. The capsule library, which is located just behind the seating area, is a small, private retreat for client to relax and read.

10|01

3D rendered perspective


1st Floor Master Bedroom Perspective scale not defined

concept description The first floor master bedroom, which is designed to be barrier free, as the concern of accessibility and the limitted space is regarded as the design problem. Circulation is allocated to be accessible for wheel chair. Finally, the concept follows the modern contemporary as per request, while it is toned down as the demographic concern.

3D rendered perspective

01|11


M01

M02

M03 M04

M05

M06

M07

A01

A02

A03

A04

A05

A06 A09

material legend M01 M02 M03 M04 M05 M06 M07

White concrete Wall Hafary Sahara Oak Laminated Wood Flooring Metal Lathe Accentuation Clear Glass & Frosted Glass Partition Caesarstone Zulu Classico Black Countertop Fanal Habitat Natural Bathroom Flooring Tiles Black Concrete Textured Resilient Flooring

A07

A08

A05

amenities legend A01 A02 A03 A04 A05 A06 A07 A08 A09 A10 A11 A12 A13 A14

Buck Suspended Luminaries Track Light Azora Lighting Recess Downlight Aplomb Foscarini Hanging Pendant Fixtures Industrial Edison Hanging Halogen Bulb Philip Cove LED Strip Bark Lodge Rustic Table Lamp Dupioni Silk Black out Curtain Round Barrel wine Rack by Houzz Bark Lodge Rustic Floor Lamp Wall Hung Planter Fitting The City Night Table by Houzz Baxton studio black tufted sofa Modular Sebastopol End Table Gerrit Rietveld zig zag chair reproduction

12|01 material and chart

A10

A11

A12

A13

A14


Conflict. Commercial Retail Project

Incursio Formal Menwear Retail Store module : Design Studio 2 location : Mandarin Gallery Orchard #01-02/03 total area : 225 sqm

Design Brief Floor Plan Ceiling Plan Elevations and Sections 3D Perspective Detail Drawings

14 15 16 17 18 21


Conflict.

siteplan

keyplan

Redefining Retail Experience. concept inspiration

mandarin gallery orchard singapore

ground floor #01-02/03

adjacency diagram

client brief

concept development

The client is an European company with a franchise in North America that sells a formal attire for men. The store, located at #01-02, #01-03 Mandarin Gallery Orchard, Singapore, will be their first franchise in Asia and is targetted for young professionals. They are set to make the store as their flagship store for their brand. Aware of the tough competition in Singapore, The client are requesting rethink and recreate a new concept that will redefine shopping experience and giving them higher chance to be exposed to a larger audience. Thus, setting them apart from other fashion shops in the region.

concept description The main objective of the design is to shift one’s perspective of a formal menwear store, to break the usual norm and create a fresh retail experience in a high end attire shop. Inspired by the formation and reflection of singapore’s skyline, designer put together a modern contemporary concept into the space, where shapes are rectangular, multilevel design that interconnect three dimensionally within the spaces. Materials are chosen to express the formal design language of reflectivity, bold, organized and multilevel. It is also functions as a tool to emphasize and create balanced interior spaces.

14|02

design brief

legend Important and Essential Important but not Essential Not Important and not Essential but Convenient

private space semi private / public space public space


C

A

R13

R08 R12

R07

R10

R11

F07 R04

room legend R10

F09

R02 F04

F06 F05

R06

B

B

R05

R01

F08 F03

F01

F02

Rendered Floor Plan of Incursio Retail Store scale

1 : 75

C

A

R01 R02 R03 R04 R05 R06 R07 R08 R09 R10 R11 R12 R13

Main entrance Cashier counter Main display area for featured items and cross merchandising Shoes and Accessories section Promotional item section Office and smart casual section Business and executives section In house tailor ‘VIP’ fitting room Fitting room Staff toilet Storage room Secondary entrance / Staff entrance

feature legend F01

Main Entrance with modified full height glazing exterior panel and high ( 8’ or 2400 mm ) door

F02

Existing full height glazing

F03

Window Display room with elevated flooring and removed existing #01-02 double leaf glazed door

F04

Main display area for featured item, promotional item, cross merchandising, or exclusive accessories on a bespoke island display unit suspended with metal wire on a different level

F05

Semi suspended cashier counter with concealed communication and electrical conduit

F06

Store signage above cashier cabinet for storing stationary, packing bag, and etc.

F07

Dedicated fitting room for In House Tailor with 60-80% film coated glazing, with a veil or shade interior layer

F08

Hidden door for staff access to window display room or storage room

F09

Column or wall cladding as wall display unit and clothing racks.

floor plan

02|15


F01

C05

F02

Lighting Legend Halogen spot light C05

Recess led downlight C01

Hanging pendant Led light line Led light line Hidden cove led

C05

C07

C04 C05

Lighting Legend Halogen spot light Recess led downlight

C03

C08

C05

Hanging pendant Led light line

C04

C05

C05

C07 C07

C06

F02

Led light line

C03

C02

Hidden cove led F01

C05

ceiling height legend C01 C02 C03 C04 C05 C06 C07 C08

3675 3600 3400 3200 3075 3000 2800 2600

C04

Slightly recessed ceiling panel for lighting fixtures

F02

Inset led light tube fixture covered w/ translucent pvc. transitioning from the wall cladding to ceiling.

F03

Multilevel ‘isles’ ceiling above the main display area.

F04

‘Empty’ space above skyline bespoke display unit for shelves suspension harness

F05

Semi hidden led light line fixed on the ceilng aisles (in between ceiling isles)

16|02

ceiling plan

C03

C03

C06 C06

feature legend F01

C07

C06

C06

F03

Reflective Ceiling Plan scale

1 : 75

F04

F05


F07

F06

F05

F03

F04

F02

F01

F08

room legend

F09

R07 | R08

R09

R04

R01 R02 R03 R04 R05 R06 R07 R08 R09 R10 R11 R12 R13

R01

R02

Section A-A scale

1 : 75

F06

F10

F04

F11

F05

F02

F12

Main entrance Cashier counter Main display area for featured items and cross merchandising Shoes and Accessories section Promotional item section Office and smart casual section Business and executives section In house tailor ‘VIP’ fitting room Fitting room Staff toilet Storage room Secondary entrance / Staff entrance

feature legend F03

R06 | R10

R03

R04

R02

Sectional Elevation B-B scale

1 : 75

F10

F04

F03

F06

F13

F03

F03

R05

Sectional Elevation C-C scale

R03

R07

F01

Chrome plated aluminum alloy store signage mounted on orange stained MDF panel.

F02

Semi suspended cashier counter w/ chrome plated steel tube legs and steel wire harness covered w/ chrome plated steel tube, surface finished w/ resin coating on top of relief veneer.

F03

Wall display unit w/ combinations of cloth racks and pigeon hole shelfing for shirts, visual merchandise, accessories, and belt cabinet

F04

Drop ceiling feature on different level, suspended w/ steel wire. Side extrusion covered w/ glazing or acrylic panel as alternate material.

F05 F06

80% film coated high reflective tempered glazing for VIP changing room glass box. room interior layered with veil shade and full blind curtain Inset led lighting system w/ translucent pvc covering

F07

Bespoke wall cabinet unit for tailoring cloth material.

F08

Bespoke in house tailor workdesk with measuring template surface, dedicated cabinet for storing tailoring tools material

F09

Raised flooring 4 step ( 750mm ). w/ electrical conduit and other mep system below.

F10

Main display area for featured item, promotional item, cross merchandising, or exclusive accessories on a bespoke island display unit suspended with metal wire on a different level

F11

Column cladding used as display unit and cloth racks

F12

In house tailor bespoke suspended shelving double up as extra storage and visual merchandising unit.

F13

Disguised staff door access as mirror w/ hidden door hinge.

1 : 75

elevation and section

02|17


Main Display Area Perspective 1 scale not defined

concept description The main display area, the promotional section, and the office and smart casual attire area. Different type of bespoke display unit is used throughout the space, multilevel island display unit, column cladding display unit, and the skyline display shelving. Office and smart casual section is on an elevated flooring, to show spatial division without sacrificing the openess of the space.

18|02

3D rendered perspective


Main Display Area Perspective 2 scale not defined

concept description The main display area, the promotional section, and the executive attire area. Different type of bespoke display unit is used throughout the space, multilevel island display unit, column cladding display unit, and the skyline display shelving. Executive section is on an elevated flooring, where an in-house-tailor is situated with its respective changing room which is designed to be on a film coated glazing.

3D rendered perspective

02|19


Cashier Counter Perspective 1 scale not defined

concept description The cashier area, designed to be hybridly suspended and supported with composition of steel tubes. It is to express the main concept where it aims to disrupt the audience’s perspective of the space. Along the below surface, a ‘canal’ is concealed for electrical and communication conduit, which outputs via the steel cylinder.

20|02

3D rendered perspective


F03

F01 edleuro aleve series white pine veneer

F04 brushed satin chrome plating

achromatic contrast color scheme

F03

concept description F02

Inspired by Singapore’s skyline, the cashier counter designed with the intention of creating a floating effect, while the counter is long and quite bulky, this create a distortion in viewer’s perspective, subconciously attracting them to see this sculpture -like furniture in a different perspective

feature legend

Cashier Counter Detail scale

not defined

F01

Chrome plated aluminum alloy store signage mounted on orange stained MDF panel.

F02

Veneered dowel joined MDF panel counter top finish w/ glossy resin protective coating

F03

chrome plated steel cylinder (48 mm dia.) for electrical and communication conduit (power, telephone, lan, steel wire harness).

F04

Hidden electrical, communication, and multimedia outlet for cashier counter PC, POS terminal, credit card terminal and telephone.

detail drawings

02|21


F03 F01

COEM Ceramiche Anthracite 600mm X 300mm

F03

5500 K T8 LED fluorscent replacement tube

achromatic contrast color scheme

F04

concept description

F03

Inspired by Singapore’s skyline, the main built in display unit designed with the intention of creating a illusionary skyline effect, creating solid void effect which can be appliceable for both suspended and floor mounted unit. The area is lit with LED lightline to show spatial division, as this unit is particulary used for displaying high value item.

feature legend F01

ceiling mounted suspense hardware. larger strings are cladded with chrome plated steel tube, while smaller strings for smaller unit are left exposed.

F02

suspense hardware built-in to display unit

F03

display unit with different elevation, the higher part of the shelving is utilised as a visual merchandise unit, as the lower part become ergonomically accessible. the lower unit used to display heavier object.

F04

floor recess LED light line system with aluminum T transition channel in between tiles. the position of the led light is collateral with the ceiling mounted system

22|02

detail drawings

F02

‘Skyline’ display unit composition scale

not defined


Ripple. Commercial Office Project Mocellin Sharp and Associates module : Design Studio 3 location : Asia Square Tower 1, Floor 47 total area : 726 sqm

Design Brief Floor Plan Ceiling Plan Focus Area Plan Focus Area Elevations Concept Development Drawings Focus Area Perspectives

24 25 26 27 28 29 32


Ripple. Influencing Office Habitude

client brief

concept image

Mocellin Sharp and Associates is a well-established award winning international advertising company headquartered in New York City. It is a large private which primarily aim for multinational and high profile clients or organizations. A highly creative company dealing with both conservative and unconventional clients at the same time. They are expanding to Asian market and has chosen Singapore as its milestone in their expansion campaign. It is locted in the Asia Square Tower Floor 47, Central Business District Singapore. This office will function as co-headquarter in the new Asia region.

concept description The ripple concept, symbolize the nature of the company’s workflows, to influence and to expand. The office implements the concept in such way, that it promotes open office solution which a concentrated circular approach. Where there is a designated “club” location to connect between the hives. The office consisted mainly of three main firm, the public space, the PR office, and the main studio. Whereas the curvilinear form, achromatic contrast, and modern material is applied with the objective of creating formal language of focus, and balance between calming mood and fast paced industry in the office firm.

key plan

Asia Square Tower Level 47. #47-01

site plan

Asia Square Tower, 8 Marina View, S018960

24|03

design brief

mind mapping

planning and zoning


PRODUCED BY AN AUTODESK EDUCATIONAL PRODUCT

R15 R13

PRODUCED BY AN AUTODESK EDUCATIONAL PRODUCT

R11

R12

R07

R05

R14

R16 R04

R03

R02

R06 R01 R08

R24 R17 R19

R10 R09

R20

R21

R24

R21

R23

Floor Plan of Mocellin Sharp & Associates scale

1 : 200

R22

R18 R17

room legend R01 R02 R03 R04 R05 R06 R07 R08 R09 R10 R11 R12 R13 R14 R15 R16 R17 R18 R19 R20 R21 R22 R23 R24

Main entrance Reception Waiting area Teleconference room Server room IT staff office PR staff office Informal meeting area Archive Storage PR director office Viewing room Conference room Management office General Manager office Staff lounge, resource library Studio designer office Creative director 1 office Production room Equipment storage Copywriter office Creative director 2 office Photocopy room Fire escape exit

floor plan 03|25


4FT FLUORSCENT LIGHTLINE RECESS LED DOWNLIGHT HIDDEN LED COVE LIGHT RECESS LED DOWNLIGHT 4FT LED FLATLIGHT HALO PENDANT

PRODUCED BY AN AUTODESK EDUCATIONAL PRODUCT

2FT LED FLATLIGHT

PRODUCED BY AN AUTODESK EDUCATIONAL PRODUCT

LEGEND

CH02

CH02

CH01

F03

CH01

CH02

CH01

CH01

CH01

CH02

F02

CH01

F01

CH01

F04 CH02

CH01

CH02

CH02

LEGEND 2FT LED FLATLIGHT

4FT FLUORSCENT LIGHTLIN RECESS LED DOWNLIGHT

Ceiling Height Legend CH01 CH02

HIDDEN LED COVE LIGHT RECESS LED DOWNLIGHT 4FT LED FLATLIGHT

2700 2400

HALO PENDANT

CH02

CH02

Ceiling Feature Legend ‘Ripple’ drop down ceiling panel, custom cut into forms, with LED illumination on each iterations, covered with translucent pvc sheets. Bespoke different sized suspended halo lighting on top of waiting area Ripple drop down ceiling panel with custom cut spacing to mount projector. Office lounge custom cut gypsum panel ceiling with curvilinear channel for custom made versatile seating - book shelf. Multilayer drop down @ 100mm interval

26|03 ceiling plan

Reflective Ceiling Plan scale

1 : 200

PRODUCED BY AN AUTODESK EDUCATIONAL PRODUCT

F01 F02 F03 F04


R14

F06

F03

F03

F05

F02

R17

F06

R16

F01

room legend R14 R16 R17

F04

Management office Staff lounge, resource library Studio designer office

feature legend

F05

Rendered Focus Area Floor Plan

scale

F01

Black chalkboard feature wall as medium for creative and inspiration activity, such as brainstorming and mind mapping

F02

Buiilt in curvilinear book shelf partition double up as lounge seating unit. w/ upholstered seating cushion and custom cut MDF board w/ metal structure

F03

Hermanmiller Public office workstations with sets of lateral storage cabinet and printing equipment

F04

Pantry kitchen island built in on column cladding with plumbing and electrical point, sink, and space for cooking equipment and storage

F05

Hermanmiller canvas office hive workstation solution for studio designer with return surface for drafting table as requested by client.

F06

Group of lateral storage with dedicated user of 2 unit per users.

1 : 75

focus area plan 03|27


F01

F02

F03

F04

F0

R15

R17

Elevation B

scale 1 : 150

F05

F06

F07

F08

F09

F0

room legend R15 R16 R17

General Manager office Staff lounge, resource library Studio designer library

feature legend F01

Frosted glazing panel promoting natural light sources along with privacy

F02

Accoustic insulated gypsum wall partition with custom cut opening for frosted glass installation

F03

Four cluster of Hive workstation for studio designer

F04

Lateral storage unit with a surface desk for information interchange

F05

Built in curvilinear book shelf double up as seating area for staff lounge, and as open partition.

F06

Ripple multi layer drop down ceiling feature with led illumination with pvc covering per iterations @ 100mm

F07

Circular column cladding for plumbing and electrical point, along with circular track for rotary folding table.

F08

Folding table with circular track for positioning along the column cladding as pivot point.

F09

Circular lounge’s pantry cabinetry with countertop with sink and several small cooking equipment and storage.

F10

Blackboard wall for mindmapping and brainstorming activity for the studio designer.

F11

Graphic treatment on painted wall, double up as space for putting up information board.

28|03 selected elevations and sections

F0

R16

Elevation C

scale 1 : 150

F10

F11

R16

Elevation D

scale 1 : 150


F01

03

Black chalkboard wall

02

Autumn maple wood vinyl flooring

05

F04

complementary color scheme

feature legend Studio Designers’ Staff Lounge and Resource Library Concept scale not defined

F01

Black chalkboard feature wall as medium for creative and inspiration activity, such as brainstorming and mind mapping

F02

parametric wall treatment with a wall washer illumination to enhance or emphasise texture.

F03

Ripple multi layer drop down ceiling with led illumination

F04

Built in curvilinear versatile bookshelf open partition that double up as lounge’s seating unit.

F05

Pantry island counter for dispenser, equipment and utensils storage.

concept development 03|29


F03

achromatic contrast color scheme

F01

black gloss finish gypsum fiber

city SQ blue high traffic carpet tile

achromatic contrast color scheme F05

F04

feature legend F01

Topographic parametric feature wall with 9mm thk black metal tube

F02

Curvilinear fresnel gloss gypsum fiber reception counter with tempered glass countertop finish

F03

Ripple multi layer drop down ceiling with led illumination

F04

Tempered glass partition on smaller portion of opening to main office

F05

Smart glass system for conference room partition

30|03 concept development

Office Entrance and Concierge Concept scale not defined

F02


F03

3

F01 Beige of Karnezeika marble F02

F04

1

Smart glass system

city SQ blue high traffic carpet tile

achromatic contrast color scheme

feature legend Main Conference Room Concept scale not defined

F01

Corporate signage on a marble feature wall

F02

Smart glasss system for conference room partition

F03

Ripple multi-layer drop down w/ led illumination on a translucent pvc housing and a cut out space for projector

F04

Graphical treatment as wall finish.

concept development 03|31


General Office Space Perspective 1 scale not defined

concept description The main office area (the designer studio), and the office lounge that functions as the club area. The open lounge is a centralised area where exchange of informations and multi-activity is conducted as the implementation of the ripple concept. Workstations are set in hive cluster of hives with a accoustic panel to reduce noise and enhance privacy.

32|03 focus area perspective


General Office Space Perspective 2 scale not defined

concept description The main office area (the management office), which is located just north of the office lounge. It is an office room for the financial and account staffs. Their workflow requires a privacy yet frequent meeting with auditors and reporting to other departments about the company’s financial status, therefore the workstation here includes a guest seating and a glazing partition.

focus area perspective 03|33


Management Office Perspective 1 scale not defined

concept description The management office workstation with 2 hermanmiller swoop lounge guest chairs per sets. Above is a hanging LED hanging pendant, which function as a task light. LED light in a translucent pvc housing is mounted on the wall creates a feature wall.

34|03 focus area perspective


Management Office Perspective 2 scale not defined

concept description Different views of the management office, from the corridor. A signage of the room is situated near the partition opening with the graphic artwork from the abstraction of ripple. LED light in a translucent pvc housiing is mounted on the floor and lit during the night as accent light.

focus area perspective 03|35


Conference Room Perspective 1 scale not defined

concept description The front view of the conference room, the glass partition is using the smart glaze technology, which turns opaque when users holding conference. the partition also utilised to hold graphic stickers, as the showcase of the company’s product.

36|03 focus area perspective


Conference Room Perspective 2 scale not defined

concept description The conference interior view one, the matte black wall is used as medium for the projectior. bespoke ceiling made from the abstraction of the ripple concept. It houses the lighting fixtures for task light during presentation where other general lighting is turned off, enabling occupants to read and write or using their laptops.

focus area perspective 03|37


Conference Room Perspective 3 scale not defined

concept description the second view of the conference roominterior. the back side of the room is where the travertine stone feature wall with the company signage, few cabinetry for storing equipments and some hospitality equipment such as beverage equipment.

38|03

focus area perspective


Collision Commercial Retail Project Phoebe and Chloe

module : Design Studio 2 location : Paragon Shopping Mall, Singapore total area : 36 sqm

Design Brief Plan and Elevations Isometric Drawing Perspective Drawing Detail Drawing

40 41 42 43 44


Collision A Playful Fusion client brief

image objective

planning and zoning

Mocellin Sharp and Associates is a well-established award winning international advertising company headquartered in New York City. It is a large private which primarily aim for multinational and high profile clients or organizations. A highly creative company dealing with both conservative and unconventional clients at the same time. They are expanding to Asian market and has chosen Singapore as its milestone in their expansion campaign. It is locted in the Asia Square Tower Floor 47, Central Business District Singapore. This office will function as co-headquarter in the new Asia region.

concept description The ripple concept, symbolize the nature of the company’s workflows, to influence and to expand. The office implements the concept in such way, that it promotes open office solution which a concentrated circular approach. Where there is a designated “club” location to connect between the hives.

application of pvc pipe

playful way to display merchandise

playful storage

playful way to display merchandise

The office consisted mainly of three main firm, the public space, the PR office, and the main studio. Whereas the curvilinear form, achromatic contrast, and modern material is applied with the objective of creating formal language of focus, and balance between calming mood and fast paced industry in the office firm.

site plan

key plan

Paragon Shopping Mall, Orchard Road Singapore

Paragon Shopping Mall, Level 3

40|04 design brief

existing site


F02

F07

PRODUCED BY AN AUTODESK EDUCATION

F04

R02

R04

R01 R03

R01

F03

R01

R06

F04

F05

F01

Floor Plan scale 1:50

F02

F05

F02

PRODUCED BY AN AUTODESK EDUCATIONAL PRODUCT

R05

F03

R01

R02

F03

F03

SYMBOL

WALL MOUNTED SPOTLIGHT ADJUSTABLE DOWNLIGHT TRACK LIGHT

room legend

F01

R01 R02 R03 R04 R05 R06

Ceiling Plan scale 1:50

F01

F07

feature legend

F06 F03

F03

Front Elevation

Entry point Cross merchandise section, larger size accessories Promotional item section Small accessories section Impulse purchase point Cashier counter

N AUTODESK EDUCATIONAL PRODUCT

F02

LEGEND

F01

Double sided satin metal alloy store signage mounted on reclaimed pvc partition

F02

Pivoting wall display panel with hollow core to store merchandise during non operating hours

F03

Mannequin and promotional graphic

F04

texture laminated mdf Island display unit with accessible lateral storage inside the respectibe unit

F05

reclaimed pvc pipe as store’s partition, ceiling detail, and as structural bearing for fixing store’s partition mounted display

F06

The store’s signature gold painted frame display

F07

existing site’s structure and accent: load bearing column and void railing.

F08

Island display unit with lateral storage hidden underneath of respective island

scale 1:50

plans and elevation 04|41


F03

F06

F03

F04

F03

F01

feature legend F01

Double sided satin metal alloy store signage mounted on reclaimed pvc partition

F02

Pivoting wall display panel with hollow core to store merchandise during non operating hours

F03

Mannequin and promotional graphic

F04

texture laminated mdf Island display unit with accessible lateral storage inside the respectibe unit

F05

reclaimed pvc pipe as store’s partition, ceiling detail, and as structural bearing for fixing store’s partition mounted display

F06

The store’s signature gold painted frame display

F07

existing site’s structure and accent: load bearing column and void railing.

F08

Island display unit with lateral storage hidden underneath of respective island

F09

Phoebe and Chloe’s signature gold painted display

F10

oak laminated cashier counter with mdf panel & hardwood stud

42|04 rendered 3d drawing

F05 F06

F03

South East Isometric View scale not defined


Store Perspective 1 scale not defined

concept description The lease area for the store is 12 metre long and 3 metre wide. It can be quite narrow circulation considering the open multiple entrance. The store aesthetic elements are embedded with industrial and classical engraving elements. Creating a fusion to create playful and fun place to shop. Display are arranged in such a way to create ‘impulse’ to purchase and to be effective in sale.

rendered 3d drawing 04|43


F06

F03

german anegre wood textured laminate

F05

F04

reclaimed metal can

F02 achromatic contrast color scheme F01

feature legend F01

Lateral display storage hidden underneath the island display unit. Hinges are either flap hinges or pull out panel.

F02

bespoke wall mounted spot light using reclaimed aluminum can

F03

Wall display unit with multiple detachable and flippable accessories display, with different color coding related to merchandises’ base color

F04

Metal chain latch lock panel mechanism for security during non operating hours.

F05

Classical elements ‘engraving’ graphic on display’s edging and as aesthetical accent

F06

Pivot center to flip and attach the panel to the designated spot.

44|04 detail drawings

Small Accessories Display Unit Detail scale not defined


F05

F01

F03

reclaimed pvc tube for partition and store structure

cherry wood laminated wood flooring

F06

F04 F01

Frame Display Unit Detail scale not defined

F02

achromatic contrast color scheme

feature legend F01

Phoebe and chloe Signature gold painted on a white stained timber frame

F02

Classical molding treatment attached on top of reclaimed pvc tube

F03

Promotional Graphic attached on timber framing mounted on reclaimed pvc tube.

F04

Side sectional detail of display unit fixture on pvc tube

F05

reclaimed pvc pipe as store’s partition, ceiling detail, and as structural bearing for fixing store’s partition mounted display

F06

laminated wood flooring with slight elevation and 2% sloping on the lease edging

detail drawings 04|45



Animation Please scan the QR code below!

Confetti. Hospitality Project

L Hotel by LUXE properties group module : Design Studio 4 location : 139 Selegie Road, Singapore total area : 930 sqm

Design Brief Floor Plan Concept Development Sketch Focus Area 1 : Lobby Area Focus Area 2 : Superior Room Detail Drawings

48 49 50 52 58 66


Confetti A Symbolic Shade client brief

planning diagram

LUXE Properties Group is an established Singaporean firm with years of experience in managing boutique hotel businesses in Singapore and abroad. They are currently on a campaign to open a new concept boutique hotel in the heritage part of Singapore, and are expecting a new market to their business.

about L hotel L Hotel is a new three-star boutique hotel by LUXE Properties. It will be housed in a heritage shophouse with a unique cultural background located in Selegie road, Singapore. It is a new concept hotel targeting mainly young couple tourists, with short period of stay. L hotel offers two types of room: common and superior, which differs in material quality and sizes. The new hotel also offers varieties of services such as Rooftop F&B, which operates as breakfast in the morning and as a public full-time bar and restaurant in the evening; along with special services such as in-room dining.

concept description The proposed design concept for L hotel is to incorporate contemporary style with subtle integration of art-deco element to preserve the building historical value. While targeting for couples, the design elements of the space are implemented to boost the romantic value of the hotel. By using achromatic contrast color scheme, the design express bold statement in harmony to the form, and shapes; soft materials are integrated with curvilinear objects, creating movement and counter the art-deco geometric elements to draw desirable attention from the public.

First Floor Lobby Area Adjacency Diagram

site plan

image objective

139 Selegie Road, Singapore 188309

street at Bonn, Germany.

48|05 design brief

Typical Bedroom Floor Adjacency Diagram

Rooftop Level Adjacency Diagram

existing site

the shore spa, miami.

cups and canvas, cafe and art community center


PRODUCED PRODUCED BY AN PRODUCED BY AUTODESK AN AUTODESK BY EDUCATIONAL AN AUTODESK EDUCATIONAL PRODUCT EDUCATIONAL PRODUCTPRODUCT

R12

R12

R16

R16

R16

R10

R07

R14

R13

R10 R09

R04

R17

R06

R18

R04 R04

R05

R15 R04

R03 R19 R01

R02 R15

R15

room legend

scale 1 : 150

2nd to 4th Floor Typical Floor Plan scale 1 : 150

Fifth Floor Rooftop Bar Floor Plan scale 1 : 150

Entrance Reception Lobby Lounge Corridor Management Office Manager Office Staff Service Area Laundry Area Barrier free Toilet Public Toilet Outdoor Lounge Loading Bay, Back Exit/Entrance, Emergency Stairs Room Service Quarter Superior Room Common Room Lift Lobby Full Time Kitchen Bar Area Outdoor Dining Area

schematic floorplan 05|49 PRODUCED PRODUCED BY AN PRODUCED AUTODESK BY AN BY AUTODESK EDUCATIONAL AN AUTODESK EDUCATIONAL PRODUCT EDUCATIONAL PRODUCT PRODUCT

First Floor Lobby Floor Plan

R01 R02 R03 R04 R05 R06 R07 R08 R09 R10 R11 R12 R13 R14 R15 R16 R17 R18 R19

PRODUCED BY AN AUTODESK EDUCATIONAL PRODUCT

R11

PRODUCED BY AN AUTODESK EDUCATIONAL PRODUCT

PRODUCED BY AN AUTODESK EDUCATIONAL PRODUCT

R08


F03

FR 100% PE Faux Leaf Grid

F02

F05

Creation Baumann Amethyst 100% FR Trevira CS PE curtain

achromatic contrast color scheme

F01

feature legend F01

Elevated engineered timber flooring with sloping ramp for barrier free solution

F02

Curvilinear Veil Curtain for visual separation and subtle privacy elements

F03

Ceiling confetti feature with fire rated faux leaf grid on metal wire mesh suspended on ceiling grid system

F04

Curvilinear ceiling recessed led lighting on translucent pvc housing

F05

Serpentine Sofa reproduction for group seating and aesthetical enhancement

50|05 schematic development

Lounge Lobby Schematic Perspective scale not defined

F04


F08

F03

F07

F02

beechwood engineered timber canopy cladding F05

modular interlocking ‘dune’ tiles

achromatic contrast color scheme

feature legend

F04

F01

Rooftop Bar Schematic Perspective

scale not defined

F06

F01

Double leaf folding door w/ weatherproofed timber framing and glazing panel.

F02

New canopy extension from the existing building structure cladded w/ engineered timber on diagonal arrangement

F03

Red amethyst creation baumann’s FR veil curtain

F04

Wood textured vinyl flooring on elevated platform to avoid water incursion

F05

Bar liquor display rack w/ back-lit LED illumination on white stone textured veneer shelving

F06

Bar island counter w/ polished white travertine top in reflective finishes and modular interlocking ‘wave’ tile on counter surface w/ wash LED illumination

F07

Bespoke gloss finish painted overhead liquor shelving w/ built inneon illumination

F08

Corridor cove led as accent lighting

schematic development 05|51


F04

F06 F03

F02

room legend R01 R02 R03 R04 R05 R06

Entrance Reception Corridor Cluster Seating Lounge Group Seating Lounge Piano Stand

F01

feature legend F01

Double leaf pivot high door with glazing panel and white stained timber frame

F02

Composite Stone (caesarstone) Jet black reception desk top and front finish, with bevelled edging and timber hardwood framing

F03

slight step up platform transition to create visual distinction between corridor and lobby lounge

F04

Veil curtain path, creating subtle visual privacy and adds the romantic value to the interior

F05

Red velvet full blind curtain concealing the opening to the hotel’s management office, double up as hotel’s concept and signature identity.

52|05 rendered lobby floor plan

0 100 200

500

1000

Rendered Hotel Lobby Floor Plan


F01

C02

F04

C03

C01 C01 F03

F03

F02

ceiling height legend C01 C02 C03

3920 3000 2700

feature legend 0 100 200

500

PRODUCED BY AN AUTODESK EDUCATIONAL PRODUCT

1000

Reflective Ceiling Plan of Hotel Lobby

PRODUCED BY AN AUTODESK EDUCATIONAL PRODUCT

PRODUCED BY AN AUTODESK EDUCATIONAL PRODUCT

PRODUCED BY AN AUTODESK EDUCATIONAL PRODUCT

C03

C03

F01

The hotel’s signature confetti ceiling feature, created by suspending metal wiremesh and fire rated material faux leaf on different level.

F02

Veil Curtain curvilinear railing and track for the lounge’s visual privacy and separations.

F03

Recessed curvilinear ceilnig mounted led strip on a translucent pvc housing to create color gradation on the veil curtain when applied during the nighttime.

F04

Accoustical Gypsum Panel drop down ceiling above lobby’s lounge to create spatial illusion and equipment concealment such as MEP, wiring, and lighting

lobby ceiling plan 05|53


F02

F03

F01 0 100 200

500

1000

Rendered Facade Elevation

F07

F04

F06

room legend R01 R04 R05

Entrance Cluster Seating Lounge Group Seating Lounge

feature legend F01

Double leaf pivot high door with glazing panel and white stained timber frame

F02

The weatherproofed paint hotel signage mounted on the excess part of the load bearing column, with neon illumination at the back of the article.

F03

The smaller hotel signage on chrome plated steel with neon illumination at the back for nighttime operation

F04

Trellis open partition to highlight the transition between corridor and lounge and also to create subtle privacy and space division

F05

Slight step up platform transition to create visual distinction between corridor and lobby lounge

F06

Transparent veil curtain on a curvilinear track

F07

The ‘confetti’ ceiling feature on a suspended metal wire mesh

F08

Industrial hanging pendant light as task and ambience

F09

Accessories amenities for magazine, brochures, and news paper racks and storage

54|05 rendered lobby elevations

F09

F08

F05 0 100 200

500

1000

Rendered Lobby Elevation A


F01

F05

F06

F02

0 100 200

500

1000

F08

F06

F03

Rendered Lobby Elevation B room legend R01 R02 R03 R04 R05 R06

F04

Entrance Reception Corridor Cluster Seating Lounge Group Seating Lounge Piano Stand

feature legend F09

F07

F06

F01 0 100 200

500

1000

Rendered Lobby Elevation C

F01

the Confetti ceiling feature made by fire rated PE faux leaf mounted on suspended wire mesh

F02

Composite Stone (caesarstone) Jet black reception desk top and front finish, with bevelled edging and timber hardwood framing

F03

slight step up platform transition to and open trellis partition from laminated finish wood stud

F04

Veil curtain creating subtle visual privacy and adds the romantic value to the interior

F05

Red velvet full blind curtain concealing the opening to the hotel’s management office, double up as hotel’s concept and signature identity.

F06

Named amenities and furnitures such as Vladimir Kagan’s serpentine sofa reproduction and Yamaha digital baby grand

F07

industrial hanging pendant as task and ambience light

F08

Clusters of couple seating SOHO sofa.

F09

Waterdrop hanging pendant for piano illumination, as ambience and task light

rendered lobby elevations 05|55


Hotel Lobby Perspective 1 scale not defined

concept description The first view of the hotel lobby lounge from reception counter. There are a lot of application of veil curtain as part of the main design. It double up as aesthetical form of the hotel as well as creating visual boundaries and a subtle privacy addition to the space, as the concept inteded for the specific target market.

56|05 rendered lobby perspective


Hotel Lobby Perspective 2 scale not defined

concept description the second view of the hotel lobby lounge from the lounge perspective. This view emphasis on the overall impression by the users of the space of the design elements of the lobby. The bold red of ceiling confetti creates movement and guides the potential clientelle into the hotel.

rendered lobby perspective 05|57


F09 F05

F02

F03 F01

room legend R01 R02 R03 R04 R05 R06

F04

Entrance door Wardrobe Corridor Bathroom Dressing Corner In room dining Area BVed area

feature legend F01

Step down to open bathroom area.

F02

2 types of tiles in bathroom, using ornamental tiles as accentuation of the space

F03

Luggage rack for baggage and shoes

F04

Mini bar counter for tea, coffee, snacks, processed food, and alcoholic drinks such as beer and wine.

F05

in house dining table covered with white linen provided by hotel management

F06

Dressing table and stool for the couple, also double up as study and charging dock for electronics

F07

Bespoke hollow bedside table on different color to play with the hotel’s signature color and also to create visual distinction for the couple

F08

Bespoke headboard feature wall, using modular arts’ interlocking ‘notes’ gypsum fiber tiles, combined with woven image’s dune PET recycled tile

F08

Caesarstone composite quartz vanity countertop with bevelled edging mounted on vapor resist plywood

58|05 rendered superior room plan

F07

F06

0 100

200

F07

500

F08

1000

Rendered Superior Room Floor Plan


PRODUCED BY AN AUTODESK EDUCATIONAL PRODUCT

C02

C03

PRODUCED BY AN AUTODESK EDUCATIONAL PRODUCT

C01

F01

C01

ceiling height legend F03

200

500

1000

PRODUCED BY AN AUTODESK EDUCATIONAL PRODUCT

0 100

F02

Reflective Ceiling Plan of Superior Room

PRODUCED BY AN AUTODESK EDUCATIONAL PRODUCT

PRODUCED BY AN AUTODESK EDUCATIONAL PRODUCT

PRODUCED BY AN AUTODESK EDUCATIONAL PRODUCT

C01 C02 C03

2700 2500 2400

feature legend F01

Drop down ceiling for ducting access and HVAC system

F02

recessed ceiling part for cove led strip housing

F03

Slight drop down ceiling above the bed to conceal electrical wiring for lightings

superior room ceiling plan 05|59


F10

F02

F03 F04

F01

F05 0 100

200

500

1000

Rendered Superior Room Elevation A room legend R02 R03 R05 R06

Wardrobe Corridor Bathroom In room dining Area Bed area

feature legend F01

Wall mounted vanity counter with composite stone top and water resistant laminate finish cabinet

F02

Various bathroom fittings and amenities

F03

Red hydrophobic shower curtain

F04

over the counter polished ceramic lavatory with standing chrome faucet

F05

in house dining table covered with white linen provided by hotel management

F06

Recess ceiling part and slight drop for electrical housing and cove led light

F07

Bespoke hollow bedside table on different color to play with the hotel’s signature color and also to create visual distinction for the couple

F08

Bespoke headboard feature wall, using modular arts’ interlocking ‘notes’ gypsum fiber tiles, combined with woven image’s dune PET recycled tile

F09

Wardrobe and Minibar counter unit, with sliding door for wardrobe and a shelving for safe, and pivot hinged cabinet door below the minibar counter for mini fridge

F10

Kohler wall fastened chrome plated shower set and tub filler

60|05 rendered superior room elevations

F06

F07

F09

F08

0 100

200

500

1000

Rendered Superior Room Elevation B


F01 F02

0 100

200

500

1000

Rendered Superior Room Elevation C F04

F03

room legend R01 R03 R04 R05 R06

Entrance door Bathroom Dressing Corner In room dining Area Bed area

feature legend

F08

F01

in house dining table covered with white linen provided by hotel management

F02

Bespoke hollow bedside table on different color to play with the hotel’s signature color and also to create visual distinction for the couple

F05

F03

Drop down ceiling to accomodate HVAC system ducting and diffusers.

F05

F04

Mini bar counter for tea, coffee, snacks, processed food, and alcoholic drinks such as beer and wine.

F05

Dressing table and stool for the couple, also double up as study and charging dock for electronics

F06

Step down to open bathroom area.

F07

Custom vanity mirror (optional) wall mounted and over length up to the bath tub area with back illumination to highlight the mirror

F08

Wall mounted mirror for dressing table

F07

F06 0 100

200

500

1000

Rendered Superior Room Elevation D

rendered superior room perspective 05|61


Hotel Superior Room Perspective 1 scale not defined

concept description the view of the typical superior room of the L Hotel. The head board feature wall is following the same ‘language’ as the lobby, creating movement towards the beds by using achromatic contrast. The intended overall impression of the room is to be cozy and dim, comfortable and romantic mood.

62|05 rendered superior room perspective


Hotel Superior Room Perspective 2 scale not defined

concept description the second view of the superior room, the aerial view shows the overall impressions and desired quality of the room, along with the general image of the room shape and sizes. Implementing yet the same language, the room uses art-deco style wall finishes and treatments.

rendered superior room perspective 05|63


Hotel Superior Room Perspective 3 scale not defined

concept description the open bathroom views, with clear glass partition with double leaf pivoting door for the access. The bathroom boast its absence of privacy, in response to the design elements of the lobby. Using a couple of dimmer lights the design intent is to create intimate mood and openess.

64|05 rendered superior room perspective


Hotel Superior Room Perspective 4 scale not defined

concept description Another angle of bathroom view from the bathtub. By putting the angle as if in a user’s perspective, the design intent and atmosphere of the bathroom can be grasped better.

rendered superior room perspective 05|65


polished ceramic over vanity vessel sink

caesarstone jetblack polished composite stone vanity top

galvanized steel L bracket w/ screw dowel fastener

neutral color scheme

feature legend F01

Caesarstone black polished composite stone vanity countertop with bevelled edging

F02

L angle support with dowel screw fastener for wall mounted vanity

F03

moisture resistant 2� x 4� hardwood cabinet framing w/ mortise-tenon joint, screw reinforced fastener

F04

laminated 19mm moisture resistant plywood cabinet backing

F05

resin coated, white stained MDF cabinet door w/ art-deco element sculpting

F06

chrome plated aluminum towel ring fitting screw fastened on cabinet panel

F07

nickel plated steel european cabinet door hinge w/ door load bearing up to 5kg door

F08

polished ceramic over the top bathroom vessel sink w/ chrome plated stand alone mixer faucet

66|05 detail drawings

F01

Bathroom Vanity Sink Detail scale not defined


ceiling grid system channel T

metal wire mesh

achromatic contrast color scheme

feature legend

Ceiling Confetti Detail scale not defined

F01

Ceiling grid system main channel Tee (3600mm)

F02

Ceiling grid system cross channel Tee (1200mm)

F03

Ceiling grid system vertical suspense stud

F04

Suspense metal steel wire, screw and bolted with steel furring

F05

Metal wiremesh sculptued into different level, fastened into suspense wire and hung to ceiling grid

F06

fire rated faux leaf grid attached to wire mesh and fastened by cabel fastener

F07

Ceiling grid suspense wire anchored into existing concrete slab

detail drawings 05|67



Appendices Construction Drawing Kitchen and Retail Shop module

: Construction Studies 1 & 2


GENERAL NOTES :

2475 1225

625

1

1400 600 600 800

5

600

2400 5

5

700

5

5

600

4100

1200

2

600

2400

5

1200

1

800

800 400 400

5

700

6

  

5

1

5

6

5

10

1 2

50

600

400 800

5

1

1

9 4500

6

300

1

2 2

5

SPECIFIC NOTES :

1400

400

1

5

6500

200

3 2

5

1200

800

200

625

The contractor to be responsible for: - Verifying all drawings, specifications,dimensions and measurements as well as site, conditions and notifying the designer of all discrepancies and omissions before commencing the works. - Submitting samples and shop drawings for review and approval by designer before commencing works. - Ensuring that all work is keeping with all national building codes. - All necessary repairs, patching and cleaning of site during and after completition of works. - Verifying existing site conditions prior to submissions of quotations. - Not starting the construction unless these drawings are signed approved. - All work specified on all drawings and specifications and supplying all necessary materials and labour required to complete all phases of work in accordance with the designer's standards.

A B

A B

DATE:

REVISIONS:

5

DETAIL NO. SHEET NO.

900

FULL HEIGHT CABINET 5

50

5

5

5

1

500

100

1000

8

1 600

350

5

1900

NO.

PROJECT TITLE:

700

KITCHEN PROJECT 5

DRAWING TITLE:

PLANS OF CABINET

350

1

NAME:

FERDY CHENG

COURSE:

CONSTRUCTION STUDIES 1

TERM:

JULY 2014 (5.1)

ASSIGNMENT NO.:

5

1 1

BASE CABINET PLAN VIEW SCALE 1 : 25

2 1

OVERHEAD CABINET PLAN VIEW SCALE 1 : 25

RafflesDesign Institute DATE:

16-09-2014

SCALE:

1:25

SHEET:

1


GENERAL NOTES : The contractor to be responsible for: - Verifying all drawings, specifications,dimensions and measurements as well as site, conditions and notifying the designer of all discrepancies and omissions before commencing the works. - Submitting samples and shop drawings for review and approval by designer before commencing works. - Ensuring that all work is keeping with all national building codes. - All necessary repairs, patching and cleaning of site during and after completition of works. - Verifying existing site conditions prior to submissions of quotations. - Not starting the construction unless these drawings are signed approved. - All work specified on all drawings and specifications and supplying all necessary materials and labour required to complete all phases of work in accordance with the designer's standards.

4100 1700

2400

1000

700

800

100 WOOD SPACER

800

800 FULL HEIGHT WINDOW OPENING

1 3 3

3

5

700

350

3

500

400

1050 2500

450

100

250

3

4

400

800

1900

400

800

100 BLACK STAINED STAINLESS STEEL KICK PLATE

2800

ELEVATION OF DRY AND WET KITCHEN

A B

A B

DATE:

REVISIONS:

SCALE 1 : 25

600

600

600

200

600

600

6

4

6

6

DETAIL NO. SHEET NO.

1050

950

400

100

2 3

600

325

1 2

4

2

4

2

325

350

100

4

3

250

4

4

250

3

4

4

600 150

600

4 2

100 BLACK STAINED STAINLESS STEEL KICK PLATE

3

4

4

4

500

1800

3

1

9

3

SPECIFIC NOTES :   

50

3

1

3

10

600

5

750

4

2

900

600

3

100

3

1500

600

3

4

3

NO.

100

2 2

2500 2100

4

600

DRAWING TITLE:

ELEVATIONS OF KITCHEN NAME:

FERDY CHENG CONSTRUCTION STUDIES 1

8 1200

6

7

600

ELEVATION OF WASHING AREA

TERM:

JULY 2014 (5.1)

ASSIGNMENT NO.:

2400

SCALE 1 : 25

KITCHEN PROJECT

COURSE:

4 100 BLACK STAINED STAINLESS STEEL KICK PLATE

2400

50

250

3

850

750

3

2

1

900

50

250

3

250

2

6

550

1

PROJECT TITLE:

450

550

3

5

3 2

ELEVATION OF SVC AREA SCALE 1 : 25

RafflesDesign Institute DATE:

16-09-2014

SCALE:

1:25

SHEET:

2


GENERAL NOTES :

100 WOOD SPACER W/ 5 PLASTIC LAMINATE 19 X 38 WOOD FURRING

5

100

10 DIA. LEVELING SLOT FOR ADJUSTABLE SHELF 15 ADJUSTABLE PLYWOOD SHELF W/ PLASTIC LAMINATE

600

19 MULTILAYERED MDF CABINET DOOR W/ PAINT FINISH

300

100 WOOD SPACER W/ PLASTIC LAMINATE

10 DIA. LEVELING SLOT FOR ADJUSTABLE SHELF

6

6

3

100

625

The contractor to be responsible for: - Verifying all drawings, specifications,dimensions and measurements as well as site, conditions and notifying the designer of all discrepancies and omissions before commencing the works. - Submitting samples and shop drawings for review and approval by designer before commencing works. - Ensuring that all work is keeping with all national building codes. - All necessary repairs, patching and cleaning of site during and after completition of works. - Verifying existing site conditions prior to submissions of quotations. - Not starting the construction unless these drawings are signed approved. - All work specified on all drawings and specifications and supplying all necessary materials and labour required to complete all phases of work in accordance with the designer's standards.

15 ADJUSTABLE PLYWOOD SHELF W/ PLASTIC LAMINATE

SPECIFIC NOTES :   

19 MULTILAYERED MDF 3 CABINET DOOR W/ PAINT FINISH

950

19 PLYWOOD DRAWER SIDE W/ PLASTIC LAMINATE 6

5

BEVELED MDF EDGING W/ 25 GAP FOR GRIP 5

19 MULTILAYERED MDF CABINET DOOR W/ PAINT FINISH

BEVELED MDF EDGING W/ 25 GAP FOR GRIP

1 4

3

5 2400 500

BEVELED MDF EDGING W/ 25 GAP FOR GRIP

A B

DATE:

REVISIONS:

550

19 MULTI LAYERED PLYWOOD OVERHEAD CABINET BASE

3

A B

2500

600

19 PLYWOOD CABINET BASE W/ PLASTIC LAMINATE 6

HIDDEN LED STRIP 12 MODULAR INTERLOCKING 2 PANEL BACKSPLASH

2 4

CAVITY FOR MICROWAVE

1

DETAIL NO. SHEET NO.

2

1 3

1

900

600

15 DIA. PVC WATER SUPPLY 48 DIA. PVC DRAIN CAVITY FOR OVEN

100

4

100 BLACK STAINED STAINLESS STEEL KICKPLATE

TRAP 19 MDF BOARD CABINET DOOR W/ THERMOFOIL 100 BLACK STAINED STAINLESS STEEL KICKPLATE

19 X 64 WOOD FURRING

NO.

PROJECT TITLE:

KITCHEN PROJECT 5

DRAWING TITLE:

SECTIONS OF CABINET

19 X 64 WOOD FURRING NAME:

550

75

50

550 600 625

FERDY CHENG

COURSE:

CONSTRUCTION STUDIES 1

TERM:

JULY 2014 (5.1)

ASSIGNMENT NO.:

1 3

SECTION OF FULL HEIGHT CABINET SCALE 1 : 10

2 3

SECTION OF SINK CABINET SCALE 1 : 10

5

RafflesDesign Institute DATE:

16-09-2014

SCALE:

1:10

SHEET:

3


GENERAL NOTES :

12 PLYWOOD CABINET BACKING 19 X 38 WOOD FURRING 19 PLYWOOD OVERHEAD CABINET BASE W/ LAMINATED PLASTIC ON BOTH SIDES 6

EXISTING WALL

MATERIAL FINISHES SCHEDULE KEY

12 MODULAR GYPSUM / GLASS FIBER PANEL BACKSPLASH 2

FLUORESCENT LED STRIP

20 THK QUARTZSTONE COUNTERTOP 1 EPOXY GROUT

1

2

SEALANT 15 WATER SUPPLY PVC PIPE

1 4

BACKSPLASH DETAIL

BRAND/SUPPLIER

CODE

REMARKS

JET BLACK

POLISHED

CAESARSTONE HAFARY PTE LTD

CJB3100

STONE CUT TO SIZE

2

MODULAR GYPSUM /GLASS FIBER INTERLOCKING TILE

400 X 400 X 16 25MM RELIEF

WHITE

MATTE FINISH

MODULAR ART INC

DUNE S16

HEAT RESIST & WATERPROOF

3

ACRYLIC ENAMEL PAINT

N/A

VOLCANIC BLACK

HIGH GLOSS LACQUER

NIPPON PAINT SG

NPN1918A

PAINTED OVER MDF

4

THERMOFOIL LAMINATE

0.3MM THK

FLAKEBOARD MILLTOWN OAK

MATTE FINISH

DACKOR INC

WF345

N/A

5

PLASTIC LAMINATE

0.7MM THK

BLACK

GLOSSY FINISH

GREENLAM PTE LTD

PCA9761

GREENLAM

6

PLASTIC LAMINATE

0.7MM THK

BLACK

MATTE FINISH

GREENLAM PTE LTD

PCA9771

GREENLAM

SPECIFIC NOTES : 

APPLIANCES SCHEDULE KEY 1

3 4

COUNTER TOP CUT OUT

FINISH

20MM THK

2 12 PLYWOOD CABINET BACKING

COLOR

QUARTZ STONE

19 X 38 WOOD FURRING 19 X 38 WOOD FURRING

SIZE

1

SCREED

DOUBLE LAYERED 19 PLYWOOD CABINET BASE

MATERIAL

The contractor to be responsible for: - Verifying all drawings, specifications,dimensions and measurements as well as site, conditions and notifying the designer of all discrepancies and omissions before commencing the works. - Submitting samples and shop drawings for review and approval by designer before commencing works. - Ensuring that all work is keeping with all national building codes. - All necessary repairs, patching and cleaning of site during and after completition of works. - Verifying existing site conditions prior to submissions of quotations. - Not starting the construction unless these drawings are signed approved. - All work specified on all drawings and specifications and supplying all necessary materials and labour required to complete all phases of work in accordance with the designer's standards.

NAME

SIZE L W H

AXIA II 6 S-F ABOVE 990 X 410 X185 CABINET KITCHEN SINK

COLOR/FINISH

BRAND/SUPPLIER

CODE

REMARKS

ANTHRACITE ( BLACK )

BLANCO INTL LTD

516875

N/A

ATLA - S COMPACT SINK TAP

200 X 195 X 55

ANTHRACITE W/ POLISHED CHROME

BLANCO INTL LTD

515333

N/A

NUTID MICROWAVE OVEN

597 X 540 X 455

BRUSHED ALUMINUM BLACK CERAMIC

IKEA SG

701.423.41

INSTALLED TO CAVITY

STAINLESS STEEL

ROBERT BOSCH PTE LTD

HBA13B150A

BUILT IN INSTALLATION

ROBERT BOSCH PTE LTD

KAD62S51

50 MM SPACE ALLOCATED FOR VENTILATION

SERIE6 BUILT IN SINGLE 595 X 595 X 515 OVEN

5

SERIE 8 COOLSPACE REFRIGERATOR

900 X 710 X 1745 MATTE BLACK BRUSHED ALUMINUM

6

CONDENSER DRYER

600 X 640 X 840

WHITE EURETHANE

ROBERT BOSCH PTE LTD

WTC84101SG

SLIDE UNDER COUNTERTOP

7

AUTOMATIC WASHER

600 X 590 X 850

WHITE EURETHANE

ROBERT BOSCH PTE LTD

WAE16061SG

SLIDE UNDER COUNTERTOP

8

RENLIG DISHWASHER

606 X 622 X 851 BLACK STAIN STAINLESS STEEL

IKEA SG

302.548.73

SLIDE UNDER COUNTERTOP

9

GLASS CERAMIC COOKTOP

762 X 534 X 73

CERAMIC W/ TEMPERED GLASS SURFACE

IKEA SG

100.919.95

MOUNTED TO COUNTERTOP

10

EXTRACTOR HOOD

762 X 302 X 346

STAINLESS STEEL

IKEA SG

102.548.69

BUILT IN TO OVERHEAD CABINET

A B

A B

DATE:

REVISIONS:

DETAIL NO. SHEET NO.

SCALE 1 : 2

HARDWARE SCHEDULE KEY

ROUNDED COUNTERTOP EDGING 1 DRIP CAP 20THK QUARTZSTONE COUNTERTOP 1

1

BRAND/SUPPLIER

CODE

REMARKS

HAFELE HOLDING PTE LTD

110.35.276

N/A

CHROME PLATED

HEAVY DUTY CABINET DRAWER RUNNER

GALVANIZED STEEL

HAFELE HOLDING PTE LTD

540.38.990

LOAD BEARING UP TO 75KG

3

DRAWER RUNNER LENGTH 450MM

GALVANIZED STEEL

HAFELE HOLDING PTE LTD

701.423.41

BALL GUIDED LOAD BEARING UP TO 10KG

4

DRAWER RUNNER LENGTH 450MM

GALVANIZED STEEL

HAFELE HOLDING PTE LTD

423.36.461

4 FRICTION ROLLER GUIDED LOAD BEARING UP TO 25KG

5

A SERIES 110 DEG. HINGE ARM

NICKEL PLATED

HAFELE HOLDING PTE LTD

311.60.500

FULL OVERLAY SCREW MOUNT

6

LID STAY SYSTEM

NICKEL PLATED

HAFELE HOLDING PTE LTD

373.66.660

VERTICAL AWNING LIFT UP TO 6KG DOOR LID

SEALANT 19 X 38 WOOD FURRING 19 MDF BOARD CABINET DOOR 3

FINISH

DRAWER HANDLE

1 2

COUNTER TOP CUT OUT

NAME

NO.

PROJECT TITLE:

KITCHEN PROJECT DRAWING TITLE:

DETAILS AND CHART NAME:

FERDY CHENG

COURSE:

CONSTRUCTION STUDIES 1

TERM:

JULY 2014 (5.1)

ASSIGNMENT NO.:

2 4

ABOVE COUNTER SINK DETAIL

SCALE 1 : 2

5

RafflesDesign Institute DATE:

16-09-2014

SCALE:

1:2

SHEET:

4


GENERAL NOTES :

A

B

The contractor to be responsible for: - Verifying all drawings, specifications,dimensions and measurements as well as site, conditions and notifying the designer of all discrepancies and omissions before commencing the works. - Submitting samples and shop drawings for review and approval by designer before commencing works. - Ensuring that all work is keeping with all national building codes. - All necessary repairs, patching and cleaning of site during and after completition of works. - Verifying existing site conditions prior to submissions of quotations. - Not starting the construction unless these drawings are signed approved. - All work specified on all drawings and specifications and supplying all necessary materials and labour required to complete all phases of work in accordance with the designer's standards.

D

C

14800 3250 400

9700

2850

650

1850 3125

5925 3250

1250

1425

FLOORING LEGEND A 2250

2350

VIP C. ROOM FL-002

3200

IN HOUSE TAILOR FL-001

9250

600

2600 950

800

BUILT IN OAK CLOTHING RACK VARNISHED

D

DISPLAY AREA 1 FL-001/FL-003

B

DEMOLISHED WALL EXISTING FULL HEIGHT GLASS PANEL

SATIN LACQUER

FL-002

POLYETHYLENE CARPET

3 THICK.

DARK OLIVE

N/A

FL-003

TINOS MARBLE TILE

600X600X15

BLACK

POLISHED

FL-004

VINYL FLOORING

3 THICK

CONCRETE AGGR.

N/A

SYMBOL

NAME

HATCH

THICKNESS

A

PARTITION WALL

100

B

EXISTING WALL

VARIES

SPECIFIC NOTES : 

C

TECHNICAL WALL

150

D

DEMOLISHED WALL

N/A

SYMBOL

TYPE

SIZE (MM)

MATERIAL

REMARKS

01

DOUBLE SWING DOOR

1600X2100X15

CLEAR GLAZING

EXISTING

02

SWING DOOR

800X2100X15

PE VENEER

AFRICAN WALNUT

03

SWING DOOR

800X2100X15

PE VENEER

AFRICAN WALNUT

04

SWING DOOR

800X2100X15

UPVC

WHITE PAINTED

05

HIDDEN SWING DOOR

800X2100X15

HOLLOW CORE

MIRROR CLAD

06

DOUBLE SWING DOOR

1200X2100X15

TEAK

VARNISHED

07

HIDDEN SWING DOOR

1200X2100X15

HOLLOW CORE

ACRYLIC CLAD

A B

A B

DATE:

REVISIONS:

WINDOW SCHEDULE SYMBOL

TYPE

SIZE (MM)

01

DISPLAY WINDOW

FULL HEIGHT

EXISTING

02

DISPLAY WINDOW

800X1600X12

CLEAR GLAZED

03

DISPLAY WINDOW

800X1600X12

CLEAR GLAZED

04

DISPLAY WINDOW

FULL HEIGHT

EXISTING

DETAIL NO. SHEET NO.

REMARKS

ENTRANCE FL-001

A

3 4

WINDOW DISPLAY FL-001

1350

FINISH

AMERICAN OAK

WALL MOUNTED MDF DISPLAY W/ VENEER

4600

3

2850

150

DISPLAY AREA 2 FL-001

COLOR

2000X150X12

2600

5050

B DISPLAY AREA 3 FL-001

15000

800

1 6

1050

1200

900

A

500

11800

2450

CASH COUNTER FL-001

SIZE (MM)

ENGINEERED WOOD

DOOR SCHEDULE

1825

900

1200

150

725

800

2100

2 3

4

950

1350 900

900 2000

02

1550

CHANGING ROOM

900

2250

500

800

A

800

1400

FL-002

03

1475

950

900

FL-002

2850

2

03

800

1400

07 CHANGING ROOM

700

2075 375

02

4500

04

700

650

A

NAME

FL-001

WALL LEGEND

1400

800

4650

1000

3000

FL-006

STAFF RESTROOM

C

4 4

C

1750

1

2 4

VIP LOUNGE FL-001/002

1700

06

800

5275

05

850

2900

STAFF/STORAGE FL-004

SYMBOL

NO. 04

01

3000

800

1 3

01

3 3

5500 9300

800 14500

4400

PROJECT TITLE:

RETAIL CONSTRUCTION PACKAGE

DRAWING TITLE:

FLOORPLAN NAME:

FERDY CHENG

COURSE:

CONSTRUCTION STUDIES 2

1 1

FLOORPLAN OF INCURSIO RETAIL STORE SCALE 1 : 50

TERM:

OCT 2014 (6.1)

ASSIGNMENT NO.:

2

RafflesDesignInstitute DATE:

10-11-2014

SCALE:

1:50

SHEET:

1


GENERAL NOTES :

1100

600

500 1600

CH 3650 1600

800

900 600

1600

1500

4 7

1600

1500

DATE:

REVISIONS:

DETAIL NO. SHEET NO.

CH 4000

1500

800 1500

1500

A B

1500

1700

1250

1000

1700

1250

1475

CH 3650

1100

850

750

1500

1000

750

A B

1500

1300

CH 3650

3 5

600

2500

1575

1500

CH 3650

COVE LED

7500

600

1500

800

600

700

750

FLUORSCENT TUBE

1500

1000

CH 3000

1500

CH 3650

CH 3000

700

700

CH 3000

WALL WASHER TRACK LIGHTING

1000

700 700

3 7

CH 3000

SPECIFIC NOTES : 

1600 800

800

RECESSED DOWNLIGHT

1500

1400

1000

1500 900

1075

1500

2700

2125

1500

900

525

1600 1400

725

LIGHTING FIXTURE

PENDANT LIGHTING

750

CH 3650

SYMBOL

ADJUSTABLE DOWNLIGHT 1150

1600

600

LEGEND

CH 3000

600

850

1500

700 675 1150

900

CH 3000

800

525

950

1400

CH 4000

CH 3000

650

2000

2050

1500

700

CH 3350

1600

1450

1200

700

1525

1500

700

1400

1600

600

1500

850

600

1500

850

1325

The contractor to be responsible for: - Verifying all drawings, specifications,dimensions and measurements as well as site, conditions and notifying the designer of all discrepancies and omissions before commencing the works. - Submitting samples and shop drawings for review and approval by designer before commencing works. - Ensuring that all work is keeping with all national building codes. - All necessary repairs, patching and cleaning of site during and after completition of works. - Verifying existing site conditions prior to submissions of quotations. - Not starting the construction unless these drawings are signed approved. - All work specified on all drawings and specifications and supplying all necessary materials and labour required to complete all phases of work in accordance with the designer's standards.

NO.

PROJECT TITLE: 1250

1500

1500

1250

600

1500

1500

600

RETAIL CONSTRUCTION PACKAGE

DRAWING TITLE:

REFLECTIVE CEILINGPLAN

1 2

REFELECTIVE CEILINGPLAN OF INCURSIO RETAIL STORE SCALE 1 : 50

NAME:

FERDY CHENG

COURSE:

CONSTRUCTION STUDIES 2

TERM:

OCT 2014 (6.1)

ASSIGNMENT NO.:

2

RafflesDesignInstitute DATE:

10-11-2014 SCALE:

1:50

SHEET:

2


3000

800

800

5500

800

GENERAL NOTES :

4400 800

BLACK ACRYLIC PAINTED PRECAST CONCRETE W/ PREVIOUS SIGNAGE REMOVED

800

VENEER WOOD PANEL W/ BLACK STAIN

750

INCURSIO

2375

1 3

1050 10400 1575

1600

1 4

15 VENEER WOOD PANEL W/ BLACK STAIN

750 150

REPEATED FACADE DETAIL *

300

925 1525

300 2000

GROUND LEVEL

DISPLAY AREA 1

SCALE 1 : 50

EXISTING 300 CONCRETE SLAB

EXISTING 300X800 CONCRETE BEAM

SUSPENDED CEILING

3650

DROP CEILING

3250

500

CEILING

4500

1200

1 5 900

800

3250

EXISTING FULL HEIGHT GLAZING

NAME:

FERDY CHENG

2150

100 AMERICAN OAK WALL BASE MOLDING

DRAWING TITLE:

ELEVATIONS & SECTION

650

800

3650

900

4000

800

25X150 CLASSICAL GYPSUM CROWN MOLDING

750

4200

PROJECT TITLE:

RETAIL CONSTRUCTION PACKAGE

1250

350 500 3000

REVISIONS:

SHEET NO.

INTERIOR ELEVATION

300

1150

DATE:

DETAIL NO.

0

NO.

4500

A B

1525

SUSPENSION METAL WIRE FOR CEILING PANEL @ 400 O.C.

COURSE:

CONSTRUCTION STUDIES 2

350

3350

A B

300

925

REFRESHMENT AREA ENTRANCE

CHANGING ROOM ENTRANCE

4500 3650

2150

03 38 X 194 OAKWOOD STUD DISPLAY RACK W/ BLACK STAIN GLOSS FINISH

300

CEILING DROP CEILING

4000

650 1800

2700

REPEATED FACADE DETAIL * 02

900

1825 800 350

800

1200

300

1500

1100

350

5050

650

300

1400

300

1000

2 3

CUSTOM MADE COLUMN AND WALL CLADDING WITH * ( ASTERISK ) MARK ARE FACADE DETAILS THAT IS REPEATED THROUGHOUT THE INTERIOR REFER TO STOREFRONT ELEVATION DRAWING PAGE 3

SCALE 1 : 50

EXISTING COLUMN

12 ART DECO OAK VENEER PANEL ON 19 PLYWOOD

SPECIFIC NOTES : 

1400

STOREFRONT ELEVATION

SKYLINE PENDANT LIGHT 3650

1600

0

ENTRANCE

4400

950

1400

EXISTING FULL HEIGHT GLAZING

3000 300

4000

GROUND LEVEL

2 5

WINDOW DISPLAY

FACADE OPENING

EXISTING #01-03 ENTRANCE DOOR GLAZED W/ NICKEL PLATED ALUMINUM FRAMING

150 OAK WALL BASE MOLDING W/ BLACK STAIN *

125

300 FULL HEIGHT GLAZED WINDOW W/ EXISTING DOOR REMOVED

4800

STORE SIGNAGE MOUNTED ON VENEER WOOD PANEL W/ BLCAK STAIN

2200

12 HDF COLUMN CLADDING W/ N2307A BLACK ACRYLIC PAINT * 150 OAK RAIL MOLDING W/ BLACK STAIN *

750

2375 875

4000

4800

50 OAK CROWN MOLDING W/ BLACK STAIN *

PROPERTY LINE

The contractor to be responsible for: - Verifying all drawings, specifications,dimensions and measurements as well as site, conditions and notifying the designer of all discrepancies and omissions before commencing the works. - Submitting samples and shop drawings for review and approval by designer before commencing works. - Ensuring that all work is keeping with all national building codes. - All necessary repairs, patching and cleaning of site during and after completition of works. - Verifying existing site conditions prior to submissions of quotations. - Not starting the construction unless these drawings are signed approved. - All work specified on all drawings and specifications and supplying all necessary materials and labour required to complete all phases of work in accordance with the designer's standards.

GROUND LEVEL

IN HOUSE TAILOR

3 3

38 X 194 OAKWOOD STUD DISPLAY RACK W/ BLACK STAIN GLOSS FINISH

GENERAL SECTION SCALE 1 : 50

0

TERM:

OCT 2014 (6.1)

ASSIGNMENT NO.: DISPLAY AREA 1

ENTRANCE

2

RafflesDesignInstitute DATE:

10-11-2014

SCALE:

1:50

SHEET:

3


GENERAL NOTES :

WEATHER PROOFING SEALANT EXISTING DOUBLE SWING GLAZED DOOR 9 ALUMINUM THRESHOLD

50X300 METAL CLAMP CEILING SUPPORT SYSTEM

CEILING

3650

CEILING

15 ENGINEERED WOOD [FL-001] W/ TONGUE AND GROVE CLIP 19 PLYWOOD

FIBERGLASS ACCOUSTIC BLANKET DROP CEILING 3350

650

19 PLYWOOD 19X38 WOOD FURRING @ 400 O.C.

3 MM RELIEF TEXTURED WALLPAPER

750

3 MM RELIEF TEXTURED WALLPAPER

DROP CEILING

12 ACCOUSTIC GYPSUMBOARD CEILING

3350

12 ACCOUSTIC PANEL 35 ACOUSTICAL METAL DECKING EXISTING CONCRETE SLAB

15

ALUMINUM TRANSITION MOLDING ALUMINUM ALLOY TRIM

25

EXISTING 15 SLATE TILES 22 MORTAR

50

12 ACCOUSTIC GYPSUMBOARD CEILING

850

FIBERGLASS ACCOUSTIC BLANKET

300

12 GYPSUMBOARD

140 HRWD STUD @ 400 O.C.

22 STEEL FURRING @ 400 O.C.

SPECIFIC NOTES :

150 STEEL STUD @ 400 O.C.

0

ACCOUSTIC FIBERGLASS BLANKET 19X38 WOOD FURRING @ 400 O.C.

ACCOUSTIC FIBERGLASS BLANKET

19 PLYWOOD

22 STEEL FURRING @ 400 O.C.

50X650 CUSTOM CUT HRWD PANEL BLACK STAINED



12 GYPSUMBOARD 750

12 GYPSUM - FIBERGLASS COMPOSITE PARAMETRIC • • • • •• • •• • ••• • • • •• • • •• •••••••••••••••••••••••• POROUS CORE

38X94 OAK DISPLAY WINDOW CASING

500

3 4

3650

1650

12 CLEAR TEMPERED GLASS DISPLAY WINDOW

ROUGH WINDOW OPENING

DISPLAY WINDOW JAMB

300

38 HDF DISPLAY SHELVING WOOD VENEERED

38X140 HRWD SILL DISPLAY WINDOW HEAD

FLOOR TRANSITION DETAIL A SCALE 1 : 2

A B

A B

DATE:

REVISIONS:

5 7 1400

19X194 OAK STOOL W/ BLACK STAIN 38X140 HRWD SILL

6 NICKEL PLATED STEEL TRANSITION MOLDING

50X100 OAK APRON W/ BLACK STAIN

15 ENGINEERED WOOD [FL-001] 19 PLYWOOD

12 VENEERED MDF PANEL W/ 3MM RELIEF

12 ACCOUSTIC PANEL 35 ACOUSTICAL METAL DECKING EXISTING CONCRETE SLAB

38 HDF DISPLAY SHELVING WOOD VENEERED

DETAIL NO. SHEET NO.

13 POLYETHYLENE TEXTURED MULTICOLOR CARPET 18 SCREED 12 ACCOUSTIC PANEL 35 ACOUSTICAL METAL DECKING EXISTING CONCRETE SLAB

15 ENGINEERED WOOD [FL-001]

950

19 PLYWOOD THIN LAYER OF MINERAL WOOL ACOUSTIC INSULATION

RAISED FLOORING

400

12 ACCOUSTIC PANEL 25X50 WHITE ASHWD WALL BASE MOLDING

38X294 HRWD JOIST @ 400 O.C 350

03

3650

50X150 STEEL RUNNER

300

38X140 HRWD DOUBLE TOP PLATE

The contractor to be responsible for: - Verifying all drawings, specifications,dimensions and measurements as well as site, conditions and notifying the designer of all discrepancies and omissions before commencing the works. - Submitting samples and shop drawings for review and approval by designer before commencing works. - Ensuring that all work is keeping with all national building codes. - All necessary repairs, patching and cleaning of site during and after completition of works. - Verifying existing site conditions prior to submissions of quotations. - Not starting the construction unless these drawings are signed approved. - All work specified on all drawings and specifications and supplying all necessary materials and labour required to complete all phases of work in accordance with the designer's standards.

NO.

25X100 AMERICAN OAK WALL BASE MOLDING GROUND LEVEL EXISTING CONCRETE

0

GROUND LEVEL

-90

EXISTING CONCRETE

PROJECT TITLE:

0

RETAIL CONSTRUCTION PACKAGE

-90

DRAWING TITLE:

FLOORING AND WALL DETAIL NAME:

FERDY CHENG

COURSE:

CONSTRUCTION STUDIES 2

TERM:

OCT 2014 (6.1)

1 4

WALL SECTION A

SCALE 1 : 10

2 4

WALL SECTION A

SCALE 1 : 10

4 4

FLOOR TRANSITION DETAIL B SCALE 1 : 2

ASSIGNMENT NO.:

2

RafflesDesignInstitute DATE:

10-11-2014

SCALE:

AS NOTED

SHEET:

4


GENERAL NOTES : PROPERTY LINE

1200

1975

EXISTING 300 CONCNRETE SLAB

4500 EXISTING CONC SLAB

250

200

200

1200

200

70

250

210

48 VENEERED HRWD PANEL W/ BLACK STAIN

300

70

4800

SCREW LOCK SUSPENSION WIRE FASTENING SYSTEM

SIGNAGE 75

75

75

75

3475

75 75

75

4 5

50X300 METAL CLAMP CEILING SUPPORT SYSTEM CAVITY FOR ELECTRICAL ACCESS

3775

STEEL WIRE FIBERGLASS ACOUSTIC BLANKET 22 STEEL FURRING @ 400 O.C. 300

SPECIFIC NOTES : 

50 OAK CROWN MOLDING W/ BLACK STAIN *

3475

4000 RECESS CEILING

12 GYPSUMBOARD CEILING PANEL

12 HDF COLUMN CLADDING W/ N2307A BLACK ACRYLIC PAINT * 150 OAK RAIL MOLDING W/ BLACK STAIN *

The contractor to be responsible for: - Verifying all drawings, specifications,dimensions and measurements as well as site, conditions and notifying the designer of all discrepancies and omissions before commencing the works. - Submitting samples and shop drawings for review and approval by designer before commencing works. - Ensuring that all work is keeping with all national building codes. - All necessary repairs, patching and cleaning of site during and after completition of works. - Verifying existing site conditions prior to submissions of quotations. - Not starting the construction unless these drawings are signed approved. - All work specified on all drawings and specifications and supplying all necessary materials and labour required to complete all phases of work in accordance with the designer's standards.

CUSTOM MADE COLUMN AND WALL CLADDING WITH * ( ASTERISK ) MARK ARE FACADE DETAILS THAT IS REPEATED THROUGHOUT THE INTERIOR REFER TO STOREFRONT ELEVATION DRAWING PAGE 3

EXISTING FACADE DETAIL

65

50

150 OAK WALL BASE MOLDING W/ BLACK STAIN *

3650 RECESS CEILING

5W 2700K LED STRIP 19X38 HRWD FURRING WHITE PAINTED

1 5

DROP CEILING DETAIL A

GROUND LEVEL

0

SCALE 1 : 5

2 5

SIGNAGE ELEVATION

A B

A B

DATE:

REVISIONS:

SCALE 1 : 20

100

50

50

DETAIL NO. SHEET NO.

48 VENEERED HRWD PANEL W/ BLACK STAIN 19 PLYWOOD 19X38 HRWD FURRING

SIGNAGE - UPPER PART

50

3775

EXISTING #01-03 ENTRANCE DOOR GLAZED W/ NICKEL PLATED ALUMINUM FRAMING

38 LIGHT DENSITY ACOUSTICAL FIBEREGLASS BATT 140 HRWD STUD

EXISTING 300 CONCNRETE SLAB

10W 3500K LED STRIP

SCREW LOCK SUSPENSION WIRE FASTENING SYSTEM

50 CHROME PLATED STEEL SIGNAGE SCREWED AND MOUNTED ON STEEL TUBE

450

4500 EXISTING CONC SLAB

15 STEEL TUBE W/ 9MM CAVITY FOR POWER LINE

5W 2700K LED STRIP MOUNTED ON GYPSUMBOARD W/ 9MM CAVITY FOR POWER LINE

NO.

PROJECT TITLE:

RETAIL CONSTRUCTION PACKAGE

METAL CLAMP CEILING SUPPORT

DRAWING TITLE: 3475

SIGNAGE - LOWER PART

135

STEEL WIRE

150

FIBERGLASS ACOUSTIC BLANKET 250

EXISTING FULL HEIGHT GLASS PANEL

22 STEEL FURRING @ 400 O.C. 12 GYPSUMBOARD CEILING PANEL

3650 RECESS CEILING

SCALE 1 : 5

NAME:

FERDY CHENG CONSTRUCTION STUDIES 2

25 ALUMINUM STEEL ANGLE FASTENER SCREWED TO GYPSUMBOARD

DROP CEILING DETAIL B

CEILING AND SIGNAGE DETAIL

COURSE:

9 TRANSLUCENT PVC PANEL

3 5

38X140 HRWD SILL

TERM:

OCT 2014 (6.1)

4 5

SIGNAGE DETAIL SCALE 1 : 5

ASSIGNMENT NO.:

2

RafflesDesignInstitute DATE:

10-11-2014 SCALE:

AS NOTED

SHEET:

5


GENERAL NOTES : 950

100

525

INCURSIO

HIDDEN DOOR TO STAFF/STORAGE ROOM

25 CHROME PLATED STEEL INTERIOR SIGNAGE 12 HDF COLUMN CLADDING W/ N2307A BLACK ACRYLIC PAINT * 150 OAK RAIL MOLDING W/ BLACK STAIN *

975

975

CASH COUNTER FL-001

07

4 6 800

685

400

15 BLACK OPAQUE TEMPERED GLASS TOP

60

SPECIFIC NOTES :

70

1850

60

The contractor to be responsible for: - Verifying all drawings, specifications,dimensions and measurements as well as site, conditions and notifying the designer of all discrepancies and omissions before commencing the works. - Submitting samples and shop drawings for review and approval by designer before commencing works. - Ensuring that all work is keeping with all national building codes. - All necessary repairs, patching and cleaning of site during and after completition of works. - Verifying existing site conditions prior to submissions of quotations. - Not starting the construction unless these drawings are signed approved. - All work specified on all drawings and specifications and supplying all necessary materials and labour required to complete all phases of work in accordance with the designer's standards.



3 6

CUSTOM MADE COLUMN AND WALL CLADDING WITH * ( ASTERISK ) MARK ARE FACADE DETAILS THAT IS REPEATED THROUGHOUT THE INTERIOR REFER TO STOREFRONT ELEVATION DRAWING PAGE 3

150 OAK WALL BASE MOLDING W/ BLACK STAIN *

830

975

575

650

15 BLACK TINOS MARBLE SLAB PANEL

15 BLACK OPAQUE TEMPERED GLASS TOP

2 6

15 HDF COUNTERTOP W/ 10 TEMPERED GLASS TOP MOUNTED

1 6

75

75

250

75 BLACK TINOS MARBLE KICKPLATE

1975

400

300

2 6

CASH COUNTER PLAN VIEW SCALE 1 : 10

2000

300

CASH COUNTER ELEVATION 1 SCALE 1 : 10

A B

A B

DATE:

REVISIONS:

DETAIL NO. SHEET NO.

CASH COUNTER FL-001 15 BLACK OPAQUE TEMPERED GLASS TOP

07 12 PLYWOOD DRAWER SIDE W/ WHITE PLASTIC LAMINATE

NICKEL PLATED EUROPEAN HINGE

12 PLYWOOD DRAWER BACK W/ WHITE PLASTIC LAMINATE

19 PLYWOOD CAB FRAME W/ PLASTIC LAMINATE

LOCK JOINT

125

100

400

PROJECT TITLE:

400

670

100 HRWD KICKPLATE W/ PLASTIC LAMINATE

CASH COUNTER PLAN & ELEVATION NAME:

200

400

48 WOOD SPACER

200 200

15 MDF & 9 PLYWOOD DOUBLE LAYER DRAWER FRONT W/ PLASTIC LAMINATE 400

NO.

DRAWING TITLE: 19X38 DRAWER STOP

150

15 MDF CABINET DOOR W/ PLASTIC LAMINATE

450

500

19 PLYWOOD CABINET BACKING

101

15 HDF COUNTERTOP W/ 10 TEMPERED GLASS TOP MOUNTED

RETAIL CONSTRUCTION PACKAGE

19X38 HRWD STUD FRAME @ 400 O.C.

48 WOOD SPACER

2 7 50

60

130

400

685 400

770

400

55 75

860 60

1 7

150

100

1900

FERDY CHENG

COURSE:

CONSTRUCTION STUDIES 2

TERM:

OCT 2014 (6.1)

ASSIGNMENT NO.:

3 6

CABINET PLAN VIEW SCALE 1 : 10

4 6

CASH COUNTER ELEVATION 2 SCALE 1 : 10

2

RafflesDesignInstitute DATE:

10-11-2014 SCALE:

1 : 10

SHEET:

6


GENERAL NOTES : The contractor to be responsible for: - Verifying all drawings, specifications,dimensions and measurements as well as site, conditions and notifying the designer of all discrepancies and omissions before commencing the works. - Submitting samples and shop drawings for review and approval by designer before commencing works. - Ensuring that all work is keeping with all national building codes. - All necessary repairs, patching and cleaning of site during and after completition of works. - Verifying existing site conditions prior to submissions of quotations. - Not starting the construction unless these drawings are signed approved. - All work specified on all drawings and specifications and supplying all necessary materials and labour required to complete all phases of work in accordance with the designer's standards.

15 BLACK OPAQUE TEMPERED GLASS TOP W/ ROUND EDGING

70

50

225

125

80

80X80 CORD OUTLET FOR POWER / TELEPHONE LINE 50 ACCESS CAVITY FOR CORD MANAGEMENT

38X194 HRWD SILL SCREWED TO STUD 19X38 HRWD STUD FRAME 12 GYPSUMBOARD PANEL 15 BLACK TINOS MARBLE PANEL COUNTER FRONT

19 PLYWOOD CABINET BACKING

BEVELLED EDGING

15 HDF COUNTERTOP W/ 10 TEMPERED GLASS TOP MOUNTED

NICKEL PLATED EUROPEAN HINGE

15 MDF CABINET DOOR W/ PLASTIC LAMINATE 19X38 HRWD FRAME 15 PLYWOOD ADJUSTABLE SHELVING W/ PLASTIC LAMINATE DOWEL PIN FOR ADJUSTABLE SHELF

830

19X38 HRWD DRAWER STOP

SPECIFIC NOTES :

15 MDF & 9 PLYWOOD DOUBLE LAYER DRAWER FRONT W/ PLASTIC LAMINATE

 12 GYPSUM - FIBERGLASS COMPOSITE PARAMETRIC • • • • •• • •• • ••• • • • •• • • •• •••••••••••••••••••••••• POROUS CORE

12X450 4 FRICTION ROLLER GUIDED NICKEL PLATED DRAWER RUNNER W/ 10KG MAX LOAD

40W HALOGEN BULB W/ 50 CAVITY CUT TO FIT

300

12 PLYWOOD DRAWER BACK PLASTIC LAMINATED W/ MORTIESE & TENON STUB JOINT

25 ACCESS HOLE FOR POWER LINE

12 PLYWOOD DRAWER BASE PLASTIC LAMINATED W/ MORTISE & TENON STUB JOINT

38 HDF DISPLAY SHELVING TOP VENEERED W/ MILTER LOCK JOINT

5W 2700K LED STRIP

HI TENSILE RIVET FASTENER W/ CYLINDRICAL HOUSING

75 BLACK TINOS MARBLE KICKPLATE

19 PLYWOOD CABINET BASE W/ PLASTIC LAMINATE

UPPER SHELF TOP

355

65

100

38 HDF DISPLAY SHELVING BACK VENEERED W/ MILTER LOCK JOINT

2 7

CASH COUNTER DETAIL 1 SCALE 1 : 5

400

3 MM RELIEF TEXTURED WALLPAPER

1 7

2725

125

19X38 WOOD FURRING

100 HRWD KICKPLATE W/ 3MM ALUMINUM PLATE

75

A B

A B

DATE:

REVISIONS:

12 GYPSUMBOARD

CASH COUNTER DETAIL 2

22 STEEL FURRING @ 400 O.C.

SCALE 1 : 5

150 STEEL STUD @ 400 O.C.

DETAIL NO. SHEET NO.

ACCOUSTIC FIBERGLASS BLANKET 22 STEEL FURRING @ 400 O.C.

38 HDF DISPLAY SHELVING BASE VENEERED W/ MILTER LOCK JOINT

12 GYPSUMBOARD 150

975

12 PLYWOOD DRAWER SIDE PLASTIC LAMINATED

UPPER SHELF BASE 2050

STEEL WIRE FIBERGLASS ACOUSTIC BLANKET 22 STEEL FURRING 25 ACCESS HOLE FOR POWER LINE

12 GYPSUMBOARD CEILING PANEL

40W 3500K LED WALL WASHER SCREWED TO CLAMP SUPPORT 48 CHROME PLATED STEEL ROD FOR CLOTH RACK SCREWED TO SIDE

METAL CLAMP CEILING SUPPORT SYSTEM

LOWER SHELF TOP 1700

NO.

FIBERGLASS ACOUSTIC BLANKET

PROJECT TITLE:

STEEL WIRE

RETAIL CONSTRUCTION PACKAGE

22 STEEL FURRING 12 GYPSUMBOARD CEILING PANEL

RECESSED CEILING 4000

DRAWING TITLE:

DROP CEILING 3000

25 STEEL U CHANNEL FASTENER

12 MODULAR GYPSUM FIBERGLASS COMPOSITE INTERLOCKING TILE W/ 3MM RELIEF

23W 1500LM CONDENSED FLUORSCENT PENDANT W/ STEEL CYLINDRICAL HOUSING

12 GYPSUMBOARD PANEL 22 STEEL FURRING

CASH COUNTER, SHELVING, LIGHTING DETAIL

16X25 STEEL ANGLE TO ATTACH PENDANT SHADE TO CEILING

NAME:

FERDY CHENG

9 TRANSLUCENT RESIN COATED POLYCARBONATE SHEET PENDANT SHADE W/ CUSTOM LASER CUT ARTWORK

FIBERGLASS ACOUSTIC BLANKET 22 STEEL FURRING 12 GYPSUMBOARD PANEL

COURSE:

CONSTRUCTION STUDIES 2

WHITE ACRYLIC ENAMEL PAINT

TERM:

OCT 2014 (6.1)

ASSIGNMENT NO.:

2

3 7

WALL WASHER DETAIL

SCALE 1 : 5

4 7

SKYLINE PENDANT DETAIL SCALE 1 : 5

5 7

SHELVING DETAIL SCALE 1 : 5

RafflesDesignInstitute DATE:

10-11-2014 SCALE:

1:5

SHEET:

7


Turn static files into dynamic content formats.

Create a flipbook
Issuu converts static files into: digital portfolios, online yearbooks, online catalogs, digital photo albums and more. Sign up and create your flipbook.