index
what does architecture mean to me? It´s the combination between artistic and cultural trends and a constructive method joined in a sensitive combination. I think that, in the realities of the contempory world where we live, the world is going through an imminent change, as architect we have an obligation to find ways successfully incorporate new building material, trends, construction methods with resources used in the past. We have to believe pleasing architecture is possible and we must create the new structures and buildings that are practical, aesthetically, pleasing and environment responsible that will inspire the future because of that I believe in BIM, it is begining to chage the way buiding look, the way they function, and the ways in wich they are built.
Fernando García Blanco
name
April 17th, 1989
D.O.B.
Bachelor in architecture + MArch + BIM Management Plaza Sagrada Familia nº3, Principal 3, Barcelona, Spain
qualification address
fgbarquitectura@gmail.com
+34 666 25 28 59
phone
BIM is not a thing or a type of software but a human activitythat ultimately involves broad process changes in design, construction and facility management. It create more sustainable building construction processes and higher performances facilities with fewer resourses and lower risk than can be achive using traditional preactices. “…In any case, the architect has an obvious assignment: we are here to make more human the mechanic nature of the materials”. Alvar Aalto
02 - 05 resume 06 - 23 profession activity 24 - 35
education projects
personal summary about me
Origins. Architect by University of Seville, I went to Australia to learn english and to discover other ways of working and facing problems. My last two years living in Australia has been an experience of great personal and professional improvement. During this time I have, not only learned a language but also a new way to work in many aspects, the value of hard work during 3 months in the hospitality area and a wonderful experience working in two differents companies with very important architectural projects. BIM Manager. Encouraged to keep growing, I completed a master degree at BIM Management Steering by UPC (Barcelona) focusing my aptitud in new technologies and team working, both drivers of the actuar AEC trend. Member of fraternity. Active member in the famous residence hall (Colegio Mayor Hernando Colón). I participated leading teams of people with differents backgrouds and careers. We developed multidisciplinary activities as educational seminars (from 2008 to 2012 organizer and assitant of “Season of Architecture”, seasons given by first level architects (Souto Moura, Alberto Campo Baeza, etc)), cuturals, sports or social. International perspective. After two years I have, not only learned a language but also a new way to work in many aspects, a wonderful experience working in two differents companies with very important architectural projects, some of them in colaboration with Wanda group (Chinese business group), with colaboration and team working as business value.
skills/knowledge
Main capabilities according Clifton´s test: Activator Communitation Lidership Ambition Woo Empathy I also considered myself: Responsible and reliable Adaptative to different environments and situations Ability to work under pressure Ambitious and dedicated
Ambitions
At this new stage I want to give a step forward in my career with a new rol and to have new responsabilities with BIM as a core. I wish to be Project Manager in a medium term, therefore I want to go futher with architectural design and teamworking coordination, to be able to join effort between client, specialists, consultants, etc. I would like to keep traveling, then I imagine myself ruling international projects in a long term, so I could do what I like, architecture, travel and teamworking.
02
formative summary Master BIM Project Manager UPC (Universidad Politécnica de Cataluña), Barcelona, Spain _ April 2018
degree
Bachelor in architecture + MArch Escuela Técnica Superior de Arquitectura, University of Seville, Spain (mark End Course Proyect: notable), 2014 Qualification High School Colegio Colón, Maristas. Huelva, Spain. 1995-2007 relevant work experience Architect, design/construction documentation, retail (Cartier) & BIM construction modeling and coordination, office building (Hines/Bimetric) G4 Group, Barcelona, Spain _ June 2017 - June 2018 Consultant architect / BIM modeling IMC, Barcelona, Spain _ March 2017 - June 2017 Architect assistant / Draft person Ewert&Leaf, Melbourne, Australia. March 2016 - August 2016 Architect assistant / Draft person DBI Design, Gold Coast, Australia. March 2015 - February 2016 Practices in the Technical Office of Architectural Design Service Infrastructure at the University of Seville, Spain. April-June 2012
Spanish Mother language
language
English Advance
Travelling
Politics
Photography
Food
Business
Sports
interests
03
computer programs / courses
software
BIM SOFTWARE
DRAFTING
Revit + plug-ins
Autocad
Dynamo
Sketchup
Archicad Naviswork
RENDERING
Solibri
3D Studio y V-Ray
BIM PLATFORMS
GRAPHIC DESIGN
Bimsync
Adobe Photoshop
Bimcollab
Adobe Ilustrator
Autodesk A360
Adobe InDesign Corel Draw
TEAMWORK PLATFORMS Trello Slack
courses
OFFICE Package Office 2016
Dynamo course Online certificated course, 50h: bmlearning_2018 Slip Resistance Essencial seminar Certificate of Attendance: METZ, Gold Coast, Australia. 2015 Galvanizers Association of Australia CPD Event Certificate of Attendance: Galvanizers, Gold Coast, Australia. 2015 Workshop “Infographic Development of Architecture Render” Academic course: Render Factory, Seville, Spain. Marzo 2013 II National Meeting about Sustainable Building and Eco-Efficient Solutions Escuela Técnica Superior de Arquitectura de Sevilla, Spain. 2010 Organizer and Assistant I, II editions of “Meeting about Building” 2009_2010 Colegio Mayor Hernando Colón, University of Seville, Spain. 2009-2010 Organizer and Assistant X, XI, XII, XIII editions of “Cycle of Architecture” Colegio Mayor Hernando Colón, University of Seville, Spain. 2008-2011
04
referees
Andreu Santacreu Architect & Bim Manager, Chief of staff at G4 Group asantacreu@groupg4.com + 34 932 379 620
referees
Mr. Toby Ewert Co-director/Architec of Ewert&Leaf architects@ewertleaf.com.au + 61 396 862 100 Mr. Raith Anderson Managing Director/Architec of DBI Design info@dbidesign.com.au + 61 755 399 788 Mr. Andrés Agudo Martínez Coordinator of Technical Office of Architectural Design of Service Infrastructure at the University of Seville andresam@us.es +34 954 485 705 Mr. Francisco Sánchez Quintana Assistant Manager of Escuela Técnica Superior de Arquitectura, University of Seville pacosanchez@us.es +34 954 557 866
05
professional activity My professional experience began in Australia, where I went to learn English.
During one year I was involved in various projects in DBI in Gold Coast. The project I worked the most on (10 months) was Jewel. The coordination of the team work was internal (DBI departments) and external (clients, consultants, specialists, etc.), it must to run like clockwork, non-stop feedback. My role in this experience was multitasking, technical support as an architect, interior design, and especially draftsman in CAD and BIM system. After, during 6 month I worked in Ewert&Leaf in Melbourne. This time I worked with a smaller firm with smaller projects that let me getting involved more indepth in some projects. I was involved in various residential, multi-residential jobs and hospitality projects. The stages I undertook were predominately Town Planning and Construction Documentation.
INDEX 08 - 09
OFFICES & RETAIL IN BCN
2017-8
10 CARTIER 2017
After my year in Australia, I went to Barcelona to focus at BIM. So, at the same time I coursed a Master BIM Management and I worked for two firms.
11 CAP 2017
For two months I realized a rol as consultant architect and BIM modeling in the firm IMC. Developing and modeling of a small-scale CAP (Primary Care Center).
12 - 17 JEWEL 2015-6
I started working in luxury retail. A lot of documentation are developed with great complexity and level of detail, both in design and construction projects.
18 - 19
DUQM BEACH RESORT
2015-6
Next, I worked modeling and coordinating a building in BIM for the client Hines. Our work was audited by Bimetric. BIM quality and coordination standards were very rigorous.
20 - 21
BEACH HOTEL
2015-6
22 - 23
RIVERSDALE HOUSES
2016
07
offices & retail in bcn
M
L
K
3.95
J
3.95
I
3.85
H
3.85
G
3.85
52.10 6.10
4.05
F
E
D
4.50
B
4.50
A
4.50
4.50
33.43
PLANTA CUBIERTA
30.28
PLANTA OCTAVA
27.09
PLANTA SEPTIMA
23.94
PLANTA SEXTA
20.76
PLANTA QUINTA
17.58
PLANTA CUARTA
14.41
PLANTA TERCERA
11.23
PLANTA SEGUNDA
8.05
PLANTA PRIMERA
4.07
PLANTA ALTILLO
0.00
PLANTA BAJA
-3.75
PLANTA SOTANO -1
-7.00
PLANTA SOTANO -2
SECCIÓN A
2
PLANTA CUBIERTA
3.15 3.18 0.40
3.18
0.40 2.88
2.48
3.18
0.30 0.40 2.88
2.48
3.18
0.30 0.40 2.88
2.48
40.43
3.18
0.30 0.40 2.88
2.48
3.18
0.30
1.10
0.40 2.48
0.30
3.98
0.70 8.05
7.35
4.07 3.25
0.27 0.60
2.85
3.18
3.75
0.27
2669.10
0.27 3.48 0.27 2.98 0.47
PROYECTO EJECUTIVO
1
2.88
0.38 2.50
0.40 4.57
0.27 0.27 0.47
2.98
3.48
4.57
7.75
0.60
1.32
My participation has been focused on the development of the executive project (building documentation), carried out in BIM. The project consists in the remodeling and rehabilitation of the old Banco Popular building, in Paseo de Gracia. It proposes a redistribution of the office floors getting a new vertical communication space which includes a vertical garden. To realize this operation, the existing patio will be used, increasing its dimensions and relocating the main staircase inside.
2.85
2.45
0.30
0.39 2.46 0.38 0.38 2.50 0.38 2.50 0.38 2.50
0.40 2.88 0.30
2.48
Client Hines
3.15
1.10
0.40 2.48 2.88
0.90 0.38 2.50
0.53
0.40 2.48 0.40
2.50
2.88
0.40 0.40 0.40 0.40 2.48
0.30
2.88
0.30
2.88
Length 12 month
2.48
0.30
2.88
2.48
0.30
Submission [in process]
2.48
0.30
2.85
Coordinator Ferran Tortosa and Ernest Boronat
2.45
0.30
2.88
1.02 0.53
Studio G4 Group, Barcelona
2.50
2.85
0.35
0.46
RETAIL, OFFICES & PREMIUM OFFICES, barcelona
C
4.50
Section
E: 1 : 100 @ A1
A
M
PROYECTO EJECUTIVO
E: 1 : 500 @ A1
L
K
J
1
2
2
1
A-02.9
A-02.9
A-02.8
A-02.8
I
H
G
F
E
D
C
B
2
1
2
1
A-02.7
A-02.7
A-02.6
A-02.6
A
52.10 3.95
3.95
3.85
3.85
3.85
4.05
6.10
4.50
4.50
4.50
4.50
4.50
1 1
4.04
A-02.5
1.92
2
3
TERRAZA 1 2.10
+17.68
OFICINA
1 A-02.4
+17.58
6.03
A-02.3
1.5 0
m
BAÑO ACCESIBLE
VESTIBULO OFICINA
5 2.07
1.5 0 ø
1.2 0
1.94
6 ASCENSOR 1
ASCENSOR 2
ø
BAÑO MUJERES
m
1 A-02.2
PASILLO
1.5 0
+17.68
ø
LIMPIEZA TERRAZA 2
m
m
ø
BAÑO HOMBRES
22.10
4
1
7
ESCALERA A
4.01
105 104 103 102 101 100 99 98 116
+17.58 1
115 114 113 112 111 110 109 108 107 106
A-02.1
8
Fourth floor N
Facade CGI
08
1
PROYECTO EJECUTIVO
PLANTA CUARTA_PLANTAS GENERALES E: 1 : 100 @ A1
(not by me) 20.SUP. UTIL PLANTA CUARTA USO BAÑO ACCESIBLE BAÑO HOMBRES BAÑO MUJERES
SUP. UTIL 5.10 m² 8.35 m² 8.40 m²
20.AREAS CONSTRUIDAS2
20.SUP. UTIL POR PLANTA PLANTA PLANTA CUBIERTA PLANTA OCTAVA PLANTA SEPTIMA
SUP. UTIL 229.82 m² 428.91 m² 517.66 m²
PLANTA Sobre Rasante PLANTA CUBIERTA PLANTA OCTAVA PLANTA SEPTIMA
ZONAS COMUNES 31.06 m² 105.92 m² 105.18 m²
RETAIL
OFICINAS
231.28 m² 464.15 m²
TOTAL 31.06 m² 337.20 m² 569.33 m²
E
D 1
2
E
D 1
A01
A-04.5.1.3 A-04.5.1.3
2
Laforja 12 08006 Barcelona www.groupg4.com +93-237 96 33
A-04.5.1.3 A-04.5.1.3
M01
NOTES:
7
A-04.5.1.5
M01
2
A11
3
1 A11 T04
2
A11
S01
S07
0.36 m
S02
1
A-04.5.1.5
3
B01
4
A-04.5.1.4
1.19 m
1 0.94 m
4
T01 0.35 m
S03 A11 T01
5
5 1
T02
8
A-04.2.4.3
3
6
A-04.5.1.3
5
7
4
A11
A01
A01
A01
M11
M15
M15
M13
A-04.5.1.4
A-04.5.1.3
5
3
1.20 m
A01
m
A01
S06
A11
A-04.5.1.4
T02 A11
A01
A01 T02
8 4.56
1.98 m
0.17 m
7
4
T02
1.2 0
6
A-04.5.1.3
M15
ø
3
M15
1.20 m
M14 A01
T03
1.08 m
A11 T03
A11
A11 M14
M12
0.81 m
6
M01
S07
6
1.03 m
A11
0.23 m
A01 M01
S01
A11 M16
2
2
3
A-04.5.1.6
A11 T01
1
0.32 m
M01
6
2.37 m
M16 A11 A11
1.61 m
3
2.03 m A-04.5.1.6
A-04.5.1.6
A-04.5.1.6
8
A11 T04 A11
7
S01
S07
S04
A11
A11 M16
T01
M02
filters 7to parameterize correctly (revit screenshot)
7
1
1
A-04.0.2 A-04.0.3
Core plan 1 4
3
2
A-04.0.5
2
A-04.1.A.4 A ESPECIFICACIONES
PLANTA CUBIERTA 33.43 33.43 PLANTA CUBIERTA
B07 FA01 FA03 FA05
BARANDILLA EXTERIOR 0,73M PLACA DE CEMENTO AQUAPANEL OUTDOOR RESISTENTE AL AGUA e=12,5mm. AISLAMIENTO TÉRMICO MULTICAPA e=20mm. AISLAMIENTO DE LANA DE ROCA ROCKWOOL ALPHAROCK-E- 225, e. 60mm, RESISTENCIA TÉRMICA 1,75 (m²K)/W,CONDUCTIVIDAD TÉRMICA 0,034 W/(mK) Y EUROCLASE A1 DE REACCIÓN AL FUEGO AISLAMIENTO DE LANA DE ROCA ROCKWOOL ALPHAROCK-E- 225, e. 80mm, RESISTENCIA TÉRMICA 2,35 (m²K)/W,CONDUCTIVIDAD TÉRMICA 0,034 W/(mK) Y EUROCLASE A1 DE REACCIÓN AL FUEGO PLACA DE YESO LAMINADO A ESTANDAR 12,5 mm PLACA DE YESO LAMINADO A ESTANDAR 15 mm PIEZA DE TERMOARCILLA COCIDA ALIGERADA R-12,5 de 300x190x190 JUNTA DE MORTERO DE 1 CM DE ESPESOR MA26 BALDOSA 600x600mm AGLOMERADO DE MADERA DE ALTA DENSIDAD 23 mm ENCAPSULADO EN CHAPA ACERO GALVANIZADO MA33 PEDESTALES REGULABLES DE ACERO ZINCADO CON CABEZA CON JUNTA ANTIVIBRATORIA COLOCADOS SOBRE ALMOHADILLA FONOABSORBENTE MA43 PERFIL DE ACERO LAMINADO EN FRIO EN U. DIMENSIONES SEGÚN DETALLE MA45 PERFILERÍA DE PLANCHA DE ACERO GALVANIZADO 100mm MA47 TABLERO TIPO NATURE DE TARIMATEC MA48 MORTERO DE REGULARIZACIÓN MA49 SOPORTE REGULABLE DE POLIPROPILENO PARA PAVIMENTOS FLOTANTES DE TERRAZAS Y CUBIERTAS TRANSITABLES CON UNA PENDIENTE MÁXIMA DEL 3% MA51 PERFIL TUBULAR 110X130 MA52 PLACA PREFABRICADA DE UHPC-SLIMCONCRETE HORIZONTAL ACABADO PÉTREO TIPO PIEDRA MONTJUIC e.5 cm CON SUBESTRUCTURA PORTANTE MA53 SELLADO DE JUNTA ENTRE MATERIALES DE OBRA CON MASILLA DE SILICONA NEUTRA MONOCOMPONENTE MA55 MORTERO POLIMÉRICO DE CEMENTO CON RESINAS SINTÉTICAS Y FIBRAS MA56 FORMACIÓN DE PENDIENTES CON MORTERO DE PERLITA Y CEMENTO DE DENSIDAD 350 KG/M3, DE 10 CM DE ESPESOR MEDIO MA57 CAPA DE MORTERO ARMADO + ACABADO EXTERIORMENTE ENFOSCADO CON MORTERO MONOCAPA (OC) MA61 AISLAMIENTO CON PLANCHAS DE POLIESTIRENO EXPANDIDO EPS, DE 100 KPA DE TENSIÓN A LA COMPRESIÓN, e 80mm MA76 CHAPA DE ACERO INOXIDABLE PARA LA CORONACION DE PRETIL. DIMENSIONES SEGÚN DETALLE MA97 FORJADO EXISTENTE DE HORMIGON ARMADO e: 23 cm MA99 IMPERMEABILIZACIÓN CON UNA MEMBRANA DE DENSIDAD SUPERFICIAL 1,15 kg/m2 ESPESOR 1 mm DE UNA LÁMINA DE ETILENO PROPILENO DIENO (EPDM), MA100 LÁMINA ANTIPUNZONAMIENTO GEOTEXTIL NO TEJIDO TERMOSOLDADO DE POLIPROPILENO-POLIETILENO CON RESISTENCIA AL PUNZONAMIENTO MA102 BARRERA DE VAPOR/ESTANQUEIDAD CON LÁMINA AUTOADHESIVA DE BETÚN MODIFICADO SBS CON ARMADURA DE FIELTRO DE FIBRA DE VIDRIO MA104 LÁMINA IMPERMEABILIZANTE AUTOPROTEGIDA DE BETÚN ELASTOMÉRICO SBS MA105 ENYESADO A BUENA VISTA SOBRE PARAMENTO HORIZONTAL INTERIOR MA144 JUNTA PERIMETRAL DE EXPANSIÓN POLIESTIRENO EXPANDIDO MC SISTEMA MURO CORTINA FWS50 SG SCHÜCO FORMADO POR: -MONTANTE 105 mm -TRAVESAÑOS 105 mm -VIDRIOS 8MM STOPRAY VISION 72T / 16 GAS ARGON 90% / 66.1 STRAOBEL 2x PLANIBEL CLEAR PH1 MÓDULO PREFABRICADO DE UHPC-SLIMCONCRETE HORIZONTAL ACABADO PÉTREO TIPO PIEDRA MONTJUIC e=5 cm, CON SUBESTRUCTURA PORTANTE. DIM. 22,5X55X22,5 cm. L=392 cm. INCLINACIÓN 0,00º. PH5 MÓDULO PREFABRICADO DE UHPC-SLIMCONCRETE HORIZONTAL ACABADO PÉTREO TIPO PIEDRA MONTJUIC e=5 cm, CON SUBESTRUCTURA PORTANTE. DIM. 22,5X110X22,5 cm. L=392cm. INCLINACIÓN 0,00º. PV5 MÓDULO PREFABRICADO DE UHPC-SLIMCONCRETE VERTICAL ACABADO PÉTREO TIPO PIEDRA MONTJUIC e=5 cm, CON SUBESTRUCTURA PORTANTE. DIM. 22,5X110X5 cm. H=255 cm. INCLINACIÓN 9,72º.
A A-03.1.4
2
ACABADOS
179175 178174 173 177 172 171 176 170 175 L03 PI06 169 174 168 173 167 172 166 171 165 170 L02 R15 164 PI06 169 163 168 162 167 161 160 166 PI06 159 165 158 164 157 PI06 163 156 155 162 154 161 153 152 160 159 151 150 158 149 157 L03 156 155 154 153 PI06 93 152 92 91 151 R15 90 150 89 149
PI06
A04
R15
PI06
27.09
27.09
L03
PI06
92
PI06
91 77
9079
78
76
75
PROYECTO EJECUTIVO
3
84 PLANTA 1, 2, 3, 4, 5, 6 83 E: 1 : 500 @ A1
L02
PI06
77
79
78 76
80
73
58 72
M02 A08 L02
59
PI06 60
57 71
MA94
58
59 57
60
62
63
64
56
L02
44
PI06
L02 M02 A08
PI06
70
16
15
S09
MA94
MA92
MA91
MA77
A00
MA87
A01 A11
A04
14.41
PLANTA TERCERA
ACABADOS
MA24
MA23
65
43
A04
MA24
L03
PLANTA TERCERA
45
46
PROYECTO EJECUTIVO
ESPECIFICACIONES
A04
A04
PI06
11.23
51
4
2
R15
PLANTA SEGUNDA
PI06
50
8.05
49
PLANTA PRIMERA
47
L03 L03
A04
R15
PI06
50
32
47
MA23
31
49 30
25
8.05
PI06
29
28
2
A-04.1.A.5
PI06
27
1
PLANTA PRIMERA
4.07
26
2
PLANTA ALTILLO
PROYECTO EJECUTIVO
E: 1 : 50 @ A1
Stair datails 2
E: 1 : 50 @ A1
PROYECTO EJECUTIVO
DETALLE E
PROYECTO:
E: 1 : 5 @ A1
DIBUJADO:
2
Fecha:
A-04.1.A.6
1216-02 As indicated
ESCALA:
A06
L02
PROYECTO EJECUTIVO
SECCIÓN D
Group G4
Rev. Documentación:
14/05/18 PE
Proyecto Ejecutivo
ESPECIFICACIONES
09
2 08
07
A-04.1.A.5
2
06
05
04
4.07 03
02
A-04.1.A.8
PLANTA ALTILLO 0.00
PLANTA BAJA
2
A04 PANELADO DE TABLERO DE DM SOBRE ACABADO SUPERFICIAL DE CHAPA NATURAL DE ROBLE A06 ESPEJO CLARO A07 APLACADO DE PIEDRA NATURAL NORA BEIGE 30mm A08 MODULO VEGETAL PRECULTIVADO SISTEMA MURO BABYLON L02 REVESTIMIENTO TECHO ESCALERA COMPOSITE ALUMINIO ACABADO TBC L03 TECHO SUSPENDIDO PYL KNAUF D112 PLACA FOC TBC PROYECTOMURO EJECUTIVO M02 DE FÁBRICA DE LADRILLO CERÁMICO PERFORADO e.135, REVOCADO A DOS CARAS 15+135+15mm MA23 MORTERO DETALLE E DE AGARRE MA24 MORTERO DE NIVELACIÓN E: 1 : 5 @ A1 MA28 PANOT HEXAGONAL DE HORMIGÓN BICAPA VIBROPRENSADO 1 CM
01
MA32 MA77 MA78 MA87 MA91 MA92 MA94 PI03 PI06 R15 R28
BALDOSAS PREFABRICADAS DE CEMENTO PIGMENTADO "HUGUET" PASTOR LIGHT PERFIL DE ACERO LAMINADO UPN 240 PELDAÑEADO CON LADRILLO CERÁMICO HUECO CHAPA DE ALUMINIO ANODIZADO ALUCOIL COLOR DARK BRONCE e.3 mm ESTRUCTURA SIMPLE DE ACERO GALVANIZADO PARA ANCLAJE DIRECTO PERFIL FALSO TECHO DE DE ACERO GALVANIZADO PANEL MDF FIBRAPLAST IGNÍFUGO e.100 mm PANOT HEXAGONAL GAUDÍ DE HORMIGON BICAPA VIBROPRENSADO NEGRO COLOCADO SOBRE CAPA DE MORTERO DE 20mm BALDOSAS DE CEMENTO PIGMENTADO "HUGUET" PASTOR LIGHT DIMENSIONES TBC PUERTA DOBLE ASIMÉTRICA DE MADERA CON MARCO DE VIDRIO_EI2-60-C5 PUERTA DE UNA HOJA APLACADO PIEDRA_80cm_DERECHA_EI2-60-C5
MA32
BALDOSAS PREFABRICADAS DE CEMENTO PIGMENTADO "HUGUET" PASTOR LIGHT
A-04.1.A.8
Group G4
MA76 MA97
Proyecto Ejecutivo
AUTORES DEL PROYECTO
MA105
MA45
FA07
Ernest Boronat Teixidó
MA02
PLANO
MA102 MA03
0.23 m
MC
A-04.5.1.1
PV5 MA03 MA102 0.23 m MA97
MA48
MA26
MA33
MA76
MA02
PTE. 2%
MA53 PH1 FA01 FA05 MA43 FA07
PDG PDG PROYECTO:
MA45
Fecha:
MA45
E
PROYECTO:
Ferran Tortosa Vallvé
Ernest Boronat Teixidó
FA07
A 3
PLANO
FA01 MA52
PROYECTO EJECUTIVO
DETALLE A E: 1 : 5 @ A1
1216-02
Group G4
Rev. Documentación:
14/05/18 PE
Proyecto Ejecutivo
AUTORES DEL PROYECTO
0.23 m
As indicated
DIBUJADO:
Group G4
Rev. Documentación:
14/05/18 PE
A-03.1.8
1216-02
As indicated
ESCALA:
DIBUJADO:
FA03
MA43
Fecha:
EJECUTIVO A04PROYECTO PANELADO DE TABLERO DE DM SOBRE ACABADO SUPERFICIAL DE CHAPA NATURAL DE ROBLE
MA144
MA99
ESCALA:
2 A-04.1.A.6
1216-02
As indicated
Rev. Documentación:
14/05/18 PE
FA07 MA57
D
Ernest Boronat Teixidó PLANO
A06
All dimensions must be confirmed on site prior to construction. This drawing is copyright and must not be reproduced, copied or passed on without written consent of G4.
Ferran Tortosa Vallvé
A-03.1.7
AUTORES DEL PROYECTO
Ferran Tortosa Vallvé
Fecha:
MA99
ESPEJO CLARO SUSPENDIDO 1,00 x 2,61m ESPEJO CLARO SUSPENDIDO 1,00 x 2,4m ESPEJO CLARO SUSPENDIDO 1,00 x 1,08m
MA28
ALZADO PASSEIG DE GRACIA
MA20
C
A-04.1.A.7 11.23 PLANTA SEGUNDA
PI06
44
14.41
PI06
69
R15
6853 67 52
66
B01 B02 B03
File sent digitally in PDF. Print scale may not be the one indicated in drawings. Always take as a reference the graphic scale and the numerical dimensions indicated on drawings.
DIBUJADO:
MA55
A-03.1.6
OTROS
B00
MA28
PINTURA PLASTICA BLANCA RAL 9010 ALICATADO PORCELANICO PRENSADO SERIE TERRA MAESTRICH DE 0.28 MOSA TILES 300x600 (210V) TBC
ESPECIFICACIONES 14
S05 S06 S07
0.02
0.02
L0368 67 66
65
64
70 55 6954
46
MA32
MA87
PI06
R15
71
43 24 42 L03 23 41 22 40 PI06 21 20 39 19 38 18 37 17 36 16 35 15 34 14 L02 33 13 PI06 12 32 PI06 11 31 10 30 29 PI06 28 27 26 25 PI03 24 23 22 21 20 19 L02 18 17
PROYECTO EJECUTIVO
45
MA23
0.28
87 86
55
M02 A08
S04 MA78
MA48 MA56 MA47 MA49 3MA104 COD. 22700900,
B be confirmed INODORO SUSPENDIDO DURAVIT SERIE DURASTYLE MOD. VITAL All dimensions must A-03.1.5 on site prior to construction. This DURAVIT RIMLESS drawing is copyright and must not be reproduced, copiedLAVABOS or passed on INTEGRADOS MODELO NEW ENCIMERA DURIAN CON DOS without written consent of G4. SIENA ENCIMERA DURIAN CON TRES LAVABOS INTEGRADOS MODELO NEW SIENA LAVABO DURAIN MODELO PISA FLAT de 50 o 60 cm VERTEDERO GARDA DE ROCA CISTERNA EMPOTRADA GROHE RAPID SL 38 528 001 CON PULSADOR DE DOBLE DESCARGA URINARIO DURAVIT SERIE ARCHITEC DRY cod. 08183500 COLOR BLANCO
S03
2
56
L02
MA77
S02
ESCALA:
MA51
be reproduced, copied or passed on without written consent of G4.
MA32
A04
R15
PI06
63
62
61
41 40 39 38 PI06 37 54 36 53 35 52 34 51 33
MA91
MA23
A-04.1.A.7
72
42
PI06
M02 A08
61
MA92
MA78
TRASDOSADO AUTOPORTANTE PYL 48+15H1 HIDROFUGO TRASDOSADO AUTOPORTANTE PYL 48+15A ESTANDAR TRASDOSADO AUTOPORTATE PYL 70+25DF+25DF EI120 TRASDOSADO AUTOPORTANTE PYL 70+25DF+25DF+15H1 EI120
L03
88 87 74 86 85 73
L02
PI06
PLANTA SEPTIMA
T01 T02 T03 T04
NOTES:
PROYECTO:
FA03
SANITARIOS
S00
PI06
82
81
75 PI06 74
82
81
80
89
PLANTA SEPTIMA
MURO DE FÁBRICA DE LADRILLO CERÁMICO PERFORADO e.115, REVOCADO A DOS CARAS 15+115+15mm MURO DE FÁBRICA DE LADRILLO CERÁMICO PERFORADO e.135, REVOCADO A DOS CARAS 15+135+15mm TABIQUE DOBLE PYL 12,5H1+12,5A+48+12,5+48+12,5A+12,5H1 cm TABIQUE DOBLE PYL 12,5DF+12,5DF+48+12,5DF+12,5+12,5DF EI120 TABIQUE PLY 15H1+70+25DF+25DF EI120 TABIQUE PYL 15A+70+25DF+25DF EI120 TABIQUE PYL 12,5DF+12,5DF+48+12,5DF+12,5DF EI120 TABIQUE PYL 15A+70+15H1 HIDROFUGO TABIQUE PYL 15H1+48+15H1
PH5 FA01 MA99
File sent digitally in PDF. Print scale may not be the one indicated in drawings. Always take as a All dimensions must be confirmed reference the graphic scale and the MA100 MA61 S01 This INODORO SUSPENDIDO DURAVIT SERIE STARCK on site prior to construction. numerical dimensions indicated on drawing is copyright and must not COLOR BLANCO,drawings. PARA CISTERNA EMPOTRADA
TRASDOSADOS
0.17
93
85
84
M10 M11 M12 M13 M14 M15 M16
A04
88
83
M02
T00
MA53
PTE. 2%
NOTES:
PROYECTO EJECUTIVO PARA LA REFORMA PARCIAL DE EDIFICIO DE OFICINAS EN PASSEIG DE GRACIA 17, 08007
L02
L03
M01
MUROS
Escalera A - Detalles
M02 A08
M00
PROYECTO EJECUTIVO PARA LA REFORMA PARCIAL DE EDIFICIO DE OFICINAS EN PASSEIG DE GRACIA 17, 08007
PI06
PLANTA OCTAVA 0.24
30.28
File sent digitally in PDF. Print scale may not be the one indicated in drawings. Always take as a reference the graphic scale and the numerical dimensions indicated on drawings.
PROMOTOR: BVK HIGHSTREET RETAIL PASEO DE GRACIA S.L.U
180
MA02 MA03 MA20
0.23 m
Laforja 12 08006 Barcelona www.groupg4.com +93-237 96 33
NOTES:
0.02
M02 A08
179
PLANTA OCTAVA
PROMOTOR: BVK HIGHSTREET RETAIL PASEO DE GRACIA S.L.U
30.28
0.02
PI06
0.24
181 177 180 176
PI06
178
E: 1 : 25 @ A1
R28
A07
R28
A07
181 PI06
Laforja 12 08006 Barcelona www.groupg4.com +93-237 96 33
0.05 0.02 0.05 0.02
E: 1 : 25 @ A1
COTAS Y MOBILIARIO
0.17
1
PROYECTO EJECUTIVO
PASSEIG DE Lobby CGI (not by me)
Laforja 12 08006 Barcelona www.groupg4.com +93-237 96 33
FA07 B07
MA78
1.10 m
MA78
MA24
0.55 m
MA24
MA23
1103.37
MA23
MA32
PROYECTO EJECUTIVO
Escalera A - Detalles
MA32
9F
A-04.2.4.3
5
8
T01
9F
6
B02
4
5
1.03 m
7
1
6
4
PROYECTO EJECUTIVO PARA LA REFORMA PARCIAL DE EDIFICIO DE OFICINAS EN PASSEIG DE GRACIA 17, 08007
T04 A11
Planta_Baños_Planta tipo
A11 M16
T01 A11
A-04.5.1.3
PROMOTOR: BVK HIGHSTREET RETAIL PASEO DE GRACIA S.L.U
A11
A11 M10
T01
M01
4
A-04.5.3.1
2 3
PROMOTOR: BVK HIGHSTREET RETAIL PASEO DE GRACIA S.L.U
4
A-04.5.1.4
Detalles Fachada Passeig de Gracia
1
All dimensions must be confirmed on site prior to construction. This drawing is copyright and must not be reproduced, copied or passed on without written consent of G4.
PROYECTO EJECUTIVO PARA LA REFORMA PARCIAL DE EDIFICIO DE OFICINAS EN PASSEIG DE GRACIA 17, 08007
A-04.5.1.5
File sent digitally in PDF. Print scale may not be the one indicated in drawings. Always take as a reference the graphic scale and the numerical dimensions indicated on drawings.
0.75 m
2
m
3
S09
8
M16 2.54 m
M16 A11
5
0.81 m
M10 A11
A11
S05
B03
2.19 m
A11
2
1.83 m
6
0.85 m
1.73 m
S01
S07
0.98 m
0.32 m
A01
5
8
M16
T04 A11
M01 A01
1.5 0
A-04.5.1.5
T01 A11
1.03 m
7 A11 T04 A11
T01 A11
ø
6
1.03 m
A11 M16
T01 A11
Proyecto Ejecutivo
Facade detail
4
PROYECTO EJECUTIVO
ESPECIFICACIONES
A-03.1.4
09
Prime Tower, Burj Khalifa 1008 - Dubai
www.groupg4.com
FACADE LAYERS 20
50
3
130
50
ALL MEASUREMENT CHECKED ON SIDE
Coordinator Mr. Raith Anderson
303
50
20 50
CORNER FACADE F-61
100 100
Submission [in process] 2016_Built to 2018
M1-11 & M1-11+M1-12 MARIANITECH MESHES
130
303
3 30
3
50
130
3
50
20
50
20
NOTES File sent digitally in PDF. Print scale may not be the one indicated in drawings. Always take as a reference the graphic scale and the numerical dimensions indicated on drawings. All dimensions must be confirmed on site prior to construction. This drawing is copyright and must not be reproduced, copied or passed on without written consent of G4.
M1-14, M1-15 & M1-16 COLORED GLASSES M1-11 & M1-11+M1-12 MARIANITECH MESHES F29 WHITE PAINTED COVERING RAL9010
APD PHASE UNDER DEVELOPMENT. DESIGN MIGHT CHANGE. -NOT DEFINITIVE-
PB7 EXTRA CLEAR LAMINATED GLASS SECURITED
ALL MEASUREMENT CHECKED ON SIDE
50
TO
564
FACADE LAYERS
47
SCALE 1/50@A1; 1/100@A3
+ 4.00 m HSFP
12 4 C SH
NEW CONCEPT CHAISE BUREAU WALL SH
Standing Lamp New Concept
Standing Lamp TBD
STORAGE
ICONO 900 x 657
ICONO 900 x 657
+ 3.90 m HSFP ICONO 900
x 657
SH 50
ICONO 900
ICONO 1000 x 1400 MIRROR
+ 3.70 m HSFP
MIRROR
C
CHAISE BUREAU NEW CONCEPT
+3.70 m HSFP
MIRROR
MIRROR
ICONO 900
x 657
Icono 440 x 440
Icono 440 x 440 Icono 440 x 440
ICONO 1000 x 1400
MIRROR
MIRROR
Icono 440 x 440
E3
ACCESSORIES DISPLAY C4
ICONIC TABLE
H SH 45
PARFUM C2
124 C SH
93
SH 120
SH 120
H SH 45
C1
H SH 45 Iconographie 870 x 1115
SH C
SH 100
C SH 93
SH 50
124 C SH MIRROR
HS SH 50
C3 C3
SH 120 124 C SH
ROUND HIGH TABLE
A-04a.1
ARMCHAIR MINOTTI / AMÉLIE
TRANSITION AREA
+4.40 m HSFP
COFFE TABLE New Concept
Table Lamp New Concept
+4.20 m HSFP
ARMCHAIR MINOTTI / AMÉLIE
PB7 EXTRA CLEAR LAMINATED GLASS SECURITED
GENERAL LAYOUT
C2
+3.70 m HSFP +4.20 m HSFP
Iconographie 870 x 1115
C1
pouf 400
HS SH 50
SH 50
SH 100
130
SH 50
124
C SH
C
C SH
124
93 C
COFFE TABLE BME / TUNIS Ø 50
C SH 124
C3
50
Table Lamp New Concept
C3
ARMCHAIR New Concept
HS SH 50
STORAGE
+3.70 m HSFP
SH
C SH 93
+4.20 m HSFP
Iconographie 870 x 1115
4
50
20
50
20
3
METAL FRAME F-61 LIGHTING K5 01 CIRTUIT DIMABLE 47 3
50
METAL BEAN TRANSOM F61
1:100-1:50@A3-A1
SCALE:
COFFE TABLE New Concept
G4 group
DRAWN BY:
Table Lamp New Concept
+4.20 m HSFP
SCALE 1/5@A1; 1/10@A3
130
50
ARMCHAIR MINOTTI / AMÉLIE
TRANSITION AREA
+4.40 m HSFP
PLAN DETAIL
M1-11 & M1-11+M1-12 MARIANITECH MESHES
M1-14, M1-15 & M1-16 COLORED GLASSES
HS SH 50
MIRROR
SH
C SH 72
72
pouf 400
ACCESSORIES DISPLAY
50
B
ARMCHAIR New Concept
C2
R
C1
ARMCHAIR New Concept MIRRO
20
SH 50
11 50
3
COFFE TABLE BME / TUNIS Ø 50 Table Lamp New Concept
WALL SH 100
SH 120
C SH 93
DRAWING Nº:
Table Lamp New Concept ARMCHAIR New Concept ARMCHAIR New Concept
STORAGE
PARFUM SH 120
SH
C SH 93
93
C2
SH
C1
ACCESSORIES DISPLAY
Table Lamp New Concept
ACCESSORIES DISPLAY
SH 50
124
72
C
SH 120
WALL SH 100
SH
COFFE TABLE BME / TUNIS Ø 50
C SH 124
H SH 45
93 C C SH 72
SH 50
C SH
C
pouf 400
COFFE TABLE BME / TUNIS Ø 50
METAL FRAME F-61
47
SH 50
C SH 93 ARMCHAIR New Concept
PB7 EXTRA CLEAR LAMINATED GLASS SECURITED
EXTERNAL FACADE
SH 50
72
H SH 45
124
SH COFFE TABLE BME / TUNIS Ø 50
ARMCHAIR New Concept
MIRROR
08-09-2017
DRAWING NAME:
ACCESSORIES DISPLAY
C SH
C
H SH 45
Icono 440 x 440
C1
Iconographie 870 x 1115
ICONO 900 x 657
C2
93
TBC
+3.70 m HSFP
+ 4.40 m HSFP
pouf 400
ARMCHAIR New Concept
+4.20 m HSFP
METAL MULLION F-61
ACCESSORIES DISPLAY
COFFE TABLE BME / TUNIS Ø 50
R
SH 50
C SH 93
+4.40 m HSFP
MIRRO
SH
ACCESS ENTRANCE
ACCESSORIES DISPLAY
TBC
+3.70 m HSFP
M1-11 & M1-11+M1-12 MARIANITECH MESHES
pouf 400
ARMCHAIR MINOTTI / AMÉLIE
C
pouf 400
ARMCHAIR MINOTTI / AMÉLIE
SH 50
72
Table Lamp New Concept
124
SH
M1-14, M1-15 & M1-16 COLORED GLASSES
MIRR
OR
C SH
C
SH
COFFE TABLE BME / FLEN Ø 40
METAL FRAME F-61
C1
93
+4.20 m HSFP
+4.20 m HSFP
PB7 EXTRA CLEAR LAMINATED GLASS SECURITED
C SH 124
SH
C
+4.80 m HSFP
COFFE TABLE BME / FLEN Ø 100
SOFA MINOTTI / JACQUES
47 6
+3.70 m HSFP +4.20 m HSFP
+4.60 m HSFP
C SH 93
72
B
Table Lamp New Concept
MIRROR
50
C
TBC
+4.60 m HSFP
C SH 93
72
+4.20 m HSFP COFFE TABLE BME / FLEN Ø 40
MIRROR
+4.20 m HSFP
WOMEN INSPIRING AREA
C SH 124
WOMEN INSPIRING AREA
TBC
+4.80 m HSFP
COFFE TABLE BME / FLEN Ø 100
SOFA MINOTTI / JACQUES
+ 4.20 m HSFP
3
DATE: BOH +3.70 m HSFP
+4.20 m HSFP
+4.20 m HSFP
50 BOH
METAL MULLION 100x130mm F-61
+4.20 m HSFP
47
C2
METAL FRAME F-61
ACCESSORIES DISPLAY
Standing Lamp New Concept
100
R CON 90
ARMCHAIR MOLTENI CHELSEA
93
B
ARMCHAIR MOLTENI CHELSEA
93
SH
SH
SH
C SH 72
130
R CON 90
50
Icono 440 x 440
50
C
pouf 400
C
Standing Lamp New Concept
C
pouf 400
REFINE MIXTE MEN & WOMEN AREA
C SH 72
HB
HB
REFINE MIXTE MEN & WOMEN AREA
C SH 72
C SH 72
20
ICONO 900 x 657
50
HB
HB
ACCESSORIES DISPLAY
120
ICONIC TABLE
Icono 440 x 440
E3
ICON SIAM
SH 50
BUREAU NEW CONCEPT
CHAISE BUREAU NEW CONCEPT
+ 3.90 m HSFP
+3.70 m HSFP
DIAMOND AREA
WALL SH 60
MIRROR
SHELF LM a
SHELF LM a
ACCESSORIES DISPLAY C4
1027-87 Issued: 11/08/2017 29/08/2017 06/09/2017
20
M1-14, M1-15 & M1-16 COLORED GLASSES
NOT FOR CONSTRUCTION
CHAISE BUREAU NEW CONCEPT
BUREAU NEW CONCEPT
CHAISE BUREAU NEW CONCEPT Icono 880 x 440
124 SH
+3.70 m HSFP
Icono 440 x 440 Icono 440 x 440
+ 3.70 m HSFP
SALES AREA
ARMCHAIR ARMCHAIR CINNA / LONG TBD ISLAND
Standing Lamp TBD
+4.00 m HSFP MIRROR
C SH 72
+4.00 m HSFP
Table Lamp New Concept Standing Lamp TBD
VIP LOUNGE SALON
MIRROR
Iconographie 870 x 1115
COFFE TABLE BME / TUNIS Ø 50
+ 3.90 m HSFP
MIRROR
MIRROR
C
+ 4.00 m HSFP
SOFA BME / PIANA
BOH
+3.70 m HSFP
MIRROR
CHAISE BUREAU NEW CONCEPT
MIRROR
+ 4.20 m HSFP
A
MIRROR
ICONO 900 x 657
SH 50
NEW CONCEPT CHAISE BUREAU
124
+3.70 m HSFP
MIRROR
ICONO 900 x 657
BUREAU NEW CONCEPT
NEW CONCEPT CHAISE BUREAU
COFFE TABLE BME / TUNIS Ø 50
SH
MIRROR
COFFE TABLE BME / TUNIS Ø 90
SINGLE D
+3.70 m HSFP
ICONO 900 x 657
WALL SH 60
+4.00 m HSFP MIRROR
NEW CONCEPT CHAISE BUREAU
WALL SH 60
COFFE TABLE BME / TUNIS Ø 50
LB
Rev.
REV. 1 REV. 2 REV. 3
STORAGE
Standing Lamp New Concept
OTTOMAN BME / GUMI
METAL FRAME F-61
APD - ARCHITECTURAL SET
Standing Lamp TBD
50
PB7 EXTRA CLEAR LAMINATED GLASS SECURITED
G4 group
PROJECT No: Date: Standing Lamp TBD SOFA BME / PIANA
METAL MULLION 120X50mm (CLOSING FACADE) F-61
DRAWN BY:
02
+ 3.70 m HSFP
20
M1-11 & M1-11+M1-12 MARIANITECH MESHES
1:100-1:50@A3-A1
SCALE:
A EXTERNAL FACADE 01
+3.70 m HSFP
DIAMOND AREA
ARMCHAIR ARMCHAIR CINNA / LONG TBD ISLAND
Icono 440 x 440
x 657
4 SH C
C SH 72
WHITE PAINTED COVERING RAL9010 SALES F29 AREA
Iconographie 870 x 1115
4
+3.70 m HSFP
+4.00 m HSFP
Table Lamp New Concept
Standing Lamp TBD
12
COFFE TABLE BME / TUNIS Ø 50
Standing Lamp TBD
VIP LOUNGE SALON
SH
12
C
+4.00 m HSFP
SOFA BME / PIANA
BOH
50
F29 WHITE PAINTED COVERING RAL9010
+3.90 m HSFP
CHAISE BUREAU NEW CONCEPT
SH 50 MIRROR
+4.20 m HSFP
Icono 880 x 440
+3.70 m HSFP
60
SINGLE D
NEW CONCEPT CHAISE BUREAU
NEW CONCEPT CHAISE BUREAU
COFFE TABLE BME / TUNIS Ø 50
+3.90 m HSFP
BE
ICONO 900 x 657
BUREAU NEW CONCEPT
LB
M1-14, M1-15 & M1-16 COLORED GLASSES
TO
130
3
ICON SIAM
+3.70 m HSFP
ALL MEASUREMENT CHECKED ON SIDE
NOT FOR CONSTRUCTION WALL SH 60
50
METAL FRAME F-61
PLAN DETAIL
Date:
5
SCALE 1/5@A1; 1/10@A3
1027-87
PROJECT No:
ARMCHAIR MINOTTI / AMÉLIE
Rev.
Issued:
SECTION DETAIL REV. 1 REV. 2 REV. 3
11/08/2017 29/08/2017 06/09/2017
SCALE 1/5@A1; 1/10@A3
Facade detail
NOT FOR CONSTRUCTION
NEW CONCEPT CHAISE BUREAU
Standing Lamp TBD
NEW CONCEPT CHAISE BUREAU
47
APD - ARCHITECTURAL SET
SOFA BME / PIANA
Standing Lamp New Concept
6
EXTERNAL FACADE DETAILS
CONCEPT
STORAGE
SCALE 1/5@A1; 1/10@A3
Standing Lamp TBD
OTTOMAN BME / GUMI
COFFE TABLE BME / TUNIS Ø 90
M1-11 & M1-11+M1-12 MARIANITECH MESHES
EXTERNAL FACADE
SINGLE D
BUREAU NEW
SH 50
APD PHASE UNDER DEVELOPMENT. DESIGN MIGHT CHANGE. -NOT DEFINITIVE-
COFFE TABLE BME / TUNIS Ø 50
A
47
www.groupg4.com
File sent digitally in PDF. Print scale may not be the one indicated in drawings. Always take as a reference the graphic scale and the numerical dimensions indicated on drawings. All dimensions must be confirmed on site prior to construction. This drawing is copyright and must not be reproduced, copied or passed on without written consent of G4.
Standing Lamp TBD
SOFA BME / PIANA
SCALE 1/50@A1; 1/100@A3
METAL BEAN TRANSOM F61
Prime Tower, Burj Khalifa
NOTES
OTTOMAN BME / GUMI
870 x 1115
MIRROR
4 12
Iconographie
NEW CONCEPT CHAISE BUREAU
SH
02 COFFE TABLE Ø 90 BME / TUNIS
C
SH 50
CHAISE BUREAU NEW CONCEPT
CONCEPT
CHAISE BUREAU NEW CONCEPT
BUREAU NEW
CHAISE BUREAU NEW CONCEPT
01
PLAN DETAIL
3
EXTERNAL FACADE PLAN
Via Ceva 40 -A 10144 Torino -Italy t: +39 011 489071
1008 - Dubai
+3.70 m HSFP
2
01 CIRTUIT DIMABLE C./Laforja 12 08006 Barcelona -Spain t: +34932379625
LB
C SH 72
METAL MULLION 100x130mm F-61
facade elevation
50
3
METAL FRAME F-61
NOT FOR CONSTRUCTION
PB7
EXTERNAL FACADE ELEVATION EXTRA CLEAR LAMINATED GLASS SECURITED
1
COFFE TABLE50 Ø BME / TUNIS
47
ROUND HIGH TABLE
ACCESS ENTRANCE 08-09-2017
DATE:
general layout 01
1
02
BANGKOK – Icon Siam
GENERAL LAYOUT SCALE 1/50@A1; 1/100@A3
DRAWING NAME:
GENERAL LAYOUT
A-01.1
1:10-1:5@A3-A1
SCALE:
DRAWING Nº:
Needs to be adjusted with : > More Thai touch, more color (local silk work inspiration)
G4 group
DRAWN BY:
1027-87
PROJECT No:
Meshes to be integrated In the facade
Date:
Rev.
REV. 1 REV. 2 REV. 3
VIEW FROM THE REFINE AREA
Issued: 11/08/2017 29/08/2017 06/09/2017
DATE:
08-09-2017
DRAWING NAME:
EXTERNAL FACADE FINISHES
Facade CGI
Arches product display to be improved
(not by me)
10
BE
NOT FOR CONSTRUCTION
SCALE 1/5@A1; 1/10@A3
2
1008 - Dubai
www.groupg4.com 50
METAL FRAME F-61
20
50
120
50
50
Prime Tower, Burj Khalifa
47
METAL BEAN TRANSOM F61
NOT FOR CONSTRUCTION
3
47
M1-14, M1-15 & M1-16 COLORED GLASSES
40
Via Ceva 40 -A 10144 Torino -Italy t: +39 011 489071
50 3
BE
ICON SIAM
50
TO
C./Laforja 12 08006 Barcelona -Spain t: +34932379625
195
LIGHTING K5 01 CIRTUIT DIMABLE
APD PHASE UNDER DEVELOPMENT. DESIGN MIGHT CHANGE. -NOT DEFINITIVE-
73,29°
F29 WHITE PAINTED COVERING RAL9010
50
Client PLAN DETAILa lot To be able to build luxury retail, 1 of complex and detailed documentation is developed, both in design and construction projects. A large number of drawings are developed so they can be interpreted correctly by building suppliers throughout the world. This kind of brand have a teamwork system between different firms so they put a lot of effort to coordinate themselves with great precision. I was involved in several projects in differents countries. My role was that of a draftsman for construction documentation.
50
METAL FRAME F-61
APD - ARCHITECTURAL SET
Studio DBI Design, Gold Coast, Australia
3
METAL TRANSOM 195X50mm (CLOSING FACADE) F-61
NOTES File sent digitally in PDF. Print scale may not be the one indicated in drawings. Always take as a reference the graphic scale and the numerical dimensions indicated on drawings. All dimensions must be confirmed on site prior to construction. This drawing is copyright and must not be reproduced, copied or passed on without written consent of G4.
PLYWOOD METAL MULLION 120X50mm (CLOSING FACADE) F-61
50
C./Laforja 12 08006 Barcelona -Spain t: +34932379625
Via Ceva 40 -A 10144 Torino -Italy t: +39 011 489071
redevelopement proyect. beach hotel in broadbeach, australia
Length 10 month
LEASE LINE
CHANGE AXIS
LEASE LINE
cartier
interior CGI
(not by me)
To be ewnriched With different materials And colors and iconographies
DRAWING Nº:
A-04a.4
CAP CAP(Healthcare building) BIM MODELING, lérida
Studio IMC Coordinator Alejandro Núñez Submission 2017 Length 2 month
Foundation
Architecture
Client Voltes From 2019 the Spanish administration will start to demand the BIM as an indispensable requirement. Catalonia decides to come earlier, so It´s fair to say that many construction companies were caught off guard. They were forced to hire external staffs to model in BIM and thus comply the city council requirements. In this case, it´s a smallscale CAP (Primary Care Center). In the modeling process, we perceived numerous design failures that would occur during the construction, so they were reported properly in order to avoid them.
IFC Model must to be reported to the Town Hall administration
Water dispension
AC System
interior CGI
(not by me) revit modeling
11
jewel redevelopement proyect. beach hotel in broadbeach, australia
Studio DBI Design, Gold Coast, Australia Coordinator Mr. Raith Anderson Submission [in process] 2016_Built to 2018
The connection and extension of the Architectural narrative by the Interior Design provides a strong cohesive language for the project as a whole. The outcome, an Interior Design that reflects the strong bold, fearless language of the Architecture providing schemes that are sculptural, original, bold and luxurious.
Length 10 month Client Dalian Wanda Group & Ridong Group The Architectural narrative for the building form is rich and compelling. The building design reflects a desire to develop Architecture with a strong conceptual basis, Architecture with meaning and connection to place. The building employs a geological analogy which in concept informs all of the decision making process. The Towers are imagined as reflecting the Geometric forms and principles of the crystalline volcanic structures that form the underling geology of the Gold Coast.
60 min drive
JEWEL 20 min drive
12
+ 0,00 m
+ 18,60 m
Tower 1 - LUXURY TOWER
+ 1,20 m
+ 18,60 m
Tower 2 - HOTEL TOWER
Tower 3 - PREMIUM TOWER
Podium floor plant_Top view
13
jewel JEWEL TEAM STRUCTURE/FEETBACK WORKING
Wanda/Ridong Client
Thinc
Project Manager
A R C H I T E C T S
I N T E R I O R S
L A N D S C A P E
P L A N N I N G
32
33
OL
1 31
D BU
2
RL
30 28
5
3
EI
4
GH
DBI Design
No.
25
24
27
DATE
DESCRIPTION
14/03/15 DRAFT TENDER DOCUMENTATION MILESTONE 5.5 ISSUE 30/03/15 MILESTONE 6 ISSUE FOR INFORMATION
RD
13
14
16
Swimming Pool Consultant
NC
19
RD
Sim
DBI Landscaping
E MILE R ISSONULY TEFONR DINFOERMATION STONE
LEVEL 3 ROOF TERRACE BAR
6
POOL RELAX
Soltera
1
6.101
Sim
LEVEL 2 RL 12800
Fire Engineering A
Comercial Aquatics Australia
NC
17
LEVEL 3 RL 18600
Team Manager
CHECK
CS
20
WHARF
CPP Wind Engineering
BY
CS
17
10
15
DBI Interiors
B
21
9
11 12
6.101
22
18
8
7
1
A
18 23
26
6
Team Manager
DBI Architecture
REVISION
29
It can be apreciated how the elaboration of the facade is a result of teamwork, a continious feedback between differents DBI departments, consultant, specialists and the client. The whole complex must be perfectly functional.
R
C
H
I
T
E
C
T
U
R
E
© DBI DESIGN PTY. LTD. A. C. N. 097 951 007 info@dbidesign.com.au www.dbidesign.com.au GOLD COAST - LEVEL 1, 9 TRICKETT ST, SURFERS PARADISE QLD 4217 Ph:61 7 5539 9788 Fx:61 7 5539 9789 BRISBANE - GROUND FLOOR, 485 ADELAIDE ST BRISBANE QLD 4000 Ph:61 7 3839 4011 Fx:61 7 3839 4022 DIMENSIONS ARE SUBJECT TO SITE MEASUREMENT & VERIFICATION DO NOT SCALE OFF THIS DRAWING
Tony Dowthwaite Lighting Design
PROJECT NAME
JEWEL SURFERS PARADISE PODIUM
PUBLIC PEDESTRIAN LINK
DRAWING TITLE
PRESENTATION PODIUM SECTIONS SHEET 6
Specialist Lighting
LEVEL 1 - GROUND (PT) RL 6300
27/03/2015 3:22:09 PM
Dennis Cairns & Associates
Hydraulic Services
Nexus Design
Wayfinding
Food & Beverage Consultant
Mark Rigby & Associates
Presentation Podium Section 48
Brecknock Consulting
Hyder Consulting
EMF Griffiths
3.311
SCALE
1 : 50
CONSULTANTS
14
PROJECT LEADER
SCALE DATE PROJECT NO.
32
34
DRAWING NO.
A R C H I T E C T S
GL03
AL01
GL06
GL03
•
PODIUM MASSING REDUCED
•
FOLDS IN CLADDING REDUCED
200x50mm @1200mm Centres PC02
GL03
PC02
AL01
SLAB EDGE
PT03
200x50mm @1200mm Centres GL03
PC02
GL03
PC03
OPEN TO SKY
Public Art
Ausio Visual, Electrical Engineering, Enviromentally Sustainable Design, Vertical Transport, Mechanical Engineering, Fire Engineering, IT
PROJECT DIRECTOR
CHECKED
GL06
Civil Engineering, Structural Engineering, Facade Engineering
CAS
DRAWN
DBI Architecture holds many of the coordination activities with different consultants. All of them, specialy Structural and Facade (both runed by Hyder Consulting) have a critical importance for facade design and construction.
Waste Management
Bitzios Consulting
Traffic Consultant
18
Food Service Design Australia
OPEN TO SKY
AL01
FC03
FC02
FC01
PT03
AL01 VIEW TO OCEAN
GL03
•
GL01
REFER TO LANDSCAPE ARCHITECTS DRAWINGS
ALL EXTERNAL BRIE SOLEIL REMOVED
GL03
MATERIALS
The final task is to choose a material and get a result. The way the facade works is critical to know how it appareance will turn out, this being a crucial matter to improve a city skyline like Gold Coast’s. MATERIALS
GENERAL NOTE:
PT01 TO ALL EXTERNAL SOFFITS
PT03 TO ALL EXPOSED BALCONY COLUMNS
PODIUM MATERIAL FINISHES - OLD BURLEIGH ROAD ELEVATION
DETAILED APPEARANCE AND PROPOSED EXTERNAL FINISHES - TOWER MATERIAL FINISHES
RA NC
As indicated @ A1 MAR 2015 145155
AR-DD -PD - 4.506 B I N T E R I O R S
L A N D S C A P E
P L A N N I N G
Tower 1 - Luxury Tower Residential tower
3 Bed Apartment
13 15
1bed units_108
Tower 3 Premium Tower
2bed units_78
12
3bed units_8
9
10
Floor Plan Level 34
11
Keyplan 4
TOTAL UNITS_194
5
Average footprint_899m2 Tot. enclose area_27038m2
8 15
Tot. balcony area_6938m2
1
Levels_44 (from Podium L3)
7
High_150,25m (from ground)
6
Legend 1/ 2/ 3/ 4/ 5/ 6/ 7/ 8/ 9/ 10 11 12 13 14 15
2
Tower 2 - Hotel Tower 3 15
4 Bed Penthouse - Tower 3
Guestroom (hotel)_195
G O L D C OA S T AU S T R A L IA
Pg 45 | Jewel Interior Design Report
3 Bed Apartment - Tower 2
2 Bed Apartment
1bed units_97 3bed units_4
5
14
Residential & hotel tower
2bed units_67
4
Entry Laundry Bedroom 1 W.I.R Ensuite Bedroom 3 Bathroom Living Balcony / Dining / Kitchen / Bedroom 2 / Curtain Wall with Operable Sash / Balcony Balustrade / Curtain Wall with Awning Windows
Tower 1 Luxury Tower 12
Pg 21 Jewel Interior Design Report
Floor Plan Level 5
6
Tower 1
G O L D C OA S T AU S T R A L IA
Keyplan
1 Bed Apartment Tower 1 Luxury Tower
TOTAL UNITS_168+195
5
10 1
Floor Plan Level 5 Keyplan
Average footprint_990m2
3
7 11
Tot. enclose area_37093m2
4 5
9
Legend
8 3
2
High_176m (from ground)
4
7
9
Tot. balcony area_7311m2 Levels_49 (from Podium L3)
2
1
1/ 2/ 3/ 4/ 5/ 6/ 7/ 8/ 9/ 10 11 12
Entry Laundry Kitchen Dining Living 8 Balcony Bed 1 W.I.R Ensuite / Bed 2 / Curtain Wall with Awning Windows / Curtain Wall with Operable Sash
Legend
6
10
1/ 2/ 3/ 4/ 5/ 6/ 7/ 8/ 9/ 10
Entry Kitchen Dining Living Laundry Observatory Bathroom Bedroom Curtain Wall with Awning Windows / Curtain Wall with Operable Sashes
9
G O L D C OA S T AU S T R A L IA
Pg 47 Jewel Interior Design Report
G O L D C OA S T AU S T R A L IA
Tower 3 - Premium Tower
2 Bed Apartment - Tower 1
G O L D C OA S T AU S T R A L IA
1 Bed Apartment - Tower 1
Pg 13 | Jewel Interior Design Report
Pg 29 | Jewel Interior Design Report
1bed units_19 2bed units_48 3bed units_38 4bed units_4 TOTAL UNITS_109 Average footprint_740m2 Tot. enclose area_18729m2 Tot. balcony area_4233m2 Levels_36 (from Podium L3)
Tower 2
High_132,8m (from ground) The different footprint in every
Tower 3
level change fitting to the facade, therefore all the units are different.
typical floor plant_level 16
= BALCONY
Interior Computer Generation Images
15
DUQM BEACH RESORT master plan in oman, DUQM BEACH RESORT
Studio DBI Design, Gold Coast, Australia Coordinator Mr. Raith Anderson Submission [in process] 2015 Length 2 month Client Duqm Special Economy Authority Duqm Beach Resort is an iconic development aimed at providing a landmark tourist precinct and housing community. Al Duqm Beach Resort is located directly between Al Duqm’s City Centre and Coast Districts. The site acts as a bridge, linking the central business district and Al Duqm’s coastal spine. As a result Al Duqm beach Resort has been designed as hybrid of both districts, combining a commericial precinct, residential community and landmark tourist precinct. At a wider scale, the resort is located approximately half way between Al Duqm’s Port & Drydock and the airport. This location makes it an ideal residence for business professionals working at the Port and surrounding industries.
key constrains
aproved recint plan
building form heights
design strategy
18
vehicular circulation & hierachy
landscape open space / amenity / recreation
25 24
11 12
5
5
14 11
7
5 8
13 9
11
22
9
15
26 14
14
10
16
10
1
4
2
3
21
6
10
14
14
10 9
7
17
10 11
9 26
25
8
27
22
14 19
23
18
11
16
20 25 14 floor plant_Top view
0
100
N CONCEPT MASTERPLAN
250M
SCALE 0 24
CONCEPT MASTERPLAN
Masterplan Application Report Duqm Beach Resort, Oman / May 2015
19
beach hotel LEGEND
2
redevelopement proyect. beach hotel in broadbeach, australia
Studio DBI Design, Gold Coast, Australia Coordinator Mr. Raith Anderson Submission [in process]2015 Length 1 month Client Brookfield Multiplex
Highway, ‘The Beach Hotel Redevelopment’ is highly visual and presents an opportunity to deliver a unique building that will contribute positively to the emerging world class architecture of Broadbeach. The proposal will deliver 198 apartments over 30 storeys, 30 of which will be dedicated to house local workers. It will also provide an exciting and stimulating architectural design for the benefit of people in the building, neighbouring properties and the general public who will view the building from within Broadbeach.
1.
6
C L I M BER
T REAT MEN T T O MAT C H BROA DBEA C H L. A . P. ' GC H I GH WAY C ORRI DOR' REQUI REMEN T S (S EE B/B L. A . P. MA P 2.5)
7
15 14
4
GOL D C OAST H I GH WAY -
12
5
10. T EM PORARY REF U SE ST ORAGE 11. SER VI C E EN T RY
2.
PEGASU S D EVEL OPM EN T
12. L ARGE POT PL AN T S
3.
SAVAN N AH RESOR T
13. PU BL I C L AN EWAY
4.
VEH I C L E EN T RY/EXI T D RI VEWAY
14. D OSA ( D ESI GN AT ED OU T D OOR SM OKI N G AREA)
5.
PED EST RI AN EN T RY
15. T RAN SPAREN T AWN I N G
6.
POSSI BL E F U T U RE PED EST RI AN L I N K
16. OU T D OOR D I N I N G
7.
BI N EN C L OSU RE
8.
C ARPARK BASEM EN T RAM P
9.
RAM P F EAT U RE POR TAL WI T H
17. OU T D OOR TAVERN L OU N GE 18. SU RF PARAD E -
T REAT MEN T T O MAT C H BROA DBEA C H L. A . P. ' S EC ON DA RY S T REET S C A P E C ORRI DOR' REQUI REMEN T S (S EE B/B L. A . P. MA P 2 . 5 )
12
12 17
21
16
24 1 18 12 5
12
The exceptional residential development site for the proposed ‘Beach Hotel Redevelopment’ project deserves an outstanding architectural response to take advantage of the prime Broadbeach highway location. Located on a dual access site between Surf Parade and Gold Coast
16
4
8 23
9
10
15 13
13
BEACH HOTEL
3
13
GROUND FLOOR PLAN 1.
C L I M BER
GOL D C OAST H I GH WAY T REAT MEN T T O MAT C H BROA DBEA C H
L E G E NL. AD. P. ' GC H I GH WAY C ORRI DOR'
A-DA-1.01 / location plan
4 . 2 G R O U N D FLO O R PLA N - P RO P O S E D
R E D E V E L O P M E N T
7
14
14
15
12 12
5
10. T EM PORARY REF U SE ST ORAGE
1.
REQUI REMEN T S (S EE B/B L. A . P. MA P 11. SER VI C E EN T RY 2 .A5P ) POOL 20M L 9. POOL PLANT ROOM
2.
12. L ARGE POT PL AN T S P2. O O LPEGASU B E N C H S D EVEL OPM EN T1 0 . A / C P L A N T A R E A
3.
P3. O O LSAVAN T E R R ANCAH E RESOR T
13. I CCLI LAN 11. RES I DEPU N TBL S FA I T IEWAY ES
4.
WA WAYI C L E EN T RY/EXI T 4. L KVEH
1 2 . UN 14. I T D OSA ( D ESI GN AT ED OU T D OOR
5.
ZE N G A R DE N
1 3 . L O UN G E T E R R A C E
6.
C O V E R E D L O UN G E & DI N I N G TERRACE
D RI VEWAY
5.
PED EST RI AN EN T RY
7.
POSSI BL E F U T U RE B B Q PED EST RI AN L I N K
8.
L7. AW NBI N EN C L OSU RE
6.
14
4 12
16
LEGEND
2 6
54
14
11
Permissable Change Application // May 2014
SM OKI N G AREA)
15. T RAN SPAREN T AWN I N G
1 4 . UN I T C O UR T YA R D
16. OU T D OOR D I N I N G
15. LIFT LOBBY
17. OU T D OOR TAVERN L OU N GE
16. LIFT
1 7 . 1 : 218. 0 R ASU M PRF PARAD E - T REAT MEN T T O
8.
C ARPARK BASEM EN T RAM P
9.
RAM P F EAT U RE POR TAL WI T H
MAT C H BROA DBEA C H L. A . P. ' S EC ON DA RY S T REET S C A P E C ORRI DOR' REQUI REMEN T S (S EE B/B L. A . P. MA P 2 . 5 )
12 10
12
4
16
10
2
12
17
14
21 16
16
1
15 8
24 10
1
16
2 3
3
18
12 5
4
BEACH HOTEL
11
5 13
12
4
ELEVATION C
13
8
16
8
17
23 9
14
6
16
9
10
7
11 15
4
13
LEVEL 2 . PODIUM 13
13
3
20
Permissable Change Application // May 2014 54
BEACH HOTEL
R E D E V E L O P M E N T
A-DA-1.01 / location plan
4 . 2 G R O U N D FLO O R PLA N - P RO P O S E D
4.3 LEVEL 2 PODIUM -
PROPOSED
BEACH HOTEL
55
Permissable R E D Change E V E LApplication O P M E N// TMay 2014
WI NDOW F R AME EVER SHI ELD JAMAI CAN CHOCOLATE MATT (E3 5 TM)
WI NDOW F R AME EVER SHI ELD JAMAI CAN CHOCOLATE MATT (E3 5 TM)
GR EY TI NT GLASS
GR EY TI NT GLASS
DU LU X VI VI D WHI TE TO EXPR ESSED COLU MN
DU LU X VI VI D WHI TE TO EXPR ESSED COLU MN
F R AMED B ALU STR ADE GLASS
F R AMED B ALU STR ADE GLASS
6
2
1
3
10
5
9 4
7 6
1
living ro o m
2
kitc h e n
8
7
ma ste r b e d ro o m
8
e nsu ite
d ining ro o m d ro o m 2 BA LU STR ADE F RbstueAMI NG EQU I V. TO B ALU STR ADE F R AMI NG EQU I V. TO b a th ro o m dy la u nd ry EVER SHI ELD EVER SHI ELD b a lc o ny JAMAI CAN CHOCOLATE JAMAI CAN CHOCOLATE HOUSE TYPE D MATT (E3 5 TM) MATT (E3 5 TM) 3
9
4
10
5 6
085170
-
september
2009
A-dA-2.26
/
typical
unit
plan
-
type
2
Beach hotel
83
r e d e v e l o p m e n t
6
2
1
3
10
5
9 4
7 6
B ATTEN SCR EEN EVER SHI ELD AMB ER GOLD ma ste r b eMATT d ro o m (E4 2 TM)
1
living ro o m
2
kitc h e n
8
e nsu ite
3
d ining ro o m
9
b e d ro o m 2
4
b a th ro o m
10
stu d y
5
la u nd ry
6
b a lc o ny
8
B ATTEN SCR EEN EVER SHI ELD AMB ER GOLD MATT (E4 2 TM)
7
HOUSE TYPE D
085170
-
september
2009
A-dA-2.26
/
typical
unit
plan
-
type
2
Beach hotel
r e d e v e l o p m e n t
83 ELEVATION A
Permissable Change Application // May Permissable 2014 Change Application // May 2014
EXTERNAL FINISHES / 3D MASSING STUDY HOUSE ELEVATION
E DA E CV NHE GL OST H POUMDY TE EN 2 . 2 E X TE RN AL F I N I SH E2.2 S /E XT 3DEM RN ASSI AL N F IGN ST I SHUEDY S / 3DB RM E ASSI
L
T
Riversdale houses Multiresidencial proyect. Houses in Melbourne, australia
Studio Ewert&Leaf, Melbourne, Australia Coordinator Mr. Will Leaf and Mr. Toby Ewert Submission May of 2016 Length 3 weeks Client Hawthorn This project could be considered like the normal architectural style of this firm. First, an old house is demolished to allow to the neighbourhood grow following the City Council Masterplan. After a medium standing building is designed focusing in low sale prices and with a great design. Basement, ground level and three storys complete a construction with thirty dwellings. A gargen to get some privacy go around the property through the boundary. The facade is compounded by briks, concrete, timber, louvres and standings seam (last floor), they create very interesting geometric figures through very simple elements.
22
TITLE BOUNDARY 600
NEW BOUNDARY FENCE 1.8m ABOVE NGL
NO MORE THAN 25 PER CENT TRANSPARENCY
DRAWING ISSUE
DATE:
JULY 2016
PROJECT NO:
PRELIMINARY
DRAWING No
REV
TP-023A
TOREY BRICK UNITS VANISED IRON CHED ROOF No 19
1:200 A1
DRAWN:
NEW BOUNDARY FENCE 1.8m ABOVE NGL
SCALE: PAGE:
SUBJECT SITE - 21 RIVERSDALE ROAD
H/W
RID
GE
.84 34
H/W
31.68 SPOUT
VERANDAH
SECTION
SINGLE STOREY
DOUBLE STOREY RENDERED + BRICK DWELLING SLATE PITCHED ROOF No 23
ROAD
32.23
.74 34
H/W
SPOUT
WIDEN THE EXISTING CROSSOVER TO 21 RIVERSDALE ROAD
H/W
SECTION
RIVERSDALE
H/W 2
DOUBLE STOREY
270°00' 23.47
ROAD R I V E R S D AR LI VE E RRSODAADL E
33
.49
CONCRETE
H/W
1860
2200
ROAD
KITCHEN
ROAD
WIDEN THE EXISTING CROSSOVER TO 21 RIVERSDALE ROAD
MASTER BEDROOM
1650
RIVERSDALE
270°00' 23.47
270°00' 23.47
RIVERSDALE
KITCHEN
1509
1592
ROAD
270°00' 23.47270°00' 23.47 RIVERSDALE WIDEN THE EXISTING CROSSOVER TO 21 RIVERSDALE ROAD
BATH P. L'DRY
STUDY LIVING
ENSUITE
MASTER BEDROOM
BEDROOM 02 MASTER BEDROOM
REV
2200
JULY 2016
BALCONY AREA 8m²
1.7m HIGH ANGLED
1.7m HIGH SCREEN
1.7m HIGH ANGLED ALUMINIUM LOUVRE
1921
1798
TOWN PLANNING DRAWINGS
RIVERSDALE RD DEVELOPMENT
BALCONY AREA 8m²
1.7m HIGH ANGLED ALUMINIUM LOUVRE
1.7m HIGH SCREEN
TP-023A
HIGHLIGHT
1890
PROJECT NO:
DRAWING No ALUMINIUM LOUVREREV
1.7m HIGH SCREEN
3225
DATE:
BALCONY AREA 8m²
1859
WIDEN THE EXISTING CROSSOVER TO 21 RIVERSDALE ROAD
WIDEN THE EXISTING CROSSOVER TO 21 RIVERSDALE ROAD
WIDEN THE EXISTING CROSSOVER TO 21 RIVERSDALE ROAD
W.I.R.
LIVING
TP-023A
DRAWING TITLE
MATERIALS IN DIFFERENT LOCATIONS TO DIFFERENTIATE THE BREAKUP OF THE FACADE
W.I.R.
BATH
1.03
TWO BEDROOM AREA 71.5m²
NEW BOUNDARY FENCE 1.8m ABOVE NGL
DESIGN RESPONSE 4 SCALE: 1:200 PAGE:
DATE:
JULY 2016
PROJECT NO:
A1
DRAWN: DRAWING ISSUE
PRELIMINARY
NEW BOUNDARY FENCE 1.8m ABOVE NGL
DRAWING No
REV
TP-023A
23 AD
TOWN PLANNING DRAWINGS
P.
ENSUITE DINING
JULY 2016
DRAWING No
NEW BOUNDARY FENCE 1.8m ABOVE NGL
DESIGN RESPONSE 4
7
1700
21 RIVERSDALE RD HAWTHORN VICTORIA 3122
25
75
FRAMING ELEMENTS TO PROVIDE FIXED TIMBER BATTEN FACADE RELIEF SCREEN.
BATH
PROJECT NO: NEW BOUNDARY FENCE 1.8m ABOVE NGL
A1
PRELIMINARY
21 RIVERSDALE RD HAWTHORN VICTORIA 3122
ENSUITE
6
PROJECT
FFL 30.367
SERVICES
BEDROOM 02
DATE:
SCALE: 1:200
1.7m HIGH ANGLED ALUMINIUM LOUVRE DRAWING ISSUE
CORRIDOR
53 52 51 50
TOWN PLANNING DRAWINGS
PRELIMINARY DRAWN:
2850
1.7m HIGH SCREEN
270°00' 23.47
4800
1.7m HIGH SCREEN
NEW BOUNDARY FENCE 1.8m ABOVE NGL
270°00' 23.47
89°53' 23.47 WIDEN THE EXISTING CROSSOVER TO 21 RIVERSDALE ROAD
ROAD
2870
REV
TP-023A
PRELIMINARY
1700
1000
PROJECT
H/W 2
ROAD WIDEN THE EXISTING CROSSOVER TO 21 RIVERSDALE ROAD
32.04 ROOF
BUILDING
RENDERED
WIDEN THE EXISTING CROSSOVER TO 21 RIVERSDALE ROAD
RIVERSDALE
32.04
PARA
WIDEN THE EXISTING CROSSOVER TO 21 RIVERSDALE ROAD
NEW BOUNDARY FENCE 1.8m ABOVE NGL
25
75 1700
NEW BOUNDARY FENCE 1.8m ABOVE NGL
89°53' 23.47
R I V E89°53' R S D A L 23.47 E ROAD
DRAWING No
CENTRAL VOID TO DENOTE ENTRY
MINOR ENCROACHMENT INTO B17. 3 STOREY PODIUM PROVIDES ROBUST STREETSCAPE PRESENCE AS OPPOSED TO "WEDDING CAKE".
DECK
TIMBER
WIDEN THE EXISTING CROSSOVER TO 21 RIVERSDALE ROAD
ROAD
270°00' 23.47
GE
270°00' 23.47270°00' 23.47 RIVERSDALE
270°00' 23.47 GRASS
NEW BOUNDARY FENCE 1.8m ABOVE NGL NEW BOUNDARY FENCE 1.8m ABOVE NGL NEW BOUNDARY FENCE 1.8m ABOVE NGL
89°53' 23.4789°53' 23.47
ROAD RIVERSDALE
270°00' 23.47
A1
40 39 38 37
DINING
TWO BEDROOM AREA 71.5m²
P.
KITCHEN L'DRY DOWN
STUDY
BEDROOM 02
DESIGN RESPONSE 4
PAGE:
21 RIVERSDALE RD HAWTHORN VICTORIA 3122
REV
TP-023A
SCALE: 1:200
DRAWN: DRAWING TITLE DRAWING ISSUE
SCALE 1:200
WINDOW
1700
2700 432
BACKYARD
NEW BOUNDARY FENCE 1.8m ABOVE NGL
89°53' 23.47
ROAD RIVERSDALE
89°53' 23.47
270°00' 23.47
WIDEN THE EXISTING CROSSOVER TO 21 RIVERSDALE ROAD
1700
89°53' 23.47
2780
NEW BOUNDARY FENCE 1.8m ABOVE NGL
75
25 25
75
25
75
1700 NEW BOUNDARY FENCE 1.8m ABOVE NGL
2700 450
89°53' 23.47 89°53' 23.47
RID 25
75
1700
1000
1700 1700
1000
432
2700 432
1700 432
25
75
17001700 1700
NEW BOUNDARY FENCE 1.8m ABOVE NGL
NEW BOUNDARY FENCE 1.8m ABOVE NGL
89°53' 23.47
1700 1700
89°53' 23.47
600 2700
1700 1700
1000
1700
WIDEN THE EXISTING CROSSOVER TO 21 RIVERSDALE ROAD
DRAWING ISSUE
-- FIRST FLOOR PLAN PROJECT NO: --
DINING
75 75
75
25 25
75
1700
1700
NEW BOUNDARY FENCE 1.8m ABOVE NGL
75 1700
1000
1700 1700
1700
1700
1700
NEW BOUNDARY FENCE 1.8m ABOVE NGL
700
A1
DRAWN:
NEW BOUNDARY FENCE 1.8m ABOVE NGL
RIVERSDALE RD DEVELOPMENT
FCL 33.067 LEVEL
HIGHLIGHT
JULY 2016
R I V E R S D AR LI VE E RRSODAADL E
2700 432 600 27002700 432 432 27002700 432 432 27002700 450 432 27802700 2780
89°53' 23.47
27002700 432 432 27002700 432 432 27002700 450 432 2780 2700
450 2780
25
75
NEW BOUNDARY FENCE 1.8m ABOVE NGL
600 2700 432 600
2700
432
2700 432
1700 2700
450 2780
2700 432 2700 450
25
21 RIVERSDALE RD HAWTHORN VICTORIA 3122
PAGE:
DATE:
DRAWING No
LIVING
LIFT
.0 28
600
432
2700 432
2700
2700
432
432
2700
2700 432
432
2700
2700
450
450
2780
2780 600
25
75
2700 432
1700
600 2700 432
1000
2700 432
1700 1700
25
DESCRIPTION
SCALE 1:200
1:200
1.04
STUDY TOWN PLANNING DRAWINGS
MASTER DESIGN BEDROOM RESPONSE 4
180°21' 60.63
1700
2700
DATE
--
SCALE:
W
600
TOWN PLANNING DRAWINGS DESIGN RESPONSE 4
1.05
DININGPROJECT NO: TWO BEDROOM AREA 74.5m²
DRAWING TITLE
PAGE:
RIVERSDALE RD DEVELOPMENT
DRAWING TITLE
-- SECOND FLOOR PLAN RIVERSDALE RD DEVELOPMENT
REV
4040
NEW BOUNDARY FENCE 1.8m ABOVE NGL
NEW BOUNDARY FENCE 1.8m ABOVE NGL
H/W
2700
APPROXIMATE ONLY SETBACK BASED ON GOOGLE MAPS
PROJECT 21 RIVERSDALE RD BATH HAWTHORN VICTORIA 3122
1900
W
432
PROJECT
PRELIMINARY BEDROOM 02 RIVERSDALE RD DEVELOPMENT
W.I.R.
H/W
450
25
MINOR INCURSIONS INTO B17 ARE ACCEPTABLE TO AVOID 'WEDDING CAKE' STREET PRESENTATION
2040
DRAWING ISSUE
PROJECT
BEDROOM 03
DESCRIPTION
A1
DRAWN:
NEW BOUNDARY FENCE 1.8m ABOVE NGL
DRAWING TITLE
+6200 SECOND LEVEL SFL 33.499
BALCONY AREA 20.3m²
PAGE:
BATH
JULY 2016
DATE:
ARTICULATED FACADE TREATEMENT
H/W
2780
SCALE 1:200
1:200
P.
BATH
DINING
UP
RISER
(ALL WINDOWS ARE 1st & 2nd STOREY))
89°53' 23.47
DATE
SECOND FLOOR PLAN
--
SCALE:
KITCHEN
BATH
DESIGN RESPONSE 4ENSUITE
W
REV
--
NEW BOUNDARY FENCE 1.8m ABOVE NGL
RIVERSDALE RDLIVING DEVELOPMENT
ARTICULATED FACADE TREATEMENT
21 RIVERSDALE RD APPROXIMATE ONLYHAWTHORN SETBACK BASED ON GOOGLE MAPS VICTORIA 3122
TOWN PLANNING DRAWINGS P.
DRAWING TITLE
H/W
0°21' 60.58
3.
DO NOT SCALE, USE FIGURED DIMENSIONS ONLY. ALL DIMENSIONS ARE TO BE CONFIRMED ON SITE PRIOR TO COMMENCEMENT OR FABRICATION OF ANY WORK. ANY DIMENSIONAL DISCREPANCY TO BE BROUGHT TO THE ATTENTION OF EWERT LEAF IN WRITING. ALL WORK IS TO BE CARRIED OUT IN ACCORDANCE WITH THE CURRENT BUILDING CODE OF AUSTRALIA AND ANY RELEVANT AUSTRALIAN STANDARD, AND ALSO ANY LOCAL AUTHORITY BY-LAW'S.
DESCRIPTION ISSUE FOR TOWN PLANNING
1:20
NEW BOUNDARY FENCE 1.8m ABOVE NGL
P.
1.09
TWO BEDROOM AREA 66.9m² 41 42 43 44 45 46 47 48 49
P.
H/W
ISSUE FOR TOWN1:20 PLANNING
THREE BEDROOM AREA 102.8m²
LIVING
ENSUITE
DINING
ENSUITE
BEDROOM 02
BATH L.
H/W
NEW BOUNDARY FENCE 1.8m ABOVE NGL
1.06
MASTER NEW BOUNDARY FENCE 1.8m ABOVE NGL BEDROOM
ENSUITE
1.08 TWO BEDROOM AREA 69.1m² W.I.R
H/W
TYPICAL SCREENING DETAILSDESCRIPTION DESCRIPTION1700mm WINDOWREV DATE
HEAVILY ARCHITECTURAL FACADE
34.38 SPOUT
2.
DATE 20.07.16
TYPICAL 1700mm TERRACE SCREENING DETAILS APPROXIMATE ONLY SETBACK BASED ON GOOGLE MAPS
L'DRY C.
ENSUITE
W.I.R
MASTER BEDROOM MASTER BEDROOM
BEDROOM 02
W
DATE 20.07.16
SCALE 1:200
W.I.R
NEW BOUNDARY FENCE 1.8m ABOVE NGL
MASTER BEDROOM
W
REV A
SECOND FLOOR PLAN
--
BATH
MASTER BEDROOM
H/W
NEW BOUNDARY FENCE 1.8m ABOVE NGL
--
L.
HIGHLIGHT
BALCONY AREA 8m²
H/W
ARTICULATED FACADE TREATEMENT
1.07
1.7m HIGH SCREEN
1.7m HIGH ANGLED ALUMINIUM LOUVRE
BALCONY AREA 8m²
(ALL WINDOWS ARE 1st & 2nd STOREY))
PROJECT
0°21' 60.58
FCL 36.199 LEVEL
1.
REV A
NEW BOUNDARY FENCE 1.8m ABOVE NGL
BEDROOM 02
MATERIALS IN DIFFERENT C. TOC.DIFFERENTIATE HEAVILYLOCATIONS ARCHITECTURAL THE BREAKUP FACADEOF THE FACADE
1.7m HIGH SCREEN
1.7m HIGH ANGLED ALUMINIUM LOUVRE
H/W
180°21' 60.63
© THIS DOCUMENT / DRAWING IS PROTECTED BY FEDERAL COPYRIGHT LAW COPYING IN ANY SHAPE OR FORM, IN WHOLE OR IN PART, WITHOUT THE WRITTEN AUTHORISATION OF EWERT LEAF Pty. Ltd. IS STRICTLY PROHIBITED.
NEW BOUNDARY FENCE 1.8m ABOVE NGL
ARTICULATED FACADE TREATEMENT
NEW BOUNDARY FENCE 1.8m ABOVE NGL
34.14 SPOUT
APPROXIMATE ONLY SETBACK BASED ON GOOGLE MAPS
BEDROOM 03
THREE BEDROOM AREA 116.8m² P.
NEW BOUNDARY FENCE 1.8m ABOVE NGL
ARTICULATED FACADE TREATEMENT
HEAVILY ARCHITECTURAL FACADE
NEW BOUNDARY FENCE 1.8m ABOVE NGL
LIVING
KITCHEN
0°21' 60.58
+12600 ROOF LEVEL RL 39.931
NEW BOUNDARY FENCE 1.8m ABOVE NGL
NEW BOUNDARY FENCE 1.8m ABOVE NGL
HEAVILY ARCHITECTURAL FACADE
MATERIALS IN DIFFERENT LOCATIONS TO DIFFERENTIATE BALCONY THE BREAKUP OF THE FACADE AREA 12.6m²
DESCRIPTION
AUSTRALIAN STANDARD, AND ALSO ANY LOCAL AUTHORITY BY-LAW'S. 9000
ENVELOPE STUDY
SCALE 1:200
THE BREAKUP OF THE FACADE
NEW BOUNDARY FENCE 1.8m ABOVE NGL
MATERIALS IN DIFFERENT LAW COPYING IN ANY SHAPE OR FORM, IN WHOLE OR IN AUSTRALIAN STANDARD, AND ALSO ANYCOPYRIGHT LOCAL AUTHORITY LOCATIONS TO DIFFERENTIATE PART, WITHOUT THE WRITTEN AUTHORISATION OF EWERT LEAF Pty. BY-LAW'S.
--
SECOND FLOOR PLAN
--
HEAVILY ARCHITECTURAL FACADE
1900
DINING
LOCATIONS TO DIFFERENTIATE ARTICULATED FACADE TREATEMENT
APPROXIMATE ONLY SETBACK BASED ON GOOGLE MAPS
--
EXISTING BUILDINGS
STANDING SEAM
0°21' 60.58
DATE
2075
0°21' 60.58
1:20
TIMBER
EXISTING BUILDING TO BE DEMOLISHED
LOUVERS
0°21' 60.58
REV
THE 141027241 BREAKUP OF THE FACADE EWERT LEAF PTY. LTD. A.C.N. No. Ltd. IS STRICTLY PROHIBITED. LEVEL 1, 87-91 PALMERSTON CRESENT 1. DO NOT SCALE, USE FIGURED DIMENSIONS ONLY. ALL DIMENSIONS ARE TO BE CONFIRMED ON SITE PRIOR TO SOUTH MELBOURNE 3205 VICTORIA, AUSTRALIA COMMENCEMENT OR FABRICATION OF ANY WORK. REV DATE DESCRIPTION T: +61(3) 9686 2100 © THIS / DRAWING IS PROTECTED BY FEDERAL 2. ANYDOCUMENT DIMENSIONAL DISCREPANCY TO BE BROUGHT TO THE A 20.07.16 ISSUE FOR TOWN PLANNING COPYRIGHT LAW COPYING ANY OR FORM, IN WHOLE OR INPLAN ATTENTION OF EWERTINLEAF WRITING. --INSHAPE SECOND FLOOR F: +61(3) 9686 2700 HEAVILY ARCHITECTURAL PART, WITHOUT WRITTEN AUTHORISATION OF EWERT WITH LEAF THE Pty. 3. ALL WORKTHE IS TO BE CARRIED IN ACCORDANCE FACADE - - OUTSCALE 1:200 EWERT LEAF PTY. LTD. A.C.N. No. 141027241 Ltd. ISCURRENT STRICTLYBUILDING PROHIBITED. E: architects@ewertleaf.com.au CODE OF AUSTRALIA AND ANY RELEVANT AUSTRALIAN STANDARD, AND ALSO ANY LOCAL AUTHORITY LEVEL 1, 87-91 PALMERSTON CRESENT 1. DO NOT SCALE, USE FIGURED DIMENSIONS ONLY. ALL BY-LAW'S. DESCRIPTION REV VICTORIA, DATE SOUTH MELBOURNE 3205 AUSTRALIADESCRIPTIONDIMENSIONS ARE TO BE CONFIRMED ON SITE PRIOR TO COMMENCEMENT OR FABRICATION OF ANY WORK. ISSUE FOR TOWN PLANNING T: +61(3) 9686 2100 2. ANY DIMENSIONAL DISCREPANCY TO BE BROUGHT TO THE ATTENTION OF EWERT LEAF IN WRITING. CLAUSE 55.04-1 STANDARD B17 F: +61(3) 9686 2700 ARTICULATED FACADE 3. ALLTREATEMENT WORK IS TO BE CARRIED OUT IN ACCORDANCE WITH THE E: architects@ewertleaf.com.au CURRENT BUILDING CODE OF AUSTRALIA AND ANY RELEVANT
FCL 39.331 EWERT LEAF PTY. LTD. A.C.N. No. 141027241 LEVEL LEVEL 1, 87-91 PALMERSTON CRESENT SOUTH MELBOURNE 3205 VICTORIA, AUSTRALIA T:--+61(3) 9686 2100 SECOND FLOOR PLAN +9300 THIRD LEVEL DRAMATIC STEPPING SETBACKS CREATE SFL 36.631 SCALE 1:200 F: - - +61(3) 9686 2700 'WEDDING CAKE' FACADE TO STREET E: architects@ewertleaf.com.au 01
DESCRIPTION ISSUE FOR TOWN PLANNING
MATERIALS IN DIFFERENT LOCATIONS TO DIFFERENTIATE NEW BOUNDARY FENCE 1.8mTHE ABOVEBREAKUP NGL OF THE FACADE
FIXED TIMBER BATTEN SCREEN. NO MORE THAN 25 PER CENT MATERIALS IN DIFFERENT TRANSPARENCY
1:20
NEW BOUNDARY FENCE 1.8m ABOVE NGL
0°21' 60.58
ATTENTION OF EWERT LEAF IN WRITING. ALL WORK IS TO BE CARRIED OUT IN ACCORDANCE WITH THE CURRENT BUILDING CODE OF AUSTRALIA AND ANY RELEVANT AUSTRALIAN STANDARD, AND ALSO ANY LOCAL AUTHORITY BY-LAW'S.
DESCRIPTION
MATERIALS IN DIFFERENT LOCATIONS TO DIFFERENTIATE THE BREAKUP OF THE FACADE
APPROXIMATE ONLY SETBACK BASED ON GOOGLE MAPS
APPROXIMATE ONLY SETBACK BASED ON GOOGLE MAPS
NEW BOUNDARY FENCE 1.8m ABOVE NGL
0°21' 60.58
DATE 20.07.16
05 SECTION E
DATE
0°21' 60.58
SCALE 1:100
180°21' 60.63
REV A
1:20
NEW BOUNDARY FENCE 1.8m ABOVE NGL
180°21' 60.63
© THIS DOCUMENT / DRAWING IS PROTECTED BY FEDERAL COPYRIGHT LAW COPYING IN ANY SHAPE OR FORM, IN WHOLE OR IN PART, WITHOUT THE WRITTEN AUTHORISATION OF EWERT LEAF Pty. Ltd. IS STRICTLY PROHIBITED.
N CRESENT 1. DO NOT SCALE, USE FIGURED DIMENSIONS ONLY. ALL -SCALE 1:100 DIMENSIONS ARE TO BE CONFIRMED ON SITE PRIOR TO ICTORIA, AUSTRALIA COMMENCEMENT OR FABRICATION OF ANY WORK. TYPICAL 1700mm WINDOW SCREENING DETAILS 2. ANY DIMENSIONAL DISCREPANCY TO BE BROUGHT TO THE
REV
DATE 20.07.16
LOUVERS
PROPOSED BUILDING
NEW BOUNDARY FENCE 1.8m ABOVE NGL
NEW BOUNDARY FENCE 1.8m ABOVE NGL
MATERIALS IN DIFFERENT LOCATIONS TO DIFFERENTIATE THE BREAKUP OF THE FACADE
NEW BOUNDARY FENCE 1.8m ABOVE NGL
TYPICAL 1700mm WINDOW SCREENING DETAILS
NEW BOUNDARY FENCE 1.8m ABOVE NGL
CONCRETE RENDER
-SCALE - 1:200 SCALE 1:200
APPROXIMATE ONLY SETBACK BASED ON GOOGLE MAPS
TYPICAL 1700mm WINDOW SCREENING DETAILS
TIMBER
CONCRETE
180°21' 60.63
--
--
TYPICAL 1700mm WINDOW SCREENING DETAILS REV A
NEW BOUNDARY FENCE 1.8m ABOVE NGL
BRICK
BALCONIES
180°21' 60.63
05 SECTION E
SCREEN. NO MORE THAN 25 PER CENT TRANSPARENCY
BRICK --FIRSTFIRST FLOORFLOOR PLAN PLAN
NEW BOUNDARY FENCE 1.8m ABOVE NGL
NEW BOUNDARY FENCE 1.8m ABOVE NGL
NEW BOUNDARY FENCE 1.8m ABOVE NGL
180°21' 60.63
A.C.N. No. 141027241
COPYRIGHT LAW COPYING IN ANY SHAPE OR FORM, IN WHOLE OR IN PART, WITHOUT THE WRITTEN AUTHORISATION OF EWERT LEAF Pty. Ltd. IS STRICTLY PROHIBITED.
NEW BOUNDARY FENCE 1.8m ABOVE NGL
1. SCREENING DO NOT SCALE, USEDETAILS FIGURED DIMENSIONS ONLY. ALL TYPICAL 1700mm WINDOW SCALE 1:100MELBOURNE 3205 VICTORIA, AUSTRALIA DIMENSIONS ARE TO BE CONFIRMED ON SITE PRIOR TO SOUTH 1:20 COMMENCEMENT OR FABRICATION OF ANY WORK. 04BE BROUGHT SECTION D T: +61(3) 9686 2100 2. ANY DIMENSIONAL DISCREPANCY TO TO THE ATTENTION OF EWERT LEAF IN WRITING. F: +61(3) 9686 2700 -SCALE 1:100 3. ALL WORK IS TO BE CARRIED OUT IN ACCORDANCE WITH THE THIS DOCUMENT E: architects@ewertleaf.com.au CURRENT BUILDING CODE OF AUSTRALIA©AND ANY RELEVANT/ DRAWING IS PROTECTED BY FEDERAL
LEVEL SFL 24.005
3.
GROUND LEVEL SFL 27.235
SCALE 1:200
--
0°21' 60.58
FCL 26.785 LEVEL
1:20
LEAF PTY. LTD.
NEW BOUNDARY FENCE 1.8m ABOVE NGL
FIXED TIMBER BATTEN SCREEN. NO MORE THAN 25 PER CENT TRANSPARENCY FIXED TIMBER BATTEN
NEW BOUNDARY FENCE 1.8m ABOVE NGL
LEVEL SFL 24.005
1, 87-91 05 LEVEL SECTION E PALMERSTON CRESENT --
SCALE 1:200
WINDOW
WINDOW
FIXED TIMBER BATTEN SCREEN. NO MORE THAN 25 PER CENT TRANSPARENCY
FIRST LEVEL SFL 30.367
© THIS DOCUMENT / DRAWING IS PROTECTED BY FEDERAL
LEVEL SFL 24.005 EWERT
FIRST FLOOR PLAN
--
FCL 26.785 LEVEL
FCL 26.785 LEVEL
FIXED TIMBER BATTEN ±0 GROUND LEVEL SCREEN. NO MORE THAN 25 PER CENT SFL 27.235 TRANSPARENCY
--
NEW BOUNDARY FENCE 1.8m ABOVE NGL
SFL 27.235 LEVEL SFL 24.005
SCALE 1:100
FCL 33.067 LEVEL
--
WINDOW FIXED TIMBER BATTEN SCREEN. NO MORE THAN 25 PER CENT TRANSPARENCY
180°21' 60.63
SCALE 1:200
SECOND LEVEL SFL 33.499
FIRST FLOOR PLAN
VERANDAH
FIRST FLOOR PLAN
--
FCL 36.199 LEVEL
NEW BOUNDARY FENCE 1.8m ABOVE NGL
--
LEGEND
180°21' 60.63
--
SECTION E
180°21' 60.63
FCL 29.935 LEVEL
--
APPROXIMATE ONLY SETBACK BASEDLEVEL ON GOOGLE MAPS ±0 GROUND
WINDOW
05
FCL 29.935 LEVEL FCL 26.785 LEVEL
NEW BOUNDARY FENCE 1.8m ABOVE NGL
APPROXIMATE ONLY SETBACK BASED ON GOOGLE MAPS
THIRD LEVEL SFL 36.631
FIXED TIMBER BATTEN SCREEN. FCL 29.935 NO MORE THAN 25 PER CENT TRANSPARENCY LEVEL
APPROXIMATE ONLY SETBACK BASED ON GOOGLE MAPS
NEW BOUNDARY FENCE 1.8m ABOVE NGL
NEW BOUNDARY FENCE 1.8m ABOVE NGL
ARTICULATED FACADE TREATEMENT
TITLE BOUNDARY
. No. 141027241
+3100 FIRST LEVEL SFL 30.367
+3100 FIRST LEVEL SFL 30.367 ±0 GROUND LEVEL SFL 27.235
SCALE 1:200
0°21' 60.58
LEVEL SFL 24.005
FCL 33.067 LEVEL FCL 29.935 LEVEL
FIRST FLOOR PLAN
--
NEW BOUNDARY FENCE 1.8m ABOVE NGL
0°21' 60.58
FCL 33.067 LEVEL
APPROXIMATE ONLY SETBACK BASED ON GOOGLE MAPS
--
APPROXIMATE ONLY SETBACK BASED ON GOOGLE MAPS
WINDOW
ARTICULATED FACADE TREATEMENT
APPROXIMATE ONLY SETBACK BASED ON GOOGLE MAPS
+6200 SECOND LEVEL SFL 33.499 +3100 FIRST LEVEL SFL 30.367
ARTICULATED FACADE TREATEMENT
NEW BOUNDARY FENCE 1.8m ABOVE NGL
H/W
+6200 SECOND LEVEL FCL 26.785 SFL 33.499 LEVEL
WINDOW
NEW BOUNDARY FENCE 1.8m ABOVE NGL
H/W
±0 GROUND LEVEL SFL 27.235
+9300 THIRD LEVEL SFL 36.631 +6200 SECOND LEVEL SFL 33.499 APPROXIMATE ONLY SETBACK BASED ON GOOGLE MAPS FCL 36.199 LEVEL FCL 33.067 LEVEL
ARTICULATED FACADE TREATEMENT
32.03 SPOUT
FCL 29.935 LEVEL
LEVEL
FCL 39.331 LEVEL FCL 36.199 LEVEL
ARTICULATED FACADE TREATEMENT NEW BOUNDARY FENCE 1.8m ABOVE NGL
APPROXIMATE ONLY SETBACK BASED ON GOOGLE MAPS
H/W
+3100 FIRST LEVEL
+9300 THIRD LEVEL SFL 30.367 SFL 36.631
CLAUSE 55.04-1 STANDARD B17
CLAUSE 55.04-1 STANDARD B17
9000 IN DIFFERENT MATERIALS LOCATIONS TO DIFFERENTIATE THE BREAKUP OF THE FACADE
MATERIALS IN DIFFERENT LOCATIONS TO DIFFERENTIATE THE BREAKUP OF THE FACADE ARTICULATED FACADE TREATEMENT
TYPICAL 1700mm TERRACE SCREENING DETAILS 1:20
NEW BOUNDARY FENCE 1.8m ABOVE NGL
H/W
FCL 33.067 LEVEL
9000
EXISTING BUILDINGS
1:20
CLAUSE 55.04-1 STANDARD B17
CLAUSE 55.04-1 STANDARD B17
EXISTING BUILDING TO BE DEMOLISHED
APPROXIMATE ONLY SETBACK BASED ON GOOGLE MAPS
FCL 39.331 LEVEL
TITLE BOUNDARY
9000
+6200 SECOND LEVEL SFL 33.499
+12600 ROOF LEVEL RL 39.931 +9300 THIRD LEVEL SFL 36.631
STANDING SEAM
MATERIALS IN DIFFERENTTHE BREAKUP OF THE FACADE LOCATIONS TO DIFFERENTIATE THE BREAKUP OF THE FACADE
H/W
TITLE BOUNDARY
TITLE BOUNDARY
FCL 36.199 LEVEL
FCL 39.331 LEVEL
9000
ROOF LEVEL RL 39.931
BALCONIES PROPOSED BUILDING
LOUVERS
CLAUSE 55.04-1 STANDARD B17 SCALE 1:100
APPROXIMATE ONLY SETBACK BASED ON GOOGLE MAPS
1:20
MATERIALS IN DIFFERENT LOCATIONS TO DIFFERENTIATE
NEW BOUNDARY FENCE 1.8m ABOVE NGL
H/W
TIMBER
NEW BOUNDARY FENCE 1.8m ABOVE NGL
TIMBER
MATERIALS IN DIFFERENT 14.5m ABOVE NATURAL GROUND LEVEL (IN TYPICAL 1700mm TERRACE SCREENING DETAILS LOCATIONS TO DIFFERENTIATE ACCORDANCE WITH MAXIMUM BUILDING 1:20THE BREAKUP OF THE FACADE HEIGHT OR RGZ SCHEDULE 1 TYPICAL 1700mm TERRACE SCREENING DETAILS
9000 TYPICAL 1700mm TERRACE SCREENING DETAILS
FCL 39.331 LEVEL
TYPICAL 1700mm TERRACE SCREENING DETAILS
04 SECTION D SCALE 1:100
LOUVERS
EXISTING BUILDINGS
STANDING SEAM MATERIALS IN DIFFERENT LOCATIONS TO DIFFERENTIATE THE BREAKUP OF THE FACADE
GE
LEVEL SFL 24.005
CONCRETE
NEW BOUNDARY FENCE 1.8m ABOVE NGL
NEW BOUNDARY FENCE 1.8m ABOVE NGL
EXISTING BUILDING TO BE DEMOLISHED
RENDER
FIXED TIMBER BATTEN SCREEN. NO MORE THAN 25 PER CENT TRANSPARENCY
FCL 26.785 LEVEL
--
PROPOSED BUILDING
BRICK
GROUND LEVEL SFL 27.235 LEVEL SFL 24.005
EXISTING BUILDINGS
NEW BOUNDARY FENCE 1.8m ABOVE NGL
BALCONIES
LOUVERS
FIXED TIMBER BATTEN SCREEN. NO MORE THAN 25 PER CENT TRANSPARENCY
NEW BOUNDARY FENCE 1.8m ABOVE NGL
NEW BOUNDARY FENCE 1.8m ABOVE NGL
LEGEND
1:20
+12600 ROOF LEVEL RL 39.931
TIMBER
FCL 29.935 LEVEL FCL 26.785 LEVEL
NEW BOUNDARY FENCE 1.8m ABOVE NGL
+12600 ROOF LEVEL RL 39.931 CLAUSE 55.04-1 STANDARD B17
CONCRETE
TIMBER
NEW BOUNDARY FENCE 1.8m ABOVE NGL
FIXED TIMBER BATTEN SCREEN. NO MORE THAN 25 PER CENT TRANSPARENCY
FIRST LEVEL SFL 30.367 GROUND LEVEL SFL 27.235
--
FCL 39.331 LEVEL FIXED TIMBER BATTEN SCREEN. NO MORE THAN 25 PER CENT TRANSPARENCY +9300 THIRD LEVEL SFL 36.631
STANDING SEAM
BALCONIES
RID
BRICK
NEW BOUNDARY FENCE 1.8m ABOVE NGL
FIXED TIMBER BATTEN SCREEN. NO MORE THAN 25 PER CENT TRANSPARENCY
.86
SECOND LEVEL SFL 33.499 FIRST LEVEL SFL 30.367
04 SECTION D
+12600 ROOF LEVEL RL 39.931
LOUVERS
TIMBER BUILDINGS EXISTING
EXISTING BUILDING TO BE DEMOLISHED
RENDER LOUVERS
FIXED TIMBER BATTEN SCREEN. NO MORE THAN 25 PER CENT TRANSPARENCY
FCL 33.067 LEVEL FCL 29.935 LEVEL
TIMBER
CONCRETE
37
SCALE 1:100
BRICK
0°21' 60.58
CONCRETE
--
LOUVERS EXISTING BUILDING TO BE DEMOLISHED
STANDING SEAM
PROPOSED BUILDING
FCL 36.199 LEVEL FCL 33.067 LEVEL
TITLE BOUNDARY
BRICK
LEGEND
RENDER PROPOSED BUILDING
EXISTING BUILDINGS
STANDING SEAM
LOUVERS CONCRETE
SCALE 1:100
04 SECTION D
LOUVERS
TIMBER
CONCRETE
BRICK
THIRD LEVEL SFL 36.631 SECOND LEVEL SFL 33.499
SECTION D
--
EXISTING BUILDINGS
GE
04
BRICK
TITLE BOUNDARY
LEVEL SFL 24.005
BRICK TIMBER
STANDING SEAM
RID
LEVEL SFL 24.005
PROPOSED BUILDING
H/W
LEVEL
FCL 26.785 LEVEL
TIMBER
CONCRETE
CLAUSE 55.04-1 STANDARD B17
FCL 39.331 LEVEL FCL 36.199 LEVEL
0°21' 60.58
GROUND LEVEL SFL 27.235 FCL 26.785
LOUVERS
35.64 PARA
GROUND LEVEL SFL 27.235
BRICK
ROOF LEVEL RL 39.931 THIRD LEVEL SFL 36.631
180°21' 60.63
FCL 29.935
FCL 29.935 LEVEL LEVEL
BALCONIES
CONCRETE EXISTING BUILDING TO BE DEMOLISHED BALCONIES
180°21' 60.63
FIRST LEVEL FIRST LEVEL SFL 30.367 SFL 30.367
LOUVERS
180°21' 60.63
FCL 33.067 LEVEL
TIMBER
CONCRETE
EXISTING BUILDING TO BE DEMOLISHED
LEGENDRENDER
TIMBER
BRICK
PROPOSED BUILDING
CONCRETE
LOUVERS
180°21' 60.63
SECOND LEVEL SFL 33.499
BRICK
RENDER
180°21' 60.63
2700
TITLE BOUNDARY
FCL 36.199 LEVEL
SECOND LEVEL SFL 33.499
TIMBER BALCONIES
CONCRETE
14.5m ABOVE NATURAL GROUND LEVEL (IN ACCORDANCE WITH MAXIMUMB17 BUILDING CLAUSE 55.04-1 STANDARD HEIGHT OR RGZ SCHEDULE 1
FCL 39.331 LEVEL
THIRD LEVEL SFL 36.631
LOUVERS
LEGEND
BRICK
H/W 2
600
TITLE BOUNDARY
LEGEND 14.5m ABOVE NATURAL GROUND LEVEL (IN ACCORDANCE WITH MAXIMUM BUILDING HEIGHT OR RGZ SCHEDULE 1
CLAUSE 55.04-1 STANDARD B17 ROOF LEVEL RL 39.931
LEVEL
FCL 33.067 LEVEL
TYPICAL 1700mm TERRACE SCREENING FCL 36.199 DETAILS
ON
ROOF LEVEL RL 39.931
THIRD LEVEL SFL 36.631 FCL 39.331 FCL 36.199 LEVEL
CLAUSE 55.04-1 STANDARD B17
RENDER
14.5mCLAUSE ABOVE NATURAL GROUND LEVEL 55.04-1 STANDARD B17(IN ACCORDANCE WITH MAXIMUM BUILDING HEIGHT OR RGZ SCHEDULE 1
FCL 39.331 LEVEL
14.5m ABOVE NATURAL GROUND LEVEL (IN ACCORDANCE WITH MAXIMUM BUILDING HEIGHT OR RGZ SCHEDULE 1
BRICK CONCRETE
TITLE BOUNDARY
ROOF LEVEL RL 39.931
1:20
au
LEGEND 14.5m ABOVE NATURAL GROUND LEVEL (IN ACCORDANCE WITH MAXIMUM BUILDING HEIGHT OR RGZ SCHEDULE 1
educational projects
My main studies are: an Architect Degree at the University of Seville (US) and a Master’s Degree in BIM Management I realized in the Polytechnic University of Catalonia (UPC).
The Master in BIM Management proves my interest on new technologies and collaborative work. I consider BIM an essential methodology in large scale architecture. Two works carried out during this 18 months Master are attached.
From my period in the architecture degree I have selected 2 jobs: The End Course Project. I applyed on here all differents concepts that I learnt along my studies, from the urban design to the smallest details. A public library we attempter during an internship at the Project Office of the Vice-Rectorate Infrastructure at the University of Seville.
INDEX 26 - 28
IPD ON BIM
2018
29
BIM BUSINESS MODEL
2018
30 - 33
HOSTEL ALONG THE WAY
2014
33 - 34
PUBLIC LIBRARY
2014
BSIC
25
IPD on BIM Multipurpose IPD block coodinated ICONOFF on bim
Subject Master BIM Management Steering, UPC
COORDINACIÓN
COMUNICACIÓN
Teachers Eloi Coloma, Montse Armengol and Javier G. Montesinos
PLANIFICACIÓN
Submission January 2018
CDE
IFC2x3
Length 12 month 2
Developing of the logo with team´s values
Team with Iván Jiménez, Tamara Romero, Jose Saavedra, Antonio Rodriguez and Oscar Martí The project consists OF the development of a block in Barcelona with BIM. 25.000m2 carried out through Integrated Project Delivery, developing of its own BEP. It was coordinated by a group, which was formed by different ESTUDIO DE VIABILIDAD professional profiles. Different tools of the BIM computing environment were • BENEFICIOS A PARTIR DEL SEXTO AÑO DE EXPLOTACIÓN DEL used in the project. COMPLEJO
•
Mark Distinction
ACTUALIZACIÓN DE INSTALACIONES CADA 10 AÑOS
Scheme with teamwork, software and
ESTUDIO DE VIABILIDAD
•
ALCANCE DE LAS DISCIPLINAS
+
platforms relations
MODELADO y GESTIÓN
RESULTADO ACTUALIZADO BRUTO EN MILES DE EUROS
BENEFICIOS A PARTIR DEL SEXTO AÑO DE EXPLOTACIÓN DEL
Feasibility COMPLEJO study
1.100,0
900,0 -• Benefits fromDEthe sixth year of operation of the complex ACTUALIZACIÓN INSTALACIONES
CADAuploading 10 AÑOS - MEP every 10 years. 700,0 BRUTO EN MILES DE EUROS RESULTADO ACTUALIZADO 1.100,0
500,0
900,0
300,0
700,0 500,0
100,0 2049
2048
2047
2046
2045
2044
2043
2042
2041
2040
2039
2038
2037
2036
2049
2048
2047
2035
2046
2034
2033
2045
2032
2043
2044
2042
2031
2041
2030
2028
2029
2027
2040
2039
2038
2026
2025
2024
2037
2023
2036
2022
2021
2035
2034
2033
2032
2031
2030
2029
2028
2027
2026
2025
2024
2023
2022
2021
2020
2019
2018
-300,0
2020
100,0 -100,0
2019
-100,0
2018
300,0
-300,0
-500,0
-500,0
RESULTADO ACTUALIZADO BRUTO
RESULTADO ACTUALIZADO BRUTO
Gross actual result in thousands of euros AÑO
RESULTADO ACTUALIZADO BRUTO RESULTADO ACUMULADO ACTUALIZADO BRUTO
AÑO
2018
2019
2020
2021
2022
-408,0
-112,9
-327,0
373,9
396,4
-408,0
-520,9
-848,0
-474,0
-77,6
RESULTADO ACTUALIZADO BRUTO RESULTADO ACUMULADO ACTUALIZADO BRUTO
2023 471,2
2024
2026
570,8
645,3
939,1
1.509,9
2.155,2
2019
-408,0
-112,9
-327,0
-408,0
-520,9
-848,0
393,6
2025
545,5
2018
2020
2021
373,9
-474,0
2022
396,4 -77,6
2027 719,4
2023
2024
2025
2026
2027
471,2
545,54
570,8
645,3
719,4
393,6
939,1
1.509,9
2.155,2
2.874,6
2.874,6
4
26
Código RES _N200 _NH _COM 53 -2 .2 _CO
1. Referencia BIM team references 1. para el equipo BIM
2. Exclusive of a de project 2. Exclusivo un
proyecto
1
2
8. Definition of issues
3. BEP como biblia y herramienta viva que evoluciona
BEP
7 7. Reducción de riesgos 7. Risk reduction
5
Clasificación de espacios
The power of information
3
4 6
CLASIFICACIÓN DE ESPACIOS
3. BEP as a bible and a living tool which evolves
8
8. Definición de entregables
OC_ 2. 2- 3
51
Possibilities of BIM parameterization
Estudio del complejo
Spaces parameterized to get a quick and efficient studying:
4, Crear flujo y sistemas
CLASIFICACIÓN DE ESPACIOS
comunicación 4.de Create a workflowyand colaboración entre communication and collaborative systems betpartes ween the parties involved.
Clasificación de espacios
Building Story Service
Estudio del complejo
PARKINGS (ONH96)(ONH96) EN N-100 Parkings in N-100
COMUNICACIÓN (COM) EN N000
COMUNICACIÓN (COM) EN N000 Comunication (COM) in N000
ESPACIO ALQUILABLE (AL) EN N200
Use Detailed use
6. Better quality 6.monitoring Aumento y
monitoreo de la calidad
5. Standardizes processes = savings
5. Estandariza procesos = ahorro
Legal regulations 6
A code (free standard) has been geCLASIFICACIÓN DE ESPACIOS nerated so the Facility Manager can manage the complex efficiently. Clasificación de espacios
PARKINGS (ONH96) EN N-100
Estudio del complejo
RES_N200_SS_COM53-2.2_SH RES_Restaurant N200_Second floor SS_Servant Space COM_Comunication 53_Stair -2.1_One flight, type 1
PARKINGS (ONH96) EN N-100
SH_Shared
COMUNICACIÓN (COM) EN N000
ESPACIO ALQUILABLE (AL) EN N200 Retable Spaces (RE) in N200
16
27
Equipo B y sus talentos Título del párrafo *mínuscula
IPD on BIM Main requirements:
EL CUERPO EN MAYÚSCULAS Y ESTE TIPO Y TAMA;O, CONTAMOS SOLO CON DOS TIPO DE TEXTOS, CREO QUE MEJOR, MÁS SIMPLE CUANTO M ENSO TENGAMOS
PROYECTO CONCEPTUAL
Requerimientos básicos:
- 3000 m2 Supermarket
•
3000 M2 DE SUPERMERCADO
- 4000 m2 Offices
•
4000 M2 DE OFICINAS
- 4000 m UPC School
•
4000 M2 UPC SCHOOL.
•
6000 M2 APARCAMIENTO
•
CONEXIÓN SUBTERRÁNEA CON LA ESTACIÓN DE METRO
2
- 6000 m2 Parking
- Underground conexion with subway station • MANTENER ESCOLA BAU Y VALKIRIA HUB
INSTALACIONES_INS
CIVIL ENGEENIERING 11
- To keep BAU School and Valiria HUB • COSTE ALREDEDOR DE LOS 20.000.000€ - 20.000.000 € budget
•
CUMPLIMIENTO DE LA NORMATIVA
OBJETIVOS DEL MODELO CONCEPTUAL - To comply with city council regulations
pOBLE NOU, BARCELONA, SPAIN 10
of the conceptual model based on the SoluciónObjectives al reto que plantea el encargo recibido: assignment received: •
CUMPLE- TODOS LOS REQUISITOS Fulfil all the requirements of the property
•
- Versatile COMPLEJO VERSÁTIL complex of buildings
•
FASEAMIENTO EFICAZ ARQUITECTURA_ARQ ARQUITECTURA_ARQ
- Effective Phaseing - Allows Valkiria and Bau to keep running - Viable andENprofitable project from the ✓ PERMITE MANTENER FUNCIONAMIENTO VALKIRIA Y BAUstart - 100% of the spaces generate incomes ✓
ESTRUCTURAS_STR
mep 12
PROYECTO VIABLE Y RENTABLE DESDE EL INICIO
- Spaces that generate activity in the complex at
•
any 100% DE LOS time. ESPACIOS GENERAN INGRESOS
•
USOS QUE GENERAN ACTIVIDAD EN EL COMPLEJO A CUALQUIER to any citizen HORA DEL DÍA
•
DIVERSIDAD DE USOS QUE HACEN ATRACTIVO EL COMPLEJO A
- Diversity of uses that make the complex attractive
CUALQUIER CIUDADANO QUITECTURA_ARQ
STRUCTURE ARQUITECTURA_ARQ
13
3
iNTERIOR DISTRIBUTION
iNTERIOR cgi
ROOF DETAIL
58
58
28 ARCHITECTURE
BIM business model BIM business model developed through UPC
Subject Master BIM Management Steering, UPC Teachers Eloi Coloma, Montse Armengol and Submission May 2018 Length 4 month
Visual management to control strategies in a
-Objectives to achieve are established and the
Bsic offers standard guidelines and automated no-
BIM project
strategies to be implemented are defined
menclatures within a simple and drop-down menu
Team with Antonio Rodriguez ESTRATEGIAS DEL PROYECTO
Our implementation services and control strategies PMI, LEED, LEAN & BIM help companies that need a visual management of strategies in real time of their projects and BIM models. Also, it provides guidelines and platforms for efficient management of all life phases at the project. Unlike companies with traditional management models, BSIC offers real-time monitoring of strategies which rule planning, execution and closure of a BIM project.
TIEMPO Y FASES DE OBRA
Relationships, times and hierarchies throughout the
Control of hierarchies and interrelationships of
It incorporates all the documentation related to the
life cycle of the project
tasks, processes and strategies
project in an orderly and correlated way
Management and coordination of incidents on the
Collaboration services between parties involved
Collaboration and coordination services between
Mark Distinction
BSIC
model
different projects in real time
29
HOSTEL ALONG THE WAY Public Sacred Hostel along the way
Subject End Course Proyect, ETSAS Teachers Francisco M. Sánchez Quintana, Rafael Herrera Limones, José M. Aladro Prieto M. Fco. Garcilaso de la Vega, Miguel Ángel Gil Martí y Javier A. Velasco Acebal Submission June 2014 Length 12 month Team with *Alone A public sacred hostel, Santiago Walk (Guillena). The project was developed on a small plot on a sloping river bank. This project was motivated by moving the architectonic project closer to a scale easy to manipulate, in order to transmit the vibe and atmosphere, to connect with the soul of its users and to create the introspection of a pilgrims destination. Total floor area: 420 m2 Mark Distinction
30
Key table 1_Preliminary plaza (acces from street) 2_Albergue´s access (add to preliminary) 3_Plaza (meeting point arrival/departure Pilgrim) 4_Shade space under pergola 5_Poplar plantation (space for introspection)
top view & general section to albergue and immediate surroundings
31
HOSTEL ALONG THE WAY Key table 1_Reception 2_Toilet 3_Kitchen 4_Bicycle-room 5.1_Bathroom G 5.2_Bathroom L 6_Laundry 7_System-room 8_Meeting/living room 9_Bedroom guard 10_Hall of residence 11_Cupboard with electrical panel 12_Shade space under pergola type floor albergue
32
drawing of albergue´s outsides
75
75
40
40
35
40 40
35
+23,00
50 50
190 190
320
25 25
300 300
385 385
30
385
30
298
298
50
50
320
200 200
+20,00
20
20
50
+19,70
50
30 30
+19,65
type section DETAIL
drawing of space under pergola and hall of residence
33 drawing of meeting/living room
PUBLIC LIBRARY PUBLIC University library OF SEVILLE
Studio Service Infrastructure at the University of Seville, Spain Project’s author Dr. Miguel González Vílchez Cooperation Dr. Andrés Agudo Martínez Submission July 2013 Length 4 month Team with Andrés Agudo Martínez y Carlos Bravo Gómez This proyect was initially designed by Zaha Hadid inside Prado’s Park in Seville. Due to problems between the city council and the neighbourhood associations, the University of Seville taked responsibility of the project in its own land. Work on the first site was abandoned. We were responsible for redesigning the library, a featuring curtain wall in the building and a recreation area that allowed access between the important street in Seville and the most famous park in Seville María Luisa’s Park. Present situation Built
photo of construction FINISHED
34
long section
draw of hall
ground floor
cross section
SOUTH ELEVATION
35
gratitude
Fernando GarcĂa Blanco
name
April 17th, 1989
D.O.B.
Bachelor in architecture + MArch + BIM Management Avenida Manuel Siurot nÂş10, Huelva, Spain
qualification address
fgbarquitectura@gmail.com
+34 666 25 28 59
phone
Thank you.
37