[EN]Meaton- undermounted slide installation manual

Page 1

Fernando He | 2018

www.meaton.com.cn

Meaton Group

Shanghai, China


Meaton Group Undermounted Slide

Installation Manual

www.meaton.com.cn

Meaton Group

Shanghai, China


STEP 1

Prepare the proper cabinet before installation of the undermounted slides.

www.meaton.com.cn

Meaton Group

Shanghai, China


STEP 2

Here take 600mm cabinet as an example. Check cabinet interior dimension LW. Side panel thickness as 18mm.

www.meaton.com.cn

Meaton Group

Shanghai, China


STEP 3

Prepare the drawers waiting to be installed.

www.meaton.com.cn

Meaton Group

Shanghai, China


STEP 4

Check installation dimensions of the drawers.

Drawer SKW dimension=cabinet interior dimension LW - 41.

www.meaton.com.cn

Meaton Group

Shanghai, China


STEP 5

Here take 500mm undermonted slide as an example. Delineate installation positions in the cabinet.

www.meaton.com.cn

Meaton Group

Shanghai, China


STEP 6

Delineate the bottom drawer.

Both sides bilateral symmetry

www.meaton.com.cn

Meaton Group

Shanghai, China


STEP 7

Repeat last process for next drawers. The best distance between each layer is: the drawer panel height + 3mm.

www.meaton.com.cn

Meaton Group

Shanghai, China


STEP 8

After delineation, install the undermounted slides onto the cabinet align with the drill holes.

The first installation point is the fourth drill hole.

www.meaton.com.cn

Meaton Group

Shanghai, China


STEP 9

Two symmetrical holes need to be drilled at the back of the drawer. Diameter 6mm, depth 10mm.

Please refer to the drawing for the positions.

www.meaton.com.cn

Meaton Group

Shanghai, China


STEP 10

Install the handles onto the drawer.

Make sure that left handle on the left side and vice versa.

Put handle front to the drawer panel.

www.meaton.com.cn

Meaton Group

Shanghai, China


STEP 11

Then the drawer can be slided into the cabinet which the undermounted slides are installed.

www.meaton.com.cn

Meaton Group

Shanghai, China


STEP 12

Repeat last process, install the second drawer.

www.meaton.com.cn

Meaton Group

Shanghai, China


STEP 13

Repeat last process, Until the last drawer is finished.

www.meaton.com.cn

Meaton Group

Shanghai, China


Fernando He | November 24, 2017 www.meaton.com.cn

Meaton Group

Shanghai, China


Turn static files into dynamic content formats.

Create a flipbook
Issuu converts static files into: digital portfolios, online yearbooks, online catalogs, digital photo albums and more. Sign up and create your flipbook.