Execution
AT&T parking garage
completion in 2017
8 pier 4
phase 1
et e r t s d r 3
commercial and recreational spaces
mix use development
d
r
a
g
d
s
n
e
n
- park space expanded from existing systems - giants stadium and general use parking garage - over 300 sq ft of mix use buildings A. 25 acres of Wetlands introduce phytoremediation,rhizor emediation, bioremediation and physical methods of water and soil clean up B. development of the bayside waterfront park
c
n
a
h
l
e
n
completion in 2022
r
t
s
Residential development
t
Constructed wetlands
a
Local shops and grocery
c
secondary parking garage
d
third phase mix use development
e
e d
phase 2
c
- the home-plate inn and resort
e
e
n
i
h
a
b
s
i
m
o
i
s
n
c
construction of
e
e
r
p
i
s
a
n
c
l
k
4th street
h
a
n
r
a
e
n
k
a
Removal of asphalt parking lots and old factory buildings
construction of over 2000 homes on 900000 sq ft of building footprint completion of the park belt that connects all of mission Bay Bicycle and pedestrian paths become a full loop Introduction of agri-cultural practices for community Wetlands remain as phytoremediation contiunes to clean soils and water c. local shops and grocery built
a
mix use development New mix use development to accommodate for site growth on
100
200
n
All park spaces completed wetlands accentuate new development as it influences its development and design Recycled water collected and reused for irrigation of surrounding areas D. secondary parking garage to accommodate higher use intensities
residential development
rk
16th street
pa
bay trail
bay
st a
street
trail
enters
bike
lanes
and
continues along the proposed
community residential development
to mission bay
bayside
reconnect
street side
ua
vi
The
mission bay through 3rd
in
of
comes
parkway with
the
3rd
south
mission
Mission
ag
masterplan
b
phase 3
0
bayside waterfront park
completion in 2027
phytoremediated land
bay.
bay a
be-
destination
and
recreational
for
bay
trail
hub
users
c
public transit mariposa street
busroute through 3rd street with 3 stations within the site and 7 within a 1/4 mile outside missionbay
additional added
to
3
the
mission bay.
stations area
of
new route