MENGHITUNG KLB, KDB, KDH, KTB, PERANCANGAN TAPAK I PERANCANGAN TAPAK I 08AR1‐2009/2010 FIRMAN IRMANSYAH,ST
24 Oktober 2009
Pedoman Detail Teknis Ketatakotaan Prop.DKI Jakarta
FIRMAN IRMANSYAH,ST
FIRMAN IRMANSYAH,ST
Pedoman Detail Teknis Ketatakotaan Prop.DKI Jakarta
Studi kasus
PT. Airmas Asri Design Proposal Project 2009
FIRMAN IRMANSYAH,ST
Area Calculation CIK DITIRO Jakarta Daerah Perencanaan
1,629 40% 5%
KDB Daerah Perencanaan Tanpa dinding Max
652 33 684
Total KLB ME
Floor
4 15%
APARTMENT & TOWN HOUSE ME unit APT
Area
Roof 13th 12th 11th 10th 9th 8TH 7TH 6TH 5TH 4TH 3RD 2ND GF SB B1
334.00 357.00 525.50 525.50 525.50 639.50 639.50 639 50 639.50 639.50 698.90 698.90 543.00 273.00
50 50 50 50 50 50 50 50 50 50 50 50 50 50 75 140
m2 m2 m2 m2 m2 m2 m2 m2 m2 m2 m2 m2 m2
7,039.30 m2
775
m2 m2 m2 m2 m2 m2 m2 m2 m2 m2 m2 m2 m2 m2 m2 m2
unit TH
6516 m2 1149.88 m2 7665 88 m2 7665.88 parking Lots Area
proyeksi
2 2 4 4 4 6 6 6 6 6 6 6
m2
58
412
3.79
0
16 23 29
1,016 1,016
130.70 m2
68
2,032
130.70 m2
Resume Contruction Area KLB Total Parking Lots KDB
9,071.3 m2 7,254 m2 71 Lots 665 m2
40.8%
PT. Airmas Asri Design Proposal Project 2009
FIRMAN IRMANSYAH,ST