Issue 1063, sep 30, melb prop bk 1

Page 1











































《墨尔本地产报》电子版

每周五同步更新 阅读方便 同时可阅览《雪梨地产报》&《布里斯班黄金海岸地产报》 电脑登录 www.realestatechinese.com.au 手机或平板电脑 扫描下方二维码










































5500

19.812

5600

5100

8060

9165

3000

1600

1700

6000

6400

5209

5750

bins

bins

bins

3000

273°50'

4500

8319

1200

5500

5750

1700

500

150MM STEP DOWN

93°50'

4369

19.812

2) (5

3489

93° 50’ 19.812M

7450

1830

500 3000 1000

1) (5 3000

4) (5

3200

CARPORT

P.O.S.

4 .2 55

H3

5) (5

LETTER BOX

W1

T R E E T

W1

S

W1

S A R G E N T

W1

3202

12 SINGLE STOREY BRICK DWELLING

2000L RAIN WATER TANK

2 .1 55

6M3 EXTERNAL STORAGE

VER

H7

G.IRON GARAGE

W1

PALING &

CONCRET

W

S B

CONCRETE

W1

W1

HT=57.6(UPPER GUT

W1

SHRUBS

LA

GROUND FLOOR PLAN 1:100

Unit3

LEGEND

Ground Floor: 94.7M2 First Floor: 80.2M2 Double Garage: 36.3M2 Total: 211.2M2 S.P.O.S: 78M2 Total Open Space:92M2

W1: HABITABLE WINDOW ON GROUND FLOOR W2: HABITABLE WINDOW ON FIRST FLOOR EXISTING TREE TO BE REMOVED REFER TO LANDSCAPE PLAN FOR NEW TREE LANDSCAPING

PALING (H=1.7m)

LAWN

H2

1720

GRASS

clothesline

CANOPY TREE

Ground Floor: 98.6M2 First Floor: 88.6M2 Double Garage: 36.3M2 Total: 223.5M2 S.P.O.S: 76M2 Total Open Space:82M2

INITIAL

W1

TPZ 55.4M2 ENCROACH=5.32M2 9.6%

H2

S.P.O.S 78M2 >5M 40M2

6 .7 54

2000L RAIN WATER TANK

7 .6 54

clothesline

PROPOSED 1800MM HIGH TIMBER PALING FENCE

CANOPY TREE X 2

02 .3 3.8 554

6 8 .5 .8 53 53

6M3 EXTERNAL STORAGE

GRASS

Unit2

EXISTING TREE TPZ

PROJECT

Proposed Townhouse Development 19 Sargent Street Doncaster

Date

01/20/15 1 : 100 @ A1

Scale Drawn by

JK

Checked

JK 002

Job Number

Drawing Number

TP102

H T R O N

TITLE

Ground Floor Plan c copyright

LAWN

3720 DINING

PERMEABLE TO NATURAL GROUND

L'DRY PROPOSED 1800MM HIGH TIMBER PALING FENCE

PALING (H=2.3m)

3480

H8

OUTLINE OF FIRST FLOOR ABOVE

Ground Floor: 118.1M2 First Floor: 97.4M2 Double Garage: 36.3M2 Total: 251.8M2 S.P.O.S: 41M2 Total Open Space:104M2

DESCRIPTION

KITCHEN

PEDESTRAIN GATE

5500

Unit1

REV DATE

1630

V

L'DRY P'DR

UNIT3 LIVING

6250

CANOPY TREE

2.6

CANOPY TREE

4 .4 54

2000

DECKING FFL 53.850

KITCHEN

S.P.O.S 76M2 >5M 41M2

2000L RAIN WATER TANK

clothesline

7 .4 53

6500

P.O.S.

DOUBLE GARAGE UNIT 2 FFL 53.450

7178

GRASS

0° 0°2' 2’ 51.9303M 51.930

H7

OUTLINE OF FIRST FLOOR ABOVE

PERMEABLE TO NATURAL GROUND

00 .3 53

6M3 EXTERNAL STORAGE

1 .7 52

CONC XING

CONCRETE 9097 DRIVEWAY

UP

ENTRY UNIT 3 FFL 54.000

PALING (H=1.6m)

DINING

DECKING FFL 53.450

PROPOSED 1800MM HIGH TIMBER PALING FENCE

6975

0 .2 52

H6

8 .9 51

9 .3 51 IL

6000 SENSOR LIGHT

PROPOSED 1800MM HIGH TIMBER PALING FENCE

1 .9 53

0 .3 52

0 .5 51

PERMEABLE TO NATURAL GROUND

H4

PORCH FFL 53.850

9018

PEDESTRAIN GATE

DECKING FFL 52.300

PALING (H=1.6m)

H7

150MM STEP DOWN

SENSOR LIGHT

150MM STEP DOWN

S.P.O.S 40M2 >5M 40M2

H5

LIVING

DOUBLE GARAGE UNIT 1 FFL 52.300

1 .5 53

HOME OFFICE

UNIT2

4715

PROPOSED DRIVEWAY

1892

BATH

L'DRY

100% PERMEABLE SURFACE

3000 DOUBLE GARAGE UNIT 3 FFL 53.850

UP

LIVING

LOUNGE

PROPOSED 1800MM HIGH TIMBER PALING FENCE

6000

4.0M RADIUS

VEHICLE TURNING RADIUS

UNIT1

P'DR

CANOPY TREE

5 .0 52

E L G NN I A A I MR R 0T T 2. S ×ET H MDG 5EI 2. P S

NATURE STRIP

Site Area: 1026.6M2 Total Building Area: 420.3M2 Site Coverage: 40.9% Permeability: 36.6%

H3

2000 UP

LAWN

H3

H7

H6

19 SARGENT STREET DONCASTER TOWNHOUSE DEVELOPMENT

ENTRY UNIT 2 FFL 53.600

1:20

0 .5 53

LOUNGE DINING

ENTRY UNIT 1 FFL 52.450

SENSOR LIGHT

4.0M UP RADIUS

2226

6500

HIGH TIMBER PALING FENCE

05 .3.4 5532

5365

8582

GAS

H6

1:10

PORCH FFL 53.450

LIBRARY

WATER METER

H12

100% PERMEABLE SURFACE

KITCHEN

OUTLINE OF FIRST FLOOR ABOVE

PROPOSED CROSSOVER TO COMPLY WITH RELEVANT AUTHORITY

H4

HL WINDOW

7820

PRIVATE OPEN SPACE 64M2

P.O.S.

H3

PROPOSED DRIVEWAY

HL WINDOW

PORCH FFL 52.300

PALING (H=1.6m) PROPOSED 1800MM

PEDESTRAIN GATE

BATH

UP

TPZ 55.4M2 ENCROACH=5.47M2 9.8%

51.930

3 .6 51

HL WINDOW

0 .8 51

1:10

HOME OFFICE

CANOPY TREE

H5

GAZ

PAVERS

1.0

180°2'

H10

H3

W1

W1

H15 W1

0 .5 50 GAS

H5

W1

H6

0.38m DROP

7 .4 50

X O B IL A M M M 0 0 9

WATER METER

PERGOLA

6.4 HT=5

HT=53.9 (UPPER GUTTER)

H3

W1

H15

H12

7 .4 50 E L G NN I A A I MR R 0T T 2. S T ×EH MDG 5EI 2. P S

GAS

H6

VER

H5

H17

H10

NATURE STRIP CONC XING

WATER METER

H7

17 SINGLE STOREY BRICK DWELLING

RUBS

LAWN

H5

H7

3 .9 49 IL

5m HIGH TREES PALING (H=1.6m)





grosswaddell.com.au ALTONA 79-89 Ajax Road

NORTHCOTE Cnr St Georges & Arthurton Roads

E AV RN U B AU

37m*

m* 55

GE

OR GE

m* 55

ST

1,811m2*

D OA SR

37m*

ARTHUR

AD TON RO

*approx In conj. with

EXPRESSION OF INTEREST: THURSDAY 27TH OCTOBER 5PM Michael Lewin Jonathon McCormack 0418 835 885 0418 326 191 Andrew Prowse 0418 534 076

EXPRESSION OF INTEREST: CLOSING WEDNESDAY 26TH OCTOBER 5PM Jonathon McCormack 0418 835 885 *approx Michael Gross 0419 355 561

9947 5809


































Turn static files into dynamic content formats.

Create a flipbook
Issuu converts static files into: digital portfolios, online yearbooks, online catalogs, digital photo albums and more. Sign up and create your flipbook.