4
3
2 ZONE B-3
1 REVISION HISTORY DESCRIPTION Change from 2x to 3x
REV A
DATE 12/29/2009
APPROVED MLC
B
B 29.00 28.50 17.00 5.50 3.37
.33 thru all
A
(1.32) 3X .27 thru all
(1.21)
2X .50 thru one wall
DRAWN
A
dfoster
Notes:
11/5/2009
FIRST
12/2/2009
200 Bedford Street, Manchester, NH 03101 (603) 666-3906 -- FAX (603) 666-3907
CHECKED
mcyr 1. Material: 1-3/8" galvanized steel, Top Rail for chain link fencing 2. Remove all sharp edges and burrs.
UNLESS OTHERWISE SPECIFIED TOLERANCES: (INCHES)
TITLE +/- 1/32
FRAC. .00
+/- .01
.000
+/- .005 +/- .25 Deg.
ANGULAR 4
3
A
2
29" Tube, Tower Support SIZE
B SCALE
REV
DWG NO
A
GE-10020 SHEET 1 OF 1
1