Filipa Leal de Carvalho
registered architect in the Portuguese Architects College, worked recently at Dominique Perrault Architecture (Paris), where she had the opportunity to participate in global projects. After graduating in Architecture in the University of Coimbra in 2008, she worked at “carlorattiassociatti� studio in italy (directly related with the MIT Senseable City Lab in Boston) where she had also the opportunity to collaborate with important studios as Kengo Kuma Associates (Tokio), AgenTer (Paris) and ARUP (Italian branch), During her 4 years experience she was involved in master planning, residential, offices, educational and cultural sectors.
rehabilitation of EPFL campus dominique perrault architecture quartier de l’etang dominique perrault architecture
4 12
ka-care carloratti associatti
18
manifattura domani carloratti associatti - kengo kuma associates
22
4 ribbons park carloratti associatti - agenceter
22
social club filipa carvalho - tânia teixeira
28
unesco dialog center lands architetture studio
32
REHABILITATION OF EPFL CAMPUS Dominique Perrault Architecture
Lausanne, Switzerland 2011-2015
In 2010, Steiner SA Group Switzerland’s leading total
program offices, research laboratories and public services
services contractor combined with Dominique Perrault
engineering Felix construction and Préface (facades),
Architecture won the competition driven by the EPFL
Tecnoservice (CVC), Duchein SA (sanitary system), Daniel Willi SA
to achieve the “Campus Plan” modernization project
(structure), Protectas SA (security)
by implementing the Center for Neuroprosthetics and
site area 15 500 m2
the headquarters of the Federal School. This project
built area 4500 m2 Central Library / 14 000 m2 Mechanical
includes the renovation of two existing buildings on campus, the former Mechanical Engineering Halls and Central Library, and the creation of an iconic new
Engineering Halls responsabilities prepare and develop drawings, models, images and other documents relating to Design Development Phase and Construction Documents Phase; assist in the co-ordination
building, the Teaching Bridge.
of the internal design team; take responsibility for specific areas
Parallel to urban redevelopments already led by the
of the design and project development; liaise with members of
EPFL at the North and South of the site, architecture
the external design team and other associated organisations or companies.
must reflect the will to reinforce connections between the natural ground and the artificial soil. In this sense, the rehabilitation of the former Mechanical Engineering
re-urbanization process by breaking the existing
Halls and the Central Library buildings, but also the
separation between the technical ground-floor and the
new Teaching Bridge, are involved in the campus
university life taking place several meters higher.
congress center train station
ME CL square TL rolex learning center
benchmarks and identification of the camus heart
the 3 sites of intervention
displacement of the Teaching Lab to the heart of the campus
final project
4
TEACHING BRIDGE
CENTRAL LIBRARY
MECHANICAL ENGINEERING HALLS
flcarvalho 5
RESEARCH BUILDING - OLD MECHANICAL ENGINEERING HALLS
south faรงade
laboratories offices
plan type
6
the “atrium is a
principle of the facade opening
The building is designed in layers, like a onion. At the heart, there is the central atrium, a dynamic space with many bridges and platforms that enable the flow of ideas. Around this space there are the laboratories and after, the offices to the outside to take advantage fo the natural ligh. the old building is coated with metal sliding panels that give dynamis to the facade connection through the atrium
interior views of the atrium
flcarvalho 7
CENTRAL ADMINISTRATION (OLD CENTRAL LIBRARY)
Through a colorfull architecture, there is the intention to remark clearly the consolidation of the central administration at the heart of the campus. The building will be covered with opaque and glazed colored strips like a rainbow. The volumetry and the supporting structure of the old library has been preserved. In order to offer light to central spaces, as to the common circulations, two courtyards were created. plan type
view from avenue Piccard
8
connections with Piccard avenue
common circulations
vertical accesses offices surfaces
organizing principle of the plan type
transverse section flcarvalho 9
facade detail - building ME
frame with metal mesh frames guide
frames fixation thermal insulation
metal panel
triple glass
10
facade detail - building BI
double glass simple glass
thermal insulation
black sheet metal coating
venetian blind metal perforated suspended ceiling
flcarvalho 11
QUARTIER DE L’ETANG Dominique Perrault Architecture
Geneva, Switzerland 2010-2015
This urban redevelopment project called “Quartier de
program housing, offices, public equipements, craft,
l’Etang”, is located in the heart of urban dynamics, at
administrative, hotel, commerce, leisure
just two kilometers from the historic heart of Geneva.
team Edms SA (ingénieur civil) , Transitec (mobility), AAB J.
The site has been developed around industrial, craft and commercial activities taking advantage of the infrastructure network which is in the periphery of the urban core. Today overtaken by the city, this site
Stryensky & H. Monti SA (acustics), Karakas & Français SA (geotechnical), Ecoscan (environment), Protectas SA (fire safety), Buffet Boymont (geometer), Sequoia & Gardens (forester) site area 111 081 m² built area 232 200 m²
will mutate to meet the needs of the citizens. This change must take place within a project that requires
responsabilities develop urban analyses, general planning and volume concept; prepare drawings, models, images and other
the highest standards of spaciousness, comfort and
documents relating to Programming and Schematic Design Phase;
security for its future inhabitants. The geometry of
take responsibility for all the feasability study; liaise with members
the islets in the site is based on existing axes located
of the external design team and other associated organisations or companies.
outside the perimeter: the road network on the one hand, with the “chemin de l’Etang”, and pedestrian and
(boulevard, pedestrian areas, squares, parks) that are
cycle networks on the other hand, relying on existing
not only related to the existing road network but also
routes. The project was organized with the intention
act as key elements linking the landscape structures
of offering to the city a new set of public spaces
in the city.
12
A1
lac lĂŠman
SAINT GENIS POUILLY
GARE DE CORNAVIN
ANNEMASSE
SAINT JULIEN EN GENEVOIS
The Boulevard, organized around a system
The City Hall Square as a link between the
The Neighbourhood Square, the second space
of planted boulevard with a high quality
different parts of site. Assumes the role of
of centrality, more intimate, is mainly designed
landscape, will be the structural element of
keystone of the urban system, allowing the
to local residents. Built as a rectangular plaza
the project. A transition space, that offers
connection between the first two macro-
bordered by residential and craft buildings, it
access to important spaces: the city hall
geographical areas: the north commercial
includes in the ground floor local shops and a
square and the neighbourhood square.
showcase and the neighbourhood heart at
Neighbourhood Association.
the south.
sun
islet area
urban outline
context
high limit 48 m
privacy
possible building insertion
building flcarvalho 13
green spaces
HOUSING .................................... 89 940 m2 HOUSING / ACTIVITIES ............. 12 500 m2 APPART’HOTEL ......................... 8 000 m2 HOTEL ........................................ 10 760 m2 ADMINISTRATIVE....................
50 200 m2
ARTISANAT ............................... 49 300 m2 COMMERCE/LEIURE/ ................. 32 570 m2 PUBLIC EQUIPEMENTS.............. 12 520 m2
14
TOTAL
265 790 m2
SURFACE
111 081 m2
COS
2,39
RATIO EMPLOI/LOGEMENT
1,3
housing
neighbourhood square
sidewalk
bus stop
bus only lane
bycicle lane bus stop
two way lane
sidewalk planted parking bycicle lane
industrial complex
green screen
zoom of neighbourhood square
flcarvalho 15
typology 1 The Forum commerces / loisirs administration hotel housing
apartment hotel services
hotel reception
cinema
urban galery restaurant
commerce activities and retail
16
typology 2 The islets public equipements activities / commerce housing
activities and retail
housing to the islet heart
local shops leisure
housing to the islet heart
common spaces bicycle parking
ground floor
flcarvalho 17
KA-CARE Carloratti Associatti [COMPETITION, 3TH PRIZE]
Riyadh, Saudi Arabia 2010
This new city in the Gulf aims to be the most
program residential, offices, research, industrial parks, energy
sustainable city on the planet.
production, logistics parks, HQ/ administration, hotels, public
The design emerges from detailed analysis of the local microclimate, using computer simulations and digital site modelling to assess and exploit the exact behaviour of local wind conditions, the precise availability of water, the subtle variations in diurnal shade and the
facilities, recreational and retail team Accenture (consulting), AgenceTer (landscape architecture), Atkins (engineering), Ecologic Studio (digital computational design), MIT Senseable city lab built area 10 931 000 m2 responsabilities understand the project generated by the
opportunities for connectivity. A delicate network
parametric design; develop connections and programm
of lightweight roads and terraces emerge to follow
distribution; prepare the feasability study developing different use
the wadis and the natural lines of the terrain. The
typologies; assist in the co-ordination of the internal design team;
project offers an inverted city, overturning outmoded conventions, reversing destructive energy patterns.
take responsibility for specific areas of the design and project development; liaise with members of the external design team and other associated organisations or companies.
While the roads and urban infrastructure are placed on the exposed plateau, the city itself develops in
By creating a balanced mix of uses it is possible
the shade beneath it, a landscaped oasis of elegant
to achieve a good quality of life, integrating the
terraces, cool squares, private courtyard houses and
commercial, research and educational areas ith the
dramatic public bridges.
lmore community-based areas.
the parametric urban growth scenarios
the land cover algorithm
analysis of environmental resources in order to identificate best location The crucial innovation is the core contemporary use of the latest digital technologies to produce an interactive digital model inseparable from both the design and operations of the city. It absorbs lessons from the past as much as it
shadowing 18
proximity to water
slopes
charts paths for the future.
then
now
when
The model is inspired by the traditional way of building cities. For instance, organic unplanned cities or informal settlements developed with limited resources and simple rules. We propose a new complex city growth algorithm.
the organic city
the planned city
the complex city flcarvalho 19
full city
cool “cool spot� upper garden
thematic garden
main street canopy
inside city
city edges parkway
planted hardscape
reed beds food production softscape
20
Land use plot research hotels cultural green residential commercial administrative mosques great mosque
Inner Spine
Function cells
-Public spaces
-retails
-Connections
-university
-Structure
-research -hotel -residential
canopy
neighborhood and landscape
KA-Care will be an exemplar of electrical microgeneration where over 80% will be produced by
streets and
the canopy.Designed to be flexible the canopy will
public space
accommodate any type of solar renewable and be a perfect research test bed, and – it is dynamic and provides a beneficial micro-climates by casting shade
voronoi tessellation
and directing cool air where needed. The canopy floats ethereally above the inhabited areas, producing vital energy and improving thermal comfort
wadi
beneath it, threaded with systems and services for nourishing and optimising the city. flcarvalho 21
MANIFATTURA DOMANI Kengo Kuma associates with Carloratti Associatti
Rovereto, Italy 2010
At the beginning it will be the Park. A green area
program offices, research, industrial park, public facilities and
of five hectares, which will take immediately the
recreational.
place of asphalt and warehouses constructed in the
team Kanso (consulting), ARUP (engineering)
60s and 70s. This first phase will see in parallel the
built area 69 890 m2 + 18 900 m2 (parking)
reconstruction of historic buildings of the factory and
site area 86 090 m2
the creation of leisure facilities along the border south
responsabilities understand the design project; prepare and
to the river Leno. The future presence of industrial
develop drawings, models, images and other documents relating
buildings, will be revealed in the landscape of the park,
to the design; assist in the co-ordination of the internal design
through parallel strips as the surrounding vineyards, hiding the invisible predispositions infrastructure
team; take responsibility for specific areas of the design and project development; liaise with members of the external design team and other associated organisations or companies.
under the ground. New production structures will be raised from its impression on the ground, designed by vegetation. A system with an organic development that will minimize the drawbacks of traditional yards, returning immediately a large proportion of industrial
minimize the drawbacks of traditional yards, returning
land to the territory and the city.
immediately a large proportion of industrial land to the
A system with an organic development that will
territory and the city.
situation city plan 22
general location
train network
airports location
highway network
flcarvalho 23
green park
green park with public spaces through the river
green buffer zone
green technologic park
section AA
section BB 24
B A flcarvalho 25
4 RIBBONS PARK carlorattiassociatti with agence Ter Milan, Italy 2010
The park is in the new residential area of CityLife, a
program urban park with public facilities and recreational
redevelopment project of the historical district Fiera di
activities.
Milano, and aims to complete the overall design of the
team Agence Ter (landscape architects), Buro Happold
block giving to the complex a final grade of excellence
(engineering consultants)
and quality. The park “dei Quattro Nastri” born from
built area 69 890 m2 + 18 900 m2 (parking)
the dance of four green tapes that dialogue, talk to
site area 86 090 m2
themselves and with the existing buildings, play in
responsabilities understand the whole design project; prepare and
space and create the place design, connect themselves
develop drawings, models, images and other documents relating
to the city joining the context and showing themselves
to the design;
as a true instrument of spatial unity. A connection between the park and the human presence, a space of interaction with people, a connection between tradition and innovation, and finally a connection of the park with the city at different scales. The Park of four tapes will be a nature park that will
Mitigation of ventilation grilles, infrastructures, technical
donate to Milan a exemplar stimulus of how to build and
systems: barriers become spectacle. The principle of
recreate nature in the city.
grouping emergency exits and ventilation grilles.
the follies catalog of the Art Ribbon
wall climbing
giant slide
belvedere
interactive totem
Sport and Game Ribbon Art Ribbon Interactive Ribbon or ribbon of the “Raggio Verde”
Waterproof Ribbon or the fresh garden ribbon 0
26
40 80 m
section B
section A
Rc1 waterproof ribbon
interactive ribbon
sport ribbon
Rc1 waterproof ribbon
Tca tower
waterproof ribbon
free prairie
interactive ribbon
sport ribbon
terrace on the park
11 B
1
18
2 19
The Art Ribbon
12
21
20
A
3
6
e
Th Ar
5
10
The S
port a
n bo
7
ib
17
nd Ga
9
me R
ve Ribbon The Interacti
15
4
tR
6
ibbon
6
7 8 13
The
16 Wa te
rpr oof
15
16
15
The Interactive Ribbon
on
ibb
Rib
fR oo pr
bon
14
r
ate eW
24
1. wall climbing 2. giant slide 3. belvedere 4. interactive totem 5. interactive water games 6. children’s play rug 7. bar-kiosk
Th
8. ventilation grille 9. basket field 10. entrance to Tca Towerfootbridge 11. entrance to mall-footbridge 12. sparks pavilion 13. Entrance to the underground
22 23
road 14. the butterflies oasis 15. the flowering prairie 16. the free prairie 17. sport field 18. the terrace on the park 19. entrance to mall
0 5 10 15 20 m
20. connection park-terrace. Footbridge 21. Tca tower 22. residential lot Rc2 23. residential lot Rc1 24. residential lot Rb1
flcarvalho 27
SOCIAL CLUB Filipa Leal de Carvalho and Tânia Teixeira
Milan, Italy 2011
The social club is a temporary pavilion that will shelter
program reading spaces, kitchen, cafeteria, meeting spaces.
different activities to the small village close to Milan
built area 65 m2
as to the public in general. How to do an hierarchy of
responsabilities understand the whole design project; prepare
“spaces” in the middle of the void? A hut in the middle
and develop drawings, models, images and other documents
of the desert already creates hierarchy and defines two
relating to the design; take responsibility for all the project design
spaces, one internal and one external. If we extend this
development.
hut we will have instead three spaces, two external and
diversity and responding to changes of the program and
one internal.
target public, that the contemporary urban condition
So, we propose a flexible pavilion that can adapt
demands the contemporary urban condition. The
different spaces to specific uses. An organic
pavilion designs, through its organic and adaptable
“corridor pavilion”, which provide a serie of outdoor
shape, natural squares, that receves and put in relation
plazas, between nature and housing. The building
to youth, seniors, environmentalists, disabled people,
is dematerialized in a modular structure that allows
artisans, activists in a meeting point that claims
its adaptation to the surrounding and allow a large
universal.
programmatic diversity. The exterior is privileged
The proposed construction method is based on
in detriment of its internal taking the ability to
a modular system capable of being combined in
accommodate more people, more organizations, more
numerous forms.
different modules configurations
transversal section 28
o Perc
r
r rte U so O
ban
e
ci ati u q Ac rte o Sp rso o rc Pe
cafeteria art gallery “the citizens� multifunctional space NGO, library toilets urban garden club 0
2m flcarvalho 29
20 x 20 x 32 x
21 x 20 x 20 x
step 1: main structure
30
step 2 : beams
16 x 20 x
step 3: panels
20 x
20 x
step 4: doors
montage of main structure
groove of OSB panels
step 5: sticks
20 x
step 6 : membrane
montage of wooden sticks
membrane in tension
flcarvalho 31
UNESCO DIALOG CENTER Lands Architetture
Naters, Switzerland 2009
Rarely, when a glacier melts reveals treasures of the
program offices, seminars, research, hotel, housing, recreational
Nature, Crystals, order and perfection.
and retail
Crystals are light, color, energy, information. They are
built area Dialog Center 3 200 m2, hotel, offices and retail 12 800
the interactive , emotional and physical elements of the
m2
project.
site area 8 185 m2
The Project rises from the assumption that the Glacier
responsabilities understand the design project; prepare, develop
is an element of the Nature that blossom life within
and edit drawings, models, images and other documents relating to the design.
its environment. Crystals sparse around the terrain, among grass and flowers, denote a new landscape made up of sensations, emotions and memories. Memories are the patrimony to highlight, and in this specific case, Nature is the center of the Project. The new DialogCenter is a place of tourist promotion and simultaneously is a place of the village of Naters. It is
The Mountain has to be penetrate to discover the
an instant of Naters’ urban development. It is a place
DialogCenter, to allow getting surprised. The Mountain
coming from the knowledge of the mountains, from
has to be climbed to discover the Kräutergarten and the
geology, as an example of the movement in time.
Themenpark, the landscape of the new DialogCenter.
32
it ex
it ex
ain m
e nc tra en
cafeteria
nd co se
Theme park
n tra en ce
Pinus tree
herbs betule tree
Alpen
acier Aletsch Gl Naters 673.00 m.端.M
flcarvalho 33
2
1
kristall 1 1. bilderwelten 2. administration 3. meeting 4. lesson room 3
14
5. seminars 6. office 7. workshops
4
8. reception 9. labs 10. maintenabce
5
13
11. UNESCO 12. senses room 13. rundgang
6
kristall 3
14. exhibitions: flora fauna
12
11
9
7 kristall 2
10
geologie landschaftschutz
8
glaziologie wasser
0
34
2
4
6
8m
interactive panorama
meeting places
exhibitions
flcarvalho 35
Filipa Leal de Carvalho Architektin flc.arq@gmail.com +44 (0) 176 75751524
36