Front Garden Landscaping Application Form
Owner Details
LANDOWNER’S NAME
MOBILE EMAIL
CONTACT ADDRESS
POINT OF CONTACT NAME (if not landowner)
MOBILE EMAIL
Property Details
LOT NUMBER
STREET ADDRESS
ESTATE NAME
ESTIMATED HANDOVER DATE
I/ We confirm the below:
1. The above lot has been cleared and levelled to 30mm below kerbing, paving and hardstand.
2. All rubbish and rubble has been removed from the site.
3. 90mm PVC storm water pipe has been installed under the driveway approximately 300mm below the ground and 4m from the garage (note not applicable for rear laneway lots). This Duct is necessary to run pipework and wiring for the reticulation under the driveway, and eliminates the need to pull up any paving and to avoid extra fees that may apply if this pipe is not installed.
4. The driveway and or pathways have been installed or will be installed prior to commencement of landscaping.
5. The lot has a front tap for water connection (rear laneway lots only).
SIGNED
SIGNED
DATE
DATE
Please return your completed forms approximately 8-10 weeks prior to your date of occupancy to:
MAIL: Customer Care Manager Frasers Property Pty Ltd PO Box 3120
EMAIL: CustomerCareWA@frasersproperty.com.au