CURRICULUM VITAE
2014
-
2017
HABIBE HAZEL KARAMAN
HABIBE HAZEL KARAMAN
14
17
LANDSCAPE ARCHITECTURE GRAPHIC DESIGN & I L L U S T R A T I O N
EXPERIENCE
EDUCATION 12-14
MASTER OF LANDSCAPE ARCHITECTURE
15-16
BACHELOR OF LANDSCAPE ARCHITECTURE
(CURRENT) FREELANCE ARTIST: COMMISSION BASED GRAPHIC DESIGN AND ILLUSTRATIONS FOR CLIENTS NATIONALLY AND INTERNATIONALLY.
17 1 MONTH
ROYAL MELBOURNE INSTITUTE OF TECHNOLOGY:
KANGAN BATMAN INSTITUTE:
DIPLOMA OF LEADERSHIP AND MANAGEMENT
GRADUATE LANDSCAPE ARCHITECT: BETULA PEYSAJ, A FIRM THAT SPECIALIZES IN DEALING WITH GARDENING WITH BOTH HARDSCAPES AND SOFTSCAPES. ON THE JOB DUTIES WERE TO MAKE GOOGLE SKETCHUP MODELS, DESIGN RESEARCH AND MANAGE DETAIL PLANS AND SECTIONS
SKILLS ADOBE PHOTOSHOP
6 MONTHS
ADOBE ILLUSTRATOR
GRAPHIC DESIGNER: INTERACT WITH CLIENTS, PROMOTE IDENTITY AND PRODUCE BANNERS/ BOOKLETS.CONSISTANTLY MEET DEADLINES, COMMUNICATE FREQUENTLY AND DISCUSS THE STATUS OF THE WORK DONE. DELIVER FINAL PRODUCTS ON A TIMELY BASIS.
5 YEARS
ABOUT ME
ADOBE INDESIGN
AUTO CAD
HEAD CHEFF: HIGH QUALITY CUSTOMER SERVICE, CHECKING STOCK AND ORDERING SUPPLIES, INTERACTING WITH EMPLOYEES AND DELEGATING JOBS. PLATING FOOD AND MAKING SURE EVERYTHING IS REPRESENTABLE.
RHINOCEROS
GOOGLE SKETCHUP
23 YEAR OLD GRADUATE LANDSCAPE ARCHITECT. BORN AND RAISED IN MELBOURNE, AUSTRALIA. HAVE A STRONG PASSION FOR DESIGN AND ARTISTIC CREATIONS AND DISPLAYS. I ENJOY DRAWING DIGITAL PORTRAITS AS WELL AS SOCIALISING WITH FRIENDS AND FAMILY. I SPEND MOST OF MY FREE TIME LISTENING TO TED TALKS OR WATCHING SPEED PAINTS.
2 MONTHS
ARCHITECT ASSISTANT: DRAFTING PLANS AND SECTIONS FOR OFFICE USE. INTERACTING WITH COUNCIL CLIENTS. ON-SITE LEARNING OF SOFTWARE ARCHICAD AND PHOTOMONTAJING IMAGES FOR DOCUMENTATION PROCESSES.
CORELDRAW
3DS MAX
SPENT 5 YEARS STUDYING LANDSCAPE ARCHITECTURE AND HARBOUR VAST INTEREST IN WATER SYSTEMS, SUSTAINABILITY AND PUBLIC UTILISATIONS OF SPACES. I HARBOR ALL MY ATTENTION TO HOW SPACE AS THE ABILITY TO CHOREOGRAPH PEOPLE MOVEMENT AND HOW ENVIRONMENTS MANIPULATE THE WAY WE USE IT.
CONTENTS 01
0 1
02
14 16 20
FINAL YEAR THESIS
LET IT FLOW
STUDIO WORK
MOMENTO MORI MATERIAL GEOMETRIES
24
PROFFESSIONAL PRACTICE
03
30 32
WORK EXPERIENCES
BETULA LANDSCAPE ARCHITECTURE
34
ERIN WATT COLOURING BOOK 36
AEONDREAMSTUIOS
01 FI NAL YEAR TH ESIS
FINAL YEAR THESIS
FINAL YEAR THESIS
REDEFINING THE EDGE OF THE COMMON URBAN CANNAL
HAVING AN EXCLUSIVE AURA IN NATURE, THE ELWOOD CANAL (MELBOURNE, AUSTRALIA) CONTINUALLY FLOODS ITS VICINITY, CAUSING DISTASTE AMONG OCCUPANTS AND RESIDENTS ALIKE. IT IS INEVITABLE FOR FLOODS TO OCCUR, ESPECIALLY WITH LOW LYING LANDS SUCH AS ELWOOD ITSELF, HOWEVER, WE CAN DESIGN TO MANAGE RISKS AND MINIMISE THE DAMAGE CAUSED TO THE RESIDENTS AND COMMUNITY. THE DESIGN THESIS IS BASED ON THE REDUCTION OF NEGATIVE STIGMA SURROUNDING THE ELWOOD CANAL-
THROUGH THE MITIGATION OF THE IMPACTS OF FLOODING, PRINCIPALLY ARGUING OVER THE HUMAN INTERACTION WITH WATER THROUGH SPACE AND FORM, INTERGRATING OVERLAYING PROGRAMS. THE PRINCIPAL AIM OF THIS PROJECT IS TO REVITALISE THE SITE AND SYSTEMATICALLY ENHANCE THE HUMAN INTERACTION WITH WATER AS ITS DYNAMIC NATURE, WITH THE INTENT OF NURTURING INTEREST FOROCCUPATION AND CURIOSITY.
1
2 CANAL CROSS SECTION COMMUNITY MEETINGS
LET IT FLOW
LET IT FLOW
FINAL YEAR THESIS
FINAL YEAR THESIS
WHAT SHOULD A WATER SENSITIVE CITY LOOK LIKE?
NEW CANAL EDGE ALONG ELWOOD
3
10 STREET SWALE LEADING TO CANAL
LET IT FLOW
LET IT FLOW
AUTO PLAY SPACE
FINAL YEAR THESIS
FINAL YEAR THESIS
ONE GOOD WAY TO ALLOW FOR PLAY SPACE AND ACTIVITIES TO OCCUR IS TO PROVIDE INTERACTION WITH THE WATER. YOU CAN INTEGRADE A RAMP, AND SET TARGERS AT THE BASE OF THE CANAL FOR KIDS TO AIM AND THROW PEBBLES AT.
DYNAMIC EDGE
CANAL NATURAL SWALE FEATURE 0.1M WATER L E V E L
5
CANAL NATURAL SWALE FEATURE 0.8M WATER L E V E L
CROSS SECTIONS
LET IT FLOW
LET IT FLOW
CANAL NATURAL SWALE FEATURE 1M WATER L E V E L
6
FINAL YEAR THESIS
FINAL YEAR THESIS
7
8
NIGHT LIGHTING
LET IT FLOW
EXISTIG SITE ANALYSIS
LET IT FLOW
FINAL YEAR THESIS
FINAL YEAR THESIS
8
9
DEPLOYABLE MARKETS
LET IT FLOW
AUTO PLAY SPACE
LET IT FLOW
FINAL YEAR THESIS
MODULE CATEGORISATION
METHODS
10
11
EDGE TYPES
LET IT FLOW
& OCCUPATION
MODULE DEPLOYMENT
FINAL YEAR THESIS
FINAL YEAR THESIS
RAINY/NORMAL DAY RENDER
12
RAINY/NORMAL DAY RENDER
LET IT FLOW
THESIS BOOK COVER FOR COUNCIL
LET IT FLOW
THESIS FINAL EXHIBITION
13
STUDI O W ORK
02
17
STUDIO WORK
STUDIO WORK
OPPORTUNITIES BETWEEN NORTH AND SOUTH KOREA THE DEMILLITERISED ZONE
16
MOMENTO MORI
MOMENTO MORI
FINAL YEAR THESIS
THE DMZ SERVES AS A DIVIDER BETWEEN NORTH AND THE SOUTH, SEPARATING FAMILIES AND LOVED ONES. A DIVIDE ALWAYS EXISTS; NOT JUST PART OF MAN WITH RESPECT TO CULTURE, POLITICS AND EVEN RELIGION DIVISION IS ALSO PART OF NATURE WITH ITS FISSURES, OCEANS AND RIVERS. POLITICAL CONFLICTS LIKE IDENTITY, IDEOLOGY AND IDENTITY HAS RISEN AS A RESULT OF DIVISION. SO HOW CAN WE UTILISE TOURISM AS AN ELEMENT TO PROMOTE UNITY, PEACE AND ALSO HELPBETTER THESE CONFLICT ELEMENTS? THROUGH APPEALING TO TOURISTS AND DIVIDED FAMILIES DURING THE WAR, POTENTIAL MEMORIAL DESIGN IS INTENDED TO ACT AS A MEDIATOR BETWEEN SPATIAL AND POLITICAL CONFLICT AND TO SERVE AS A MEDIUM THROUGH WHICH WE CAN REMEMBER THE PAST AND PROMOTE HOPE FOR THE FUTURE, ELICITING A MEMORY THAT CAN BE TRANSFORMED INTO POSITIVE ENERGY AND PEACE.
18
2
M O M E N T O MORI
LET IT FLOW
STUDIO WORK
STUDIO WORK
BEAUTY THROUGH THE USAGE OF THE SITE
20
21
Central Pier Docklands
LET IT FLOW
LET IT FLOW
STUDIO WORK
STUDIO WORK
22
23
LET IT FLOW
LET IT FLOW
STUDIO WORK
STUDIO WORK
CHANGING MATERIALITY OF SURFACE TO AVOID SKATERS DAMAGING MEMORIAL SITE NOTES:
THE CONTRACTOR SHALL THE EXISTING IRRIGATION EXACT WORKS REQUIRED EXISTING IRRIGATION SYS
THE CONTRACTOR SHALL BUILDER TO ENSURE REL EXISTING IRRIGATION SYS TO THE EXISTING IRRIGAT BE UNDERTAKEN PRIOR T CONSTRUCTION OF HARD
EXISTING CONCRETE PERIMETER
THE CONTRACTOR SHALL TO THE EXISITNG CO NTR IDENTIFY Drainage grates
100mm DIA. P CONNECTED STORMWATE DRAWINGS
EXISTING CONCRETE TO BE REMOVED Exisitng concrete to be demolished and replaced by grass
EXISTING TREES
DRAINAGE P ENGINEER D Drainage pipe run across to connect the two opposing sides to allow for run off. Shaped in arch to prevent build-up.
Drainage pipes across the grass connected to the fountain in the middle of the fountain square.
EXISTING FOUNTAIN PERIMETER
Exisitng Cypress tree to be retained and protected during construction, refer to
EXISTING CONCRETE TO BE REMOVED
24
SWANSTON STREET
REV DATE AMENDMENTS 1 11.10.2015 ISSUED FOR CONSTRUCTION Contractor to verify all dimensions on site before commencing work. Report all discrepancies to superintendent prior to construction. Figured dimensions and setout point coordinates to be taken in preference to scaled drawings. All drawings may not be reproduced or distributed without prior permission from the landscape architect. Check all dimensions and site conditions prior to commencement of any work, the fabrication of any components.
REV DATE
AMENDMENTS
Civil
Hydrology
Structural
FORM Structures
Level 7, 552 Lonsdale Street Melbourne, VIC 3000 Ph: (03) 8622 3900
PROJECT
LINCOLN SQUARE FOUNTAIN SQUARE
Landscape Architect T.C.L Landscape Architects 385 Drummond Street Carlton, Vis 3053
SWANSTON STREET, MELBOURNE LANDSCAPE REDEVELOPMENT
REV DATE AMENDMENTS 1 11.10.2015 ISSUED FOR CONSTRUCTION Contractor to verify all dimensions on site before commencing work. Report all discrepancies to superintendent prior to construction. Figured dimensions and setout point coordinates to be taken in preference to scaled drawings. All drawings may not be reproduced or distributed without prior permission from the landscape architect. Check all dimensions and site conditions prior to commencement of any work, the
Landscape Works Fountain Square Demolition Plan DRAWN AC
CHECKED BFB
STATUS
ISSUED FOR CONSTRUCTION
AMENDMENTS
Civil
Hydrology
Structural
FORM Structures
Level 7, 552 Lonsdale Street Melbourne, VIC 3000 Ph: (03) 8622 3900
SCALE 1:200 @A3
DAWING NO.
M11032-LA-020
PROJECT
LINCOLN SQUARE FOUNTAIN SQUARE
Landscape Architect T.C.L Landscape Architects 385 Drummond Street Carlton, Vis 3053
SWANSTON STREET, MELBOURNE LANDSCAPE REDEVELOPMENT
25
Landscape Work Fountain Square Drainage Pipes DRAWN AC
CHECKED
SC
BFB
tel: +61 3 9380 4344 CLIENT
fabrication of any components.
tel: +61 3 9380 4344 CLIENT
REV DATE
STATUS
ISSUED FOR CONSTRUCTION
DATE CREATED CONTRACT NUMBER 11.10.2015 1049 REV
1
PROFFESSIONAL PRACTICE
DAWING NO.
M11032-LA-
STUDIO WORK
CROSS SECTION BB
STUDIO WORK
TRYPICAL SECTION 1:125
concrete continues to the park grassline only 2 meters
buffalo proposed grass input
buffalo proposed grass input
instu coloured concrete steps
existing tree
buffalo proposed grass input
FOUNTAIN SQUARE FALL
FALL
SF -04
SF -04 SF -04
CROSS SECTION AA TRYPICAL SECTION 1:125
REV DATE AMENDMENTS 1 11.10.2015 ISSUED FOR CONSTRUCTION
REV DATE
AMENDMENTS
Contractor to verify all dimensions on site before commencing work. Report all discrepancies to superintendent prior to construction. Figured dimensions and setout point coordinates to be taken in preference to scaled drawings. All drawings may not be reproduced or distributed without prior permission from the landscape architect. Check all dimensions and site conditions prior to commencement of any work, the
Civil
Hydrology
Structural
Landscape Architect T.C.L Landscape Architects 385 Drummond Street Carlton, Vis 3053
FORM Structures
Level 7, 552 Lonsdale Street Melbourne, VIC 3000 Ph: (03) 8622 3900
Landscape Works
PROJECT
LINCOLN SQUARE FOUNTAIN SQUARE
tel: +61 3 9380 4344 CLIENT
fabrication of any components.
Fountain Square Section 3 of 3
DRAWN coloured instu concrete edge, refer to water feature AC consultants and drawings.
SWANSTON STREET, MELBOURNE LANDSCAPE REDEVELOPMENT STATUS
CHECKED
SCALE
BFB
1:125 @A3
ISSUED FOR CONSTRUCTION
DATE CREATED CONTRACT NUMBER 11.10.2015 1049 REV
DAWING NO.
M11032-LA-703
1
Buffalo grass refer to planting plan Top soil refer to civil drawings SF -04
E mbedded ground soil for the grass 190mm deep refer to cross sections perv. page
DRAINAGE GAPS
water body, refer to water feature consultants and drawings for water levels SF -04
GRASS TURF
SCALE 1:25
1.96
2.29
26 SF -04
26 DRAINAGE GAPS100MM
5.6
REV DATE AMENDMENTS 1 11.10.2015 ISSUED FOR CONSTRUCTION Contractor to verify all dimensions on site before commencing work. Report all discrepancies to superintendent prior to construction. Figured dimensions and setout point coordinates to be taken in preference to scaled drawings. All drawings may not be reproduced or distributed without prior permission from the landscape architect. Check all dimensions and site conditions prior to commencement of any work, the fabrication of any components.
REV DATE
AMENDMENTS
Civil
Hydrology
PROFFESSIONAL PRACTICE Structural
FORM Structures
Level 7, 552 Lonsdale Street Melbourne, VIC 3000 Ph: (03) 8622 3900
Landscape Architect T.C.L Landscape Architects 385 Drummond Street Carlton, Vis 3053
PROJECT
LINCOLN SQUARE FOUNTAIN SQUARE SWANSTON STREET, MELBOURNE LANDSCAPE REDEVELOPMENT
Landscape Works Fountain Square Sections 2 of 3 DRAWN AC
CHECKED BFB
SCALE 1:10 & 1:20 @A3
tel: +61 3 9380 4344 CLIENT
STATUS
ISSUED FOR CONSTRUCTION
DAWING NO.
M11032-LA-702
REV DATE AMENDMENTS 1 11.10.2015 ISSUED FOR CONSTRUCTION Contractor to verify all dimensions on site before commencing work. Report all DATE CREATED CONTRACT NUMBER discrepancies to superintendent prior to construction. Figured dimensions and 11.10.2015 1049
setout point coordinates to be taken in preference to scaled drawings. All drawings may not be reproduced REV or distributed without prior permission from the landscape architect. Check all dimensions and site conditions prior to commencement of any work, the
1
fabrication of any components.
REV DATE
PROFFESSIONAL PRACTICE
AMENDMENTS
Civil
Hydrology
Structural
FORM Structures
Level 7, 552 Lonsdale Street Melbourne, VIC 3000 Ph: (03) 8622 3900
Landscape Architect T.C.L Landscape Architects 385 Drummond Street Carlton, Vis 3053
PROJECT
LINCOLN SQUARE FOUNTAIN SQUARE SWANSTON STREET, MELBOURNE LANDSCAPE REDEVELOPMENT
Landscape Works Fountain Square Collage 1 of 2 DRAWN AC
tel: +61 3 9380 4344 CLIENT
STATUS
DAWING NO.
CHECKED BFB
SCALE nill
STUDIO WORK
DOCUMENTATION ANALYSIS PROVIDED BY ASPECT STUDIOS BOXHILL GARDENS
28
PROFFESSIONAL PRACTICE
PROFFESSIONAL PRACTICE
WOR K EX P ER IENCES
17
03
TURK EY EXPERIENCE
TURKEY EXPERIENCE
BETULA LANDSCAPE ARCHITECTURE, DETAIL SECTIONS, PLANS AND PHOTOSHOP Saç levha_5mm + Elektrostatik boya_ral:7022
30
Saç levha_3mm + Elektrostatik boya_ral:7022 Paslanmaz metal ?mm
Sac levha
12
3
0.
BLA - Betula Landscape Architecture (Consept Design, 1-Final Design,2- Application Project ) 00 - Floor Level (B1-Basement Level 1, 00-Ground Floor,01-First Floor)
12
01 - Drawing Type (01- PLAN , 02-PLANTING PLAN,03-SECTION , 04-DETAILS , 05-LIGHTING , 06-IRRIGATION )
5
3
PROJECT NAME:
20 PERSPEKTIF
BOLLARD MODÜLÜ_30*30*h:30 Ö:1/10
50
50
90
90
90 12
60
70
75
75
75
90
100
20
Floor Level_Name_Drawing Type
YAN
ÜST
40
BLA-00-01
DRAWING NUMBERING:
30
30
40
30
40
5846 Sayılı Fikir ve Sanat Eserleri Hk.Kanun'un,3458 Sayılı Mühendis ve Mimarlık hakkındaki 7303 Sayılı TMMO Yasası uyarınca: Müelliflerinden izinsiz projede ve uygulamada hiçbir değişiklikyapılamaz. Fenni mesul sadece 3094 Sayılı İmar Kanununun 28 ve 38.maddelerindeki görevleri yerine getirmekten sorumludur.
120
40
NOTLAR
Alt yapı bağlantıları mevcut sisteme uygun şekilde uygulayıcı firma tarafından çözülecek ve proje müellifine onaylatılacaktır. Alt yapı bilgileri için bkz. Altyapı Projeleri
30
ARKA
PERSPEKTIF
ÜST
YAN
YAN
ARKA
h:90
50
30
YAN
ÜST
20
ÇÖP KUTUSU MODÜLÜ_40*40*h:100_ral:7022 Ö:1/10
ÖN
Tüm eğim betonları için bknz. mimari ve mekanik projeler. Tüm süzgeçler için bkn. mekanik projeler.
KÜLLÜK MODÜLÜ_20*12*h:90_ral:7022 Ö:1/10
LEJAND
FIBER SAKSI MODÜLÜ_120*50*h:90_ral:7022__TABAKLI Ö:1/10 10
Elektrostatik boyalı metal tabak 2mm_ral:7022 Saç levha_Elektrostatik boya_ral:7022
50 5
85
90
90
79 10
14
2
124,5
76
88 YAN
ÜST
ARKA
2
10
50
73
102
88 121
PERSPEKTIF
PERSPEKTIF GÖRÜNÜŞÜDÜR
FIBER SAKSI MODÜLÜ_120*50*h:90_ral:7022__TABAKLI
BİSİKLET PARKI MODÜLÜ_88*5*h:102_ral:7022 Ö:1/10
Ö:1/10 60
Elektrostatik boyalı metal tabak 2mm_ral:8019 180
1 10
90
107
h:100
54
h:90 64
Elektrostatik boyalı metal tabak 2mm_ral:7022 60 5
150 8
15
84
67
h:70 60
110
90
80
90
FIBER SAKSI MODÜLÜ_Q120h:107_ral:8019 Ö:1/10
FIBER SAKSI MODÜLÜ_Q120h:107_ral:8019 Ö:1/10
FIBER SAKSI MODÜLÜ_150*90*h:70_ral:9007__TABAKLI FIBER SAKSI MODÜLÜ_180*90*h:100_ral:9007__TABAKLI
Kısaltmalar:
Ö:1/10
bü -bordür üstü mü -metalüstü tü -toprak üstü
Elektrostatik boyalı metal tabak 2mm_ral:7022
180
10
2
Elektrostatik boyalı metal tabak 2mm_ral:7022
90
64 Elektrostatik boyalı metal tabak 2mm_ral:7022
70
1
LANDSCAPE & URBAN DESIGN
304
FIBER SAKSI MODÜLÜ_Q120h:107_ral:7022 Ö:1/10
FIBER SAKSI MODÜLÜ_150*90*h:70_ral:9007__TABAKLI FIBER SAKSI MODÜLÜ_180*90*h:100_ral:9007__TABAKLI
BETULA PEYSAJ
PROJECT PHASE
10
10
80
FIBER SAKSI MODÜLÜ_Q120h:107_ral:7022 Ö:1/10
2 80 FIBER SAKSI MODÜLÜ_60*50*h:90_ral:7022 Tabaklı
Ö:1/10
BETULA LANDSCAPE ARCHITECTURE
DESIGN CONTROL / APPROVEL
Tayfun YAZGI/L.ARCHİTECT Elif KIYCI/L.ARCHİTECT
DATE 06.03.2017
BETÜL AKÜZÜM / L. ARCHITECT
DRAWING NAME
SCALE
BLA_04
1/20
PROJECT NAME
33
POLONEZ YOLU BEYKOZ KONAKLARI KARŞISI AYHAN ÇIKMAZI NO:4 BEYKOZ / İSTANBUL TEL: 0 216 425 32 50 - 53 betula@betula.com.tr FAX: 0 216 425 32 55 www.betula.com.tr
NAME
DRAWING NO BAL_04
8
15
84
90
100
107
LS 10
32
NIVO ATAKOY
150
110
REVISION
BLA_04_DONATI_DETAYI
Ö:1/10
BETULA PEYSAJ
FREELANCE ILLUSTRATION
GRAPHIC DESIGN
COLOURING BOOK PAGES FOR U.S. AUTHOR ERIN WATT
33
2
ERIN WATT
WALKERS DOUGHNUTS
FREELA NCE ILLUSTRATION
FREELANCE ILLUSTRATION
CHARACHTER DESIGN FOR ANDROID NOVEL GAME WITH AEONDREAMSTUDIOS
35
2
AEONDREAMSTUDIO
AEONDREAMSTUDIO
20
17 THE ADVENTURE WILL BE CONTINUED
18
19