Gabriel Itzai Gaytan Architecture Portfolio
Light Cemetery
Year - Spring 2017
Instructor - Karen King Location - Undetermined
The Light cemetery has very specific uses and interacts with the summer and winter solstice. They are placed on the tops of buildings in order to catch the light without any interference.
Light Drawings °
Building Diagrams ° ° ° ° Light Cemetery 7 am - noon
1. View showing the exterior of the building 2 & 3 showing how light inhabitants the space
1.
2. 3.
Light Cemetery Noon - 6 pm Building Diagrams ° °
1, 2 & 3 showing how light
the space 1. 2. 3.
inhabitants
7 am 8 am 11 am 12 pm 3 pm 4 pm
9 am 10 am 1 pm 2 pm 5 pm 6 pm
Mace / Weiss Residence
Year - Fall 2019
Construction Completed
Designed while Working at Shelley M. Hughes Architects P.C. Location - Cloudcroft, NM
Project S.F. 1,826 Heated Living Area 2,455 Total
Located on the North East end of Cloudcroft and border National forest two sides and two neighbors. This site was a challenge to accomdate the house the clients wanted and to face the house away from the neighbors and face towards the national forest.
The main focus of the house is a slanted wall that leans towards you and welcomes you in to the home. You walk in to the dining room and kitchen and there is one wall that has a fireplace incorporated that delineates the living room from the dining room. Moving through the Hallway and going towards the Master wing which houses the master bathroom, master closet, and master bedroom at the end of the hallway. When orientating the building we wanted to have as many windows in the Bedroom but also to keep the bedroom private to achieve this we orientated the building 35 degrees to the East.
This house also features a concrete patio on the North end of the living room to look out towards the forest. Downstairs is a living room, closet and bathroom for the owners guests.
Entry View
Exterior View
DN DW Washer Dryer Refrigerator
M
W / D 4 Slate Tile Master BR 5 Slate Tile Master Bedroom 7 Slate Tile Kitchen 2 Slate Tile Living Room 1 Slate Tile Hall 3 Slate Tile 1
2
3 A5 105 BUILT-IN
Unfinished Storage 8 Conc. Porch 9 Conc. Master Closet 6 Slate Tile LINE OF ROOF ABV. MTL. DOWN SPOUT OVERFLOW 14'
TOWEL HOOKS SLOPED WALL SLOPED WALL BOARD-FORM CONC. FINISH SHOU-SUGI BAN FINISH SHOU-SUGI BAN FINISH BUILT-IN
BUILT-IN
102 F A D D C
FROSTED PLEXIGLASS 2' TALL
WIDE
WOODEN
DOWN SPOUT IN WALL
H
H
J J H abv. J J H abv. XX L abv. L abv. B
K
DATE SHEET A2 09.23.2021 M a c e / W e i s s R e s i d e n c e Mai
1 First Floor Plan SwingWidthHeightHardwareComments
3'0" 6'10" 41'1" 101 107 103 104
J J
A5
A5
FURN. 6'1 1/4" 6'0" 8'10" 5'1" 15'1" 23' - 10 1/2" 3' - 9" 2' - 0" 3' - 11" 16' - 5 1/2" 50' - 0" 16' - 10"
- 0" 36' - 0"
FURN.
FURN.
6'1 1/4" 35'0"
x 10'
w/
MULLIONS 2'2 1/2" 4'5" 41' - 10" 4' - 0" 4' - 2" 15'7" 17'8" 7'10" 4'4" 12'5" 5'6" 3'3" 3' - 11" 5' - 11" 9' - 6" 7' - 0" 4' - 9" 10' - 9" 8' - 2" 15'7 1/2" 8'6" 11'4 1/2" 21'3 1/2" 9' - 2" 3' - 11" 9' - 2" 6' - 3" 2' - 11" 1'10" 2'2" 6'3 1/2" 9'5" 1'10 1/2" 14'9" 9' - 8" 11' - 0" 2' - 1"
9'8" 10' - 9" 106
abv.
abv.
abv. B abv.
K 1 5'5 1/4"
1/4" = 1'-0"
Basement Floor Plan 0' - 0" First Floor Plan 10' - 0" Roof 20' - 8" Bottom of Basement Footing -2' - 4" A9 3 A9 2 EXPOSED GLULAM (TYP.) ROOFING - METAL "CF" OR STANDING SEAM PANELS TITAINIUM SUREFOOT ROOF UNDERLAYMENT 1/2" SHEETROCK CEILING ROSEBURG 24" FLOOR JOIST RFPI 400 (2)-1/16 " WIDE (1)-3/8" LVL FLANGE 3/8" OSB WEB @ 16" O.C. w/ SIMPSON STRONG TIE JOIST HANGERS 2x6 EXT. WOOD FRAMED WALL w/ R-21 BLOWN - IN FIBERGLASS INSULATION 8" CMU EXT. WALL w 2x6 FURR-OUT w/ R-19 FIBERGLASS BATT INSULATION 2x4 INT. WALL w/ R-19 FIBERGLASS BATT INSULATION 8" CMU WALL FILLED w/ 3000 PSI CONC. 1/2" SHEETROCK CEILING 24" FLOOR TRUSSES @ 16" O.C. w/ R-30 FIBERGLASS BATT INSULATION 5/8" ROOF SHEATHING 8" CMU STEM WALL CONC. FOOTER 16" ROOF JOISTS RFPI 400 @ 12" O.C. w/ SIMPSON STRONG TIE JOIST HANGERS CONC. FOOTER BEYOND 8" CMU EXT. WALL w/ 2x4 FURR-OUT w/ FIBERGLASS BATT INSULATION BUILT-IN FURNITURE 11 7/8" FLOOR JOIST RFPI 400 @ 16" O.C. w/ SIMPSON STRONG TIE JOIST HANGERS TRANSLUCENT WALL BEYOND GRADE M a c e / W e i s s R e s i d e n c e 1308 Geronimo St Cloudcroft, NM Otero County 201823 1/4" = 1'-0" 2 Section 2 Main Floor - Living Room Stairs to Basement
Basement Floor Plan 0' - 0" First Floor Plan 10' - 0" Roof 20' - 8" Bottom of Basement Footing -2' - 4" A10 1 EXPOSED @ INTERIOR GLULAM w/ R-49 FIBER BATT INSULATION BEYOND ROOFING - METAL "CF" OR STANDING SEAM ROOFING PANELS - TBD TITAINIUM SUREFOOT ROOF UNDERLAYMENT 1/2" SHEETROCK CEILING 24" FLOOR TRUSSES @ 16" O.C. w/ R-30 FIBER BATT INSULATION 11 7/8" TRIPLE LVL RIGID LAM HEADER ABV. DOOR OPENING 8" CMU EXT. WALL w 2x6 FURR-OUT w/ R-19 FIBERGLASS BATT INSULATION 1/2" SHEET ROCK CEILING PAINTED 4" STEEL POST BEYOND 2 x 12 HSS PERIMETER FRAMING SLOPED 2x6 EXT. WOOD FRAMED WALL w/ R-21 BLOWN - IN FIBERGLASS INSULATION METAL WRAPPED FASCIA STEEL GLASS RAILING 4" CONC. SLAB ON 1.3" METAL DECK FORMSEE STRUCTURAL EXPOSED CONC. SLAB SLATE TILE FLOOR FINSIH 5/8" SHEATHING METAL SEAMLESS GUTTER & DOWN SPOUTS METAL WRAPPED WOOD TREADS w/ TRANSLUCENT RISERS BEYOND TRANSLUCENT PANEL WALL BEYOND RAILING @ STAIRS BEYOND GRADE 48" TALL WALL BEYOND Bottom of Basement Footing -2' - 4" FIBERGLASS BATT INSULATION 24" FLOOR TRUSSES @ 16" O.C. w/ R-30 FIBERGLASS BATT INSULATION Basement Floor Plan 0' - 0" First Floor Plan 10' - 0" CONC. 7'10 1/4" DATE SHEET NOTFOR CONSTRUCTION A5 09.16.2021 M a c e / W e R e s i d e n 1308 Geronimo St Cloudcroft, NM Otero County Sections 201823 1/4" = 1'-0" 1 Section 1 Main Floor - Looking at Fireplace
Floor
Looking
Kitchen
Main
-
at
Cloudcroft Brewing Company Production Facility
Year - Fall 2019
Construction Completed - Fall 2022 Designed while Working at Shelley M. Hughes Architects P.C. Location - Cloudcroft, NM
Project S.F. 1,826 Heated Living Area 2,455 Total
Located on the North East end of Cloudcroft adjacent to the original brewery building.
The site was an odd shape and also has an electric easement cutting right across the face of the building. This made the building have an odd shape but the owners wanted to get the most out of the land and make this the building where they make all their beer and spirits.
The goal of project was to house double the amount of equipment in order to keep up with a growing buisness. While working with the owners very closely we picked the butterfly roof design. This designed work for them the best because it gave them more height in order to fit all the equipment they wanted and gave them a second story storage area. The main area of the building is all production with fermenters, mast tun’s, letina’s and glycol chillers. It has two restrooms for the employees and a tunnel that goes into their cold room for extra storage. The second floor is for all the grain storage and empty cans.
F1 F2 F3 F4 F5
S
F7
Production
Custom Cold Room 2 Bathroom 3 Utility
5 Bathroom 4 F UV F F P 10
104 6 S4.3 FF FF 10 13' -7" 105 " 3 - 11 1/16" 2' - 9" L1 L2 L3 L4 38'6 1/2" 9'8" 39 " 5' 7" 16 '10 3/32 " 109 " 04 1/2 " 58 19/32 " 8 - 8" 10 - 111/2" STAIRS ABV. CHASE ABV. A B F ABV. D ABV. D ABV. D ABV. D ABV. D ABV. D ABV. C ABV. 4 A1.0 2 -59/16" 3 A7.1 A A B1 B B B1 B1 D D B1 E F1 F1 F F1 F1 F1 F1 F Stairs 55 RAILING First Floor Plan 0' - 0" WOOD STAIR TREAD WOOD STAIR STRINGER 12" 0'6 13/32" 0' - 11" 12" O.C. BOARDS DATE SHEET PERMIT SET A1.0 09.02.2020 1/4" = 1'-0" 1 First Floor Plan Floor Area Schedule Room Number Level Name Area 1 First Floor PlanProduction Floor 1552 SF 2 First Floor PlanCold Room 158 SF 3 First Floor PlanWomens Bathroom93 SF 4 First Floor PlanMen's bathroom 67 SF 5 First Floor PlanStairs 89 SF 5 1958 SF 6 Second FloorStorage 887 SF 7 Second FloorGrinding Room 74 SF 2 961 SF Grand total: 7 2919 SF 3/4" = 1'-0" 4 Stair Detail CONC. LANDSCAPE ELEMENT FLOOR PLAN LEGEND # EQUIPMENT -SEE SHEET A3.1 FOR EQUIPMENT SCEHDULE FF -FROST FREEZE FAUCET -SEE PLUMBING Revision Number
UP UP UP UP A2.0 3 A2.0 2 A2.0 1 A2.1 1 A2.1 2 44' -8" 48' 2 1/2" 7' - 6" 9 - 6" 12' -9" 14'- 11" 20' - 6 17/32" 0' - 11 17/32" 3' - 2" 3' - 5 1/2" 8' 0" 4' 11 1/2" 35713/32" 39 " 310 " 39 " 69 15/32 " 3 '11 1/4 " 7 - 817/32" 1 ' -63/4" A1.0 3 A1.0 2 1 A6.0 2 A6.0 3 A6.0 4 A6.0 69 15/32 " 35713/32" 1601/16" 3 -025/32" 8'0" 6'1" 80" 7'4" 32" 03"
F6
F8
B2 M1 B1 4 2 1 1 2 5 5 3 6 7 9 9 6 8 4'0" 7 -813/32"
Floor 1
Hall
10411 1/4 " 102 105 106 107 108 109 101 103
First Floor - Production Area
Second Floor - Looking North-East
Second Floor - Exterior View
First Floor - Exterior Patio View
Residence
Year -Spring 2020 Construction Completed Designed while Working at Shelley M. Hughes Architects P.C. Location - Cloudcroft, NM
Located 5 miles east of Cloudcroft. It is placed on a 2.4 acre site where most of the site on a steep fall off. The challenge for this house was to place the house in a area where most of the trees were already cut or fallen.
The owners came to us with an idea board of what they wanted and how much square footage. As well they had to have a septic tank and water storage since this subdivision has no water source.
The house has one bed room but then has a bunk room with 4 queen bed off to the south. The house has an open kitchen and living room with a deck to east that opens to the view. Down below the deck are two water storage tanks that house 4,000 gallons of water that gets collected from the roof of the main house. The metal siding was chosen to minimize maintenance and save cost.
Entry View
Project S.F. 1,367 Heated Living Area 2,096 Total Exterior View
Crespo
GLASS
SEE
B C D E F G
SL - LOW EHIGH ALTITUDE GLASS - TEMP AS REQUIRED
FIXED - LOW EHIGH ALTITUDE GLASSTEMP AS REQUIRED
TRAPEZOID - LOW E - HIGH ALTITUDE GLASS - TEMP AS REQUIRED
TRAPEZOID - LOW E - HIGH ALTITUDE GLASS - TEMP AS REQUIRED
SL - LOW E - HIGH ALTITUDE GLASS - TEMP AS REQUIRED
SL - LOW E - HIGH ALTITUDE GLASS - TEMP AS REQUIRED
PRIVACY SET
PASSAGE SET
BYPASS SET
POCKET SET
BARN DOOR SET
SLIDING DOOR HARDWARE
K SELF CLOSING HINGES
NOTE: 1. GMCI STND - REFER TO CONTRACT
2. ALL METAL EXTERIOR DOORS FINAL PAINT COLOR - REFER TO CONTRACT
8'0"
6'4" 8'6"
WIRE MESH RAILING
WOOD BURNING WOOD STOVE - ON TOP OF CULTURED STONE HEARTH 5' - 11" 6' - 0 1/2"
2'4" Deck 8
12'0"
CMU WALL FROM BASEMENT RA - SEE A10 16"
8'6" 107 106
2' - 6" 1' - 1 1/2" 6'8"
CULTURED STONE UP TO 5' A.F.F. BEHIND WOOD STOVE WOOD FLOOR EXPOSED CONC. w/ SEALER
Side Patio 10 0' - 7 3/4"
6X6 POST TYP.
108
Bunk Room 4
A SH
102 105 101
A SH A SH A B 103
6'7"
8'7 1/2"
Guest Bathroom 3
11'0"
40' - 0" 12' - 0" 11' - 9" 3' - 11 3/4" 0' - 7 1/2" 6' - 0" 5' - 4 3/4" 6' - 8" 5' - 7" 23' - 8 1/4" 8' - 8" 5' - 8" 1' - 11 3/4" 18'2"
F F F ABV. F ABV.
7' 9" 2' - 3" 7' - 7"
104
Living Room 5 Kitchen 6 Entrance 7
4'8"
UP
9'0 1/2" 12' - 0"
W/D 2
2' - 10" 6' - 8" 4'3"
2' - 9 1/2" 17' - 7" 19' - 7 1/2"
6'8 1/2"
3'8" 11'9"
3'2"
Entrance Porch 9
1 A4 0'7" 3'0" 5'0 1/2" 0'10" 3'0" 3'2" 3 A4
6'7"
0'9" 3'8"
2'3" 11'0" 6' - 0"
25'0" GLU LAM STAIR TREADS & STRINGERS 4' - 6 1/2" 9' - 4 3/4" 4' - 1 1/4"
5' - 3" 6'11" 40' - 0"
2 A4
A B C D
LOCKSET
DEAD BOLT
STRIP & THRESHOLD
ELEV. SEE ELEV. SEE ELEV. SEE ELEV. SEE ELEV. SEE ELEV. 4' - 0" 3'0" 3'0" 5' - 0" 4' - 0" 1'0" 4' - 0" 4' 0" 1' 4" 4'0" 4'0" 1'4" 12 12 8 8
E F G H J
SINGLE CYLINDER
WEATHER
1/4" =
1 1. First Floor 101 102 103 104 105 106 107 108 201 202 203
A A
F
1/4" = 1'-0" Door Hardware
1'-0"
204 B01 NumberLevel 21. 31. 41. 51. 61. 71. 112. 122. 132. HLA 10. 81. 91. 101. Non Project Window A A:
B B: C C: D D E E F F: F
G G
Main Floor - Looking at Kitchen
Main Floor - Looking at Bunk Beds
The Grand Cloudcroft Hotel
The Grand Cloudcroft Hotel is a privatly owned hotel that started design in 2019 as an idea and broke ground on the project last spring.
Construction completion is expected for May 2023.
My role as part of this team was to assist the main architect on the elevations and building sections. I also assisted in the 3D modeling and to show the other partners what the exterior as well as the interior would look like.
Year - Spring 2021
Expected Completion Summer 2022
Designed while Working at Shelley M. Hughes Architects P.C. Location - Cloudcroft, NM
Project S.F. 39,649 s.f.
21'-4 7'-7 36'-4" 6'-8" 17'-1 13'-4" 230'-10 A2.7 A5.2 A5.2 A5.2 A5.2 1'-0" 12'-9" A2.9 2'-0" 4'-4" 2'-5" 4'-0" 4'-0" 2'-234 12'-8" A5.1 A5.1 SOUND CONTROL @ ALL WALLS SCHEDULE 8" CMU FOUNDATION WALL, SEE STEEL STUDS, GA. PARTITION 12" CMU FOUNDATION WALL, SEE GROSS FLOOR: 2ND FLOOR 13,330sf revisions: 04.22.2022 PERMIT SET A1.1 First Floor Plan 32 =1'-0" A1.1 First Floor Plan 13'-4" A9.1 A5.0 A5.2 A5.2 4'-4" FE CMU FOUNDATION WALL, SEE LOAD BEARING, INSULATION AS revisions: 04.22.2022 PERMIT SET A1.4 Second Floor Plan =1'-0" A1.4 Second Floor Plan 6'-8" 6'-8" 8'-4" 30'-2 25'-4" 56'-2 30'-0" 29'-5 28'-2 14'-10 A5.0 4'-0" 27'-0" 8'-0" 12'-9" 30'-0" 1'-5 A2.8 A2.6 A2.5 2'-0" 6'-11" 2'-5" 4'-0" 4'-0" 2'-2 12'-8" 8'-10 FE TYPE W/ BLOWN IN R-21 INSULATION 8" CMU FOUNDATION WALL, SEE STEEL STUDS, 22 GA. PARTITION 2"x6" STUD FRAMED INTERIOR LOAD 12" CMU FOUNDATION WALL, SEE NOTE: SEE ENLARGED FLOOR PLANS FOR DIMS, BASEMENT FLOOR 13,091sf TOTAL PROJECT 39,649sf revisions: 04.22.2022 PERMIT SET A1.1 First Floor Plan =1'-0" 1 A1.1 First Floor Plan
Catalyst Church
Year - Fall 2020
Not Built
Designed while Working at Shelley M. Hughes Architects P.C. Location - Cloudcroft, NM
Project S.F. 11,746 Heated Living Area
Located in Artesia, Nm the church pastor came to us as they were working on plans to build their congregation and to start that they wanted to buildini a 300 seat sanctuary and a classroom wing.
Working with an Architect from Las Cruces Nm, we worked on several design options before the church committee selected this option. They wanted the Sanctuary to be a big design feature. We worked very closely with the structural engineer in order to achive our design intent.
We worked on closely together with the architect in Las Cruces in order to get a bid set together to send out to contractors.
Valle de Oro Visitor Center
Year - Fall 2017
Instructor - Geoff Adams
Location - Albuquerque, Nm
The valle de oro Visitor Center will be a catalyst for the area. Seeing as the land is undisturbed right now and is full of flora and fauna. The building will incorporate all the wildlife and the views around the area for visitors to enjoy all the site has to offer.
Building Diagrams
Cold Winds Summer Overhang summer Glazing to allow winter sun in Steel diagrid added for shear movement Winter Warm Winds Cold Winds are de ected because shape of building Are turned away from building View Entrance shortened for intimate entrance Observation Deck elongated for views View View Extra layer of Glazing to protect against the sun Extra layer of Glazing to protect against the sun Shadin
year. The shading
turns and varies
size
the
system addedto also the harsher times of the
system
in
according to
space and the amount of light needed.
Site Plan
Masterplan
Classroom Multipurpose Room O ce Manager Catering Kitchen O ce Deputy Manager O ce Cutodial O ce Mechanical O ce Electrical O ce Audobon O ce Volunteers O ce Environmental Educator O ce Biologist O ce Security Storage Storage O ce Youth Group Conference Room Break Room Gallery Space Cafe Seating Lobby Open to Below Observation Deck Summer Overhang to block summer sun Glazing to allow winter sun in Steel diagrid added for shear movement Winter de ected of building away
building Entrance shortened for intimate entrance
The
Second Floor Plan First Floor Plan Facade Diagrams
from
Extra layer of Glazing to protect against the sun Extra layer of Glazing to protect against the sun Shadin system addedto also reduce the impact of sunduring the harsher times of the year.
shading system turns and varies in size according to the space and the amount of light needed.
Transverse Section
Entrance Ramp
First Floor looking West
Longitudinal Section
Second Floor Lobby View
Typical Wall Section
Capilla Peak Resiliency Center
Year - Fall 2016
Collaborated with Ifreet Rahiima Instructor - Alex Webb & Ane Gonzalez Lara Location - Capilla Peak, Nm
The center is located on top of mountain and lets the user take in all the views around them while also camping or learning about the area.
Snowflake Diagrams Dahlia Flower Diagrams
Started with a Single Rhombus Changed the Scale Connected at Different Points
Final Iteration
Spatial Concept Renders
Section A-A
Gabriel Itzai Gaytan
Contact Email ggaytan11@yahoo.com Phone 915-261-2952