ISCOM 471 Final Exam
Download here: http://homeworkfox.com/questions/business/47/iscom-471-final-exam
d. TQM 24 Manufacturing is involved in what phases of the product design process? a. Production ramp-up b. Initial planning c. Concept development d. All of the above 25 Variability in demand magnified as we move from the customer to the producer in the supply chain is called a. cause and effect b. push system c. Pull system d. Bull Whip effect 26 JIT drawbacks include all of the following EXCEPT a. stable production level b. limited flexibility in products produced c. vendors do not need to be located nearby d. still require work in process when used with Kanban 27 A _________ approach actually schedules in detail each resource using the setup and runtime required for each order. a. infinite loading b. finite loading c. forward scheduling d. backward scheduling 28 The main objectives of manufacturing strategy are a. translating required competitive dimensions into specific performance requirements for operations b. making the necessary plans to ensure that operations capabilities are sufficient to accomplish performance requirements c. converting order winners into specific performance requirements d. all of the above 29 The purpose of a “time fence” is which of the following?