GBC Indonesia KEGIATAN – HAMBATAN – USULAN/SOLUSI
STRUKTUR ORGANISASI DIREKTORAT RATING &TEKNOLOGI * Dept. Rating Development * Dept. Certification * Dept. Training & Education
* Rencana Divisi Project Communication Officer
Direktur Rating dan Teknologi Administration
Manager Rating Development
Manager Certification
Manager Training
1 org + 5 staf
1 org + 3 staf
1 org + 2 staf
Project Communication Officer (Rencana)
Scope of Responsibility Dept Rating :
Dept Sertifikasi :
Susun Konsep Perangkat Penilaian Dan Formulir
Melakukan Sertifikasi
Analisa Dan Studi
Penyesuaian / Workshop
Diskusi Kelompok
Kualitas & Kelengkapan
Konsensus National Pengenalan (Launching) Mendampingi Tim Sertifikasi / Tim Lainnya
Data Dasar Dari Proyek Registrasi Proyek
Melakukan Verifikasi Evaluasi & Penyesuaian Proses dan Prosedur
Dept. Training : Data Dasar Keanggotaan GA, GP, dll. Mengadakan Training : 1.Greenship Associates, 2.GP untuk NB, 3.GP untuk EB 4.Training SeriesDLL.
Dept. Rating 2010 -2012 Rating Tools New Building
: 17 Juni 2010 Rating Tools Existing Building : 13 January 2011 Rating Tools Interior Space : Oktober 2011
RATING DEPARTMENT JOB DESK
We have to do the job, otherwise we loose the
momentum Limited manpower and not cover the whole area of GB
INSIDE RATING DIVISION
(MAIN JOB DESK) OUTSIDE RATING DIVISION, INSIDE GBC INDONESIA OUTSIDE RATING DIVISION, OUTSIDE GBC INDONESIA
Inside Rating Department Develop Rating Tools Framework
Draft Rating Tools
Final Draft National Consensus
Manual/Technical Book
OUTSIDE RATING DEPARTMENT, INSIDE GBC INDONESIA Certification Agenda Involve in workshop for project team Involve in verification of project documents Develop and update evaluation form for each GREENSHIP rating tool
Training Agenda Develop and update GA training material Develop and update GP training material Membership Agenda Support membership team in giving explanation about GREENSHIP to prospective members
OUTSIDE RATING DEPARTMENT, OUTSIDE GBC INDONESIA Government Project Eco hotel Eco office Eco industry Eco airport Eco drainage Eco hospital Agenda
Involve in meeting and discussion Involve in developing draft for each project Academic or Assosiation Agenda Being resource speaker in seminar Being resource speaker in lecture session Develop paper research Media Agenda Develop article, at least twice a month
New Building Existing Building Interior Home Neigborhood Industry
INSIDE RATING DEPARTMENT (MAIN JOB DESK) - 2011 Week
September
1
2
3
October
4
2
3
4
1
2
3 4
December
5
1
2
3
RTC Launch 1.1.
RTC Frameworks
1
November
Rapat komisi: nama
30 sept sharing
Draft 1 Discussion w/ Expert Draft 2
14 oct, 1st Look Persiapan I II TAG 1 Nov 8 Nov 11 Nov
Discussion w/ TAG
Draft 3
Persiapan, IT
National Consensus Developing Book
Web simulation Manual Jadi 1 dengan web simulation
Project Excercise Final dari Rating Hak Cipta & Cover Cetak Final Launching
Mid Oct
Target dari IAI
4
New Building Existing Building Interior Home Neigborhood Industry
INSIDE RATING DEPARTMENT (MAIN JOB DESK) - 2012 January 1 2 3 4 RTC
February March 12 3 4 1 2 3 4
April 1 2 34 1
Meeting RTC EB Komisi 1.1
Frameworks Draft 1
First Look
Discussion w/ Expert Draft 2 Discussion w/ TAG Draft 3 National Consensus Developing Book Project Excercise Final dari Rating Hak Cipta & Cover Cetak Final Launching
Persiapan
TAG 1 TAG 2
Mei 2 3
4
1
June 2 3
4
Dept. Sertifikasi 2011-2012 ď‚— In total 68 Building Projects have come in contact at
various status. ď‚— Profiling in Type, Location & Status has raised some issues need to be care.
GREENSHIP TYPE 1%
2% 3% 3%
12%
54%
25%
New Building Eksisting Building Interior Space Neighborhood Manufacturing Natural Ventilation Power Plant GREENSHIP type anticipated by
market
LOCATIONS 14%
1% 4% Jabotabek Bali
8%
Jateng & Jogja
Jatim Lain-lain 73%
In Status 80
•Data Contact person •Certification Type 70 •Paket perkenalan
Banyaknya Proyek
60 •Intense Communication •Pertemuan perkenalan & diskusi
50 40 30 20
•Donasi Pendaftaran •Isi Formulir •Kontrak
10
•Pembayaran •Assessment
0 Pernah Menghubungi
Pernah Progresif
S = 68 Total Proyek yang menghubungi
Minimum Donation
Registered
GREENSHIP PROJECTS No. Building Name 1 The Breeze Office, BSD City 2 Sopodel Tower 3 Rasuna Tower 4 PUSDEP, Pertamina 5 Energetic Material Center PT Dahana Tbk 6 RS. Dr. Kariadi Semarang 7 Perpustakaan UGM 8 DPRD & Pengembangan Balaikota 9 Gereja Kristus Raja 10 Ciputra World Jakarta 11 German Centre Indonesia 12 Alamanda Tower 13 Austrian Embassy Jakarta 14 Sampoerna Strategic Square 15 Menara BCA, Grand Indonesia Office Tower 16 Gedung Menteri PU 17 Teknogas
Stage Registration Registration Registration Registration Registration Registration Registration Registration W1 & W2 W1 & W2 W1 & W2 W1 & W2 W3 W3 Certification Assessment Design Recognition Certification Assessment
PROBLEMS IDENTIFIED Certification Process & SOP still under pilot process &
completing. Manpower is still under training & out of numbered. The system is still new & need further dissemination to Indonesia’s Building Industry. A more strategic approach in dissemination & education on GREENSHIP
Dept. Training 2011-2012 ď‚— Complex job to hold a training
(material, instructor, event, venues) ď‚— Develop training material for GP on EB, IS and training series ď‚— GP is not legally accredited
GREENSHIP Associate Participant 140 120 100 80 60 40 20 0
121 66
79
61
GREENSHIP Associate…
I (2 phases, Feb 2010)
II (Nov 2010)
III (Feb 2011)
IV (Jun 2011)
GREENSHIP Professional Participant 60 50 40
55 47
44 37
32 26
30 20
GP Participant
25
Graduated GP
79%
10
81%
57%
II (Nov 2010)
III (Mar 2011)
xx% Success Rate
0
I (Jul 2010)
IV (Jul 2011)
Total GP s/d Batch-3 = 88 orang
standar kompetensi
RENCANA TRAINING PROGRAM 2012 GREEN BUILDING INDONESIA No 1 2 3 4
5 6 7
1
2
3 4 5
Kegiatan
JAN
Main Training 12-14 GREENSHIP Associate (GA) Batch VI GREENSHIP Professional (GP) Batch VI GREENSHIP Associate (GA) Batch VII GREENSHIP Professional (GP) Batch VII GREENSHIP Professional (GP) EB Batch II GREENSHIP Associate (GA) Batch VIII GREENSHIP Professional (GP) Batch VIII Series Training EEC - OTTV ( Overall Thermal Transfer Value) EEC - Natural Lighting EEC - On Site Renewable Energy Material Resource and Cycle : Building and Material Reuse Certified Wood Modular Design Regional Material ASD - Storm Water Management ) IHC - Outdoor Air Introduction BEM - West Management BEM - Pollution of Conctruction Activity BEM - Proper Commisioning
FEB
MAR
APRIL
MEI
JUNI
JULI
AUGUST
SEPT
NOV
3,4,9-11 5-7 4,5,10-12
12-14 16-18 28,2 4-6 9
25
24
19 30
25
DEc
KE I S MP L U N A GBCI mempunyai komitment untuk mentransformasi market sehingga mempunyai paradigma baru
green Stake holder banyak berharap dari GBCI Tanggung jawab, misi dan beban kerja GBCI mempunyai skala nasional, kompleks dan meliputi semua sendi kehidupan berbangsa Kita harus merubah paradigma kita bahwa : We have a big mission and responsibility We need a big vehicle