1 minute read

EXCELLENCE IN CRAFTSMANSHIP: $50+ MILLION

EXCELLENCE IN CRAFTSMANSHIP: $50+ MILLION

PROJECT NAME

Island Waterpark at Showboat Resort

WINNER

E.P. Guidi, Inc.

PROJECT DESCRIPTION

Island Waterpark at Showboat Resort — the largest beachfront indoor waterpark and one of the largest openair greenhouse structures in the country — was a complex project from inception through completion. Five separate design firms were involved and specialty contractors came from across the world, including Canada and Australia, to help ensure the massive fast-track project was a success. The workmanship required from sitework, survey/layout, excavation, water control, concrete foundations, underground utilities, specialized piping, and inserts, up through slab-ongrade was exacting. The craftsmanship and quality of work necessitated top-tier finishes, requiring materials to be sourced globally and skilled manpower of the highest level.

OWNER

Tower Investments

ARCHITECT

SOSH Architects

ENGINEER

Concord Engineering

Groundswell Design Group

Innovations Design Group

Martin Aquatic Design & Construction

GBCA MEMBER COLLABORATORS

Shore Building Contractors, Inc.

This article is from: