1 minute read
EXCELLENCE IN CRAFTSMANSHIP: $50+ MILLION
EXCELLENCE IN CRAFTSMANSHIP: $50+ MILLION
PROJECT NAME
Island Waterpark at Showboat Resort
WINNER
E.P. Guidi, Inc.
PROJECT DESCRIPTION
Island Waterpark at Showboat Resort — the largest beachfront indoor waterpark and one of the largest openair greenhouse structures in the country — was a complex project from inception through completion. Five separate design firms were involved and specialty contractors came from across the world, including Canada and Australia, to help ensure the massive fast-track project was a success. The workmanship required from sitework, survey/layout, excavation, water control, concrete foundations, underground utilities, specialized piping, and inserts, up through slab-ongrade was exacting. The craftsmanship and quality of work necessitated top-tier finishes, requiring materials to be sourced globally and skilled manpower of the highest level.
OWNER
Tower Investments
ARCHITECT
SOSH Architects
ENGINEER
Concord Engineering
Groundswell Design Group
Innovations Design Group
Martin Aquatic Design & Construction
GBCA MEMBER COLLABORATORS
Shore Building Contractors, Inc.